ALS-U Quality Evaluation Survey - AL-1208-0209.pdf

PDF 139 KB Posted

Attached to
M1 Flexures for the Advanced Light Source Upgrade (ALS-U) Beamlines Federal contract opportunity
Solicitation number
MG-081622
Issued by
Department of Energy

View the file

Other files for this federal contract opportunity

Other files attached to M1 Flexures for the Advanced Light Source Upgrade (ALS-U) Beamlines, newest first.
File Type Posted
ALS-U Units Policy and Units Definition - AL-1009-9880.pdf PDF
ALS-U BUILD TO SPECIFICATION CAD MODEL AND DRAWING - AL-1265-6612.pdf PDF
ACL AL-1567-1043A M1 Flexure.pdf PDF
AL-1418-3364B.pdf PDF
4) SOW M1 Flexure AL-1567-0364A.pdf PDF
1) RFP-MG-081622.docx DOCX document
3) GP-Fixed Price Non-Commercial.pdf PDF
2) LBNL_SAMPLE_SubK.docx DOCX document
5) Rep-Cert Form M1 Flexure.docx DOCX document
UHV Chamber and Component Production Requirements - AL-1220-7841.pdf PDF
6) Proposal Pricing Attachment A.xlsx XLSX spreadsheet
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ALS-U supplier quality evaluation survey

Release Date: Dec 13 2021 4:23:33 PM PST

Document Number: AL-1208-0209 Revision: B

Document Status: Released Document Type: QUALITY ASSURANCE

Category Code: AL7001

ALS-U - GENERAL

QA

AL-1208-0209 Rev. B Doc. Status: Released Page 2 of 8

Advanced Light Source Upgrade Project Lawrence Berkeley National Laboratory

Latest version of this document can be found in the LBNL Document Control Center.

A hardcopy of this document is for reference ONLY.

Table of Contents

1 Revision History

2 Abbreviations and Acronyms

3 Purpose

4 General Information

5 Quality management system

6 Control of purchased item

7 Process control

1 REVISION HISTORY

Rev. CM Number Description of Change A Initial release B Updated the calibration requirements

2 ABBREVIATIONS AND ACRONYMS

ALS Advanced Light Source ALS-U Advanced Light Source Upgrade LBNL Lawrence Berkeley National Laboratory

3 PURPOSE

In an effort to assist the ALS-U vendor evaluation process, this questionnaire was developed to learn about the quality systems of a potential fabricator or supplier. This questionnaire was designed to be utilized as an initial survey of a supplier’s quality systems. It is not necessarily a substitute for a formal on-site supplier evaluation. This questionnaire is to be completed and returned by the supplier.

AL-1208-0209 Rev. B Doc. Status: Released Page 3 of 8

4 GENERAL INFORMATION

Company Name

Company Address

Telephone Number

Production Manager

Quality Manager

How many additional employees perform QA/QC functions besides Quality Manager?

Is your facility capable of working more than one shift? YES NO

If yes, how many.

Please list any Quality Assurance registrations, certifications, or distinctive awards (examples: ISO 9000, Mil-Specs, Six Sigma process controls, etc.)

Does your calibration program meet the standard? (Examples: ISO/IEC 17025, (ANSI)/NCSL Z540-1-1994, ANSI/NCSL 540.3-2006, etc.) If yes, please provide the supporting materials

AL-1208-0209 Rev. B Doc. Status: Released Page 4 of 8

5 QUALITY MANAGEMENT SYSTEM

Is there a written QA Plan or QA Program? YES NO

If yes, please attached it to the survey

Are QA processes, and inspection functions audited by your QA organization?

YES NO

If yes, please indicate frequency

Is personnel training provided? YES NO

Is there a process to ensure personnel are properly qualified? YES NO

Is there a procedure for document control and records management? YES NO

If yes, please describe the procedure briefly or provide examples

Are there any certifications under any other licensing or qualification program? (AWS-ASME Welder Qualifications, Nondestructive Test Society, etc.) If yes, please list them below

YES NO

Is there a system for disposition of nonconforming materials? YES NO

AL-1208-0209 Rev. B Doc. Status: Released Page 5 of 8

6 CONTROL OF PURCHASED ITEM

Do you qualify suppliers and subcontractors? YES NO

If yes, please attach supporting documents

Do you visit the subcontractor’s plant facilities? YES NO

Are your suppliers’ test reports and records checked for acceptability? YES NO

Are incoming materials inspected? YES NO

If yes, please attach supporting documents

Is there a system for identification and labeling of materials? YES NO

Is defect material identified and segregated? YES NO

Is reworked material re-inspected? YES NO

Is space for storage and control of materials allocated? YES NO

Are records kept showing the acceptance, rejection, or disposal of material?

If yes, please attach supporting documents

AL-1208-0209 Rev. B Doc. Status: Released Page 6 of 8

7 PROCESS CONTROL

Is there a process inspection role? YES NO

Do you have a system for reviewing new process specifications and inspection instructions?

YES NO

Do you have an in-process control and recording system for work activities (e.g. job travelers)?

YES NO

If yes, please attach supporting documents

Do you have capability for producing shop drawings, tooling design? YES NO

Are customer specifications interpreted into shop specifications and inspection instructions?

YES NO

Are drawing and specifications prepared for purchase orders and subcontractors?

YES NO

Are revisions reviewed for conformity to customer’s specifications? YES NO

If yes, please describe how and identify the person responsible for this function:

Are calibration records available for gages and instruments? YES NO

If yes, please attach supporting documents

Is there a final inspection step before delivery to the customer? YES NO

Does the organization have final inspection function separate from production function?

YES NO

Are written inspection instructions, product specifications, and/or drawings available?

Who reviews these and how often are they updated?

Do you regularly communicate with customer during fabrication? YES NO

If yes, how often do you communicate

AL-1208-0209 Rev. B Doc. Status: Released Page 7 of 8

Do you consider corrective action or matters resulting from customer complaints

How do you respond to them

Is there a continuous improvement plan for QA program YES NO

If yes, please describe the main strategies

Prepared by Title Date

AL-1208-0209 Rev. B Doc. Status: Released Page 8 of 8

PLEASE ATTACH ANY ADDITIONAL SUPPORTIVE DOCUMENTATION OR INFORMATION ABOUT YOUR

ORGANIZATION’S QUALITY PROGRAM

(Example: QA Plan, Listing of QC capabilities, travelers, tags, NCR format, etc.)

1 Revision History
2 Abbreviations and Acronyms
3 Purpose
4 General Information
5 Quality management system
6 Control of purchased item
7 Process control