- Solicitation number
- RFP ACS 210000000841 3
- Issued by
- Kalamazoo County, Michigan
About this file
This is an addendum to bid specifications for the Almont High School Auditorium Theatrical Equipment Renovations project in Michigan, prepared by SPC Chuck Horndt on March 5, 2021. The project encompasses theatrical equipment upgrades including modifications to stage rigging, curtain tracks, and electrical systems. Specific work includes straightening and stabilizing the cyc curtain track on stage right, repositioning the upstage border curtain, upgrading the ETC ERP main breaker to 100 amps, installing a 100 amp main breaker on the ETC DRD dimmer rack, connecting stage boxes to non-dimmable circuits, disconnecting floor boxes from the electrical system while preserving wiring for future use, replacing an ETC 9104A-U box with an ETC 9104C-U box, installing male L5-20 plugs with ETC type "C" connectors on all new theatrical lighting fixtures, and replacing three existing entry lighting control stations with three new Unison Heritage 5 Button Wall Stations.
A performance bond is not required for the project, though 15 percent retention of the total contract price will be held until project completion. Michigan State Sales Tax is not applicable. The contractor is responsible for obtaining all required permits and inspection fees. No specific pricing, contract term, funding sources, or award timeline is provided in this addendum document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2021 Almont HS Auditorium RFP Final.pdf | ||
| RFP Amendment Due to Weather Delays.docx.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Almont High School Auditorium Theatrical Equipment Renovations
Addendum to Bid Specifications
Draft 03-05-21 Rev A by SPC Chuck Horndt
General:
1) A bid and/or performance bond is not required for the project. A 15% retention of the total contract price will be held until the project is fully completed.
2) State of Michigan Sale Tax is not required for this project. The contractor shall be responsible for any required permits and/or inspection fees.
Base Stage Rigging as Part of Base Theatrical Lighting:
1) The Cyc Curtain Track shall be straightened on the Stage Right side of the track. The mounting point of the Cyc Curtain track to the stage right wall shall be stabilized.
2) The Upstage Border curtain shall be moved downstage of the Third Electric so the Border is downstage of the electric pipe by at least 12”.
Base Theatrical Electric:
1) Change the ETC ERP Main Breaker to 100 Amp.
2) The ETC DRD dimmer rack shall have a 100 Amp main breaker.
3) The two stage boxes on the front of the stage wall shall be connected to two non-dimmable circuits from the ETC ERP panel, one circuit for each box.
4) All Floor Boxes onstage shall be disconnected from the electrical system. Wiring shall be left in place for future use but must be disconnected from any power source.
5) Change (1) ETC 9104A-U box to (1) - ETC 9104C-U box.
6) All new Theatrical Lighting Fixtures shall have Male L5-20 Plugs, ETC type “C”.
7) The (3) Unison Heritage 5 Button Wall Stations shall replace the existing (3) entry lighting control stations.