All_Exhibits_-_Revised.pdf
PDF 4 MB Posted
- Attached to
- 24RS0011 - DOMESTIC HOT WATER LOOP SERVICES
- Solicitation number
- 0000035511
About this file
This document is a comprehensive contract solicitation from the California Department of Veterans Affairs (CalVet) for Domestic Hot Water Loop Services at the Veterans Home of California-Redding. The project involves removing existing thermostatic mixing valves and associated piping and valves in three mechanical rooms (E/H, C/D, and A/B) and replacing them with updated systems. The state will provide three Aerco ADMS Smart Water Tempering System racks, and the contractor will be responsible for installation, including Grundfos hot water pumps, proper piping, electrical connections, and ensuring the system is water-tight with no leaks. Work is to be performed during 6:00am-8:00pm Monday through Friday, with no work on state holidays, and will require coordination with CalVet's Contract Manager.
The contract (Agreement Number 24RS0011) requires the contractor to have appropriate licensing, specifically a Class "C-36" Plumbing Contractor or Class "B" General Building Contractor license. The contractor must provide factory-trained technicians and submit proof of training with their bid package. While the total project cost is not explicitly stated, the solicitation includes detailed technical specifications for the equipment, including precise temperature control requirements, pressure ratings, and installation guidelines. The contractor will be responsible for all aspects of the installation, including modifications to existing Unistrut supports, relocating fire sprinkler equipment, and ensuring compliance with all federal, state, and local regulations, including Title 24 of the California Building Code.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bidders_Checklist.pdf | ||
| IFB_Solicitation_-_DVBE_Goal.pdf | ||
| Verification_Documents.pdf | ||
| Walk_Thru_Sign_In_Sheet.pdf | ||
| Bid_Form_-_Cost_of_Project.pdf | ||
| Bidders_Certification.pdf | ||
| Addendum_-_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
California Department of Veterans Affairs Exhibit A - Scope of Work
Agreement Number: 24RS0011 Contractor: TBD
DOMESTIC HOT WATER LOOP SERVICES
1. INTRODUCTION/SERVICES
A. Contractor shall provide services, as specified, to California Department of Veterans Affairs (CalVet).
Contractor shall provide services at the Veterans Home of California-Redding (Home), located at 3400 Knighton Road, Redding CA 96002. Contractor shall provide all labor, materials, staff, transportation, license, permits and every other item of expense necessary, unless otherwise stated, to provide Domestic Hot Water Loop repair services. Services shall be provided at the Home, upon request and in compliance with terms of this Agreement.
B. CalVet Domestic Hot Water Loop repairs shall consist of removing existing thermostatic mixing valve and associated piping and valves and replacing with updated system in mechanical rooms E/H, C/D and A/B.
1. State Provided Equipment: Three (3) Aerco ADMS Smart Water Tempering System racks.
2. Data Sheets: Exhibit A-2.
C. All work shall be coordinated and approved by CalVet Contract Manager or designated representative.
Services shall be performed during the hours of 6:00am-8:00pm Monday through Friday unless otherwise specified. No work is to be performed on State holidays or on an overtime basis unless prior approval is received in writing from the Contract Manager, prior to this work taking place. Any and all services performed outside the scope of this Agreement or not approved by the Contract Manager, or designated representative, will be at the sole risk and expense of the Contractor.
D. Contactor must be able to perform the tasks associated with providing services under the scope of their license. Contractor will provide services in accordance with federal and state laws and regulations and CalVet policies.
E. Contractor is not authorized to deliver or commence services as described in the Agreement until written approval has been obtained from CalVet Contract Manager and Contractor has received an executed Agreement from CalVet. Any delivery or performance of service commenced prior to the Contractor obtaining all written approvals shall be considered voluntary on the part of the Contractor.
2. CONTACT INFORMATION
A. The project representatives during the term of this agreement will be:
Construction Supervisor Contract Manager Veterans Home of California-Redding: California Department of Veterans Affairs , SSM II , Associate Construction Analyst 3400 Knighton Road Redding, CA 96002 1227 “O” Street, Sacramento, CA 95814 Phone: ( ) Phone: ( ) Email: @calvet.ca.gov Email: @calvet.ca.gov
Contractor Representative:
TBD
B. Contract Representatives, addresses, and phone/fax numbers may be changed by issuing a twenty
(20) day prior written notification and shall not require a formal amendment to this Agreement. The notifying party shall provide complete contact information for the replacement Contract Representative including, name, title, mailing address, phone/fax numbers, and email address. All other changes require a formal written amendment to this agreement.
3. MINIMUM QUALIFICATIONS
mailto:@calvet.ca.gov mailto:betsy.vierra@calvet.ca.gov
All service performed under this Agreement shall be performed by qualified service technicians in the employ or under the direction of the Contractor.
Contractor shall provide a service technician who is factory trained on the equipment specified in this Agreement. Contractor shall provide the State with proof of the required training for each service technician providing services under this Agreement. Acceptable proof may be a resume showing experience, training and factory school completion. The Contractor shall submit the proof of training with their bid package to CalVet.
All sub-contractors to the primary contractor must meet the same minimum qualification requirements as the primary contractor.
4. STATE RESPONSIBILITIES
A. A complete set of cut-sheets for new thermostatic mixing equipment will be provided by the Contract
Manager to the Contractor at the commencement of the contract. See Exhibit A-2, B. Owner Furnished (State Provided), Contractor Installed (OFCI) equipment:
1. Three (3) Aerco ADMS Smart Water Tempering System racks.
2. Liquidated damages and contractor warranties shall not apply to State Provided equipment.
5. CONTRACTOR’S RESPONSIBILITIES
A. Contractor shall complete this project in accordance with the Exhibit A1: Domestic Hot Water
Demolition and New Work Final Report dated 03/27/2024. This plan, its scope of work and general notes are incorporated herein by this reference. As outlined below, the Contractor Shall:
1. All work provided by the Contractor shall conform to the latest requirements of Federal, State, City, and County regulations. This includes but is not limited to Title 24 of the California Building Code of Regulations and other standards identified in Exhibit A1.
2. Submit a utility out of service request to CalVet’s project representatives in writing, detailing the time and duration of any utility that must be out of service during construction, and refrain from doing so without the State’s consent as specified.
3. CONSTRUCTION SCHEDULE: The Contractor will submit a construction schedule at the pre-construction meeting. Prior approval of the schedule from the State is required before commencement of the work. The Contractor will be responsible for planning and scheduling the work and for monitoring the progress of the work with respect to the schedule. The Contract Manager reviews the schedule against actual field progress and provides comments. Contract Manager also reviews contractor’s monthly update of record drawings for completion. Contractor incorporates Contract Manager’s comments and submit/sends Schedule and Application for Payment to State Contract Manager for approval and payment.
4. SUBMITTALS, RFI’S AND SHOP DRAWINGS: The Contractor will submit a Submittal Schedule at the pre-construction meeting. Prior approval of the schedule from the State is required before commencement of the work. This schedule will become integrated with the construction schedule.
See Exhibit A1 for additional requirements.
5. SUBSTITUTIONS: All proposed deviations from specified items require formal submittal for review by the State. The Contractor will submit each proposal for substitution in writing within 14 days of Notice to Proceed, to the State for review and recommendation. Substitution request transmittal shall be submitted to the Contract Manager, and also be copied to the Construction Supervisor.
The Contractor must submit each such request in ample time for processing so as not to delay progress of the work.
6. CLARIFICATIONS:
a. When the Contractor requires clarification of the Contract Documents, they will submit a
Request for Interpretation (RFI) – Appendix A. The RFI’s will be numbered consecutively, and submitted in a timely manner so that the response can be provided before a critical activity is affected.
b. Each Submittal and RFI’s will be submitted electronically with a cover sheet via email (in MS Word or PDF format with any pdf sketches / drawings necessary attached) directly to the Contract Manager. Contract Manager will log in the Submittal’s and RFI’s and forward it to the A&E. The A&E will furnish the answer back to the Contract Manager as appropriate, and then Contract Manager will issue the final response back to the Contractor and the Construction Supervisor.
c. Responses to Submittal and RFI’s will be made by the State to the Contractor within ten (10) calendar days unless the State notifies the Contractor in writing that a response will take longer.
d. If the A&E determines that a Change Order should be prepared in response to the RFI, they will advise the Contract Manager, if agreed, the A&E will then assist with the necessary documentation and submit it to the Contract Manager for processing.
e. If the Contractor believes the RFI response warrants a Change Order, they will notify the Contract Manager within seven (7) days of receipt of the RFI response.
7. CHANGE ORDERS:
a. Change Orders shall be processed in accordance with the Conditions of the Contract. The procedures described below are intended to relate that process to the organization for this project. Only a Contract Manager can authorize a Change Order.
b. The process includes the Proposed Change Order (PCO) and the Change Order (CO). The PCO is the source document that identifies and describes a potential change in the work.
After the PCO is approved, it will be followed by a CO which defines the changes in the work, together with any change in the contract price and/or time for completion. The CO, not the PCO, is the official document for amending the contract.
c. Origination – A request for a CO may be initiated by the Contractor, the A&E, or the State. In each case, the PCO will be completed and forwarded to the Contract Manager.
d. Preparation – After review, Contract Manager will request the A&E, if appropriate, to prepare plans and specifications. Contract Manager will then transmit the PCO to the Contractor for pricing and/or time impact.
e. Contractor Proposal – Within the time allowed in the Contract Documents (10 days), the Contractor will return the PCO to the Contract Manager, including a detailed breakdown of all cost and time associated with the change, and justification therefore.
f. Negotiations – Contract Manager will review the Contractor’s proposal, confer with the A&E as required, and will either accept the terms, enter into negotiations with the Contractor, or cancel or modify the PCO, if appropriate.
g. Authorization – When agreement has been reached, Contract Manager will prepare the CO, sign it, and send two copies to the Contractor for signature. Multiple PCO’s may be included in a single CO. When the Contract Manager receives the CO back from the Contractor with their signature, copies will be distributed accordingly. The receipt of the CO signed by the Contract Manager is the Contractor’s authorization to proceed.
h. In the event that the Contractor and the State cannot agree on the cost and/or time required, the State may direct the Contractor to proceed on a “time and material” basis.
8. INSPECTION AND TESTING:
a. Inspection – The Construction Supervisor is responsible for inspection of the Contractor’s work for compliance with the Contract Documents and quality control. The Contractor is responsible for requesting an inspection in writing 48 hours prior to any work being covered.
Failure to properly request inspection prior to covering an area of work is subject to immediate rejection by the State requiring immediate removal and remediation of said work at the Contractor’s expense.
b. Testing – The Contractor will comply with the Contract Documents regarding testing, and will coordinate with the Construction Supervisor and/or Contract Manager regarding the scheduling of such tests.
9. PROJECT COMPLETION AND CONTRACT CLOSEOUT
a. Based on the requirements of the Contract Documents, the following are established:
i. When the Contractor considers the work is complete, he will submit to the Contract Manager:
1. Certification that the work or a designated portion thereof, is complete and ready for final inspection.
2. A list of items to be completed or corrected, if such exists.
3. Certification that the equipment and systems have been tested and are operational.
ii. After receipt of such notice, the Construction Supervisor and/or Contract Manager will determine whether the project is ready for final inspection.
iii. Should the State determine that the work is not complete; the Contractor will be notified in writing by the Contract Manager, giving the reasons therefore. When the Contractor has remedied any deficiencies, they will submit a second notice to the Contract Manager.
b. Final Inspection:
i. When the Contract Manager determines that the project is ready for final inspection, the
Construction Supervisor will arrange for the inspection team, which will include the A&E and Contract Manager.
ii. A punch list will be prepared by the entities noted above and submitted to the Contract Manager for consolidation. Contract Manager will then transmit it to the Contractor for their completion/correction of the listed items.
c. Contract Close Out:
i. Contract Close Out involves review of the Contract Documents, and schedules to ensure that the Contractor has completed all required work.
ii. Contractors shall assist CalVet representatives with providing As-built conditions within the Exhibit A1: Domestic Hot Water Demolition and New Work Final Report. No formal construction drawings are expected to be developed by the Contractor. Any drawing errors in this Report will be corrected within the warranty period.
iii. A complete set of product, operations and maintenance manuals for all new equipment shall be provided in a packaged PDF format.
iv. Warranties
v. Spare parts and maintenance materials
vi. Statement of completion of punch list items
vii. The Contractor will prepare the final application for payment in accordance with the
General Conditions and forward it to the Contract Manager for Processing.
10. All work shall be coordinated with the State Contract Representatives. Upon receipt of approved contract, Contractor shall contact the Contract Manager to schedule project pre-construction (start) meeting and to establish project start and completion dates.
11. Contractor understand and agrees that only the best general practice is to prevail and that only workmanship of the finest quality shall be acceptable.
12. Contractor understands and agrees that the cost of furnishing, installing, maintaining and removing signs, lights, barricades or other such devices shall be the responsibility of the Contractor.
13. Contractor shall be responsible for public safety, included but not limited to the placement of barricades, warning cones or roping off of areas in which work is taking place to protect pedestrian traffic.
14. Contractor shall secure all materials, tools, and equipment when not in use.
15. Contractor shall have an easily accessible fire extinguisher, first aid kit, and emergency medical plan of action.
16. Contractor shall make arrangement for and pay all fees, charges and costs required to provide and maintain temporary heat, ventilation, light, water supply, electrical supply, communications system, transportation, enclosures, and all other facilities necessary to successfully carry out the work. It is the Contractor’s responsibility to remove all temporary facilities at his/her expense at the completion of the work, and restore the area to its original condition, unless otherwise directed in writing.
17. Contractor understand that time is of the essence for this Agreement and that the State will sustain damages if the work is not completed by the term end date of this Agreement. Therefore, Contractor agrees to make every effort to complete work by the term end date of this Agreement.
18. Contractor shall comply with the Home’s parking and sign-in policy requirements.
19. Contractor’s employees shall wear visitor identification supplied by the Home upon arrival at the
Home.
4. LICENSES, PERMITS, AND CERTIFICATION REQUIREMENTS
A. Contractor shall ensure all necessary licenses, permits, and certification requirements are verified and current throughout the entire term of this Agreement.
B. Contractor shall maintain a valid Class “C-36” Plumbing Contractor OR Class “B” General Building
Contractor license issued by the California Department of Consumer Affairs, Contractors State License Board. All licenses and certifications shall be verified by CalVet.
5. WORK AREA
While working on CalVet premises, Contractor agrees to perform services with as little disruption to the Veterans Home operations as possible.
6. WORKMANSHIP
All work provided by the Contractor shall conform to the latest requirements of Federal, State, City, and County regulations. This includes but is not limited to Titles 17, 19 and 22 of the California Code of Regulations. Contractor is responsible for compliance with all applicable laws, codes, rules and regulations in connection with work performed under this Agreement. Any services performed by the Contractor will be inspected by the Contract Manager after completion. The Contract Manager is solely responsible for determining acceptability of the work performed.
7. INDEPENDENT CONTRACTOR STATUS
A. The Contractor shall be considered “Independent Contractors” in relation to CalVet and the State.
Therefore, Contractor shall not be considered employee(s) of the Home and shall not be entitled to any employee benefits from CalVet or the State including, but not limited to, the following:
1. Premium Pay, Overtime Pay, or Holiday Pay;
2. Medical Insurance;
3. Vacation or Sick Leave;
4. Worker’s Compensation; or
5. Other employee benefits
27 March 2024
DOMESTIC HOT WATER DEMOLTION AND NEW WORK FINAL REPORT
CALIFORNIA DEPARTMENT OF VETERAN AFFAIRS
3400 KNIGHTON ROAD, REDDING, CA 96002
KEY PLAN
998 Park Ave., San Jose, CA 95126
Ph: 408-297-1881 Fax: 408-294-3186 www.adcengineers.com
AB
CD
EH
EXHIBIT A1
http://www.adcengineers.com/
CalVet Redding DHS Report Final Report 27 March 2024
Advance Design Consultants, Inc. Page 2
PROJECT SUMMARY:
Remove existing thermostatic mixing valve and associated piping and valves and replace with updated system in mechanical rooms E/H, C/D and A/B.
TABLE OF CONTENTS
COVER PAGE / KEY PLAN
PROJECT SUMMARY / TABLE OF CONTENTS
PROJECT SCOPE OF WORK
ABBREVIATIONS
SYMBOLS
EH MECHANICAL ROOM PIPING – DEMOLITION PLAN
CD MECHANICAL ROOM PIPING – DEMOLITION PLAN
AB MECHANICAL ROOM PIPING – DEMOLITION PLAN
EH MECHANICAL ROOM PIPING – NEW WORK PLAN
CD MECHANICAL ROOM PIPING – NEW WORK PLAN
AB MECHANICAL ROOM PIPING – FIRE EQUIPMENT RELOCATION
AB MECHANICAL ROOM PIPING – RACK MODIFICATION
AB MECHANICAL ROOM PIPING – NEW WORK PLAN
AB MECHANICAL ROOM PIPING – RACK INSTALLATION (TOP VIEW)
TYPICAL RACK SUPPORT DETAIL
Advance Design Consultants, Inc. Page 3
PROJECT SCOPE OF WORK:
1. Introduction
CalVet DHW System Repair Services shall consist of the removal and replacement of three thermostatic mixing valve setups and associated valves, pumps, and piping in mechanical rooms AB, CD, and EH. Additionally, new Unistrut supports shall be installed to support the new thermostatic mixing valve system. For the AB mechanical room, three fire sprinkler head storage boxes shall be removed from the existing locations and placed at another fire-authority-approved location, selected by the owner, and away from the new work area. The AB mechanical room’s thermostatic mixing valve rack requires preparation prior to installation. The Unistrut on the AB rack must be cut, trimmed, and reattached so that the rack can fit in the room. Note that the racks and pumps have already arrived on site.
A. Based Scope - Perform DHW System Replacement:
1. Remove the existing thermostatic mixing valves and associated electrical wiring and water piping to point of connections shown on drawings for all three mechanical rooms;
AB, CD, and EH.
2. Install (N) shutoff valves via. system shutdown (and draining) or hot-tap as needed for all three locations.
3. Prior to installing racks, install a (N) Grundfos Hot Water Pump on each of the three
(N) Aerco ADMS Smart Water Tempering System (owner furnished, contractor installed, OFCI). The (N) Aerco rack to be installed in the AB mechanical room must have its Unistrut structure modified prior to installation. Contractor to provide factory startup and training for all new equipment. Despite equipment already being purchased, contractor is expected to contact local factory representative and include startup and training in their price.
4. Install three (N) Aerco racks and seismically secure them with Unistrut supports to the ground and walls as needed.
5. Reconnect the (N) Aerco ADMS Smart Water Tempering System to power. Assure all piping and electrical connections are installed correctly, and that the system is water tight with no leaks.
Equipment Selection shown below:
Product Data – AERCO AMDS SMART WATER TEMPERING SYSTEM (OFCI)
• Item: A1 Qty: 3
• Ready to be installed on site.
• Model: ADMS150-S1-110
• Maximum Operating Pressure 200psi
• Maximum Hot Water Temperature 200°F
• Minimum Hot Water Supply Temperature 2°F above set point
• Hot Water Inlet Temperature Range 120-180°F
• Cold Water Inlet Range 39-80°F
• Minimum Flow 0.5gpm
• Temperature Adjustment Range 80-180°F
• Compliances: ASSE 1017, cUPC, NSF, CSA 24/UL873
• Pump Relay 16A @ 250 VAC
• Alert Relay 5A @ 250 VAC, 5A @ 30 VDC
Advance Design Consultants, Inc. Page 4
• Water Inlet Sizes 2”
• Water Outlet Sizes 2.5”
• Water Return Inlet/Outlet Sizes 1”
Product Data – GRUNDFOS HOT WATER RETURN PUMPS (OFCI)
• Item: A2 Qty: 3 Tag(s): P-1, P-2, P-3
• Ready to be installed on site.
• Model (all three same model): TPE3 40-120 S-A-G-I-BBQE-DCB
• Rated Pump Speed 3390 rpm
• Rated Flow 62.1 US gpm
• Operating Flow 13 gpm
• Rated Head 23.62 ft
• Operating Head 38 ft
• Maximum Head 39.37 ft
• Impeller Diameter 2.91”
• Gross Weight 60.2 lb
• Maximum Operating Pressure 174.05 psi
6. Contractor awarded shall be provided complete submittals upon request.
7. Provide Lock Out Tag Out for existing electrical circuits when completing work. Field verify existing power circuits serving DHW systems. Demolish, adjust, or replace circuits and circuit breakers as needed for a complete operating system. Do not abandon circuits in place, all must be completely removed.
8. New piping rack, components and all piping shall be completed insulated meeting current Title-24 minimum insulation requirements, per Table 120.3-A, see below.
Provide removable insulation blankets for components that are frequently accessed.
Repair all insulation in existing closets with serve this new rack, it is expected that this entire area shall be refreshed as needed with insulation. Provide all new labeling over new insulation and on existing exposed lines.
AutoCAD SHX Text
DESIGN ENGINEER:
AutoCAD SHX Text
CAD DRAFTER:
AutoCAD SHX Text
MICHAEL ZELL
AutoCAD SHX Text
LORENZO RIOS JR.
AutoCAD SHX Text
ENGINEERS:
AutoCAD SHX Text P-0.0
AutoCAD SHX Text
ABBR.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
ABBREVIATIONS
AutoCAD SHX Text
ABBR.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
ABBREVIATIONS
AutoCAD SHX Text (R)
AutoCAD SHX Text
RELOCATED
AutoCAD SHX Text
POINT OF CONNECTION
AutoCAD SHX Text
POC
AutoCAD SHX Text
WATER GAUGE
AutoCAD SHX Text
WG
AutoCAD SHX Text
SOLENOID VALVE
AutoCAD SHX Text
SV
AutoCAD SHX Text
NOT IN CONTRACT
AutoCAD SHX Text
NTC
AutoCAD SHX Text
DET
AutoCAD SHX Text
DETAIL
AutoCAD SHX Text W
AutoCAD SHX Text
WASTE
AutoCAD SHX Text
RD
AutoCAD SHX Text
ROOF DRAIN
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
INCH(ES)
AutoCAD SHX Text
IN
AutoCAD SHX Text
GALLON
AutoCAD SHX Text
GAL
AutoCAD SHX Text
GAUGE
AutoCAD SHX Text
GA
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
FLR
AutoCAD SHX Text
EQUIP
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
DOWN
AutoCAD SHX Text
DN
AutoCAD SHX Text
NORMALLY OPEN
AutoCAD SHX Text
NO
AutoCAD SHX Text
NC
AutoCAD SHX Text
NORMALLY CLOSE
AutoCAD SHX Text
GALLON PER HOUR
AutoCAD SHX Text
GPH
AutoCAD SHX Text
NEW
AutoCAD SHX Text (N)
AutoCAD SHX Text
ARCH
AutoCAD SHX Text
AFF
AutoCAD SHX Text
ABOVE FINISHED FLOOR
AutoCAD SHX Text
ARCHITECTURAL
AutoCAD SHX Text
POUNDS PER SQUARE INCH
AutoCAD SHX Text
PSI
AutoCAD SHX Text
SQUARE FEET
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
TYP
AutoCAD SHX Text
SQ. FT.
AutoCAD SHX Text
CONN
AutoCAD SHX Text
CONT
AutoCAD SHX Text
DIA
AutoCAD SHX Text
DIAMETER
AutoCAD SHX Text (E)
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
CONTINUATION
AutoCAD SHX Text
CONNECTION
AutoCAD SHX Text
EL
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
FT
AutoCAD SHX Text
FEET
AutoCAD SHX Text
GPM
AutoCAD SHX Text
GALLON PER MINUTE
AutoCAD SHX Text
FLOOR DRAIN
AutoCAD SHX Text
FD
AutoCAD SHX Text
CO
AutoCAD SHX Text
CLEAN OUT
AutoCAD SHX Text
OVERFLOW DRAIN
AutoCAD SHX Text
OD
AutoCAD SHX Text
CW
AutoCAD SHX Text
COLD WATER
AutoCAD SHX Text
HW
AutoCAD SHX Text
HOT WATER
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HOT WATER RETURN
AutoCAD SHX Text
PRESSURE GAUGE
AutoCAD SHX Text
PG
AutoCAD SHX Text
SS
AutoCAD SHX Text
SANITARY SEWER
AutoCAD SHX Text W/
AutoCAD SHX Text
WITH
AutoCAD SHX Text V
AutoCAD SHX Text
VENT
AutoCAD SHX Text
VTR
AutoCAD SHX Text
VENT THRU ROOF
AutoCAD SHX Text
FLOW METER
AutoCAD SHX Text
FM
AutoCAD SHX Text
DIFFERENTIAL PRESSURE
AutoCAD SHX Text
DP
AutoCAD SHX Text
COND
AutoCAD SHX Text
CONDENSATE
AutoCAD SHX Text
LB
AutoCAD SHX Text
POUND
AutoCAD SHX Text
AP
AutoCAD SHX Text
ACCESS PANEL
AutoCAD SHX Text
CD
AutoCAD SHX Text
CONDENSATE DRAIN
AutoCAD SHX Text
BFP
AutoCAD SHX Text
BACKFLOW PREVENTER
AutoCAD SHX Text
MAV
AutoCAD SHX Text
MANUAL AIR VENT
AutoCAD SHX Text
PRESSURE DIFFERENTIAL
AutoCAD SHX Text
PD
AutoCAD SHX Text
PIPE SUPPORT
AutoCAD SHX Text
PS
AutoCAD SHX Text
FW
AutoCAD SHX Text
FIRE WATER
AutoCAD SHX Text
POTABLE WATER
AutoCAD SHX Text
PW
AutoCAD SHX Text
RECYCLED WATER
AutoCAD SHX Text
RW
AutoCAD SHX Text
NATURAL GAS
NG
AutoCAD SHX Text
CAD DRAFTER:
AutoCAD SHX Text
MICHAEL ZELL
AutoCAD SHX Text
LORENZO RIOS JR.
AutoCAD SHX Text
ENGINEERS:
AutoCAD SHX Text P-0.1
AutoCAD SHX Text
SYMB.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
SYMBOLS
AutoCAD SHX Text
HUMIDITY SENSOR
AutoCAD SHX Text H
AutoCAD SHX Text P
AutoCAD SHX Text
AutoCAD SHX Text
M-2 INDICATES WHERE DETAIL IS SHOWN
AutoCAD SHX Text
M-1 INDICATES WHERE DETAIL IS TAKEN
AutoCAD SHX Text
EQUIPMENT DESIGNATION
AutoCAD SHX Text
EQUIPMENT NO.
AutoCAD SHX Text
1 INDICATES DETAIL NUMBER
AutoCAD SHX Text
A INDICATES SECTION
AutoCAD SHX Text
M-1 INDICATES WHERE DETAIL IS TAKEN
AutoCAD SHX Text
M-2 INDICATES WHERE DETAIL IS SHOWN
AutoCAD SHX Text
AutoCAD SHX Text
SHEET NOTES
AutoCAD SHX Text
AutoCAD SHX Text
DEMOLITION NOTE
AutoCAD SHX Text
PD
AutoCAD SHX Text
PRESSURE DIFFERENTIAL
AutoCAD SHX Text
DIRECTION OF FLOW
AutoCAD SHX Text
REDUCER
AutoCAD SHX Text
PIPE DROP
AutoCAD SHX Text
PIPE RISE
AutoCAD SHX Text
POINT OF CONNECTION
AutoCAD SHX Text
ITEMS OR EQUIPMENT
AutoCAD SHX Text
TO BE DEMOLISH
AutoCAD SHX Text M-2
AutoCAD SHX Text M-1
AutoCAD SHX Text
AutoCAD SHX Text M-2
AutoCAD SHX Text M-1
AutoCAD SHX Text A
AutoCAD SHX Text
THERMOSTAT
AutoCAD SHX Text T
AutoCAD SHX Text
LIMIT OF DEMOLITION/ DISCONNECT
VALVE
DEMOLITION NOTES: MAINTAIN T-FITTING, REMOVE AND CAP DOWNWARDS FACING HOT WATER RETURN PIPE. REMOVE (E) ELECTRICAL DISCONNECT AND ASSOCIATED ELECTRICAL CONDUIT AND CONNECTIONS, REINSTALL AS NECESSARY. THE HEIGHTS OF THE HOT WATER RETURN PIPING ABOVE THIS POINT ARE NOT DIMENSIONALLY ACCURATE SO THAT IT MAY BE SHOWN MORE CLEARLY.
AutoCAD SHX Text
AutoCAD SHX Text
DESIGN ENGINEER:
AutoCAD SHX Text
CAD DRAFTER:
AutoCAD SHX Text
MICHAEL ZELL
AutoCAD SHX Text
LORENZO RIOS JR.
AutoCAD SHX Text
ENGINEERS:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text
%%UEH MECHANICAL ROOM PIPING - DEMOLITION PLAN
AutoCAD SHX Text 1/2" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(E) 1" HOT WATER RETURN (135°)
AutoCAD SHX Text
(E) 2" HOT WATER RETURN (135°)
AutoCAD SHX Text
(E) 2" MIXED WATER SUPPLY (120°)
AutoCAD SHX Text
(E) 2" COLD WATER SUPPLY
AutoCAD SHX Text
(E) 2" HOT WATER SUPPLY (140°)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text GENERAL NOTES: CONTRACTOR SHALL PROTECT EXISTING TO REMAIN EQUIPMENT, PIPING AND CONDUITS DURING DEMOLITION AND CONSTRUCTION. FIELD VERIFY DEMOLITION ITEMS PRIOR TO DEMOLITION. COORDINATE WITH THE FACILITY MANAGEMENT ON EXISTING EQUIPMENT TO BE REMOVED. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS INCLUDING PIPE SIZES AND LOCATION PRIOR TO START OF CONSTRUCTION ACTIVITIES.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(E) WATER HEATER
AutoCAD SHX Text
(E) ELECTRICAL CONDUIT
AutoCAD SHX Text
(E) UNISTRUT (TYP.)
AutoCAD SHX Text
(E) UNISTRUT (TYP.)
AutoCAD SHX Text
PD-1.0
AutoCAD SHX Text
FLOOR PLAN:
AREA OF WORK
DEMOLITION NOTES: (E) FIRE EQUIPMENT AND PIPING SHALL REMAIN. FIRE EQUIPMENT AND PIPING SHALL REMAIN. REMOVE (E) ELECTRICAL DISCONNECT AND ASSOCIATED ELECTRICAL CONDUIT AND CONNECTIONS. REINSTALL AS NECESSARY.
AutoCAD SHX Text
AutoCAD SHX Text
DESIGN ENGINEER:
AutoCAD SHX Text
CAD DRAFTER:
AutoCAD SHX Text
MICHAEL ZELL
AutoCAD SHX Text
LORENZO RIOS JR.
AutoCAD SHX Text
ENGINEERS:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text
%%UCD MECHANICAL ROOM PIPING - DEMOLITION PLAN
AutoCAD SHX Text 1/2" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(E) 2" HOT WATER SUPPLY (140°)
AutoCAD SHX Text
(E) 1 " HOT WATER 12" HOT WATER RETURN (135°)
AutoCAD SHX Text
(E) 2" COLD WATER SUPPLY
AutoCAD SHX Text
(E) 1" HOT WATER RETURN (135°)
AutoCAD SHX Text
(E) 2" MIXED WATER SUPPLY (120°)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text GENERAL DEMOLITION NOTES: CONTRACTOR SHALL PROTECT EXISTING TO REMAIN EQUIPMENT, PIPING AND CONDUITS DURING DEMOLITION AND CONSTRUCTION. FIELD VERIFY DEMOLITION ITEMS PRIOR TO DEMOLITION. COORDINATE WITH THE FACILITY MANAGEMENT ON EXISTING EQUIPMENT TO BE REMOVED. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS INCLUDING PIPE SIZES AND LOCATION PRIOR TO START OF CONSTRUCTION ACTIVITIES.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PD-2.0
AutoCAD SHX Text
FLOOR PLAN:
AutoCAD SHX Text
AREA OF WORK
AutoCAD SHX Text
FIRE SPRINKLER PIPING (E) TO REMAIN
AutoCAD SHX Text
FIRE SPRINKLER PIPING (E) TO REMAIN
DRAIN PIPING (E) TO REMAIN
AutoCAD SHX Text
DESIGN ENGINEER:
AutoCAD SHX Text
CAD DRAFTER:
AutoCAD SHX Text
MICHAEL ZELL
AutoCAD SHX Text
LORENZO RIOS JR.
AutoCAD SHX Text
ENGINEERS:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text
%%UAB MECHANICAL ROOM PIPING - DEMOLITION PLAN
AutoCAD SHX Text 1/2" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text DEMOLITION NOTES: (E) FIRE PIPING SHALL REMAIN. (E) SPARE FIRE SPRINKLER ATTACHMENTS TO BE CHANGED TO A DIFFERENT LOCATION. CONTACT APPROPRIATE FIRE EQUIPMENT CONTRACTOR TO HAVE THEM MOVED. REMOVE (E) ELECTRICAL DISCONNECT AND ASSOCIATED ELECTRICAL CONDUIT AND CONNECTIONS. REINSTALL AS NECESSARY.
AutoCAD SHX Text
(E) 2" HOT WATER SUPPLY (140°)
AutoCAD SHX Text
(E) 1" HOT WATER RETURN (135°)
AutoCAD SHX Text
(E) 2" COLD WATER SUPPLY
AutoCAD SHX Text
(E) " HOT WATER 34" HOT WATER RETURN (135°)
AutoCAD SHX Text
(E) 2" MIXED WATER SUPPLY (120°)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text GENERAL DEMOLITION NOTES: CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS INCLUDING PIPE SIZES AND LOCATION PRIOR TO START OF CONSTRUCTION ACTIVITIES. COORDINATE WITH THE FACILITY MANAGEMENT ON EXISTING EQUIPMENT TO BE REMOVED.
AutoCAD SHX Text
PD-3.0
AutoCAD SHX Text
FIRE EQUIP.
AutoCAD SHX Text
AREA OF WORK
AutoCAD SHX Text
FIRE EQUIPMENT TO REMAIN
AutoCAD SHX Text
FLOOR PLAN:
AutoCAD SHX Text
(E) OUTLET TO REMAIN. UNPLUG EXISTING PUMP
AutoCAD SHX Text
(E) FIRE SPRINKLER PIPING SYSTEM TO REMAIN
AutoCAD SHX Text
(E) EQUIPMENT TO REMAIN
AutoCAD SHX Text
(E) FIRE SPRINKLER PIPING TO REMAIN
AutoCAD SHX Text
AutoCAD SHX Text
(E) DRAIN PIPING TO REMAIN
AutoCAD SHX Text
CAD DRAFTER:
AutoCAD SHX Text
MICHAEL ZELL
AutoCAD SHX Text
LORENZO RIOS JR.
AutoCAD SHX Text
ENGINEERS:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text
%%UEH MECHANICAL ROOM PIPING - NEW WORK PLAN
AutoCAD SHX Text 1/2" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text SHEET NOTES: PROVIDE POWER TO NEW THERMOSTATIC MIXING VALVE SYSTEM. FIELD VERIFY SOURCE OF POWER. INSTALL AND ATTACH ADDITIONAL UNISTRUT AS SEISMIC SUPPORTS FOR THE PREBUILT THERMOSTATIC RACK AS NEEDED. INSTALL (N) GRUNDFOS INSTALL AND ATTACH ADDITIONAL UNISTRUT SUPPORTS FOR THE (N) PUMP AS NEEDED. RACK AND VALVE SHALL BE PROVIDED BY OWNER.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(E) 1" HOT WATER RETURN (135°)
AutoCAD SHX Text
(N) 1" HOT WATER RETURN (135°)
AutoCAD SHX Text
(N) 2" MIXED WATER SUPPLY (120°)
AutoCAD SHX Text P
AutoCAD SHX Text
AutoCAD SHX Text (N)
AutoCAD SHX Text
(N) 1" HOT WATER RETURN (120°)
AutoCAD SHX Text
(N) 2" COLD WATER SUPPLY
AutoCAD SHX Text
(N) 2" HOT WATER SUPPLY (140°)
AutoCAD SHX Text
(N) THERMOSTATIC MIXING VALVE RACK
AutoCAD SHX Text
GRUNDFOS HWR PUMP: TPE3 40-120 S-A-G-I-BQQE-DCB
AutoCAD SHX Text
(N) AERCO AMDS SMART WATER TEMPERING SYSTEM
AutoCAD SHX Text
(E) ELECTRICAL CONDUIT
AutoCAD SHX Text
(E) WATER HEATER
AutoCAD SHX Text P-1.0
AutoCAD SHX Text
FLOOR PLAN:
AutoCAD SHX Text
AutoCAD SHX Text
AREA OF WORK
AutoCAD SHX Text
CAD DRAFTER:
AutoCAD SHX Text
MICHAEL ZELL
AutoCAD SHX Text
LORENZO RIOS JR.
AutoCAD SHX Text
ENGINEERS:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text
%%UCD MECHANICAL ROOM PIPING - NEW WORK PLAN
AutoCAD SHX Text 1/2" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text SHEET NOTES: PROVIDE POWER TO NEW THERMOSTATIC MIXING VALVE SYSTEM. FIELD VERIFY SOURCE OF POWER. INSTALL AND ATTACH ADDITIONAL UNISTRUT AS SEISMIC SUPPORTS FOR THE PREBUILT THERMOSTATIC RACK AS NEEDED. INSTALL AND ATTACH ADDITIONAL UNISTRUT SUPPORTS FOR THE (N) PUMP AS NEEDED. RACK AND VALVE SHALL BE PROVIDED BY OWNER.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text P
AutoCAD SHX Text
AutoCAD SHX Text (N)
AutoCAD SHX Text
(E) 2" HOT WATER SUPPLY (140°)
AutoCAD SHX Text
(E) 1 " HOT WATER 12" HOT WATER RETURN (135°)
AutoCAD SHX Text
(E) 2" COLD WATER SUPPLY
AutoCAD SHX Text
(E) 1" HOT WATER RETURN (135°)
AutoCAD SHX Text
(E) 2" MIXED WATER SUPPLY (120°)
AutoCAD SHX Text
(N) 1" HOT WATER RETURN (135°)
AutoCAD SHX Text
(N) 2" MIXED WATER SUPPLY (120°)
AutoCAD SHX Text
(N) 2" HOT WATER SUPPLY (140°)
AutoCAD SHX Text
(N) 1" HOT WATER RETURN (135°)
AutoCAD SHX Text
(N) 2" COLD WATER SUPPLY
AutoCAD SHX Text
GRUNDFOS HWR PUMP: TPE3 40-120 S-A-G-I-BQQE-DCB
AutoCAD SHX Text
(N) AERCO AMDS SMART WATER TEMPERING SYSTEM
AutoCAD SHX Text
(N) THERMOSTATIC MIXING VALVE RACK INSTALLED AT A 45-50° ANGLE
AutoCAD SHX Text P-2.0
AutoCAD SHX Text
AutoCAD SHX Text
FLOOR PLAN:
AutoCAD SHX Text
AREA OF WORK
AutoCAD SHX Text
FIRE SPRINKLER PIPING (E) TO REMAIN
AutoCAD SHX Text
FIRE SPRINKLER PIPING (E) TO REMAIN
DRAIN PIPING (E) TO REMAIN
AutoCAD SHX Text
CAD DRAFTER:
AutoCAD SHX Text
MICHAEL ZELL
AutoCAD SHX Text
LORENZO RIOS JR.
AutoCAD SHX Text
ENGINEERS:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text
%%UAB MECHANICAL ROOM PIPING - NEW WORK PLAN
AutoCAD SHX Text 1/2" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text SHEET NOTES: BACKUP SPRINKLER EQUIPMENT STORAGE TO BE RELOCATED TO NEW LOCATION IN THE ROOM. CONTRACTOR TO CONFIRM APPROVED NEW LOCATION WITH FIRE SAFETY/EQUIPMENT CONTRACTOR.
AutoCAD SHX Text
AutoCAD SHX Text
(E) 2" HOT WATER SUPPLY (140°)
AutoCAD SHX Text
(E) 1" HOT WATER RETURN (135°)
AutoCAD SHX Text
(E) 2" COLD WATER SUPPLY
AutoCAD SHX Text
(E) " HOT WATER 34" HOT WATER RETURN (135°)
AutoCAD SHX Text
(E) 2" MIXED WATER SUPPLY (120°)
AutoCAD SHX Text P-3.0
AutoCAD SHX Text
FIRE EQUIP.
AutoCAD SHX Text
AREA OF WORK
AutoCAD SHX Text
FIRE EQUIPMENT TO REMAIN
AutoCAD SHX Text
FLOOR PLAN:
AutoCAD SHX Text
(E) FIRE SPRINKLER PIPING TO REMAIN
AutoCAD SHX Text
CAD DRAFTER:
AutoCAD SHX Text
MICHAEL ZELL
AutoCAD SHX Text
LORENZO RIOS JR.
AutoCAD SHX Text
ENGINEERS:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text
%%UAB MECHANICAL ROOM PIPING - RACK MODIFICATION
AutoCAD SHX Text 1/2" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text SHEET NOTES: MODIFY THERMOSTATIC MIXING RACK UNISTRUT TO BE 2.5" SHORTER ON THE LEFT AND RIGHT SIDE (5" SLIMMER). RACK CAN FIT INTO CLOSET AS SHOWN AT A 45-50 DEGREE ANGLE. NOTE THAT THIS IS ONLY REQUIRED FOR THE RACK BELONGING TO THE AB MECHANICAL ROOM.
AutoCAD SHX Text
AutoCAD SHX Text P-3.1
- POINT OF CONNECTIONPOINT OF CONNECTION
AutoCAD SHX Text
CAD DRAFTER:
AutoCAD SHX Text
MICHAEL ZELL
AutoCAD SHX Text
LORENZO RIOS JR.
AutoCAD SHX Text
ENGINEERS:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text
%%UAB MECHANICAL ROOM PIPING - NEW WORK PLAN
AutoCAD SHX Text 1/2" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text SHEET NOTES: MODIFY THERMOSTATIC MIXING RACK UNISTRUT TO BE 2.5" SHORTER ON THE LEFT AND RIGHT SIDE (5" SLIMMER). RACK CAN FIT INTO CLOSET AS SHOWN AT A 45-50 DEGREE ANGLE. PROVIDE POWER TO NEW THERMOSTATIC MIXING VALVE SYSTEM. FIELD VERIFY SOURCE OF POWER. INSTALL AND ATTACH ADDITIONAL UNISTRUT AS SEISMIC SUPPORTS FOR THE PREBUILT THERMOSTATIC RACK AS NEEDED.
AutoCAD SHX Text
INSTALL AND ATTACH ADDITIONAL UNISTRUT SUPPORTS FOR THE (N) PUMP AS NEEDED.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text P
AutoCAD SHX Text
AutoCAD SHX Text (N)
AutoCAD SHX Text
(E) 2" HOT WATER SUPPLY (140°)
AutoCAD SHX Text
(E) 1" HOT WATER RETURN (135°)
AutoCAD SHX Text
(E) 2" COLD WATER SUPPLY
AutoCAD SHX Text
(E) " HOT WATER 34" HOT WATER RETURN (135°)
AutoCAD SHX Text
(E) 2" MIXED WATER SUPPLY (120°)
AutoCAD SHX Text
(N) 1" HOT WATER RETURN (135°)
AutoCAD SHX Text
(N) 2" MIXED WATER SUPPLY (120°)
AutoCAD SHX Text
(N) 2" COLD WATER SUPPLY
AutoCAD SHX Text
(N) 1" HOT WATER RETURN (135°)
AutoCAD SHX Text
(N) 2" HOT WATER SUPPLY (140°)
AutoCAD SHX Text
GRUNDFOS HWR PUMP: TPE3 40-120 S-A-G-I-BQQE-DCB
AutoCAD SHX Text
AERCO AMDS SMART WATER TEMPERING SYSTEM
AutoCAD SHX Text
(N) THERMOSTATIC MIXING VALVE RACK INSTALLED AT A 45-50° ANGLE
AutoCAD SHX Text
TOP VIEW, SEE NEXT PAGE
AutoCAD SHX Text P-3.2
AutoCAD SHX Text
FIRE EQUIP.
AutoCAD SHX Text
AREA OF WORK
AutoCAD SHX Text
FIRE EQUIPMENT TO REMAIN
AutoCAD SHX Text
FLOOR PLAN:
AutoCAD SHX Text
(E) FIRE SPRINKLER PIPING SYSTEM TO REMAIN
AutoCAD SHX Text
(E) EQUIPMENT TO REMAIN
AutoCAD SHX Text
(E) FIRE SPRINKLER PIPING TO REMAIN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CAD DRAFTER:
AutoCAD SHX Text
MICHAEL ZELL
AutoCAD SHX Text
LORENZO RIOS JR.
AutoCAD SHX Text
ENGINEERS:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text
%%UAB MECHANICAL ROOM PIPING - RACK INSTALLATION (FLOOR PLAN)
AutoCAD SHX Text 1/2" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text SHEET NOTES: INSTALL (N) THERMOSTATIC MIXING VALVE RACK AS SHOWN AT A 45 TO 50 DEGREE ANGLE INSIDE THE AB MECHANICAL ROOM. ALL (E) FIRE EQUIPMENT IS EXISTING TO REMAIN. MODIFY UNISTRUT SUPPORTS AS NEEDED TO FIT IN CLOSET.
AutoCAD SHX Text
AutoCAD SHX Text
50 DEGREE ANGLE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
P-3.3
AutoCAD SHX Text
CAD DRAFTER:
AutoCAD SHX Text
MICHAEL ZELL
AutoCAD SHX Text
LORENZO RIOS JR.
AutoCAD SHX Text
ENGINEERS:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text
%%UTYPICAL RACK SUPPORT DETAIL
AutoCAD SHX Text 3/4" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text SHEET NOTES: INSTALL (N) THERMOSTATIC MIXING VALVE RACK WITH ADDITIONAL SUPPORTS AS SHOWN OR AS NEEDED. MODIFY THE SUPPORT DESIGN AS NEEDED TO FIT INTO AB MECHANICAL ROOM.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(N) " DIA. GALV CHANNEL 12" DIA. GALV CHANNEL BOLT WITH SPRING NUT (TYP)
AutoCAD SHX Text
(N) P1325 (TYP)
AutoCAD SHX Text
(N) P1000T UNISTRUT (TYP)
AutoCAD SHX Text
(N) P2072A (TYP)
AutoCAD SHX Text
12" DIA. HILTI-KB-TZ-CS EMBED 2" MIN PER ESR 1917 (TYP)
AutoCAD SHX Text
(N) P1346 (TYP)
AutoCAD SHX Text
(N) P1000T UNISTRUT, CONFIRM STUD LOCATION, SECURE TO WALL USING STUDS (TYP)
AutoCAD SHX Text
(N) P1000T UNISTRUT, CONFIRM STUD LOCATION, SECURE TO WALL USING STUDS (TYP)
P-3.4
BVierra Text Box
EXHIBIT A-2
STATE OF CALIFORNIA DEPARTMENT OF VETERANS AFFAIRS
DOMESTIC HOT WATER LOOP SERVICES
VETERAN'S HOME OF CALIFORNIA, REDDING
PROJECT NUMBER: CA21-0204
AGREEMENT NUMBER: 24RS0011
THERMOSTATIC MIXING VALVE RACK TECHNICAL DATA SHEET Pages 1 to 6
GRUNDFOS HOT WATER RETURN PUMP MATCHING MODEL
NUMBER ON SITE Pages 1 to 2
Technical Data Sheet
ADMS™ Smart Water Tempering System
The AERCO Digital Mixing Station (ADMS™) is a smart water tempering system that allows temperature controlled distribution of potable hot water throughout the loop. The lead-free1 ADMS™ regulates distribution temperature within ±2ºF in accordance to ASSE 1017 at all flow conditions (including low and zero demand periods) and its temperature setting is field configured without the use of special software and laptop. The building automation system (BAS) ready ADMS™ can be configured with strainers, building recirculation pump and Flow/BTU monitor package to allow facilities managers to remotely monitor and control distribution wa-ter temperatures along with monitoring of flow and energy consumption.
Unlike the traditional thermostatic mixing valves, it is capable of func-tioning under varying pressure differentials across the inlets.
Features
• Configurable on site without special software and laptop
• Tight temperature control of ±2ºF in accordance with ASSE 1017
• Control ±2°F during periods of low/zero demand
• 3.5” full-color, user-selectable touch screen display
• User programmable high-temperature sanitization mode
• Cold water failsafe with manual override feature to set mixed outlet temperature
• Settings can be adjusted/monitored at the controller or remotely via BACNET or Modbus interface
• Displays pressure, temperature and flow/BTU data
• Pass code protected for security
• User programmable high temperature alarm
Technical Specification Maximum Operating Pressure . . . . . . . . . . . . . . . . . . . . . . . . 200psi (1379kPa) Maximum Hot Water Temperature . . . . . . . . . . . . . . . . . . . . . . . . 200°F (93°C) Minimum Hot Water Supply Temperature2 . . . . . . . 2°F (1°C) above set point Hot Water Inlet Temperature Range . . . . . . . . . . . . . . . . 120-180°F (49-82°C) Cold Water Inlet Range . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39-80°F (4-27°C) Minimum Flow3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.5gpm (1.89lpm) Temperature Adjustment Range4 . . . . . . . . . . . . . . . . . . . 80-180°F (27-82°C) Listing /Compliance . . . . . . . . . . . ASSE 10175 , cUPC5, NSF5, CSA 24/UL873 Pump relay . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16A @ 250 VAC Alert relay . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5A @ 250 VAC, 5A @ 30 VDC Input Power . . . . . . . . . . . . . . . . . . 15 V ±10%, 60 Hz, 30 VA, 1180 fully loaded
Notes 1 The wetted surface of this product contacted by consumable water contains less than one quarter of one percent (0.25%) of lead by weight.
2 With equal pressure 3 Minimum flow when ADMS is installed at or near hot water source recirculating tempered water with a properly sized continuously oper-ating recirculating pump.
4 Low limit cannot be less than the cold water temperature. For best operation, hot water should be at least 2°F above desired set point.
5 Listed without pump
E365015 Temp. Ind. and Reg. Equip.
Less Pump
Pressure Drop Across Valve
Model Min System Draw Cv
5 psi (34 kPa)
10 psi (69 kPa)
20 psi (138 kPa)
30 psi (207 kPa)
ADMS150-S 0.5 gpm (1.9 lpm) 26.88 60 gpm
(227 lpm) 85 gpm
(322 lpm) 120 gpm
(454 lpm) 147 gpm
(556 lpm)
ADMS200-S 0.5 gpm (1.9 lpm) 42.70 96 gpm
(363 lpm) 135 gpm (511 lpm)
191 gpm (723 lpm)
234 gpm (886 lpm)
ADMS150-D 0.5 gpm (1.9 lpm) 53.57 120 gpm
(454 lpm) 170 gpm
(644 lpm) 240 gpm (908 lpm)
294 gpm (1113 lpm)
ADMS200-D 0.5 gpm (1.9 lpm) 85.27 192 gpm
(727 lpm) 270 gpm
(1022 lpm) 382 gpm (1446 lpm)
468 gpm (1772 lpm)
ADMS200-T 0.5 gpm (1.9 lpm) 127.90 288 gpm
(1090 lpm) 405 gpm
(1533 lpm) 573 gpm
(2169 lpm) 702 gpm
(2657 lpm)
Flow Capacity
Dimensions Single Valve
33 1/4" [844mm]
70 3/8" [187mm]
11 7/8" [301mm]
8 3/8" [212mm]
BA
20 1/8" [511mm]
7 3/8" [86mm]
11 7/8" [301mm]
8 1/4" [210mm]
33 1/4" [844mm]
20 1/8" [511mm]
Hot Water Inlet Cold Water Inlet To Water Inlet
Mixed Water Outlet Return
Dual Valve
Triple Valve
C
D
A
B
Cold Water Inlet
Hot Water Inlet
13 5/8” (346mm) 7 7/8”
(198mm)
To Boiler Return Mixed Water Outlet
15” (381mm)
15 3/8” (389mm)
41 1/2” (1054mm)
GF
B
A D E
I
C
G
H
Hot Water Inlet
Cold Water Inlet
14 5/8” (371mm)
To Water Inlet Return
Mixed Water Outlet
Triple Valve
Model Inlets Outlet Return A B C D
ADMS200-T3-00 6”
(152 mm)
6” (152 mm)
3” (76 mm)
95.75” (2432 mm)
105” (2667 mm)
36.25” (921 mm)
18.125” (460 mm)
ADMS200-T3-01 6”
(152 mm)
6” (152 mm)
3” (76 mm)
107” (2718 mm)
116.25” (2953 mm)
36.25” (921 mm)
18.125” (460 mm)
ADMS200-T3-10 6”
(152 mm)
6” (152 mm)
3” (76 mm)
111.75” (2838 mm)
121” (3073 mm)
36.25” (921 mm)
18.125” (460 mm)
ADMS200-T3-11 6”
(152 mm)
6” (152 mm)
3” (76 mm)
123.75” (3143 mm)
133” (3378 mm)
36.25” (921 mm)
18.125” (460 mm)
Dual Valve
Model Inlets Outlet Return A B C D E F G H
ADMS150-D3-00 4”
(102 mm)
4” (102 mm)
3” (76 mm)
82.625” (2099 mm)
92” (2337 mm)
37.125” (943 mm)
11.875” (302 mm)
11.5” (292 mm)
21.875” (556 mm)
3.625” (92 mm)
7.25” (184 mm)
ADMS150-D3-01 4”
(102 mm)
4” (102 mm)
3” (76 mm)
90.625” (2302 mm)
100” (2540 mm)
37.125” (943 mm)
11.875” (302 mm)
11.5” (292 mm)
21.875” (556 mm)
3.625” (92 mm)
7.25” (184 mm)
ADMS150-D3-10 4”
(102 mm)
4” (102 mm)
3” (76 mm)
104.375” (2651 mm)
113.75” (2889 mm)
37.125” (943 mm)
11.875” (302 mm)
11.5” (292 mm)
21.875” (556 mm)
3.625” (92 mm)
7.25” (184 mm)
ADMS150-D3-11 4”
(102 mm)
4” (102 mm)
3” (76 mm)
112.375” (2854 mm)
121.75” (3092 mm)
37.125” (943 mm)
11.875” (302 mm)
11.5” (292 mm)
21.875” (556 mm)
3.625” (92 mm)
7.25” (184 mm)
ADMS200-D3-00 6”
(152 mm)
6” (152 mm)
3” (76 mm)
91.75” (2330 mm)
100” (2540 mm)
41.75” (1060 mm)
13” (330 mm)
13.5” (343 mm)
23.5” (597 mm)
4.5” (114 mm)
7.375” (187 mm)
ADMS200-D3-01 6”
(152 mm)
6” (152 mm)
3” (76 mm)
103” (2616 mm)
111.25” (2826 mm)
41.75” (1060 mm)
13” (330 mm)
13.5” (343 mm)
23.5” (597 mm)
4.5” (114 mm)
7.375” (187 mm)
ADMS200-D3-10 6”
(152 mm)
6” (152 mm)
3” (76 mm)
107.75” (2737 mm)
116” (2946 mm)
41.75” (1060 mm)
13” (330 mm)
13.5” (343 mm)
23.5” (597 mm)
4.5” (114 mm)
7.375” (187 mm)
ADMS200-D3-11 6”
(152 mm)
6” (152 mm)
3” (76 mm)
121.375” (3083 mm)
130” (3302 mm)
41.75” (1060 mm)
13” (330 mm)
13.5” (343 mm)
23.5” (597 mm)
4.5” (114 mm)
7.375” (187 mm)
Single Valve*
Model Inlets Outlet Return A B
ADMS150-S1-0 2”
(51 mm)
2.5” (64 mm)
1” (25 mm)
56.375” (1432 mm)
50” (1270 mm)
ADMS150-S1-1 2”
(51 mm)
2.5” (64 mm)
1” (25 mm)
78.25” (1988 mm)
72” (1829 mm)
ADMS150-S2-0 2”
(51 mm)
2.5” (64 mm)
2” (51 mm)
56.375” (1432 mm)
50” (1270 mm)
ADMS150-S2-1 2”
(51 mm)
2.5” (64 mm)
2” (51 mm)
78.25” (1988 mm)
72” (1829 mm)
ADMS200-S1-0 2.5”
(64 mm)
3” (76 mm)
1” (25 mm)
63.625” (1616 mm)
57” (1448 mm)
ADMS200-S1-1 2.5”
(64 mm)
3” (76 mm)
1” (25 mm)
80.75” (2051 mm)
74” (1880 mm)
ADMS200-S2-0 2.5”
(64 mm)
3” (76 mm)
2” (51 mm)
63.625” (1616 mm)
57” (1448 mm)
ADMS200-S2-1 2.5”
(64 mm)
3” (76 mm)
2” (51 mm)
80.75” (2051 mm)
74” (1880 mm)
*Strainers shipped loose and are field installed
Ordering Information
Valve Size 150: 1.50” Valve 200: 2.00” Valve
Valve Quantity S: Single Valve D: Double Valve T: Triple Valve
Return Pipe Size* 1: 1” Return 2: 2” Return 3: 3” Return
Flow/BTU Package 0: None 1: Flow/BTU Package
Strainers 0: None 1: Strainers
Recirc Pump 0: No Pump 1: Factory supplied and installed pump
If the pump option is selected, the following information must be provided on an order:
ADMS - -
*1” Return or 2” return are available options for single valve configurations
Pump manufacturer: ___________________________________________________________________________
Manufacturer model and p/n: ____________________________________________________________________
System head loss: _____________________________________________________________________________
Required flow to maintain recirculation temperature: _________________________________________________
Warning ADMS™ provides user-directed control and monitoring of water distribution systems. It is the user’s responsibility to select and maintain water temperatures that are safe and appropriate for the water system users and facility. ADMS’s Sanitization mode is intended for use as part of a user-directed, controlled and supervised protocol that has been safely and properly designed.
It is recommended to install ADMS™ as part of a ASSE compliant water distribution system, including point-of-use mixings valves.
Installation and adjustment of the ADMS™ are the responsibility of the owner and installer and must be done by qualified personnel in accordance with the manufacturer’s instructions, and complying with all governmental requirements, building and construction codes and standards.
The owner and user of the ADMS™ is responsible for selecting and installing the product in an appropriate water distribution system, proper sizing, maintaining proper water quality/condition, and deciding what temperature is safe and appropriate for the water distribution users and facility.
Always read and follow User Guide & Instruction Manual and all product warnings and labels, and comply with all governmental and safety requirements.
Typical Specification Lead free digital water temperature control and monitoring system shall feature full-color touchscreen inter-face which is configurable on location and does not require factory pre-programming. System shall control water temperature to ±2°F in accordance with ASSE 1017 and during periods of low/zero demand and feature a user-programmable high temperature alarm. Unit shall feature Feed Forward or Predictive Control which antici-pates changes in system demand and adjusts valve pre-emptively to maintain mixed set point. Controller shall be password protected and feature a user-adjustable outlet temperature range of 80 - 180°F and an approach temperature of 2°F.
System shall digitally monitor inlet pressure and temperature, mixed outlet temperature, mixed outlet set point, pressure and flow/BTUs (optional), as well as return temperature without the use of an external module.
System shall control an engineer specified recirculation pump based on user-set return temperature limits.
Controller shall integrate with building automation systems through Bacnet and Modbus protocols and feature local and remote temperature alarms. System will also feature a user-set and controlled, high-temperature sanitization mode for use as part of user’s safe and properly designed thermal bacteria eradication protocol. In the event of a power failure or loss of cold water, system will close the hot water supply. System shall be listed/ approved to ASSE 1017, cUPC, NSF and CSA 24/UL873 and should be mounted on a heavy-duty welded strut with corrosion resistance coating and factory tested as a complete unit.
System shall be a ADMSXXX-XX-XXX.
© 2023 AERCO
AERCO International, Inc. • 100 Oritani Drive • Blauvelt, NY 10913
USA: T: (845) 580-8000 • Toll Free: (800) 526-0288 • AERCO.com
Heating and Hot Water Solutions
Company name:
Created by:
Phone:
Date: 19/03/2024
Printed from Grundfos Product Centre [2024.11.002]
Qty. Description
1 TPE3 40-120 S-A-G-I-BQQE-DYB
Note! Product picture may differ from actual product
Product No.: 98819519
Single-stage, close-coupled, volute pump with in-line suction and discharge ports of identical diameter.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .