Alger_Rd_60%_Structure_Plans.pdf
PDF 8 MB Posted
- Solicitation number
- PD 25-26.054
- Issued by
- Escambia County, Florida
About this file
This file contains 60% design structure plans for a bridge replacement project on Alger Road in the Town of Century, Escambia County, Florida, prepared by Mott MacDonald. The project involves the replacement of an existing bridge over an unnamed branch with a new approximately 27-foot 10-inch span prestressed concrete slab unit bridge. The bridge structure includes two reinforced concrete abutments supported by helical piles, sheet pile walls with geosynthetic reinforced soil (GRS) wingwalls, five precast prestressed flat slab units, approach slabs on both ends, and related appurtenances. The design accommodates two 9-foot lanes with 3-foot shoulders and incorporates post-tensioning details, expansion joints, and traffic railings. The plans indicate a design high water elevation of 72.50 feet and account for flood conditions with a 100-year design frequency discharge of 403 cubic feet per second. Key structural elements include concrete pile caps with Class IV concrete (5.5 ksi), precast slab units with Class VI concrete (8.5 ksi), and approach slabs with Class II concrete (5.5 ksi). The plans reference governing standards including FDOT FY 2025-26 Standard Specifications and AASHTO LRFD Bridge Design Specifications (9th Edition) and incorporate load rating calculations for HL-93 live loads with dynamic load allowance.
The design plans were prepared as a 60% submittal in February 2026 by registered professional engineer Bart F. Hendricks and checked by engineer R.H.B. The document includes comprehensive details across 15 sheets covering general notes, bridge hydraulic recommendations, GRS abutment sections and elevations, sheet pile wall specifications, pile cap and foundation layouts, framing plans, prestressed slab unit sections with post-tensioning details, approach slab typical sections, and geotechnical boring logs. Soil conditions indicate moderately aggressive pH levels (5.9) requiring appropriate concrete protection and material selection. The bridge location is at coordinates 30.979°N, 87.260°W with section/township/range designation 5N/30W. Design considerations include provision for existing utilities including water and gas lines in the construction area, overhead electrical power lines requiring coordination during sheet pile installation, and drainage to east and west sides of the bridge structure. The project number is 502101595 with consultant registry number 155 and vendor number 591294824004.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION MAP
Miles
0 0.5 11 reproduction.
Note: The scale of these plans may have changed due to CONSULTANT PROJECT NO. 502101595
Registry #155
Vendor No. 591294824004
(850)484-6011
Pensacola, Florida 32502
Suite 700
220 West Garden Street
Mott MacDonald
PLANS PREPARED BY:
PENSACOLA
NAVAL AIR
STATION
SHERMAN
FIELD
STATION
CORRY
NTTC
FIELD
SAUFLEY
PENSACOLA
REGIONAL
AIRPORT
McDAVID
ISLAND
ONO PERDIDO
KEY
TO
MOBILE
A
L
A
A
FLOWER
A
B
M
HillWalnut
L
ATMORE
A A B
SANTA
ROSA
CANTONMENT
PENSACOLA
TALLAHASSEE
BASE LINE
TO MILTON
QUINTETTE
INOMOL
CENTURY
A M
FLOMATON
TO
Pensacola Beach
SANTA
ROSA
COUNTY
ISLAND
TO MILTON
d
B a y d i o
Per
TRACOASTAL
NI
WATERWAY
INTRACOASTAL
WATERWAY
B A L D
W
IN
C
O U
N T Y
R i v e r
P e r d i d o
B a y
E s c a m b i a
O F
P e n s a c o l a
G U
L F
M E
X I C
O
E a s t
B a y
E s c a m b i a
R i v e r
B a y
ESCAMBIA COUNTY
A
C O
U N
T Y
S A
N T
A
R O
S A
10 9
27 28
29 31
2 1
3 2
14 13
11 12
18 16
11 12
5 4
29 28
31 9
53 2
3 5
36 31
15 14
22 23
18 17
3 2
1 6
13 18
4 3
20 21
16 15
13 18
2 1
8 9
1814 13
34 35
2119 20
31 32
24 19
27 26 25
14 13
4 3
8 9
20 21
6 5
31 32
8 9
3 2
20 22
23 24
30 29
19 20
18 17
19 20
31 32
3534 3136 32 33 34
31 32 3433 36
33 34
T R
A N S
C S
X
C S
X
S S
S Y S
T E
M
S E
A B
O A
R D
ST. L.S.F. RY.
RY.LST SF
R O
A D
I L
R A
R Y
.S F
L S
T
R R
R R
R A I L
W A
Y F
R A
N C I S
C O
S A
N A
N D
S T
L O
U I S
4A
4A
4A
99A
99A
97A
97A
97A
297A
297A
Power
I psco
Eagle
Goulding dgeE
Big
Power
I psco
Eagle
Goulding dgeE
Big
SHEET DESCRIPTIONSHEET NO.
INDEX OF STRUCTURE PLANS
PROJECT SITE
ENGINEERING DEPARTMENT
ESCAMBIA COUNTY, FLORIDA
THE TOWN OF CENTURY
PLANS PROPOSED FOR
(BRIDGE NO. ######)
STRUCTURE PLANS
This drawing is the property of Mott MacDonald Florida, LLC., and may not be reproduced without written permission. This document should not be relied on or used in circumstances other than those for which it was originally prepared and for which Mott MacDonald was commissioned. Mott MacDonald accepts no responsibility for this document to any party other than the person or entity by whom it was commissioned.
N O
T I C
E
T H
E O
F F
I C
I A
L R
E C
O R
D O
F T
H I S
S H
E E
T I
S T
H E
E L
E C
T R
O N
I C
F I L
E D
I G
I T
A L
L Y
S I G
N E
D A
N D
S E
A L
E D
U N
D E
R R
U L
E
G
.0
F
.A .C
PROJECT MANAGER:
REG. FL ENG. NO:
SECTION/TOWNSHIP/RANGE:DISTRICT:
PROJECT ENGINEER:
SIGNATURE: DATE:
51391BART F. HENDRICKS, P.E.
SHEET NUMBER:
5 / 5N / 30W
R U
S
/1
/2
:0
:5
P
M Z
S
T R
U C
T \5
C
D B
G \A lg e r \D r a w in g s \S tr u c t\
B
K e y s h e e t.
d g n
30.979 N, 87.260 W
Bridge Location
R
R
B-01
T o M cD a vi d
To Jay
T 5 N T 5 N
T o
F lo m a to n
BRIDGE REPLACEMENT
ALGER ROAD OVER UNNAMED BRANCH
STANDARD INDEX DESCRIPTIONINDEX NO.
STANDARD PLANS FOR BRIDGE CONSTRUCTION
GUARDRAIL536-001
BORING LOGS (2 OF 2)B1-15
BORING LOGS (1 OF 2)B1-14
BRIDGE LOAD RATINGB1-13
SHEET PILE WALL NOTESB1-12
TABLE OF VARIABLES - SLAB UNITSB1-11
PRESTRESSED BEAM SECTIONSB1-10
TYPICAL SECTION AND APPROACH SLAB DETAILSB1-09
FOUNDATION AND WALL LAYOUT PLANB1-08
FRAMING PLANB1-07
PILE CAP SECTIONS AND DETAILSB1-06
GRS WINGWALL SECTIONB1-05
GRS ABUTMENT SECTIONS AND DETAILSB1-04
GRS PLAN AND ELEVATIONB1-03
BRIDGE HYDRAULIC RECOMMENDATIONSB1-02
PLAN AND ELEVATIONB1-01
GENERAL NOTESB-02
BRIDGE KEYSHEET & INDEX OF DRAWINGSB-01
FEBRUARY 2026
60% SUBMITTAL
2025.084/.085
170001-021
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
F E
B R
U A
R Y
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K E
D
B Y
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
T
IM
O T
H Y
C A
R D
E N
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
C H
A N
G E
I N
C O
R P
O R
A T
IO
N e ll o w
H ig h L ig h te r)
C H
E C
K E
R
R P
(R e d
P e n
X -O u t to D is a g rr e e o r R e m a rk
O R
IG
IN
A T
O R
Q o rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A S
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q
(B lu e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. ######
60% Plans
"2
1Prestressed Slab Units
3"Pile Caps
3"Approach Slabs Bottom
2"Approach Slabs Top & Sides
B-02
Designation
Size
Quantity
CONCRETE STRENGTH TABLE
CONCRETE CLASS
Superstructure Substructure
Concrete Steel
IN STRUCTURE
LOCATION OF CONCRETE
STRENGTH (PSI)
COMPRESSIVE
MIN 28-DAY
Aggressive
Slightly
GENERAL NOTES
Unless Otherwise NotedUON
TypicalTyp.
Right of WayR/W
Normal High WaterNHW
Minimum Vertical ClearanceMVC
Minimum Horizontal ClearanceMHC
MemberMbr.
Front Face Of BackwallFFBW
Soil: pH = 5.9 Moderately Aggressive Extremely Aggressive
Class �: (Bridge Deck) f'c=4.5 ksi Approach Slabs for opening to loads.
and may be increased to reduce time to reach critical strength requirements
Concrete strength shown in the Concrete Strength Table is minimum required
346. Precast concrete shall conform with ALDOT Specifications Section 512.
All Cast-in-Place Concrete Shall Conform with FDOT Specifications Section
Concrete:2.
Typical Reinforcing Bars Are Designated As: 4~4A1
Reinforcing Steel: Grade 60 Carbon steel per Specifications Section 9311.
Materials:H.
Sewer and Water Lines: 85 plf
Utilities6.
Exempt per Structures Design Guidelines 2.3.1
Seismic5.
wind speed of 170 mph
As per AASHTO and as modified by Structures Design Guidelines with a basic
Wind Load4.
Concrete Cover: (minimum unless otherwise noted)3.
or vertically unless otherwise noted.
All dimensions in these plans are measured in feet either horizontally
Plan DimensionsI.
accordance with AASHTO M-232 unless otherwise noted.
a. All steel bolts and hardware shall be ASTM A307 galvanized in
Steel Hardware5.
post-tensioning within 7 days after placing keyway concrete.
compressive strength of 4.5 ksi. Adjust concrete mix design to allow
c. Stress Post-Tension bars after keyway concrete reaches a strength of 3.0 ksi.
concrete reaches initial set until the concrete reaches a compressive
b. The grouted beams should not be disturbed form the time keyway keyways with concrete.
a. Pressure wash precast slab unit keyways just prior to filling
Keyway Grout4.
dimension is noted to face of concrete.
location of reinforcing steel are to centerline of bar except where clear
Section 415 for allowable tolerances. All dimensions pertaining to the fabrication tolerances unless shown as "minimum cover". See Specifications
Concrete cover dimensions shown in the plans do not include placement and
WithW/
Top ofT/
Edge of PavementEOP
ElevationEL.
Expansion JointEJ
Each FaceE.F.
Design High WaterDHW
Counter SinkCSK
Bridge NumberBN
Bottom ofB/
Abbreviations:
disposition of utilities.
See the Roadway plans for Utility Owner information and slab concrete.
specifications a minimum of (2) weeks prior to placing approach
Perform backfill and compaction in accordance with the
Q. Backfill absorption.
M153 or AASHTO M213 modified to allow a maximum of 25% water expansion joint material shall meet the requirements of AASHTO instructions and the joint details shown in the plans. Pre-formed as Dow Corning 890-SL. Install using the manufacturer's written
Joint Sealant shall be a low-modulus, self-leveling silicone such
P. Joint Sealant
Other Concrete Surfaces - Class 3 Surface Finish.
Riding Surfaces - Broomed Finish
O. Concrete Surface Finish
Alger Road will be closed for construction.
Traffic ControlN.
Elevation for the existing bridge location.
Existing Bridge shall be Demolished and Disposed. See Plan and
M. Existing Bridge to those shown shall require approval of the Engineer.
indicated in the plans. Additional construction joints or alterations
Construction joints will be permitted only at the locations
Joints In ConcreteL.
Number:Name:
in accordance with the Traffic Railing Standard Plans:
Place the following bridge name and number on the traffic railings
Bridge Name and NumberK.
3.
locations. Locate utilities prior to driving piles.
The utilities shown in the Bridge Plans are at approximate 2.
For locations of existing utilities, See Plan and Elevation Sheet. 1.
UtilitiesJ.
Concrete Thermal Coefficient: 0.000006 per °F
Range: 70 °F
Fall From Mean: -35 °F
Rise From Mean: +35 °F
Mean: 70 °F
3. Design Temperatures properties.
thickness in the dead load but omitted from the design of the section
None. The beam depth includes a 1" sacrificial Future Wearing Surface
150 pcfReinforced Concrete
15 plf (Self-supporting)Traffic Railings
Dead Loads:2.
FL-120 for load rating
HL-93 with Dynamic Load Allowance
1. Live Loads:
Design LoadingsG.
FB Multipier v5.9
STAAD Pro V8i SS5
Structural Analysis Programs: F.
equations.
AASHTO Bridge Design Specifications (9th Edition) Live Load Distribution and fatigue limit states. Live Load distribution factors determined from
Load and Resistance Factor Design (LRFD) method using strength, service
Design MethodologyE.
ENVIRONMENT ITEM COVER
EnvironmentD.
adjustment, and are expressed in U.S. Survey Feet.
Elevations shown are referenced to NAVD 88 Vertical Datum, 1991
Vertical DatumC.
most expensive of the contract documents options.
identified prior to bid shall be controlled and constructed according to the in writing to the engineer of record prior to bid. Conflicts which are not
Report conflicts between plans, specifications, and other contract documents 5.
no less quality than a comparable APL product.
accepted if they meet all the requirements of the Specifications and provide
(APL) or as referenced in the Specifications. Substitute products will only be
e. Approved material refers to a product on the FDOT Approved Products List applicable.
d. Testing requirements that exceed the requirements of the County are not
c. FDOT Submittal requirements are not applicable.
b. Methods of payment and Pay Item Numbers are not applicable.
applicable.
a. Division I General Requirements & Covenants shall be excluded and not following exceptions:
Specifications for Road and Bridge Construction (latest edition) with the
All work, unless otherwise indicated, shall conform to the FDOT Standard 4.
http://co.escambia.fl.us/Bureaus/ PublicWorks/Engineering.html
Escambia County General Paving and Drainage Technical Specifications. 3.
Highway Construction - For Precast Bridge Components
Alabama Department of Transportation 2022 Standard Specifications for 2.
Implemented/SpecBooks/default.shtm
Documents. http://www.dot.state.fl.us/programmanagement/
Specifications for Road and Bridge Construction, as amended by Contract revised Index Drawings as appended herein, and FY 2025-26 Standard
Florida Department of Transportation, FY 2025-26 Standard Plans and 1.
Governing Standards and Construction SpecificationsB.
FDOT Design Manual dated January 2025.3.
and all subsequent interims.
Load and Resistance Factor (LRFD) Bridge Design Specifications, [9th] Edition
American Association of State Highway and Transportation Officials (AASHTO) 2.
FDOT Structures Manual dated January 2025.1.
Design SpecificationsA.
f'c=5.5 ksiClass IV CIP Pile Caps, Keyways f'c=8.5 ksiClass VI Precast Slab Units
Moderately AggressiveSlightly AggressiveWater: pH = 6.49
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
F E
B R
U A
R Y
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
T
IM
O T
H Y
C A
R D
E N
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h L ig h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g rr e e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. ######
60% Plans
S
71 72
71 72
Notes:
1. See sheet B1-03 for sheet piling details.
2. See sheet B1-08 for foundation layout.
3. See sheets B1-14 and B1-15 for Soil
Boring Logs.
Legend
Sanitary Sewer Line
Wetland Limits
Direction of Traffic
Direction of Flow
Existing Riprap
Existing Structure
Existing Water Line
(to be Replaced)
WARNING: WATER AND GAS
MAIN AND OVERHEAD POWER
LINES IN THE AREA OF
CONSTRUCTION
Design High WaterDHW
Expansion BearingE
B e g in B r id g e
S ta
.0
E L
.7
E n d B r id g e
S ta
.8
E L
.7
Existing Overhead
Electrical Wire
Existing Telephone Pole
1+00.00
B e g in
V P
I
S ta
.5
E L
.3
E n d V
P I
S ta
.5
E L
.5
1.10% 1.10%
NE: 81°33'59.32"
Approximate Soil
Boring Location
Existing Gas Line
(to be abandoned)
B1-01
L a n e
L a n e
3'-0"3'-0"
Min. Clr.
2'-0"
Overall Bridge Length
Sta. 0+70.92
Begin Approach
Sta. 0+86.00
Begin Bridge
Sta. 1+13.83
End Bridge Sta. 1+28.92
End Approach
EJ EJ
Approach Slab
15'-0"
Span
27'-10"
Approach Slab
15'-0"
Min. Horiz. Cl. = 21'-10"
Out to Out Bridge Length
58'-0"
� Alger Rd
� Helical Piles
� Helical Piles
Limits
Riprap Rubble
Culvert
Existing CMP Guardrail
Existing
Plan
Pole
Existing Telephone
R/W
R/W
DHW: 72.50'
Elevation
Culvert
Exist. CMP
Bent 2
End Bridge
Bent 1
Begin Bridge See Roadway Plans
Guardrail
Helical Piles
Wall
Sheet Pile
Rubble Limits
Riprap
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
F E
B R
U A
R Y
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
T
IM
O T
H Y
C A
R D
E N
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h L ig h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g rr e e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. ######
60% Plans
S
71 72
71 72
1+00.00
NE: 81°33'59.32"
B1-02
Min Horiz Clr
21'-10"
Sta. 1+29.00
End Approach
Sta. 1+14.00
End Bridge
(to be Removed)
Existing Culverts
Sta. 0+86.00
Begin Bridge
Sta. 0+71.00
Begin Approach
Wetlands Line
Approx
Direction of Stationing
Wetlands Line
Approx
Alger Road
Sta. 1+13.83
End Bridge
0.73 Sq. Mi.
Drainage Area
Project Location
BRIDGE NO. ######
STRUCTURE
PROPOSED
NOTE:
STAGE ELEV. NAVD (ft)
FLOOD DATA:
DISCHARGE (cfs)
AVERAGE VELOCITY (f/s)
EXCEEDANCE PROB. (%)
FREQUENCY (yr.)
MAX. EVENT OF RECORD DESIGN FLOOD BASE FLOOD GREATEST FLOOD
OVERTOPPING or
TOTAL SCOUR ELEVATION
PIER INFORMATION LONG TERM
SCOUR ELEV.
WORST CASE ≤ 100 yr.
FREQ. (yr.) FREQ. (yr.)
HYDRAULIC RECOMMENDATIONS
BEGIN BRIDGE STATION1.
2.
3.
4.
CLEARANCE PROVIDED:
MINIMUM CLEARANCE:
ABUTMENTS:
NAV: HORIZ.
NAV: HORIZ.
VERT.
VERT.
END BRIDGE STATION
ABOVE EL.
ABOVE EL.
DRIFT: HORIZ.
DRIFT: HORIZ.
VERT.
VERT.
ABOVE EL.
ABOVE EL.
END BRIDGEBEGIN BRIDGE
RUBBLE GRADE:
SLOPE:
BURIED OR NON-BURIED HORIZ. TOE:
TOE HORIZ. DISTANCE:
LIMIT OF PROTECTION:
DECK DRAINAGE:5.
REMARKS:
AREA OF OPENING@D.F.
HYDRAULIC DESIGN DATA
EXISTING STRUCTURES
SKEW ANGLE
SIZE AND TYPENUMBERS
ELEV. LOW MEMBER
BRIDGE WIDTH
TYPE CONSTRUCTION
SPAN LENGTH
OVERALL LENGTH
FOUNDATION
(REFERENCE)
WORST CASE ≤ 500 yr.
TERMS:
WATER SURFACE ELEVATIONS: N.H.W. (Non-Tidal)
CONTROL (Non-Tidal)
M.H.W. (Tidal)
M.L.W. (Tidal)
(to be Removed)
Existing Culverts
Existing Grade
EL: 72.50
DHW
EL: 69.96
OHW
Sta. 0+86.00
Begin Bridge
( 1 ) ( 2 ) ( 3 ) ( 4 )
SCOUR PREDICTIONS FOR PROPOSED STRUCTURE DESCRIBED ABOVE:
design stages, feet-NAVD 1988.
cautioned against the assumption of precision for the discharge rates, units are in cubic feet per second and the
This hydraulic data is a summary of design calculations and is provided for informational purposes only. The user is
Greatest Flood: The most severe that can be predicted where overtopping is not practicable.
Overtopping Flood: Causes flow over the highway, over a watershed divide, or thru emergency relief structures.
Base Flood: Has a 1% chance of being exceeded in any given year (100 year frequency)
Design Flood: Utilized to assure a desired level of hydraulic performance.
N/A
28'-0"
N/A
DOUBLE CMP
9.82 SF
N/A
69.13
CONCRETE
27'-10"
27'-10"
CONCRETE
97.11 SF
22'-11"
74.58
N/A
Unknown
Unknown
Unknown
Unknown
Unknown
72.50
7.63
4.0
73.32
8.95
0+86.00 1+13.83 0 DEG.
N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A
Bank & Shore
1:2
Buried
N/A
N/A
Bank & Shore
1:2
Buried
N/A
N/A
Runoff from the bridge will drain to the east and west side of the bridge
Note:
Do not use the information on this sheet for construction purposes. This sheet is in the plans for documentation and to assist construction personnel with drainage concerns.
N/A N/A
N/A
74.41
9.54
0.2
N/A
28'-4"
N/A
CMP CULVERT
1.77 SF
N/A
68.45
N/A
27'-5"
N/A
CMP CULVERT
4.91 SF
N/A
68.90
BENTS 1 & 2 2" � HELICAL PILES
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
F E
B R
U A
R Y
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
T
IM
O T
H Y
C A
R D
E N
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h L ig h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g rr e e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. ######
60% Plans
B1-03
"2
23'-9
"8
8'-7 "8
8'-72'-5" 2'-5"
9"
"2
23'-6
Cap
Wall
New 6"� Waterline
Typ.
GRS Reinforcement
Sta. 0+86.00
Begin Bridge
Bridge Beams
� Bearing Line
Superstructure
Right Coping
Superstructure
Left Coping
� Alger Rd
Beam Seat
Approach Slab
Sta. 0+71.00
Begin Approach
Wall Typ.
Sheetpile
GRS ABUTMENT ELEVATION
GRS ABUTMENT PLAN
WARNING:
OF CONSTRUCTION
LINES AT AREA
* OVERHEAD POWER
Wall Cap = MC13x31.84.
with OSHA requirements.
identify and mark lines to aid in complying lines. Coordinate with Gulf Power to installed underneath overhead electrical
3. Sheet piles and precast beams are to be and required properties.
See Sheet B1-12 for sheet pile wall notes2.
See Sheet B1-06 for pile cap details.
See Sheet B1-05 for wingwall section.
See Sheet B1-04 for sections and details.
Wingwalls are folded out for elevation view.1.
Notes:
T/RSF, EL. ##.##
EL. ##.##
B/RSF
EL. ##.##
B/Excavation
EL. ##.##
B/Sheet Pile, EL. 73.57
T/Wall Cap Waterline
New 6"�
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
F E
B R
U A
R Y
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
T
IM
O T
H Y
C A
R D
E N
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h L ig h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g rr e e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. ######
60% Plans
B1-04
"2 x d e e p s lo tt e d h o le
6"
3'-0"10"
"8
1/2" Joint "2
1"
5"
3'-0"
Filed Drill into Precast Footing
"� x 3" Exp. Bolts @48" O.C.8
Typ 1
2-24
Wall Cap Typ.
MC13x31.8
In s ta ll E a E x p
B o lt a t T
/h o le
3L7x4x
� Bridge Beam Bearing
Begin/End Bridge between pads
" Exp. Polystyrene2
Stop 3" from ends
Typ. Reinf.
Typ Ea
Sheet Leg
Typ Ea
Sheet Leg Wall Cap Typ.
MC13x31.8
Typ Ea
Sheet Leg Wall Cap Typ.
MC13x31.8
Beam Seat
" bead silicon sealant2 1w/
Set footing directly on cap
Slab Beam
Pad
Bearing
"x3" 2 aggregate off cap
Use as form to keep
1/2"x4" Exp. Board w/barge cement
Bond pad to cap
Approach Slab
Wing Sheet Pile
Wing Sheet Pile
SHEET PILE WING SECTION AT FOOTING
SHEET PILE WING SECTION
DETAIL A, SHEET PILE ABUTMENT SECTION
Precast Footing
Reinf. Layers
Primary GRS
(GRS Reinf. Not Shown)
(GRS Reinf. Not Shown)
(FFSW)
Sheet Pile
Abutment Face angle leg at ends
Continue sealant full height " Exp Jt Material2
1Over 3"x
Silicon Sealant w/Backer Rod w/Backer Rod
Joint Sealant for polymer nosing wide min. section w/blockout
Asphalt, 3" deep x 12"
Polymer Joint Nosing
GAB
Slab
Approach
Approach
Begin/End
Exp. Jt. Material
1/2" x 4" deep
APPROACH EXPANSION JOINT DETAIL
Bearing Bed Reinf., 4~Layers x 4'-0" when filling keyways
Fill gap below joint w/concrete
NOTES:
1. Work this sheet with GRS Abutment Plan and Elevation sheets.
2. Seal weld wall cap sections with 3/16" fillet welds.
Joints:
1. Furnish Poured Joint with Backer Rod Expansion Joint System in accordance with FDOT Specification Section 458 and 932 as supplemented and modified by these details. Furnish joint system consisting of Poured Joint Material, Foam Backer Rods, and all associated miscellaneous components. Dow XJS Expansion Joint System with 902 RCS Joint Sealant is the preferred joint system.
2. Submit material product information and joint details which modify or complete the information shown here prior to installation.
3. Install the joint sealant when the ambient temperature is between 55° F and 85° F and will be rising for the next three hours.
4. Joint sealant shall be a Type D silicone sealant material that meets the specifications and is on the APL. (Dow 902 RCS is preferred)
5. Backer rod material shall be a soft type, low-density extruded polyethylene with a skin-like outer texture that will not bond to the silicone sealant as recommended by the joint sealant manufacturer. Size as required by joint manufacturer.
6. Joint nosing material shall be either a polymer mortar or elastomeric concrete designed and tested by the manufacturer to be used with the sealant to produce a bridge deck joint sealant system. The system shall have a 2-year warranty.
7. The joint shall be installed in accordance with the manufacturer's written instructions.
8. Block-out newly placed asphalt to allow placement of the nosing material after the asphalt has cooled to less than 98° F.
9. Install the nosing material and allow it to cure properly. Remove the joint width form and create the chamfer as recommended by the manufacturer. Seal any cold joints placed in the nosing material. Prime the joint faces, install the backer rod, and install the sealant material as recommended by the manufacturer.
Joint Sealant w/Backer Rod Approach Slab
Approach Slab Turndown
Turndown (Beyond)
Approach Slab
Begin/End Bridge
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
F E
B R
U A
R Y
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
T
IM
O T
H Y
C A
R D
E N
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h L ig h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g rr e e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. ######
60% Plans
Wingwall Section
B1-05
22'-11"
Slab Unit 1
4'-3" 5" 5" 5" 5"
Slab Unit 2
4'-3"
Slab Unit 3
4'-3"
Slab Unit 4
4'-3"
Slab Unit 5
4'-3"
Alger Rd�
Flat Slab Units Typ.
Precast Prestressed
EL: 72.00
piles.
fabric or damaging sheet carefully to avoid puncturing stone. Place riprap filter fabric without bedding
Class 2 to be installed on
Riprap Rubble is ALDOT 4.
installing sheet piles.
##.## or deeper prior to
Excavate down to elevation 3.
unit details.
for precast prestressed slab
See Slab Unit Details sheets 2.
B1-03 and B1-04.
Work this sheet with Sheets 1.
Notes:
Helical Pile
Reinf.
GRS Backfill
Section 985
Specification
Type D-2 or D-3
Filter Fabric
Pile Cap
T/Pile Cap
Sheet Piling
Wall
Sheet Pile
5'-9"
Compacted soil
Wall
Sheet Pile
"4
4'-11
Helical Pile Helical Pile
Compacted soil
Helical Pile
Helical Pile
3"
3"
5'-9"
"8
5'-0
2025.084/.085
170001-021
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
F E
B R
U A
R Y
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
T
IM
O T
H Y
C A
R D
E N
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h L ig h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g rr e e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. ######
60% Plans
B1-06
SECTION A-A
SECTION B-B
Substructure Concrete
Steel Reinforcement
Item Description Unit Quantity Notes
CY 4.54
LB 407
Estimated Quantities
Class IV, 5.5 ksi
Grade 60
Bill of Reinforcing Steel
Mark Size No. Req'd Length Location Bending
A1 5 16 5'-2" Pile Cap Straight
A2 5 20 4'-6" Pile Cap Straight
A3 5 8 4'-10" Pile Cap Straight
A4 5 4 22'-0" Pile Cap Straight
A5 5 2 21'-6" Pile Cap Straight
A6 5 2 22'-10" Pile Cap Straight
A7 5 4 0'-8" Pile Cap Straight
Notes:
1. All quantities are for one pile cap.
A8 5 10 1'-10" Pile Cap Straight
A
B
A
B
PILE CAP PLAN VIEW
1~5A1
1~5A1
1~5A1
2~5A1
1~5A1
1~5A1
1~5A1
2~5A2
1~5A2
2~5A2
2~5A2
1~5A2
2~5A2
1~5A3
1~5A3
1~5A3
1~5A3 to maintain 3" cover on all sides.
Way. Adjust spacing as needed
Use 1'-0" Typical Spacing, Ea.
pile wall
Sheet against sheet piles
Pour concrete slab 2~5A4
2~5A5
2~5A6
1~5A7
1~5A8
1~5A8
1~5A8
1~5A8
1~5A8
1~5A7
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
F E
B R
U A
R Y
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
T
IM
O T
H Y
C A
R D
E N
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h L ig h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g rr e e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. ######
60% Plans
Approach Slab Approach Slab
B1-07
15'-0" 27'-10" 15'-0"
1"
3'-11"3'-11"
1"
6~PT Ducts at 4'-0" Sp.
� Alger Rd
FRAMING PLAN
Slab Unit Number#
Sta. 0+70.92
Begin Approach
Sta. 1+29.00
End Approach
Post-Tensioning Recess, Typ (see details sheet)
Note: Bridge railing not shown
Sta. 1+13.83
End Bridge
Sta. 0+86.00
Begin Bridge
P.T. Duct Typ.
Typ.
Keyway
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
F E
B R
U A
R Y
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
T
IM
O T
H Y
C A
R D
E N
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h L ig h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g rr e e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. ######
60% Plans
71 72
FOUNDATION LAYOUT PLAN
LEGEND
Direction of Traffic
Existing Sanitary
Sewer Line
Existing Water Line
Proposed Helical Pile
Existing Structure
Notes:
1. All pile spacing is dimensioned along the centerline of the pile.
Wetland Limits
WARNING:
GAS MAIN AT AREA
OF CONSTRUCTION
OVERHEAD POWER
LINES AT AREA OF
CONSTRUCTION
B1-08
Sta. 0+86.00
Begin Bridge
Sta. 1+13.83
End Bridge
3'-0"
3'-0"
2" � Helical Pile Existing Culvert
� Alger Rd
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
F E
B R
U A
R Y
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
T
IM
O T
H Y
C A
R D
E N
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h L ig h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g rr e e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. ######
60% Plans
B1-09
15'-0" 1'-9"
"2
12'-8 "2
1'-2 2'-10"
22'-11"
4'-3"
� Alger Rd
9'-4"9'-4"3
5A1 @ 1'-0" O.C.
5B1 @ 1'-0" O.C.
5A2 @ 1'-0" O.C.
5B2 @ 1'-0" O.C.
5A1 @ 1'-0" O.C.5A2 @ 1'-0" O.C.
5B1 @ 1'-0" O.C.5B2 @ 1'-0" O.C.
5A3 @ 1'-0" O.C.
Beam Seat (Beyond)
2'-0"9'-0"9'-0"2'-0"
Out to Out Bridge
23'-6"±
� Alger Rd
PT Duct
(Beyond)
Turndown
Approach Slab
Ea. Side
3~5B3
5B4 @ 1'-0" O.C.5B4 @ 1'-0" O.C.
16'-9"
1'-10" "2 11'-2
3~5B1
5A4 @ 1'-0" O.C.
14'-6"
"4 312'-6 "4
32'-1"2 11'-2
3'-0"
5A2
5A4
"4 31'-51'-4"3'-0"
5B4
5B2
A
A
Approach Slab Section
Section A
Slope: 0.02 Ft/Ft Slope: 0.02 Ft/Ft
Lane Lane ShoulderShoulder
Typical Section 5" Typ.
Bill of Reinforcing Steel
Mark Size No. Req'd Length Location Bending
A1 5 18 22'-5" Appr. Slab Straight
A2 5 24 16'-0" Appr. Slab See Diag.
A3 5 24 2'-0" Appr. Slab Straight
B1 5 16 22'-5" Appr. Slab Straight
B2 5 24 16'-9" Appr. Slab See Diag.
Estimated Quantities
Item Description
Substructure Concrete
Steel Reinforcement LB
Unit
CY
19.12
Quantity Notes
Class II, 5.5 ksi
Grade 60
Notes:
1. Quantities are for one approach slab
B3 5 6 16'-3" Appr. Slab Straight
B4 5 26 6'-4" Appr. Slab See Diag.
A4 5 30 4'-6" Appr. Slab See Diag.
5A2
5B2
Bar Bending Diagrams
A
A
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
F E
B R
U A
R Y
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
T
IM
O T
H Y
C A
R D
E N
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h L ig h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g rr e e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. ######
60% Plans
(Omit 4C1 or 4C2 conflicting with PT Duct)
B1-10
2'-0" Min. Lap
5~6C1
1~6C2
4C1 4C1
� Unit
Symmetrical about � Unit
Transverse PT Spacing 4'-0", Typ
4C1
1~6C2
1'-0"
2'-0"
"2 12'-104C1
2'-0"
"2
"4 3 "4
"2
" Chamfer, Typ4
ELEVATION
SECTION X-X 2
I n n e r D u c t
O u te r D u c t
R73 Hex Nut, R9F Hardened Washer
R73 Hex Nut
ASTM Part Number
F436
A29 or A576
R9F-11-436
R73-10
4"
"� Hole4
"8
ELEVATION
PLAN
PT COMPONENT TABLE
PT Component
See PT Component Table
Bearing Plate, 1"� Post-Tension Bar
A722 R71-08Post-Tension Bar
P o s t-
T e n s io n B a r
¡ PT Duct & Bar
See Bearing Plate Detail
Casting Length = L
Top of Beam
Duct from
6" to ¡ PT
Symmetrical about � Unit
Spacing 4C1 or 4C2 Pairs and Dim. R to compensate for elastic and time dependent shortening effects) including length increase as required for unit placed on grade, (Overall length of Prestressed Slab Unit along ¡ unit, ¡ PT Duct
REINFORCEMENT DETAIL
Top of Beam
Top of Beam 3"� Schedule 40 PVC, Outer Duct, Cast-in-Beam
2"� Schedule 40 PVC, Inner Duct, Cast-in-Beam
3"� Schedule 40 PVC, Outer Duct, Cast-in-Beam
See PT Component Table
R9F Hardened Washer, Approach Slab Unit Shown, Precast Barrier similar
Strands
Strands
Strands
Strands
End Cap
" Max2
See Reinforcement Detail
6C2
Note: Shift Stirrups to Miss PT Ducts & Recesses as Req'd
2"
2"
� Unit
Symmetrical about � Unit
Transverse PT Spacing 4'-0", Typ
Casting Length = L
Symmetrical about � Unit
Spacing 4C1 or 4C2 Pairs conflicting with PT Duct)
(Omit 4C1 or 4C2 and Dim. R to compensate for elastic and time dependent shortening effects) including length increase as required for unit placed on grade, (Overall length of Prestressed Slab Unit along ¡ unit, Strands
Strands with Epoxy
Coat Beam Ends
Note: Shift Stirrups to Miss PT Ducts as Req'd
1~6C3 5~6C1
2~6C3
5~6C1 by one quarter turn to account for keyway concrete shrinkage.
2 months after the bridge is complete, remove End Caps and re-tension PT bars by turning all R73 Hex Nuts10.
Coat bearing plate and PT assembly with corrosion inhibiting grease prior to placing end cap.
PT End Cap shall be fiber reinforced nylon, friction fitted into slab unit.9.
Bearing Plate shall be ASTM A36 or better.8.
Field Cutting of Post-Tension Bar shall be done with an abrasive wheel or band saw.7.
" Ea. End)8
7" verifies proper tensioning. (4 3A Post-Tension Bar total elongation measurement of 16.
Use Torque Tensioning to achieve initial tension of 0.6fy = 90 ksi (76.5 kips).5.
Begin Post-Tensioning at midspan of bridge and proceed tensioning towards either Begin or End of Bridge. 4.
Simultaneously Tension the Post-Tension Bar at both ends.3.
Install inner duct and PT bar together.
Coat PT bars with corrosion inhibiting grease just prior to placing in the inner duct.2.
Post-Tension (PT) Bars shall be 1"� ASTM A722 150 ksi All-Thread.1.
See Details
4'-3"
2'-0" Min. Lap
5~6C1
1~6C2
4C1 4C11~6C2
"2
"4 3 "4
"2
" Chamfer, Typ4
6" to ¡ PT Duct from Top of Beam
Strands
Strands
4'-3"
7"
"7
2~4A1 (@ Ea PT Recess)
5" 3"
2~4A1 (@ Ea PT Recess)
"2
3"
" Chamfer, Typ4 with Epoxy
Coat Beam Ends
8 Sp. @ 3" 6 Sp. @ 6" 8 Sp. @ 8" 4 Sp. @ 1'-0" 4 Sp. @ 1'-0"8 Sp. @ 8"6 Sp. @ 6"8 Sp. @ 3"
" Chamfer, Typ4
1~6C2
6C3
See Post-Tensioning Details, This SheetSee Post-Tensioning Details, This Sheet
1'-7"
"2
6C1
6C2, 6C3
1'-7"
TYPICAL SECTION - SLAB UNITS 2 THRU 4TYPICAL SECTION - SLAB UNITS 1 AND 5
BENDING DIAGRAMS
POST-TENSIONING DETAILS
X
X
BEARING PLATE DETAILS
POST-TENSIONING NOTES:
ELEVATION AT END OF SLAB UNITS 2 THRU 4ELEVATION AT END OF SLAB UNIT 1
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
F E
B R
U A
R Y
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
T
IM
O T
H Y
C A
R D
E N
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h L ig h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g rr e e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. ######
60% Plans
Direction of Stationing
B1-11
END 1 END 2
J
K1
J
K2
L
"8
6 "8
"4
3'-2" = 4
17 Spa. @ 2
2"
W
"8
"4
3'-2" = 4
17 Spa. @ 2
W
"8
- fully bonded strands.
STRAND PATTERNS
DIMENSION NOTES
STRAND DEBONDING LEGEND
ANGLE Ø ANGLE Ø
SCHEMATIC PLAN VIEW AT SLAB ENDS - CASE 1
End Bridge
� Slab Unit
Begin Bridge � Bearing� Bearing the bottom of the slab unit.
are measured perpendicular to � Bearing along
** End of slab unit bearing dimensions "J" and "K" slab unit.
Dimension "R" is calculated at mid-height of the the top of unit at the centerline of slab unit.
sheet with a single asterisk (*) are measured along
* All longitudinal slab unit dimensions shown on this
NOTES:
1. Use 6/10" diameter, Grade 270, Low Relaxation Strands stressed to 43.9 kips each. Area per strand equals 0.217 sq. in.
2. Top Type N Strands shall be ASTM A416 Grade 250 or 270, 3/8" diameter or larger, stressed to 10.0 kips each.
3. Submit any proposed strand arrangement changes to reduce number of types for approval.
4. Cast barriers within 14 days following strand cutting.
TABLE OF VARIABLES - PRESTRESSED CUSTOM WIDTH SLAB UNITS
DIM R
DIMENSIONS *
UNIT
DIM L
W
DIM
DIM K2DIM K1DIM J
END OF UNIT **
END 2END 1
ANGLE Ø
END 2END 1
CASE
PLAN VIEWSTND.
PTRN.
TYPERelease28 Day
STRENGTHS (psi)
CONCRETE PROPERTIES
CLASS
SLAB UNIT
LOCATION
SPAN
NO. NO.(S) / TYPE
Table Date 01-01-12
9" O
O
901118500 6000VI1 9" 9" 27'-10"4'-3"
1 VI 8500 6000 2 1 1
O
O
90 9" 9" 9" 4'-3" 27'-10"
1 & 5 / 12"x51"
2-4 / 12"x51"
REQUIRED
UNITS
NO. OF
3"16
"16
Top row strands stressed at 10.0 kips each. Bottom row strands stressed at 33.8 kips each.
" Diameter Special, Grade 270, Low Relaxation Strands. Area per strand equals 0.167 sq. in.2 1STRAND DESCRIPTION: Use
TYPE 2 20 STRANDSTYPE 1 20 STRANDS
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
F E
B R
U A
R Y
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
T
IM
O T
H Y
C A
R D
E N
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h L ig h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g rr e e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. ######
60% Plans
B1-12
PERMANENT STEEL SHEET PILE NOTES
shape) controls
(thickness deflection and move the wall top back into the planned position.
Construction of the GRS wall and back-filling outside the wall shall be controlled to remove initial wall 6.
All welding shall be performed using an AWS Certified Welder.5.
shall visit the site and evaluate planned equipment to determine if pile splicing will be required.
installation below the lines without splicing using an excavator mounted vibratory hammer. The contractor
Installation of sheet piles below overhead electrical lines is required. The length of sheet piles may allow 4.
prior to sheet pile installation.
the area adjacent to the sheet pile wall position be excavated to this initial elevation to avoid de-watering excavation elevation prior to sheet pile installation may be below the water table. It is recommended that only
Sheet piles are sized considering excavation on both sides of the wall prior to pile installation. Required 3.
and required pre-excavation elevations.
Refer to GRS Abutment Plan and Elevation sheets for required sheet pile tip, cut-off elevations, wall layout, 2.
The Contractor is responsible for means and methods of construction.1.
INSTALLATION:
Design Passive Resistance Factor of Safety = 1.5.4.
wall to resist construction loads.
means and methods exceed the design parameters shown, the Contractor's Specialty Engineer will redesign the
The Design Parameters indicated in this table were used in the sheet pile wall analysis. If the Contractor's 3.
See Steel Sheet Pile Wall Cantilever Data Table.2.
supporting with sheet piles providing face protection.
Wall design loads based on the temporary excavated condition prior to GRS installation. GRS is self-1.
DESIGN LOADING:
Moderately Aggressive
ENVIRONMENT:
Vertical Datum used is NAVD 88.
VERTICAL DATUM:
Allowable Stress Design (ASD).
DESIGN METHOD:
for Road and Bridge Construction, as amended by Contract Documents.
Florida Department of Transportation, FY 2025 Design Standards and January 2025 Standard Specifications
GOVERNING STANDARDS AND CONSTRUCTION SPECIFICATIONS:
Specifications (7th Edition) and approved interims as specified in the Structures Design Guidelines.
American Association of State Highway and Transportation Officials (AASHTO) LRFD Bridge Design 2.
FDOT Structures Manual Dated January 2025, Volume 1 and 2.1.
DESIGN SPECIFICATIONS:
ALGER ROAD STEEL SHEET PILE WALL, CANTILEVER DATA TABLE
CONSTRUCTION INFORMATION DESIGN PARAMETERS
Soil Water (10) Design Live Loads
Wall Location Minimum Minimum Maximum Wall Elevation Elevation Vertical Horizontal
Section Modulus Moment of Inertia Wall Tip Top Wall Front Wall Back Wall Wall Live Live
Wall Station Offset (Side) Cold-Formed Hot-Rolled Cold-Formed Hot-Rolled
Example
Elevation Elevation Front Slope Back Slope Front Back Load Load
Number (begin to end) (ft) (in^3/ft) (in^3/ft) (in^4/ft) (in^4/ft)
Shapes
(ft) (ft) (ft) (degrees) (ft) (degrees) (ft) (ft) (psf) (plf)
1 0+89.209
0+70.459 to
11.392' (Lt) 5.64 4.7 N/A PZ 22, SCZ 21N 65.28 75.28 75.00 0.00 70.00 70.00 0 0
1 0+88.709 11.892' (Rt)
11.892' (Lt) to
1 0 0
2 11.392' (Lt)
N/A 75.00 45
0070.0070.000.0075.004575.0075.2865.28PZ 22, SCZ 21NN/AN/A4.75.64
1 0+89.209
0+70.459 to
11.392' (Rt) 5.64 4.7 N/A PZ 22, SCZ 21N 65.28N/A 75.28 75.00 0.00 70.00 70.0075.00 45
1+29.541
1+10.791 to
0 05.64 4.7 N/A PZ 22, SCZ 21N 65.28N/A 75.28 75.00 0.00 70.00 70.0075.00 45
2 0 05.64 4.7 N/A PZ 22, SCZ 21N 65.28N/A 75.28 75.00 0.00 70.00 70.0075.00 45
2 11.392' (Rt)1+29.541
1+10.791 to
0 05.64 4.7 N/A PZ 22, SCZ 21N 65.28N/A 75.28 75.00 0.00 70.00 70.0075.00 45
1+11.328 11892' (Rt)
11.892' (Lt) to
Note: Maximum sheet pile section height = 10"
L7x4x3/8 with expansion bolts and sealant (cost incidental to sheet piling): 41 LF each wall3.
Sheet Pile Cap, MC 13x31.8 (cost incidental to sheet piling): 85 LF each wall2.
as the minimum requirements.
Wall area calculated using minimum wall dimensions. Longer uniform length piles may be installed at the same cost
Sheet Piling, Steel, F&I, Permanent: Wall 1 = 1496 SF, Wall 2 = 1479 SF1.
QUANTITIES:
Applied corrosion preventive coating to welded and bolted area to match protection provided on sheets.9.
Spot weld end of bolts.8.
Place weld, equal to thickness of sheet, along vertical sides of splicer, with an E70 welding rod.7.
Securely tighten both bolt assemblies.6.
Set 2nd pile into splicer.5.
Partially tighten the bolt assembly.4.
Place splicer onto driven pile.3.
Torch-cut a 1"x1" notch in each of the two flanges of driven pile.2.
difference between splice elevations of adjacent sheets. Install pile splicers using the procedure below.
manufactured to develop the capacity of the pile section shall be used. Stagger splice points with 2'-0" height
If it is determined that splicing sheet piles is required to install below the overhead electrical lines, pile splicers 1.
SHEET PILE SPLICING:
Sheet pile installation is not allowed from 7:00 p.m. to 7:00 a.m.6.
with the Specifications.
accordance with Specification Section 560. Apply inorganic zinc primer to all steel sheet pile surfaces in accordance
Coat exposed surface of steel sheet piles to 5 feet below the Front Of Wall Soil Elevation (**), with coal tar-epoxy in 5.
thickness. Required steel pile properties have been increased to include the sacrificial thickness.
Pile design service life of 75 years includes contributions from the steel coating and a 0.09 inch sacrificial steel 4.
Minimum sheet pile flange and wall thickness = 0.375".3.
Wall, Cantilever Data Table.
Steel piles may be Hot-Rolled or Cold-Formed. Cold-Formed section properties are shown in the Steel Sheet Pile 2.
962 of the specifications.
Sheet piles shall be ASTM A328, A572, or A690 with a minimum yield strength of 50ksi in accordance with Section 1.
SHEET PILES:
The utilities shown in the Bridge and Wall Plans are at approximate locations.
For locations of existing utilities, see Plan and Elevation, Sheet B1-01.2.
shall coordinate with utility companies to support utilities as required.
The Contractor shall be responsible for identifying buried and overhead utilities prior to sheet pile installation and 1.
UTILITIES:
to starting construction.
Contractor shall verify all dimensions, elevations and angles shown for existing items that affect construction prior 3.
Do not scale drawings; Use dimensions. Drawing scales may have been changed by reproduction.2.
All dimensions in these plans are measured in feet either horizontally or vertically unless otherwise noted.1.
PLAN DIMENSIONS:
27'-10" Span
5"
5"
2025.084/.085
170001-021
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
F E
B R
U A
R Y
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
T
IM
O T
H Y
C A
R D
E N
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h L ig h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g rr e e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. ######
60% Plans
B1-13
Table Date 07-01-15
Op - Operating
Inv - Inventory
Abbreviations:
L o c a ti o n
C
L o c a ti o n
B
L o c a ti o n
A
RATING LOCATIONS
Other appropriate comments than LRFD.
DF method if other
Interior/exterior beam
Comments:
D im e n s io n
L o c a ti o n
T o n s
R a ti n g F a c to r
F a c to r
D F
D is tr ib u ti o n
D im e n s io n
L o c a ti o n
T o n s
R a ti n g F a c to r
F a c to r
D F
D is tr ib u ti o n
DWDCLL
(tons)
Weight VehicleLimit State
L e v e l
Load Factors Moment (Strength) or Stress (Service) Shear (Strength)
Load Rating Summary Details for Prestressed Concrete Bridges (Flat Slab and Deck/Girder)
N/A
N/A
N/A
N/AN/A N/A N/A
N/A
N/A
N/A
HL-93 1.75
1.35
0.80
1.25
1.00
Strength I (Inv)
Strength I (Op)
Service III (Inv)
Strength II
HL-93
HL-93
FL120
N/A
N/A
N/A
60.0 1.35
1.25
1.25
1.50
1.50
1.00
1.50
Table 2 - LRFR
R a ti n g
L o a d
D e s ig n
R a ti n g
L o a d
P e r m i t software used for rating.
4. Provide name, version #, and date of for appropriate rating methods.
3. See "FDOT Bridge Load Rating Manual" number 1 above.
2. Fill in the date in General Note resemble the bridge being rated.
sketch Showing Span Length(s) to
1. Modify or replace the Rating Location
Notes to Designer:
reinforcement been satisfied? Yes No
Article 5.7.3.5- 10th edition longitudinal
3. Has the AASHTO LRFD Specifications stress limits = 3√f'c or 6√f'c.
2. Service III Design Inventory tensile using the permit vehicle in all lanes.
1. Permit capacity is determined by
Table 2 Notes [Notes Date 07-01-15]:
January 2026 "Structures Manual".
requirements established in the
1. This table is based on the
General Notes:
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
F E
B R
U A
R Y
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
T
IM
O T
H Y
C A
R D
E N
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h L ig h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g rr e e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
Bridge No. ######
60% Plans
B1-14
Location of Core Borings
Soil Boring Logs
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .