This is a Statement of Work (SOW) for the repair of three ALCMS (Airfield Lighting and Control Management System) computers at Altus Air Force Base, Oklahoma. The project, numbered AGGN241011, requires contractor-furnished, government-installed new and repairable ALCMS systems with nodes at three locations: Air Traffic Control Tower B525 (CLIN 1), vault B198 (CLIN 2), and vault B928 (CLIN 3).

The existing ALCMS is outdated with unavailable replacement parts and non-updatable PLC system software. The new systems must meet requirements of FAA AC 150/5345-56B, UFC 3-535-01, UFC 4-010-06, DoDI 8510.01, and AFI 17-101. The scope includes demolition of existing systems without impacting airfield operations, supply and commissioning of new hardware and software, electrical and communications components, and training for Altus AFB personnel. Vault B198 contains five 20A circuits and seven 6.6A circuits, while vault B928 contains four 20A circuits and nine 6.6A circuits. Single mode fiber connectivity exists between the locations. All hardware installation will be performed by Altus AFB's Electrical Shop, and work must be coordinated with the Airfield manager to avoid operational impacts.

View the file

Other files for this federal contract opportunity

Other files attached to Aircraft Lighting and Monitoring Control System Computers, newest first.
File Type Posted
Combo ALCMS updated.pdf PDF
Instructions to Offerors updated.pdf PDF
Provisions and Clauses.pdf PDF
Instructions to Offerors.pdf PDF
Combo ALCMS.pdf PDF
Evaluation Factors.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AGGN241011 REPAIR 3 ALCMS COMPUTERS B198 B525 B928

STATEMENT OF WORK

FOR THE REPAIR OF

3 ALCMS COMPUTERS

CLIN 1 B525

CLIN 2 B198

CLIN 3 B928

AT

ALTUS AIR FORCE BASE, OKLAHOMA

Project Number:

AGGN241011

Prepared by:

WILLIAM J. SCHWAB

12 December 2024

1. BACKGROUND:

The Altus AFB airfield lighting and control management system (ALCMS) is out of date.

Replacement parts are no longer available, and the current PLC system software cannot be updated. The existing system does not meet the requirements of FAA AC 150/5345-56B Specification for L-890 Airport Lighting Control and Monitoring System, UFC 3-535-01 Visual Air Navigation Facilities, UFC 4-010-06 Cybersecurity of Facility-Related Control Systems, nor is it security compliant with DoDI 8510.01 Risk Management Framework for DoD Information Technology and AFI 17-101 Risk Management Framework for Air Force Information Technology.

2. SCOPES:

a. CLIN 1 B525: The scope of work consists of providing contractor furnished government installed new and repairable ALCMS with node at the Altus AFB Air Traffic Control Tower B525. The installation shall meet all requirements of FAA AC 150/5345-56B, UFC 3-535-01, UFC 4-010-06, DoDI 8510.01, and AFI 17-101.

The work shall also include commissioning, coordination, training for Altus AFB personnel, and all documentation required for continued functioning of the ALCMS system.

b. CLIN 2 B198: The scope of work consists of providing contractor furnished government installed new and repairable ALCMS with node at vault B198. The installation shall meet all requirements of FAA AC 150/5345-56B, UFC 3-535-01, UFC 4-010-06, DoDI 8510.01, and AFI 17-101. The work shall also include commissioning, coordination, training for Altus AFB personnel, and all documentation required for continued functioning of the ALCMS system.

c. CLIN 3 B928: The scope of work consists of providing contractor furnished government installed new and repairable ALCMS with node at vault B928. The installation shall meet all requirements of FAA AC 150/5345-56B, UFC 3-535-01, UFC 4-010-06, DoDI 8510.01, and AFI 17-101. The work shall also include commissioning, coordination, training for Altus AFB personnel, and all documentation required for continued functioning of the ALCMS system.

3. DESCRIPTIONS OF WORK:

a. CLIN 1 B525

i. Demolition plan of existing ALCMS without impacting airfield operation

ii. Supplying and commissioning new ALCMS meeting requirements of: FAA AC 150-3545-56B, UFC 3-535-01, UFC 4-010-06, DoDI 8510.01, and AFI 17-101

1. Supplying of all hardware

2. Supplying and installing all software

3. Supplying electrical components and appurtenances

4. Supplying communications components and appurtenances

b. CLIN 2 B198

i. Demolition plan of existing ALCMS without impacting airfield operation

ii. Supplying and commissioning new ALCMS meeting requirements of: FAA

AC 150-3545-56B, UFC 3-535-01, UFC 4-010-06, DoDI 8510.01, and AFI 17-101

1. Supplying of all hardware

2. Supplying and installing all software

3. Supplying electrical components and appurtenances

iii. Vault 198 contains five (5) 20A circuits and seven (7) 6.6A circuits

c. CLIN 3 B928

i. Demolition plan of existing ALCMS without impacting airfield operation

1. Plan shall include for replacement two (2) existing ACE 2 combo boxes serving ALZ

ii. Supplying and commissioning new ALCMS meeting requirements of: FAA AC 150-3545-56B, UFC 3-535-01, UFC 4-010-06, DoDI 8510.01, and AFI 17-101

1. Supplying of all hardware

2. Supplying and installing all software

3. Supplying electrical components and appurtenances

iii. Vault 928 contains four (4) 20A circuits and nine (9) 6.6A circuits

4. GENERAL REQUIREMENTS:

a. Airfield operation shall not be impacted, and work shall be coordinated with Altus

AFB’s Airfield manager.

b. All hardware installation shall be performed by Altus AFB’s Electrical Shop.

c. Single mode fiber is available inside and outside vaults B198 and B928 and connects to the communications cabinet at B525.

d. All work performed on this project shall meet all local, state, federal, Air Force and

DOD codes as well as adhere to all temporary environmental controls outlined in Specification Section 01 57 19.00 20.

e. The Government depends on the existing as-built drawings provided by previous Contractors for the accuracy. The Contractor is advised to field-verify all required information before providing a proposal.

f. The Contractor shall be required to accomplish various other small items of incidental work which may become necessary to complete the project in a satisfactory and workmanlike manner meeting the approval of the contracting officer or their designated representative. The Contractor shall include all such items of work as part of their detailed estimate for the work to be performed.

g. The Contractor shall provide all labor, materials, travel, equipment and supervision necessary to perform all work required for this project.

h. Damage to the building, utilities or any other element during the execution of this project shall be repaired and restored to its original condition by the Contractor provided workers, skilled in trades involved, at no additional cost to Government.

5. References:

The references listed below form a part of the required criteria for this project, and may not be all inclusive, nor the most current edition. The list does not relieve the contractor from ensuring the project meets all applicable standards.

• AFI 17-101 Risk Management Framework for Air Force Information Technology

• DoDI 8510.01 Risk Management Framework for DoD Information Technology

• FAA 150-5345-56B Specification for L-890 Airport Lighting Control and

Monitoring System

• International Code Council

• NFPA 70, National Electrical Code

• UFC 1-200-01 DOD Building Code General Requirements

• UFC 3-501-01 Electrical Engineering

• UFC 3-535-01 Visual Air Navigation Facilities

• UFC 4-010-01 DoD Minimum Anti-Terrorism Standards for Buildings

• UFC 4-010-02 DoD Minimum Anti-Terrorism Standards for Buildings

• UFC 4-010-06 Cybersecurity of Facility-Related Control Systems

• Unified Facilities Guide Specifications (UFGS)

END OF SOW

AT
1. BACKGROUND:
2. SCOPES:
3. DESCRIPTIONS OF WORK:
b. CLIN 2 B198
c. CLIN 3 B928
4. GENERAL REQUIREMENTS:
5. References: