Alanson Volume 1 Front End General Requirements.pdf
PDF 4 MB Posted
- Attached to
- Alanson Public Schools 2024 Bond
- Solicitation number
- RFP-ALAN-250000001496-3
- Issued by
- Emmet County, Michigan
About this file
This is a comprehensive project manual and specification document for the Alanson Public Schools 2024 Bond Issue Projects, involving the remodeling of Alanson Public School and Bus Garage in Alanson, Michigan. The project is being managed by Moore Trosper Construction Company and designed by Anthony P. Esson, Architect. The bid solicitation includes multiple bid categories covering general trades, FRP doors, aluminum frames, flooring, masonry, painting, miscellaneous specialties, mechanical/plumbing, and electrical work. The project is scheduled with a pre-bid conference on February 27, 2025, and bids are due on March 13, 2025, at 1:00 PM. Construction is planned to occur from April 1, 2025, to August 29, 2025, with substantial completion and occupancy targeted for August 29, 2025.
The project will be funded through a 2024 Bond Issue, with a comprehensive scope of work that includes removing and replacing classroom and corridor exit canopies, renovating facades, replacing floor finishes, performing asbestos abatement, replacing restroom toilet compartments, remodeling locker rooms, and installing interior finishes and HVAC systems in the bus garage. Bidders are required to provide a 5% bid bond and have the ability to provide a 100% performance and payment bond. The project will utilize a construction manager delivery method, with pre-qualification required for bidders. Bid documents are available electronically through Moore Trosper Construction Company's website and the State of Michigan's SIGMA VSS system, with all questions and requests for information to be submitted by March 6, 2025.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL & SPECIFICATIONS
VOLUME #1
Alanson Public Schools 2024 Bond Issue Projects
Remodeling Alanson Public School and Bus Garage Alanson, Michigan
February 14, 2025
CONSTRUCTION MANAGER
Moore Trosper Construction Co.
4224 Keller Road
Holt, Michigan 48842
ARCHITECT
Anthony P. Esson, Architect PO Box 479
Gaylord, Michigan 49734
ALANSON PUBLIC SCHOOLS
2024 Bond Issue Projects Remodeling Alanson Public School and Bus Garage
SECTION 000110
TABLE OF CONTENTS
MOORE-TROSPER CONSTRUCTION CO.
Section 000110 - Page 1 of 1
TABLE OF CONTENTS
Division 00 – Bidding and Contracts
000101 Project Title Page 000110 Table of Contents
Bidding Requirements
001100 Bid Advertisement 002113 Bid Instructions 002413 Scopes of Bids (A-H) 003113 Preliminary Construction Schedule 004126 Bid Form
Requirements for Contract
005233 Agreement Form 006113 Performance and Payment Bond 007316 Insurance Requirements
Division 01 – General Requirements
012300 Alternates 012500 Substitution Procedures 012600 Contract Modification Procedures 012900 Payment Procedures 012973 Schedule of Values 013000 Administrative Requirements 013300 Submittals 013516 Alteration Project Procedures 013529 Health and Safety Procedure 014200 Reference Standards and Definitions 014500 Quality Control 016000 Materials and Equipment 017100 Examination and Preparation 017123 Field Engineering 017300 Execution 017329 Cutting and Patching 017500 Sarting and Adjusting 017600 Protecting Installed Construction 017700 Closeout Procedures 017800 Closeout Submittals 017823 Operation and Maintenance Data 017839 Record Documents 017900 Demonstration and Training
END OF SECTION
Remodeling Alanson Public School and Bus Garage
SECTION 001100
BID ADVERTISEMENT
MOORE-TROSPER CONSTRUCTION CO. Section 001100 - Page 1 of 2
PROJECT: Alanson Public Schools 2024 Bond Issue Projects
Remodeling Alanson Public School and Bus Garage OWNER: Alanson Public Schools
7400 North Street Alanson, Michigan 49706
ARCHITECT: Anthony P. Esson, Architect PO Box 479 Gaylord, Michigan 49734
CONSTRUCTION MANAGER: Moore Trosper Construction Company 4224 Keller Road Holt, Michigan 48842 Project Manager: Brian Moore E-mail: bmoore@mooretrosper.com
Pre-bid Conference:
A pre-bid conference will be held at 1:00 PM on Wednesday, February 27, 2025, at Alanson Public Schools, 7400 North Street, Alanson, Michigan. Attendance is recommended but not required.
Bid Date:
Lump sum sealed proposals will be received and addressed to Rachelle Cook, Superintendent, Alanson Public Schools, 7400 North Street, Alanson, Michigan by 1:00 PM on Thursday, March 13, 2025.
Proposals will only be accepted on the proposal form provided under specification section 004126. The bids will be opened publicly immediately after. (Subject to the requirements of the Law.)
Bid Categories:
The overall scope of this portion of the project includes:
1. Remodeling Alanson Public School
a. Remove existing classroom exit canopies and renovate façade
b. Renovate existing corridor exit canopies.
c. Remove and replace classroom and corridor exit doors.
d. Remove and replace floor finishes at various locations (including asbestos abatement as noted on plans).
e. Replace existing restroom toilet compartments.
f. Remodel existing locker rooms.
2. Alanson Bus Garage
a. Install interior finishes and insulation in the existing post-framed building.
b. Install HVAC to condition (heat) the insulated space including required electrical work.
• Note: Each hired contractor will be required to provide a detailed schedule of values.
Bid Documents:
Bid Documents, drawings and specifications will be available through Moore Trosper Construction Company via the website noted below. Costs for document reproduction will be borne by each bidder.
Document Website: https://mooretrosper.sharefile.com/d-sf8f6cb7897694d5c9f802147f0415301 User will be required to register to view and download documents
Documents will also be posted on the following locations:
• State of Michigan SIGMA VSS (Vendor Self Service) mailto:bmoore@mooretrosper.com
Remodeling Alanson Public School and Bus Garage
SECTION 001100
BID ADVERTISEMENT
Section 001100 - Page 2 of 2
Request for Further Information:
All questions during the bidding period shall be referred to Brian Moore at Moore Trosper Construction Company at bmoore@mooretrosper.com. RFI’s must be submitted by 4:00 pm on March 6, 2025.
Absolutely no direct contact with the Architect or Owner will be permitted.
Pre-qualification
All bidders are required to be pre-qualified prior to award of contract (not prior to bidding).
Interest in Project
Any bidder wishing to be on the bidders list for this project please send an e-mail to Moore Trosper Construction Company at info@mooretrosper.com. The requirements for bidding this project in addition to the above referenced items are:
• A bid bond will be required (5% of total bid).
• Ability to provide a bond for 100% of the amount of each bid.
• Pay applications per AIA documents.
• Pre-qualification includes a review of financials, safety records and lawsuits, and an interview of the low bidders from each category. Post bid interviews will occur March 14-18, 2025 via Zoom.
mailto:bmoore@mooretrosper.com
Remodeling Alanson Public School and Bus Garage
SECTION 002113
BID INSTRUCTIONS
Section 002113 - Page 1 of 4
Definitions
All definitions set forth in the General and Supplementary Conditions of the Contract for Construction are applicable to these Instructions to Bidders.
“Bid Documents” include the contract, the General Conditions the Bid Advertisement the Project Manual (Specifications) all Drawings, and bid addenda issued for the purpose of preparing a bid proposal.
“Bid Category” are areas of Work performed by a Trade Contractor and its Subcontractors.
“Addenda” are written or graphic instruments issued prior to the execution of the Contract which modify or interpret the Bidding Documents, including Drawings and Specifications, by additions, deletions, clarifications or corrections.
“Bid” means a proposal prepared and submitted as required herein.
“Trade Contractor” shall refer to the entity contracted to perform the Work of one or more bid categories whether referred to in the Contract Documents as Contractor, Subcontractor, Entity, or Trade Contractor.
“Entities,” Entity shall refer to the Owner, Supplier, Contractor, Subcontractor, Individual, etc. contracted to perform the Work related to the Project.
Bidders Representation
Each Bidder, by submitting a bid, represents that the Bidder has read and understands the Bidding Documents, has visited the site and is familiar with the local conditions under which the Work is to be performed and has made his own review therefore of the facilities and difficulties attending the performance and completion of the Work.
Bidding Procedures
Combined bids of two or more bid categories may be submitted. Submitted as independent with the requirements as if submitting individually.
All bids must be submitted on the unaltered Bid Proposal Forms provided as part of the Bid Documents and in accordance with these Instructions to Bidders.
Each Bidder shall ascertain prior to submitting a bid that he has received all Addenda issued and shall acknowledge receipt on the Bid Proposal Form.
All bids must be signed as follows:
• Corporations: Signature of official shall be accompanied by a certified copy of the resolution of the board of directors authorizing the individual signing to bind the corporation.
• Partnerships: Signature of one partner shall be accompanied by a certified copy of the power of attorney authorizing the individual signing to bind all partners. If a certified copy of the partnership’s certificate submitted with the bid indicated that all partners have signed, no authorization is required.
• Bids submitted by joint ventures shall be signed by one of the joint ventures and shall be accompanied by a certified copy of the power of attorney authorizing the individual signing to bind all the joint ventures.
• Individual signing on own behalf: No authorization is required.
• Individual signing on behalf of another: Power of attorney or comparable evidence of authority shall accompany bid.
Bids shall be submitted in an opaque, sealed envelope. Facsimile and e-mail bids will not be accepted.
Remodeling Alanson Public School and Bus Garage
Section 002113 - Page 2 of 4
A bid shall be invalid if it is not delivered to the location indicated in the Bid Advertisement on or before the required bid due date and time.
No responsibility shall attach to the Construction Manager, the Owner, or representatives of either, for premature opening of any proposal, which is not properly addressed, delivered and identified.
Negligence in preparation, improper preparation, error in and/or omissions from the bid shall not relieve the Bidder from fulfillment of any and all applicable obligations and requirements of the contract documents.
The Owner, Architect/Engineer or Construction Manager, in making copies of the Bidding Documents available, do so only for the purpose of obtaining bids on the work and do not confer a license or grant for any other use.
All bids submitted shall be for the specified base specifications and scope of Work with no exceptions.
Exceptions in the base bid may be considered as basis for rejection.
Voluntary alternates will be considered at the Architect and Owner’s discretion.
Bidder shall not modify, withdraw or cancel a bid or any part thereof for sixty (60) days after the time designated for the receipt of bids.
Bid Document Review
Each Bidder shall examine the Bidding Documents carefully and, not later than seven (7) days prior to the date for receipt of bids, shall make written Request For Information (RFI) to Moore-Trosper Construction Company for interpretation or correction of any ambiguity, inconsistency or error therein discovered. Only written interpretation or correction by Addendum shall be binding.
Each Bidder shall submit a bid proposal based on the entire set of Bid Documents. Bidders shall review all Drawings and Specifications to identify work related to its respective bid category. Complete sets of Drawings are available for review at the locations indicated in the Bid Advertisement/Invitation for Bids or may be obtained from Moore-Trosper Construction Company.
Failure to review the complete set of documents and to identify items reasonably interpreted to be in the scope of the Bid Category shall not relieve the Trade Contractor of its responsibility to perform the Work.
Any incidental item of material, labor or detail, required for proper execution and completion of the Work, omitted from the Contract Documents, but required by governing codes, local regulations, trade practices, operational functions, and quality workmanship, shall be provided as part of the contract Work at no additional cost, even though not specifically detailed or noted.
Trade Contractor shall not scale Drawings to obtain dimensions.
Site Review
A pre-bid meeting will be held Thursday, February 27, 2025 at 1:00 pm at 7400 North Street, Alanson, MI.
The Bidder represents that it has carefully inspected the Project site and examined the Drawings and Specifications and other Contract Documents and is familiar with and has satisfied itself as to the nature, location and amount of the Work, the Bidder’s access thereto and ability to perform the Work, local code requirements applicable to the Work and requirements of permits and inspections, safety and barricade requirements, the terms and conditions of any applicable project labor and collective bargaining agreements, as well as the quality, quantity and availability of labor, materials, equipment and facilities and other items required for the performance of the Work and the possible limiting physical and other conditions which may be encountered in the performance of the Work and assumes all risks therefrom.
The Bidder has determined, by its own investigation and research, all the conditions affecting the Work to be performed and materials to be furnished and does not rely upon any representation by the Owner or
Remodeling Alanson Public School and Bus Garage
Section 002113 - Page 3 of 4
Construction Manager in connection therewith. In performing the Work, Bidder accepts the condition of the Project site as-is and assumes the risks with regard to existing conditions at the Project site.
The Bidder shall take its own measurements and be responsible for the correctness of same.
The Bidder shall be held to have made such examinations of the premises and no allowances will be made on its behalf by reason of error or omission on its part.
Plans, diagrams and other descriptive information which depict existing conditions are provided for scope identification and scheduling purposes only. Quantities, elevations, measurements and locations shown may have been approximated and/or gathered from dated, incomplete original construction documents.
This data should not be used for bidding purposes without field verification by the Bidder.
The Bidder’s own Contract Document review and site inspection review of the work areas shall be relied upon to provide the Bidder information he may require to properly execute and complete the work.
Questions must be submitted in writing (RFI) to the Construction Manager at least seven (7) days before the date for receipt of bids to allow time for written Addenda to be issued.
Material Substitutions
Each bid shall be based upon materials and equipment described in the Bidding Documents.
Material and equipment substitutions will not be considered unless written request has been submitted for approval at least seven (7) days prior to bid due date. Only approvals in a written Addendum shall be binding. Each substitution request shall include the following:
a. Complete description of the proposed substitution.
b. Information regarding specified material or equipment for which substitution is being submitted.
c. Drawings.
d. Manufacturer’s literature.
e. Performance and test data.
f. Effect on performance characteristics.
g. Impact on the Work of other trades.
h. Any other data or information necessary for a complete evaluation.
Owner/Construction Managers Rights
Bidder acknowledges the right of the Owner or Construction Manager to reject any or all bids and to waive any informality or irregularity in any bid received. In addition, the Bidder recognizes the right of the Owner or Construction Manager to reject a bid for no reason or any reason including but not limited to the following:
a. Bidder fails to furnish or submit data required in the Bidding Documents;
b. Bid is in any way incomplete or irregular;
c. Bidder’s performance as a Trade Contractor was unsatisfactory under a prior contract for the construction, repair, modification, or demolition of a facility with the Owner, Construction Manager or Architect;
d. Known poor performance on prior contracts with parties other than the Construction Manager, Owner or Architect; or
e. Unsatisfactory financial condition.
The Owner may accept alternates which serve its own best interest. The Owner shall have the right to accept alternates in any order or combination and to determine the low Bidder on the basis of the sum of the base bid and bid alternates accepted.
Remodeling Alanson Public School and Bus Garage
Section 002113 - Page 4 of 4
Bidders to whom award of a contract is under consideration shall submit to the Construction Manager, upon request, a properly executed New Vendor Evaluation Form.
Equal Opportunity Policies
The Bidder agrees that it will not discriminate against any employee or applicant for employment because of race, religion, color, sex, national origin or age. The Bidder shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to race, religion, color, sex or national origin.
Bid Security
Each bid shall be accompanied by a bid security in an amount of not less than 5% of the total base bid sum, pledging that the Bidder will enter into a contract with the Construction Manager under the terms stated in the Bidding Documents. This bid security will be made out to Alanson Public Schools and be in the form of a certified check, cashiers’ check, or bid bond (for any contractor wanting to provide a check contact the Construction Manager for instructions for delivery).
The Owner and/or the Construction Manager will have the right to retain the bid security of Bidders under consideration until the Contract has been executed and bonds have been furnished, the specified time has elapsed so that bids may be withdrawn, or all bids have been rejected.
The amount of the bid security shall be forfeited to the Owner upon failure of the successful Bidder to enter into a Contract within fifteen (15) business days after acceptance of the proposal.
Performance and Labor and Material Payment Bonds
100% Performance and 100% Labor and 100% Material Payment Bonds may be required as a condition of the Contract. Cost of said bonds SHALL NOT be included in the base bid, but offered as an add alternate cost.
Remodeling Alanson Public School and Bus Garage
SECTION 002416
SCOPE OF WORK
BID CATEGORY SPECIFIC NOTES
MOORE-TROSPER CONSTRUCTION CO. Section 004126 - Page 1 of 8
BID CATEGORY A – GENERAL TRADES
GENERAL – The following shall not be interpreted as a complete itemization of the work to be performed under this Bid Category. This Bid Category Trade Contractor shall be responsible for performing all work reasonably interpreted to be included in its scope of work in accordance with the drawings and specifications in addition to these Bid Category notes of clarification.
024119 Selective Demolition (Partial Interior and Exterior) 031000 Concrete Forming and Accessories 032000 Concrete Reinforcement 033000 Cast-in-Place Concrete 033500 Concrete Finishing 033900 Concrete Curing 321313 Concrete Stoops and Sidewalk 051200 Structural Steel Framing (Infill Roof Deck at Removals) 061053 Misc. Rough Carpentry 072114 Board Insulation 072116 Blanket Insulation 072026 Blown Insulation 072400 Exterior Insulation and Finish System 078400 Fire Stopping (Partial; Top of Walls) 079000 Joint Protection 081213 Hollow Metal Frames 081416 Flush Wood Doors 085113 Aluminum Windows 087100 Door Hardware (Including Supplying FRP Door Hardware for Installation by Bid Cat. ‘B’) 088000 Glazing (Partial) 092116 Gypsum Board Assemblies 095113 Acoustical Panel Ceilings
ALSO INCLUDES:
• Any ceiling rework or repairs where existing ceilings are affected by demolition.
• Include 100 LF of 6’0” high movable chain link construction fencing and 6’0” gate at west entrance of the locker room area at courtyard.
• Excavation and sand fill at interior and exterior. Note plumbing underground excavation and backfill is by work category ‘G’ Mechanical and Plumbing.
• Removal of existing exhaust fan and curb and patch this roof opening with new deck to match existing. This will be cut and capped by work category ‘G’ Mechanical and Plumbing.
• Removal and reinstallation of roof edge metal to facilitate work at the exterior wall. This must be performed by a Durolast roofing contractor.
• Roof patching at removed curb. This must be a Durolast roofing approved installer.
• Roof patching for any new roof penetrations and existing penetrations being removed. This must be a Durolast roofing approved installer. (Reference Mechanical drawings)
• All necessary cut and patching at roof for new roof units (including any temporary protection of openings).
• Any and all roofing work. Must be performed by a Durolast roofing approved installer.
Remodeling Alanson Public School and Bus Garage
MOORE-TROSPER CONSTRUCTION CO. Section 004126 - Page 2 of 8
BID CATEGORY B – FRP DOORS/ ALLUMINUM FRAMES
024119 Selective Demolition (Partial)
• Remove existing exterior doors and frames in conjunction with the replacement (provide temporary protection at opening if the door and frame cannot be replaced in
(1) one day).
079000 Joint Protection (Partial)
• Caulking at new door frames.
• Includes disconnection and reconnection of any existing access control.
084113 Aluminum Framed Entrances and Storefronts (Special-Lite) 087100 Door Hardware (Install Only)
• This Door Hardware will be Supplied by Work Category ‘A’ General Trades.
088000 Glazing (Partial)
Remodeling Alanson Public School and Bus Garage
MOORE-TROSPER CONSTRUCTION CO. Section 004126 - Page 3 of 8
BID CATEGORY C – FLOORING AND FLOORING DEMOLITION
024119 Selective Demolition of Existing Floors 093000 Asbestos Abatement of Flooring as noted on the drawings
• Including temporary protections and proper disposal.
• An accredited asbestos abatement firm must be hired for removal
• A Hygenist will need to be hired to give an ‘all clear’ designation.
096500 Tiling 096513 Resilient Flooring 096724 Resilient Base and Accessories 096813 Tile Carpeting
• Furnish and install all necessary floor preparation
• ALTERNATE #1
o Add alternate to remove and replace flooring at various toilet rooms inside classrooms (noted as bid alternate).
Remodeling Alanson Public School and Bus Garage
MOORE-TROSPER CONSTRUCTION CO. Section 004126 - Page 4 of 8
BID CATEGORY D – MASONRY
024119 Selective Demolition (Partial) 032000 Reinforcement (In Masonry) 040503 Mortar and Masonry Grouting 042000 Unit Masonry Assemblies 051200 Structural Steel Framing 0712114 Board Insulation (Partial) 072119 Foam-in-Place Insulation (Partial) 078400 Fire Stopping (Partial) Top of Masonry Walls
• Also includes:
o Miscellaneous patching, if required, at the exterior door replacements (see note A2).
o Insulate existing CMU’s with foam insulation (note A11)
079000 Joint Protection (Partial)
• New vertical control joints at exterior masonry.
Remodeling Alanson Public School and Bus Garage
MOORE-TROSPER CONSTRUCTION CO. Section 004126 - Page 5 of 8
BID CATEGORY E – PAINTING AND COATINGS
099100 Painting and Coatings 099723 Concrete and Masonry Coatings
• (Two areas in locker-room, see plan).
Remodeling Alanson Public School and Bus Garage
MOORE-TROSPER CONSTRUCTION CO. Section 004126 - Page 6 of 8
BID CATEGORY F – MISCELLANEOUS SPECIALTIES
101100 Visual Display Units 101400 Signs 102113 Toilet Compartments 102800 Toilet and Bath Accessories 105113 Metal Lockers 105153 Locker Room Benches
• Remove and salvage the existing toilet compartment mounted accessories and then reinstall per plan.
• Price to include the furnishing at installation of all miscellaneous specialties.
Remodeling Alanson Public School and Bus Garage
MOORE-TROSPER CONSTRUCTION CO. Section 004126 - Page 7 of 8
BID CATEGORY G – MECHANICAL AND PLUMBING
DIV. 22 Plumbing (Complete) DIV. 23 HVAC (Complete) 024119 Selective Demolition (Partial) 078400 Fire Stopping (Partial)
• Includes excavation and backfill for interior underground plumbing.
• Furnish and install roof curbs for new equipment. Roof work by the General Trades work category.
• Work with Work Category ‘A’ General Trades to facilitate new roof mounted equipment.
Remodeling Alanson Public School and Bus Garage
MOORE-TROSPER CONSTRUCTION CO. Section 004126 - Page 8 of 8
BID CATEGORY H – ELECTRICAL
DIV. 26 Electrical 024119 Selective Demolition (Partial) 078400 Fire Stopping (Partial) 283100 Fire Detection and Alarm
Remodeling Alanson Public School and Bus Garage
SECTION 003113
SCHEDULE
Section 003113 - Page 1 of 1
Milestone dates identified herein shall become binding under the Contract. The Bidder represents that it will provide sufficient labor, material, supervision, equipment and other necessary resources to achieve the milestone dates.
Requirements
1. Bidders shall review the milestone schedule for Work included in the construction documents and advise, at bid time, of any severe discrepancies identified.
2. Bid Proposals shall be based on overall time duration provided in the milestone schedule for all construction activities.
3. Trade Contractors will be required to submit monthly progress reports and updated schedules as directed by the Owner and /or Architect.
4. The Construction Manager will endeavor to incorporate Trade Contractor input into the final project schedule. Under no circumstances will data be incorporated that causes delay to any milestone or to the overall project completion date.
5. The Trade Contractor shall review, check, approve and submit, in such sequence as to cause no delay in the Work or in the Work of the Owner or any separate Trade Contractor, all shop drawings, product data and samples required by the Contract Documents.
6. Trade Contractors failing to meet the project schedule shall be required to submit a detailed recovery schedule within two (2) days of notification by the Owner, Architect, or Construction Manager. Such recovery schedule shall contain sufficient detail to satisfy the requirements of the Owner, Architect, or Construction Manager and shall include overtime as necessary to accomplish recovery in the shortest possible duration.
7. All additional expense including overtime cost expended by other Entities and that of the failing Trade Contractor necessary to recover lost schedule time shall be paid for by the Trade Contractor responsible for the project delay.
8. All schedule “float time” shall belong exclusively to the Owner, Architect, and Construction Manager.
9. Milestone dates are as follows:
a. Pre-bid walk through February 27, 2025 at 1:00 pm
b. Bids due March 13, 2025 at 1:00 pm
c. Contract award by March 25, 2025
d. Construction April 1, 2025 – August 29, 2025
e. Occupancy August 29, 2025
ID Task Mode
Task Name Duration Start Finish
1 DEVELOPMENT OF PLANS &
SPECIFICATIONS
101 days Mon 9/23/24 Mon 2/10/25
2 OWNER & MOORE TROSPER REVIEWS
'PARTIAL' PLANS & SPECIFICATIONS TO
FURTHER THE DEVELOPMENT OF A
COMPLETE SET OF CONSTRUCTION
DOCUMENTS
15 days Mon 1/20/25 Fri 2/7/25
18 FINAL REVIEW & APPROVAL OF THE
PLANS & SPECIFICATIONS
3 days Wed 2/12/25 Fri 2/14/25
4 ADVERTISE BID & POST TO SIGMA 2 days Thu 2/20/25 Fri 2/21/25
3 SUBMIT PLANS & SPECIFICATIONS FOR
PLAN REVIEW BY EMMETT TWP.
BUILDING DEPARTMENT
20 days Mon 2/24/25 Fri 3/21/25
5 PRE-BID SITE VISIT 1 day Thu 2/27/25 Thu 2/27/25
6 BIDS DUE 1 day Thu 3/13/25 Thu 3/13/25
7 BIDS REVIEWED, INTERVIEWS
CONDUCTED & RECOMMENDATIONS
MADE
2 days Fri 3/14/25 Mon 3/17/25
15 FORWARD RECOMMENDATIONS TO
RACHELLE COOK SO SHE CAN PREPARE
FOR THE SCHOOL BOARD MEETING
1 day Tue 3/18/25 Tue 3/18/25
9 ALANSON SCHOOL BOARD APPROVES
BID RECOMMENDATIONS
1 day Wed 3/19/25 Wed 3/19/25
10 MOORE TROSOPER AWARDS
CONTRACTS TO LOW/QUALIFIED
BIDDERS
5 days Thu 3/20/25 Wed 3/26/25
8 ALANSON SCHOOL SPRING BREAK 7 days Fri 3/21/25 Mon 3/31/25
11 SHOP DRAWING SUBMITTALS &
APPROVALS
40 days Fri 3/21/25 Thu 5/15/25
19 OBTAIN PERMITS 3 days Fri 3/21/25 Tue 3/25/25
16 ANTICIPATED CONSTRUCTION START -
DEMOLITION OF THE EXISTING LOCKER
ROOMS & BUS GARAGE START
1 day Mon 3/31/25 Mon 3/31/25
20 CONSTRUCTION TIME FRAME (This will be detailed further once actual lead times are established).
110 days Mon 3/31/25 Fri 8/29/25
13 HIGH SCHOOL EXAMS IN THE
MORNINGS (No LOUD NOISES WILL BE
TOLERATED)
3 days Wed 6/11/25 Fri 6/13/25
12 LAST DAY OF SCHOOL 1 day Fri 6/13/25 Fri 6/13/25
14 TEACHERS TO SET UP THEIR
CLASSROOMS
13 days Wed 8/13/25 Fri 8/29/25
21 FINAL INSPECTIONS, PUNCH LIST,
CLEAN UP & DEMOBILIZE FROM SITE
5 days Mon 8/25/25 Fri 8/29/25
17 SCHOOL BEGINS 1 day Tue 9/2/25 Tue 9/2/25
TWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWT Dec Dec Dec Jan Jan Jan Jan Feb Feb Feb Feb MarMarMarMarMarApr Apr Apr Apr MayMayMayMayJun Jun Jun Jun Jun Jul 6Jul Jul 2Jul 2AugAugAugAugAu
Task Split Milestone Summary
Project Summary Inactive Task Inactive Milestone Inactive Summary
Manual Task Duration-only Manual Summary Rollup Manual Summary
Start-only Finish-only External Tasks External Milestone
Deadline Progress Manual Progress
Project: ALANSON 2025 SCHED Date: Wed 2/19/25
Remodeling Alanson Public School and Bus Garage
SECTION 004126
BID FORM
BIDDER’S NAME:
MOORE-TROSPER CONSTRUCTION CO. Section 004126 - Page 1 of 5
PROJECT: Alanson Public Schools
Remodeling Alanson Public School and Bus Garage
OWNER: Alanson Public Schools 7400 North Street
Alanson, Michigan 49706 ATTENTION: Rachelle Cook, Superintendent
ARCHITECT: Anthony P. Esson
CONSTRUCTION MANAGER: Moore Trosper Construction Company Proposal This offer has been prepared after our examination of the complete drawings and specifications, together with their related documents, and our examination of the conditions surrounding the construction of the proposed work including the availability of materials, equipment and labor. The undersigned submits the following offer to enter into a Contract with Moore Trosper Construction Company and agrees to furnish all labor, material, equipment and service to complete the Work in accordance with the Contract Documents for:
Bid Category No(s).: Description:
For the Lump Sum Base Bid of: ($ ) _____________________________
______________________________________________________________________________ Dollars Add Alternate #1 Remove and replace flooring in classroom toilet rooms.
($ ) Dollars
Performance and Labor and Material Payment Bond The undersigned agrees to furnish a Performance and Labor and Material Payment Bond, cost of such bonds is (DO NOT INCLUDE BOND COST IN THE BASE BID PRICE):
($ ) Dollars
Addenda The undersigned acknowledges receipt of the following Addenda and has included the cost thereof in the Lump Sum Base Bid:
No.______ Date _________; No. ____ Date _________; No. _____ Date _________
Experience Modification Rating (EMR) List the EMR for your firm as determined by your insurance carrier for the past three (3) years.
2020__________ 2019 __________ 2018 __________
Voluntary Alternates Voluntary alternates that could serve lower cost, increase quality, or simplify construction shall be reviewed by the Owner, Architect and Construction Manager. Bidders may attach a separate sheet with detailed description. Please note attachments, if any, below.
Description Amount (note add or deduct)
Remodeling Alanson Public School and Bus Garage
MOORE-TROSPER CONSTRUCTION CO. Section 004126 - Page 2 of 5
Bid Security
Bid security in the amount of 5% of the proposal, shall accompany this proposal.
Rejection of Bid
The undersigned acknowledges the right of the Owner to reject any or all bids and to waive any informality or irregularity in the bid.
Schedule
The undersigned acknowledges that it shall meet requirements of the Project Schedule (Section 003113).
Time and Material Rates Labor rates below are to include Cost of labor including Michigan Single Business Tax, Social Security and Medicare, Federal and State Unemployment Tax, and Fringe Benefits under Collective Bargaining Agreements, and Worker’s Compensation Insurance. The rates listed below DO NOT include overhead and/or profit. These rates are only for additions and/or deletions to the contract that could not have been anticipated at the time of the bid. Include all trade sub-designations (ie. Apprentice, Journeyman, Foreman etc.)
Trade & Sub-Designations Straight Time
Shift Time
1 & ½ Time Double Time
1.
2.
3.
4.
5.
6.
Extra Work
The undersigned agrees that:
1. A maximum of 10% overhead and profit will be allowed for Changes in the Work performed by the
Trade Contractor.
2. A maximum of 5% overhead and profit will be allowed for Changes in the Work for any tier
Subcontractor.
3. For changes involving both additional costs and credits to the Contract, the mark-up will be allowed on the net add only after all credits have been deducted from the additional work.
LEGAL ADDRESS:
ZIP CODE:
CONTACT NAME:
TELEPHONE NO.:
FAX NO.:
EMAIL ADDRESS:
Remodeling Alanson Public School and Bus Garage
MOORE-TROSPER CONSTRUCTION CO. Section 004126 - Page 3 of 5
The Bidder declares the following legal status in submitting this Proposal: (Check one)
A Corporation organized and existing under the laws of the State of Michigan
A Partnership
Other
SIGNATURE
Respectfully submitted:
SIGNATURE
BY:
TITLE:
DATE:
WITNESSED BY:
Federal Employer Identification No.:
State License No.:
Remodeling Alanson Public School and Bus Garage
MOORE-TROSPER CONSTRUCTION CO. Section 004126 - Page 4 of 5
FAMILIAL RELATIONSHIP
1. GENERAL
1.1 Each Bidder shall complete, execute and submit with its Bid Proposal the following Familial
Relationship Sworn Statement.
SWORN STATEMENT
Date:
School District: Alanson Public Schools Project: 2024 Bond Issue Projects
Remodeling Alanson Public School and Bus Garage
I/We disclose below any familial relationship that exists between the Owner or any employee of Bidder and any member of the Board of Education, Board of Directors or the Superintendent of Alanson Public Schools.
Familial Relationships: None Listed Below
School District Bidder Employee/Position Relationship Associate/Position
Subscribed and sworn to before me (Company Name)
By: this day of , year (Authorized signer)
(Print or type Name and Title of Signer) (Signed by Notary Public)
Address: My commission expires:
Telephone:
Remodeling Alanson Public School and Bus Garage
MOORE-TROSPER CONSTRUCTION CO. Section 004126 - Page 5 of 5
AFFIDAVIT OF COMPLIANCE – IRAN ECONOMIC SANCTIONS ACT
The undersigned, the owner or authorized officer of the below named Bidder (the “Bidder”), pursuant to the compliance certification requirement, hereby certifies, represents and warrants that the Bidder (including its officers, directors and employees) is not an “Iran linked business” within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012 (the “Act”), and that in the event Bidder is awarded a Contract for work on the Alanson Public Schools 2020 Bond Issue Remodeling project, the Bidder/Contractor will not become an “Iran linked business” at any time during the course of performing the Work or any services under the Contract.
The Bidder further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or 2 times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of the School District’s investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal for three (3) years from the date it is determined that the person has submitted the false certification.
Subscribed and sworn to before me (Company Name)
By: this day of , year (Authorized signer)
(Print or type Name and Title of Signer) (Signed by Notary Public)
Address: My commission expires:
Telephone:
Remodeling Alanson Public School and Bus Garage
SECTION 005233
AGREEMENT FORM
Section 005233 - Page 1 of 1
General
The Contract form will be a purchase order issued by Moore Trosper Construction Company, including Attachment #1 – General Terms and Conditions and Attachment #2 – Application and Certificate for Payment.
Trade Contractors are bound to the terms of AIA A133-2009 Standard Form of Agreement between Owner and Construction Manager as Constructor, and AIA A201-2017 General Conditions of the Contract for Construction.
ATTACHMENT #1 406FR004 Version 4 Rev. Date 12/28/07
GENERAL TERMS AND CONDITIONS
Subcontractor’s signature on the face of the Purchase Order indicates acceptance of these General Terms & Conditions and any Attachments.
1. GENERAL CONTRACT.
Moore Trosper Construction Company (“Contractor”) has entered, or contemplates entering, into a General Contract with (“Owner” or “Prime Contractor”) for construction of (“Project”), located at in accordance with the plans and specifications prepared for the job by and other Contract Documents. The Contract Documents consist of plans, drawings, specifications, invitations to bidders, instructions to bidders, the proposed general conditions, special conditions, addenda and modifications to any and all foregoing, and the contract or subcontract of the Contractor with the Owner or the Prime Contractor.
Project Start Date: Date of Plans:
Project
Completion Date:
Date of
Specifications:
Addendum # Date Addendum # Date Addendum # Date Addendum # Date
Vendor, as identified on the face of the Purchase Order, (hereinafter referred to as “Subcontractor”), represents and agrees that it has carefully examined and understands this Purchase Order (hereinafter also sometimes referred to as “Subcontract”), comprised of the Purchase Order, these General Terms and Conditions and any attachments, and the Contract Documents. The Subcontract embodies the entire agreement between the Contractor and Subcontractor. The parties shall not be bound by or be liable for any statements, representations, promises, inducements, or understandings of any nature or kind not set forth in the Subcontract. No changes, amendments or modifications of any of the terms or conditions of the Subcontract shall be valid unless made in writing. There are none now and there will not be any oral agreements for payment of any amount of money in excess of the fixed amount stated in the Subcontract. Subcontractor understands and agrees that this paragraph is an extremely important provision and that the Subcontract cannot be orally modified.
Subcontractor also represents and agrees that it has investigated the nature, locality and site of the Work and the conditions and difficulties under which it is to be performed, and that it enters into this Subcontract on the basis of its own examination, investigation and evaluation and not in reliance upon any opinions or representations of Contractor.
Subcontractor agrees to be bound to Contractor by the provisions of the Contract Documents, including but not limited to, Division I – General Requirements of the specifications, and to assume to Contractor all the obligations and responsibilities that Contractor assumes to Owner and/or Prime Contractor; and Contractor agrees to be bound to Subcontractor by the provisions of the Contract Documents and to assume to Subcontractor all the obligations and responsibilities that Owner and/or Prime Contractor assumes to Contractor, except to the extent that such provisions are, by their own terms or by law, not applicable to the Subcontract Work. Where a provision of the Contract Documents is inconsistent with this Subcontract, the provision imposing the greater duty or obligation on Subcontractor shall prevail.
It is agreed that whenever the word “Architect” or “Engineer” is used in this Subcontract, it means any other person to whom the Owner and/or Prime Contractor or Contractor has delegated the authority to supervise and accept or reject the work performed and the materials furnished by the Subcontractor or Contractor under this
Subcontract. The existence or exercise of such Architect or Engineer’s authority shall not lessen or impair any rights, power or discretion therein reserved by the
Contractor.
This Subcontract is to be processed in a manner that meets or exceeds the requirements of ISO9001/2000 or equivalent standard.
2. SUBCONTRACT WORK.
Subcontractor agrees to furnish and pay for all labor (if Purchase Order includes labor), materials, equipment, services and everything necessary for completion of the Work identified on the face of the Purchase Order in accordance with the Contract Documents. Items omitted from the Contract Documents shall be included in the
Work if they are required by applicable laws, ordinances, codes, rules and regulations, if they are inferable from the intent of the Contract Documents or if they are necessary to produce the intended results.
3. SCHEDULE.
Time is of the essence for this Subcontract. Subcontractor shall commence immediately any part of the Subcontractor’s Work upon Notice to Proceed and shall diligently and continuously prosecute and complete the Work so as to maintain the schedules and milestones established by the Contractor. Subcontractor shall coordinate the Work with the other work being performed on the Project, and perform in accordance with the project schedule as it may be amended, and any other scheduling requirements listed in this Subcontract or reasonably required by Contractor, so as to facilitate and not to interfere with or delay the commencement, progress or completion of the work of the Contractor, Owner, or any other Contractor or any other Subcontractor employed on the job. The Subcontractor is cautioned that schedules and milestones are subject to review and revision and in such event, the revisions will be made available for the Subcontractor’s information at the job site of the Contractor. It is the sole responsibility of the Subcontractor to attend job meetings, keep itself informed of any revisions and conform to any such revisions by performing its work at such time and such quantity and in such manner as may be directed by the Contractor and is required for the best possible progress of the construction of the job. The Subcontractor is wholly responsible for the installation in the job of the Subcontractor’s work in the proper sequence and at the proper time. Subcontractor shall have all necessary materials available to commence work at least five days prior to the date specified for the commencement of the
Subcontractor’s work.
Any request by the Subcontractor to extend the time for commencement and completion of the Work must be in writing, state the grounds for the request, and no extension of time shall be binding on the Contractor unless agreed to in writing by the Contractor. If the prosecution or completion of the Subcontractor’s work shall be delayed, or be about to be delayed, because of natural disaster or causes wholly beyond the control and without the fault or negligence of the Subcontractor and which was not foreseeable by the Subcontractor at the time this Subcontract was entered into, Subcontractor shall, within five days after the commencement of any such delay, give to the Contractor written notice of the delay and the anticipated results of such delay. Within five days after the termination of any such delay, the Subcontractor shall file a written notice with the Contractor specifying the actual duration of the delay. Failure to give either of the above notices shall be grounds for denial of an extension of time. If the Contractor determines that the delay was beyond the control and without the fault or negligence of the Subcontractor and not foreseeable by the Contractor or the Subcontractor at the time the Subcontract was entered into, the Contractor shall determine the duration of the delay and may extend the time of performance of the Subcontract, provided that the Contractor is able to obtain such extension of time from the Architect or Owner and/or Prime Contractor.
Subcontractor hereby waives recovery for any damages suffered by reason of the delays contemplated herein. An extension of time shall constitute Subcontractor’ sole remedy for such delay.
Contractor has authority, upon written notice, to suspend, delay, or interrupt the Subcontract work if it is deemed in the best interest of the Project.
If checked, Liquidated Damages apply to this project and are $ per day after the project completion date. Subcontractor’s liability for liquidated damages are limited to delays caused by the Subcontractor, or any person or entity for whose acts the Subcontractor may be liable.
4. PERFORMANCE.
A) Subcontractor shall provide on the site a competent and fully authorized full time superintendent or foreman and sufficient properly skilled workmen to complete the Work in accordance with this Subcontract. Any employee of the Subcontractor may be refused admittance to the site or may be requested to leave the site at any time by the Contractor and the Contractor shall not be required to have or to state any reason for the action. In the event any employee or employees of the Subcontractor are so barred from the job, the Subcontractor shall immediately replace such employee or employees with employees satisfactory to the Contractor.
B) If Subcontractor fails or neglects to maintain adequate progress, Subcontractor shall reschedule other work and, at no cost to Contractor, provide additional or overtime labor reasonably required in the opinion of Contractor to meet Contractor’s schedule requirements. Subcontractor attendance at progress meetings is mandatory, unless Contractor authorizes non-attendance. Non-attendance without authorization will result in a $500 charge to Subcontractor.
C) Subcontractor shall submit, without charge, ( ) sets of Shop Drawings and ( ) samples of Product Data, as required in the Contract Documents or promptly after Contractor’s request, so as not to delay the commencement, progress, or completion of the whole or any part of the Work or other work on the project. Shop drawings shall be stamped with Subcontractor’s approval stamp as per plans and specifications, numbered, dated, and titled to show the name of the manufacturer or firm producing the drawing, the name of the Contractor, the name of the job, and a brief description in the title box of the drawing. Subcontractor shall maintain current as-built drawings during the course of the Work and shall submit a final set of as-built drawings and any manuals, warranties, and other close-out materials required by the Contract Documents and specifications promptly following Substantial Completion of Work. These items must be submitted before Contractor will authorize final payment.
By submitting shop drawings and samples, Subcontractor represents it has determined and coordinated all available field and shop measurements, field construction criteria, catalog numbers and similar data and that it checked and coordinated each shop drawing and sample with the requirements of the Work and the Contract Documents.
Approval of shop drawings shall not relieve Subcontractor of its obligation to perform the Work in strict accordance with the Plans, Specifications, and other Contract Documents, nor of its responsibility for the proper matching and fitting of the Work with contiguous work. No materials or goods shall be released or work started until Subcontractor is notified by the Contractor, unless this Subcontract specifies otherwise. Subcontractor shall advise the Contractor immediately as to the time required to make shipment after material is released.
D) Subcontractor shall secure and pay for all permits and governmental fees, licenses and inspections necessary for proper execution and completion of the Work, as well as all sales, use, consumer, gross receipts or other similar taxes and also pay all taxes imposed by Federal, State, or Local law for any employment insurance pensions, old age retirement funds or any similar purpose and/or all contributions imposed by collective bargaining agreement and to furnish all necessary reports and information to the appropriate agencies. Subcontractor shall furnish Contractor promptly upon request, a certificate from the appropriate authorities evidencing payment of all applicable taxes or contributions. The Subcontract sum agreed to be paid to the Subcontractor includes amounts for, and Subcontractor shall be liable for and shall indemnify, defend and save harmless Contractor and Owner and/or Prime Contractor from all such taxes, contributions, any interest accrued and penalties imposed, and all taxes, excises, assessments, liabilities for unpaid back wages and benefits and any other charges, liabilities, or penalties imposed or levied by any government agencies or authority on or because of the work, or any materials, equipment, services or supplies furnished or used in the performance of this Subcontract and assumes all liability for failure to comply with these provisions.
If checked, this project is exempt from sales and use tax under Michigan RAB 1999-2 because this project is either a nonprofit hospital, qualified nonprofit housing, church sanctuary, qualified water pollution control facility, or qualified air pollution facility.
E) Subcontractor, at its own expense, shall comply with and be bound by all laws, ordinances, codes, standards, notices, requirements, regulations, rules, interpretations, decisions, orders, and directions of federal, state, and municipal governments and agencies, and subdivisions thereof, and of the Owner and of the Prime Contractor, and of all others authorized by the Contract Documents, applicable to the Work and shall defend, indemnify and hold harmless Contractor and Owner and/or Prime Contractor from any and all claims, damages, losses or fines resulting directly or indirectly from any violation. Subcontractor shall pay all royalties and license fees and guarantees control of all trademarks, copyrights, patented devices, processes, materials, and equipment, used in performing or filling this order, and Subcontractor shall defend, hold harmless, and indemnify the Contractor, the Prime Contractor, and the Owner, against all suits, damages, and claims arising from the use of the same at any time, and shall pay all costs, expense, and judgments in connection herewith.
F) If checked, Subcontractor shall furnish a 100% labor and material payment bond and a 100% performance bond from a surety registered to do business where the Project is located and satisfactory to Contractor.
G) Subcontractor is to provide its own clean-up and waste container service. Subcontractor is responsible for its own tools, materials and equipment, shall confine these items to its own areas of work, shall return all items to a designated storage area at the end of each day and each day shall dispose of all debris that results from its Work. In the event Subcontractor fails to properly store its tools and equipment or remove all debris, Contractor may do so upon notice and charge the cost to Subcontractor.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .