This document is a Project Manual for the Alanson Public Schools 2024 Bond Issue Projects, prepared by Anthony Esson, Architect, and issued on February 14, 2025. The project involves remodeling Alanson Public School and the Bus Garage, with Project No. 296-24. The comprehensive manual includes detailed specifications across multiple divisions and sections, covering construction elements such as existing conditions, concrete, masonry, metals, wood, thermal and moisture protection, doors, windows, finishes, specialties, plumbing, HVAC, electrical systems, and site improvements.

The project manual provides extensive technical specifications for contractors, including material requirements, fabrication standards, installation procedures, quality assurance guidelines, and performance expectations for each construction component. The document outlines precise technical requirements for everything from structural steel framing to door hardware, with specific attention to thermal performance, fire resistance, air infiltration, water resistance, and finish quality. While no specific pricing information is directly stated, the manual serves as a comprehensive technical guide for bidding and executing the school and bus garage renovation project, with detailed instructions for achieving the desired construction outcomes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ALANSON PUBLIC SCHOOLS

2024 Bond Issue Projects

Remodeling Alanson Public School and Bus Garage Project No. 296-24 February 14, 2025

Anthony Esson, Architect Table Of Contents 00 01 10-1

DOCUMENT 00 01 10

TABLE OF CONTENTS

Section Title

SPECIFICATIONS GROUP

FACILITY CONSTRUCTION SUBGROUP

DIVISION 02 – EXISTING CONDITIONS

02 41 19 Selective Structure Demolition

DIVISION 03 – CONCRETE

03 10 00 Concrete Forming and Accessories 03 20 00 Concrete Reinforcing 03 30 00 Cast-In-Place Concrete 03 35 00 Concrete Finishing 03 39 00 Concrete Curing

DIVISION 04 – MASONRY

04 05 03 Mortar and Masonry Grouting 04 20 00 Unit Masonry Assemblies

DIVISION 05 – METALS

05 12 00 Structural Steel Framing

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 53 Miscellaneous Rough Carpentry

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 14 Board Insulation 07 21 16 Blanket Insulation 07 21 19 Foamed-In-Place Insulation 07 21 26 Blown Insulation 07 24 00 Exterior Insulation and Finish System 07 84 00 Firestopping 07 90 00 Joint Protection

DIVISION 08 - OPENINGS

08 12 13 Hollow Metal Frames 08 14 16 Flush Wood Doors 08 41 13 Aluminum-Framed Entrances and Storefronts

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Table Of Contents 00 01 10-2

08 51 13 Aluminum Windows 08 71 00 Door Hardware 08 80 00 Glazing

DIVISION 09 - FINISHES

09 21 16 Gypsum Board Assemblies 09 30 00 Tiling 09 51 13 Acoustical Panel Ceilings 09 65 00 Resilient Flooring 09 65 13 Resilient Base and Accessories 09 67 24 Resinous Flooring 09 68 13 Tile Carpeting 09 91 00 Painting and Coating 09 97 23 Concrete and Masonry Coatings

DIVISION 10 – SPECIALTIES

10 11 00 Visual Display Units 10 14 00 Signage 10 21 13 Toilet Compartments 10 28 00 Toilet, Bath, and Laundry Accessories 10 51 13 Metal Lockers 10 51 53 Locker Room Benches

FACILITY SERVICES SUBGROUP

DIVISION 22 – PLUMBING

22 00 01 General Plumbing Requirements 22 05 53 Identification for Plumbing Systems and Equipment 22 07 19 Plumbing Piping Insulation 22 07 21 Piping Safety Covers 22 10 05 Plumbing Piping 22 10 06 Plumbing Piping Specialties 22 40 00 Plumbing Fixtures

DIVISION 23 – HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

23 00 01 General Mechanical Requirements 23 05 19 Meters and Gages for HVAC Piping 23 05 53 Identification for HVAC Systems and Equipment 23 05 93 Testing, Adjusting, and Balancing For HVAC 23 07 13 Duct Insulation 23 07 19 HVAC Piping Insulation 23 09 13 Instrumentation and Control Devices for HVAC 23 09 23 Direct-Digital Control System for HVAC 23 21 13 Hydronic Piping 23 21 14 Hydronic Specialties 23 25 00 HVAC Water Treatment 23 31 00 HVAC Ducts and Casings

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Table Of Contents 00 01 10-3

23 33 00 Air Duct Accessories 23 37 00 Air Outlets and Inlets 23 72 00 Small Commercial Energy Recovery Ventilators 23 81 01 Terminal Heat Transfer Units 23 82 16 Air Coils

DIVISION 26 - ELECTRCAL

26 00 01 General Electrical Requirements 26 05 19 Low-Voltage Electrical Power Cables (600 V And Less) 26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Systems 26 05 34 Conduit 26 05 37 Boxes 26 05 53 Identification for Electrical Systems 26 09 43 Lighting Controls – Wavelinx Pro 26 24 16 Panelboards 26 27 17 Equipment Wiring 26 27 26 Wiring Devices 26 29 13 Enclosed Controllers 26 51 00 Interior Lighting 26 56 00 Exterior Lighting 28 31 00 Fire Detection and Alarm

SITE AND INFRASTRUCTURE SUBGROUP

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 16 23 Concrete Stoops and Sidewalks

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Selective Structure Demolition 02 41 19 - 1

SECTION 02 41 19

SELECTIVE STRUCTURE DEMOLITION

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Demolishing designated building equipment and fixtures.

2. Demolishing designated construction.

3. Cutting and alterations for completion of the Work.

4. Removing designated items for reuse and/or Owner’s retention.

5. Protecting items designated to remain.

6. Removing demolished materials.

1.2 CLOSEOUT SUBMITTALS

A. Project Record Documents: Accurately record actual locations of capped utilities, concealed utilities discovered during demolition, and subsurface obstructions.

1.3 QUALITY ASSURANCE

A. Conform to applicable code for demolition work, dust control, products requiring electrical disconnection and re-connection.

B. Conform to applicable code for procedures when hazardous or contaminated materials are discovered.

C. Obtain required permits from authorities having jurisdiction.

1.4 SCHEDULING

A. Cooperate with Owner in scheduling noisy operations and waste removal that may impact Owners operation in adjoining spaces.

B. Coordinate utility and building service interruptions with Owner.

1. Do not disable or disrupt building fire or life safety systems without three days prior written notice to Owner.

2. Schedule tie-ins to existing systems to minimize disruption.

3. Coordinate Work to ensure fire sprinklers, fire alarms, smoke detectors, emergency lighting, exit signs and other life safety systems remain in full operation in occupied areas.

1.5 PROJECT CONDITIONS

A. Conduct demolition to minimize interference with adjacent and occupied building areas.

B. Cease operations immediately if structure appears to be in danger and notify Architect/Engineer.

Do not resume operations until directed.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Selective Structure Demolition 02 41 19 - 2

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 PREPARATION

A. Notify affected utility companies before starting work and comply with their requirements.

B. Mark location and termination of utilities.

C. Erect, and maintain temporary barriers and security devices, including warning signs and lights, and similar measures, for protection of the public, Owner, and existing improvements indicated to remain.

D. Erect and maintain weatherproof closures for exterior openings.

E. Erect and maintain temporary protection to prevent spread of dust, odors, and noise to permit continued Owner occupancy.

F. Prevent movement of structure; provide temporary bracing and shoring required to ensure safety of existing structure.

G. Provide appropriate temporary signage including signage for exit or building egress.

H. Do not close or obstruct building egress path.

I. Do not disable or disrupt building fire or life safety systems without 3 days prior written notice to Owner.

3.2 SALVAGE REQUIREMENTS

A. Coordinate with Owner to identify building components and equipment required to be removed and delivered to Owner.

B. Tag components and equipment Owner designates for salvage.

C. Protect designated salvage items from demolition operations until items can be removed.

D. Carefully remove building components and equipment indicated to be salvaged.

E. Disassemble as required to permit removal from building.

F. Package small and loose parts to avoid loss.

G. Mark equipment and packaged parts to permit identification and consolidation of components of each salvaged item.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Selective Structure Demolition 02 41 19 - 3

H. Prepare assembly instructions consistent with disassembled parts. Package assembly instructions in protective envelope and securely attach to each disassembled salvaged item.

I. Deliver salvaged items to Owner. Obtain signed receipt from Owner.

3.3 DEMOLITION

A. Conduct demolition to minimize interference with adjacent and occupied building areas.

B. Maintain protected egress from and access to adjacent existing buildings at all times.

C. Cease operations immediately when structure appears to be in danger and notify Architect/Engineer.

D. Disconnect and remove designated utilities within demolition areas.

E. Cap and identify abandoned utilities at termination points when utility is not completely removed.

Annotate Record Drawings indicating location and type of service for capped utilities remaining after demolition.

F. Demolish in orderly and careful manner. Protect existing improvements, supporting structural members and items designated to remain.

G. Carefully remove building components indicated to be reused.

1. Disassemble components as required to permit removal.

2. Package small and loose parts to avoid loss.

3. Mark components and packaged parts to permit reinstallation.

4. Store components, protected from construction operations, until reinstalled.

H. Remove demolished materials from site except where specifically noted otherwise. Do not burn or bury materials on site.

I. Remove materials as Work progresses. Upon completion of Work, leave areas in clean condition.

J. Remove temporary Work.

END OF SECTION

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Concrete Forming and Accessories 03 10 00-1

SECTION 03 10 00

CONCRETE FORMING AND ACCESSORIES

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Formwork for cast-in place concrete.

2. Shoring, bracing, and anchorage.

3. Form stripping.

B. Related Sections:

1. Section 03 20 00 - Concrete Reinforcing.

2. Section 03 30 00 - Cast-In-Place Concrete.

3. Section 32 16 23 – Concrete Stoops and Sidewalks

1.2 REFERENCES

A. American Concrete Institute:

1. ACI 117 - Standard Specifications for Tolerances for Concrete Construction and Materials.

2. ACI 318 - Building Code Requirements for Structural Concrete.

3. ACI 347 - Guide to Formwork for Concrete.

B. American Forest and Paper Association:

1. AF&PA - National Design Specifications for Wood Construction.

1.3 DESIGN REQUIREMENTS

A. Design, engineer and construct formwork, shoring and bracing in accordance with ACI 318 to conform to design and applicable code requirements to achieve concrete shape, line and dimension as indicated on Drawings.

1.4 QUALITY ASSURANCE

A. Perform Work in accordance with ACI 347.

B. For wood products furnished for work of this Section, comply with AF&PA.

1.5 COORDINATION

A. Coordinate this Section with other sections of work, requiring attachment of components to formwork.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Concrete Forming and Accessories 03 10 00-2

2.1 WOOD FORM MATERIALS

A. Form Materials: At discretion of Contractor.

2.2 FORMWORK ACCESSORIES

A. Form Release Agent: Colorless mineral oil that will not stain concrete, or absorb moisture.

1. Manufacturers:

a. Arcal Chemical Corporation Arcal-80.

b. Industrial Synthetics Company Synthex.

c. Nox-Crete Company Nox-Crete Form Coating.

d. Substitutions: Or equal.

B. Nails, Spikes, Lag Bolts, Through Bolts, Anchorages: Size, strength and character to maintain formwork in place while placing concrete.

PART 3 EXECUTION

3.1 EXAMINATION

A. Verify lines, levels, and centers before proceeding with formwork. Verify dimensions agree with Drawings.

B. When formwork is placed after reinforcement resulting in insufficient concrete cover over reinforcement before proceeding, request instructions from Architect/Engineer.

3.2 INSTALLATION

A. Earth Forms:

1. Earth forms are not permitted.

B. Formwork - General:

1. Provide top form for sloped surfaces steeper than 1.5 horizontal to 1 vertical to hold shape of concrete during placement, unless it can be demonstrated that top forms can be omitted.

2. Construct forms to correct shape and dimensions, mortar-tight, braced, and of sufficient strength to maintain shape and position under imposed loads from construction operations.

3. Camber forms where necessary to produce level finished soffits unless otherwise shown on

Drawings.

4. Carefully verify horizontal and vertical positions of forms. Correct misaligned or misplaced forms before placing concrete.

5. Complete wedging and bracing before placing concrete.

C. Forms for Smooth Finish Concrete:

1. Use steel, plywood or lined board forms.

2. Use clean and smooth plywood and form liners, uniform in size, and free from surface and edge damage capable of affecting resulting concrete finish.

3. Install form lining with close-fitting square joints between separate sheets without springing into place.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Concrete Forming and Accessories 03 10 00-3

4. Use full size sheets of form lines and plywood wherever possible.

5. Tape joints to prevent protrusions in concrete.

6. Use care in forming and stripping wood forms to protect corners and edges.

7. Level and continue horizontal joints.

8. Keep wood forms wet until stripped.

D. Erect formwork, shoring, and bracing to achieve design requirements, in accordance with requirements of ACI 318.

E. Arrange and assemble formwork to permit dismantling and stripping. Do not damage concrete during stripping. Permit removal of remaining principal shores.

F. Do not reuse wood formwork for concrete surfaces to be exposed to view after surface defects begin to appear. Do not patch formwork.

3.3 APPLICATION - FORM RELEASE AGENT

A. Apply form release agent on formwork in accordance with manufacturer's recommendations.

B. Apply prior to placement of reinforcing steel, anchoring devices, and embedded items.

C. Do not apply form release agent where concrete surfaces are indicated to receive special finishes or applied coverings that are affected by agent. Soak inside surfaces of untreated forms with clean water. Keep surfaces coated prior to placement of concrete.

D. Reuse and Coating of Forms: Thoroughly clean forms and reapply form coating before each reuse. For exposed work, do not reuse forms with damaged faces or edges. Apply form coating to forms in accordance with manufacturer’s specifications. Apply form coatings before placing reinforcing steel.

3.4 INSTALLATION - INSERTS, EMBEDDED PARTS, AND OPENINGS

A. Install formed openings for items to be embedded in or passing through concrete work.

B. Locate and set in place items required to be cast directly into concrete.

C. Coordinate with Work of other sections in forming and placing openings, slots, reglets, recesses, sleeves, bolts, anchors, other inserts, and components of other Work.

D. Arrangement: Arrange formwork to allow proper erection sequence and to permit form removal without damage to concrete.

E. Embedded Items:

1. Make provisions for pipes, sleeves, anchors, inserts, reglets, anchor slots, nailers, water stops, and other features.

2. Do not embed wood or uncoated aluminum in concrete.

3. Obtain installation and setting information for embedded items furnished under other

Specification sections.

4. Securely anchor embedded items in correct location and alignment prior to placing concrete.

5. Verify conduits and pipes, including those made of coated aluminum, meet requirements of

ACI 318 for size and location limitations.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Concrete Forming and Accessories 03 10 00-4

F. Screeds:

1. Set screeds and establish levels for tops of concrete slabs and levels for finish on slabs.

2. Slope slabs to drain where required or as shown on Drawings.

3. Before depositing concrete, remove debris from space to be occupied by concrete and thoroughly wet forms. Remove freestanding water.

3.5 FORM CLEANING

A. Clean forms as erection proceeds, to remove foreign matter within forms.

B. Clean formed cavities of debris prior to placing concrete.

C. Flush with water or use compressed air to remove remaining foreign matter. Ensure that water and debris drain to exterior through clean-out ports.

D. During cold weather, remove ice and snow from within forms. Do not use de-icing salts. Do not use water to clean out forms, unless formwork and concrete construction proceed within heated enclosure. Use compressed air or other means to remove foreign matter.

3.6 FORM REMOVAL

A. Do not remove forms or bracing until concrete has gained sufficient strength to carry its own weight and imposed loads and removal has been approved by Architect/Engineer.

B. Loosen forms carefully. Do not wedge pry bars, hammers, or tools against finish concrete surfaces scheduled for exposure to view.

C. Store removed forms in manner that surfaces to be in contact with fresh concrete will not be damaged. Discard damaged forms.

D. Leave forms in place for minimum number of days as specified in ACI 347.

3.7 ERECTION TOLERANCES

A. Tolerances: Construct formwork to produce completed concrete surfaces within construction tolerances specified in ACI 117.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Concrete Reinforcing 03 20 00-1

SECTION 03 20 00

CONCRETE REINFORCING

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Reinforcing bars and fabric.

2. Reinforcement accessories.

B. Related Sections:

1. Section 03 10 00 - Concrete Forming and Accessories.

2. Section 03 30 00 - Cast-In-Place Concrete.

3. Section 26 05 26 – Bonding and Grounding.

4. Section 32 16 23 – Concrete Stoops and Sidewalks.

1.2 REFERENCES

A. American Concrete Institute:

1. ACI 318 - Building Code Requirements for Structural Concrete.

2. ACI 530.1 - Specifications for Masonry Structures.

B. ASTM International:

1. ASTM A184/A184M - Standard Specification for Fabricated Deformed Steel Bar Mats for

Concrete Reinforcement.

2. A185/A185M-07 Standard Specification for Steel Welded Wire Reinforcement, Plain, for

Concrete.

3. ASTM A615/A615M - Standard Specification for Deformed and Plain Billet-Steel Bars for

Concrete Reinforcement.

C. Concrete Reinforcing Steel Institute:

1. CRSI - Manual of Standard Practice.

2. CRSI - Placing Reinforcing Bars.

1.3 SUBMITTALS

A. Product Data: Submit Product Data on and supporting devices and adhesives.

1.4 QUALITY ASSURANCE

A. Perform Work in accordance with CRSI - Manual of Standard Practice.

1.5 COORDINATION

A. Coordinate with placement of formwork, formed openings and other Work.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Concrete Reinforcing 03 20 00-2

2.1 REINFORCEMENT

A. Reinforcing Steel: ASTM A615/A615M, 60 ksi yield grade, deformed billet bars, uncoated.

B. Welded Plain Wire Fabric: ASTM A185/A185M; in flat sheets; unfinished.

2.2 ACCESSORY MATERIALS

A. Tie Wire: Minimum 16 gage annealed type.

B. Chairs, Bolsters, Bar Supports, Spacers: Sized and shaped for strength and support of reinforcement during concrete placement conditions including load bearing pad on bottom to prevent vapor retarder puncture.

C. Special Chairs, Bolsters, Bar Supports, Spacers Adjacent to Weather Exposed Concrete Surfaces: Plastic-coated steel type; size and shape to meet Project conditions.

D. High Strength Anchoring Adhesive; Hilt HIT-RE 100 Epoxy Anchor or equal.

2.3 FABRICATION

A. Fabricate concrete reinforcement in accordance with CRSI Manual of Practice, ACI 318 and applicable code.

B. Form standard hooks for 180 degree bends, 90 degree bend, stirrup and tie hooks, as indicated on Drawings.

C. Form reinforcement bends with minimum diameters in accordance with ACI 318.

D. Form ties and stirrups from the following:

1. For bars No. 10 and Smaller: No. 3 deformed bars.

2. For bars No. 11 and Larger: No. 4 deformed bars.

E. Locate reinforcement splices not indicated on Drawings, at point of minimum stress.

PART 3 EXECUTION

3.1 PLACEMENT

A. Place, support and secure reinforcement against displacement. Do not deviate from required position beyond specified tolerance.

1. Do not weld crossing reinforcement bars for assembly.

B. Do not displace or damage vapor retarder.

C. Accommodate placement of formed openings.

D. Space reinforcement bars with minimum clear spacing in accordance with ACI 318.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Concrete Reinforcing 03 20 00-3

1. Where bars are indicated in multiple layers, place upper bars directly above lower bars.

E. Maintain concrete cover around reinforcement in accordance with ACI 318 as follows:

1. Concrete cast against earth: 3 inches.

2. Formed concreter surfaces exposed to earth, weather or water: 2 inches.

3. Formed concrete surfaces of walls, beams and columns not exposed to earth, weather or water: 1-1/2 inches.

4. Slabs exposed to earth, weather or water: 1-1/2 inches.

5. Slabs not exposed to earth, weather or water: 1 inch

F. Splice reinforcing where indicated on Shop Drawings in accordance with splicing device manufacturer’s instructions.

G. Lap adjoining wire mesh no less than (1) full mesh space and lace securely with wire. Offset end laps in adjacent widths to prevent continuous splice.

H. Welded wire fabric reinforcement shall be overlapped wherever successive mats are continuous in such a way that the overlap measured between outermost cross wires of each fabric sheet is not less than one full mesh spacing plus two inches. The fabric shall extend to within four (4) inches of concrete edges. It may extend through control joints where alternate wires are field cut.

It shall be adequately supported during placement of concrete to insure proper position in the slab by use of supporting chairs or bolsters.

I. Bond and ground reinforcement in accordance with requirements of Section 26 05 26.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Cast-In-Place Concrete 03 30 00 - 1

SECTION 03 30 00

CAST-IN-PLACE CONCRETE

PART 1 GENERAL

1.1 SUMMARY

A. Section includes cast-in-place concrete for the following:

1. Slabs on grade.

2. Concrete footings.

B. Related Sections:

1. Section 03 10 00 - Concrete Forming and Accessories: Formwork and accessories.

2. Section 03 20 00 - Concrete Reinforcing.

3. Section 32 16 23 - Concrete Stoops and Sidewalks.

1.2 REFERENCES

A. American Concrete Institute:

1. ACI 301 - Specifications for Structural Concrete.

2. ACI 305 - Hot Weather Concreting.

3. ACI 306.1 - Standard Specification for Cold Weather Concreting.

4. ACI 318 - Building Code Requirements for Structural Concrete.

B. ASTM International:

1. ASTM C31/C31M - Standard Practice for Making and Curing Concrete Test Specimens in the Field.

2. ASTM C33 - Standard Specification for Concrete Aggregates.

3. ASTM C39/C39M - Standard Test Method for Compressive Strength of Cylindrical Concrete

Specimens.

4. ASTM C42/C42M - Standard Test Method for Obtaining and Testing Drilled Cores and

Sawed Beams of Concrete.

5. ASTM C94/C94M - Standard Specification for Ready-Mixed Concrete.

6. ASTM C143/C143M - Standard Test Method for Slump of Hydraulic Cement Concrete.

7. ASTM C172 - Standard Practice for Sampling Freshly Mixed Concrete.

8. ASTM C231 - Standard Test Method for Air Content of Freshly Mixed Concrete by the

Pressure Method.

9. ASTM C260 - Standard Specification for Air-Entraining Admixtures for Concrete.

10. ASTM C494/C494M - Standard Specification for Chemical Admixtures for Concrete.

11. ASTM C595 – Standard Specifications for Blended Hydraulic Cements.

12. ASTM C618 - Standard Specification for Coal Fly Ash and Raw or Calcined Natural

Pozzolan for Use as a Mineral Admixture in Concrete.

13. ASTM C1017/C1017M - Standard Specification for Chemical Admixtures for Use in

Producing Flowing Concrete.

14. ASTM C1064/C1064M - Standard Test Method for Temperature of Freshly Mixed Hydraulic-

Cement Concrete.

15. ASTM C1107/C1107M - Standard Specification for Packaged Dry, Hydraulic-Cement Grout

(Nonshrink).

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Cast-In-Place Concrete 03 30 00 - 2

16. ASTM D1751 - Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types).

17. ASTM E1643 - Standard Practice for Installation of Water Vapor Retarders Used in Contact with Earth or Granular Fill under Concrete Slabs.

18. ASTM E1745 - Standard Specification for Plastic Water Vapor Retarders Used in Contact with Soil or Granular Fill under Concrete Slabs.

1.3 PERFORMANCE REQUIREMENTS

A. Vapor Retarder Permeance: Maximum 0.1 perms when tested in accordance with ASTM E154.

1.4 SUBMITTALS

A. Design Data:

1. Submit concrete mix design for each concrete strength. Submit separate mix designs when admixtures are required for the following:

a. Hot and cold weather concrete work.

b. Air entrained concrete work.

2. Identify mix ingredients and proportions, including admixtures.

B. Product Data: Submit data on admixtures and accessories.

1.5 CLOSEOUT SUBMITTALS

A. Project Record Documents: Accurately record actual locations of embedded utilities and components concealed from view in finished construction.

1.6 QUALITY ASSURANCE

A. Perform Work in accordance with ACI 301 and ACI 318.

B. Conform to ACI 305 when concreting during hot weather.

C. Conform to ACI 306.1 when concreting during cold weather.

D. Acquire cement and aggregate from one source for Work.

1.7 ENVIRONMENTAL REQUIREMENTS

A. Maintain concrete temperature after installation at minimum 50 degrees F for minimum 7 days.

1.8 COORDINATION

A. Coordinate placement of joint devices with erection of concrete formwork and placement of form accessories.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Cast-In-Place Concrete 03 30 00 - 3

2.1 CONCRETE MATERIALS

A. Cement: ASTM C595, Type IL.

B. Normal Weight Aggregates: ASTM C33.

1. Fine aggregate: size 2NS; clean, sharp, natural sand free from loam, clay lumps, or other deleterious substances.

2. Coarse Aggregate Maximum Size: In accordance with ACI 318.

3. Aggregate shall be clean, uncoated, crushed stone, processed from natural rock or stone containing no clay, mud, loam, of foreign matter.

C. Water: ACI 318; potable.

2.2 ADMIXTURES

A. Air Entrainment: ASTM C260.

B. Chemical: ASTM C494/C494M.

C. Fly Ash and Calcined Pozzolan: ASTM C618 Class F.

D. Plasticizing: ASTM C1017/C1017M.

2.3 ACCESSORIES

A. Bonding Agent: Three component, pre-proportioned, water based epoxy modified Portland cement bonding agent.

1. Manufacturers:

a. Euclid Chemical Company Model Duralprep AC.

b. Substitutions: Or equal.

B. Vapor Retarder: ASTM E1745 Class B; 15 mil thick clear polyethylene film containing no recycled content; type recommended for below grade application. Furnish joint tape recommended by manufacturer.

C. Non-Shrink Grout: ASTM C1107/C1107M; premixed compound consisting of non-metallic aggregate, cement, water reducing and plasticizing agents; capable of developing minimum compressive strength of 2,400 psi in 48 hours and 7,000 psi in 28 days.

D. Concrete Reinforcing Fibers: ASTM C1116, high strength industrial-grade fibers specifically engineered for secondary reinforcement of concrete.

1. Manufacturers:

a. Propex Concrete Systems Model Fibermesh 300.

b. Substitutions: Or equal.

2.4 JOINT DEVICES AND FILLER MATERIALS

A. Joint Filler Type A: ASTM D1751; Asphalt impregnated fiberboard or felt, 1/2 inch thick x full depth of slab.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Cast-In-Place Concrete 03 30 00 - 4

B. Joint Filler Type B: Closed cell polyethylene foam; 1/2 inch thick with preset tear strip; All-purpose Roll Foam manufactured by Right Pointe or equal.

C. Sealant and Primer: Type, as specified in Section 07 90 00.

2.5 CONCRETE MIX

A. Select proportions for concrete in accordance with ACI 318 trial mixtures, field experience, or both.

B. Concrete TYPE A:

Material and Property Measurement

Compressive Strength (28 day) 3,500 psi

Cement Content (minimum) 517 pounds/cu yd

Aggregate Type Normal weight

Water-Cement Ratio (maximum) .45 by weight

Air Content 4 to 7 percent where exposed to freeze-thaw or de-icing chemicals per ACI 318 based upon maximum aggregate size.

Fly Ash Content: 20 percent of cementitious materials by weight, maximum

Slump 4 inches plus or minus 1 inch

C. Admixtures: Include admixture types and quantities indicated in concrete mix designs only when approved by Architect.

1. Use accelerating admixtures in cold weather. Use of admixtures will not relax cold weather placement requirements.

2. Do not use calcium chloride nor admixtures containing calcium chloride.

3. Use set retarding admixtures during hot weather.

4. Add air entrainment admixture to concrete mix for work exposed to freezing and thawing or deicing chemicals.

5. Do not use flash ash, pozzolans, silica fume or slag in concrete mixes to be exposed to deicing chemicals.

D. Fibrous Reinforcing: Where scheduled, include fibrous reinforcing at rate recommended by reinforcing manufacturer.

E. Average Compressive Strength Reduction: Not permitted.

F. Ready Mixed Concrete: Mix and deliver concrete in accordance with ASTM C94/C94M.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Cast-In-Place Concrete 03 30 00 - 5

PART 3 EXECUTION

3.1 EXAMINATION

A. Verify requirements for concrete cover over reinforcement.

B. Verify anchors, seats, plates, reinforcement and other items to be cast into concrete are accurately placed, positioned securely, and will not interfere with placing concrete.

3.2 PREPARATION

A. Prepare previously placed concrete by cleaning with steel wire brush and applying bonding agent.

Remove laitance, coatings, and unsound materials.

B. In locations where new concrete is installed adjacent to existing concrete, dowel new work into existing work with #4 deformed dowels. Drill holes in existing concrete, insert steel dowels and pack solid with non-shrink grout. Space dowels at 2’-0” on center maximum. Apply bonding agent to concrete surface in accordance with 3.2.A.

C. Remove debris and ice from formwork, reinforcement, and concrete substrates.

D. Remove water from areas receiving concrete before concrete is placed.

3.3 PLACING CONCRETE

A. Place concrete in accordance with ACI 318.

B. Notify testing laboratory minimum three (3) business days prior to commencement of operations.

C. Ensure reinforcement, inserts, embedded parts, formed expansion and contraction joints are not disturbed during concrete placement.

D. Install vapor retarder under interior slabs on grade in accordance with ASTM E1643. Lap joints minimum 6 inches and seal watertight by adhesive applied between overlapping edges and ends or by taping edges and ends with vapor retarder manufacturer recommended tape.

E. Repair vapor retarder damaged during placement of concrete reinforcing. Repair with vapor retarder material; lap over damaged areas minimum 6 inches and seal watertight.

F. Separate slabs on grade from vertical surfaces with joint filler as scheduled.

G. Deposit concrete at final position. Prevent segregation of mix.

H. Place concrete in continuous operation for each panel or section determined by predetermined joints.

I. Consolidate concrete.

J. Maintain records of concrete placement. Record date, location, quantity, air temperature, and test samples taken.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Cast-In-Place Concrete 03 30 00 - 6

K. Place concrete continuously between predetermined joints.

L. Do not interrupt successive placement; do not permit cold joints to occur.

M. Place floor slabs in checkerboard or saw cut pattern indicated.

N. Saw cut joints within 12 hours after placing. Use 3/16 inch thick blade, cut into 1/4 depth of slab thickness.

O. Screed floors and slabs on grade level, maintaining surface flatness Ff of 25 and surface levelness Fl of 20.

3.4 CONCRETE FINISHING

A. Provide formed concrete surfaces to be left exposed with smooth rubbed finish.

B. Finish concrete floor surfaces to requirements of Section 03 35 00.

3.5 CURING AND PROTECTION

A. Immediately after placement, protect concrete from premature drying, excessively hot or cold temperatures, and mechanical injury.

1. Protect concrete footings from freezing for minimum 7 days.

B. Maintain concrete with minimal moisture loss at relatively constant temperature for period necessary for hydration of cement and hardening of concrete.

C. Cure concrete as specified in Section 03 39 00.

3.6 FIELD QUALITY CONTROL

A. Field inspection and testing will be performed by Owner’s testing laboratory in accordance with

ACI 318.

B. Provide free access to Work and cooperate with appointed firm.

C. Submit proposed mix design of each class of concrete to inspection and testing firm for review prior to commencement of Work.

D. Strength Test Samples:

1. Sampling Procedures: ASTM C172.

2. Cylinder Molding and Curing Procedures: ASTM C31/C31M, cylinder specimens, standard cured.

3. Sample concrete and make one set of three cylinders for every 50 cu yds or less of each class of concrete placed. At a minimum, provide one set of cylinders for concrete footings, one set of cylinders for concrete pier foundations, and one set of cylinders for concrete sidewalks and paving.

4. When volume of concrete for any class of concrete would provide less than 5 sets of cylinders, take samples from five randomly selected batches, or from every batch when less than 5 batches are used.

5. Make one additional cylinder during cold weather concreting, and field cure.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Cast-In-Place Concrete 03 30 00 - 7

E. Field Testing:

1. Slump Test Method: ASTM C143/C143M.

2. Air Content Test Method: ASTM C231.

3. Temperature Test Method: ASTM C1064/C1064M.

4. Measure slump, and temperature for each concrete load at point of delivery.

5. Measure air content in air entrained concrete for each concrete load at point of delivery.

F. Cylinder Compressive Strength Testing:

1. Test Method: ASTM C39/C39M.

2. Test Acceptance: In accordance with ACI 318.

3. Test one cylinder at 7 days.

4. Test two cylinders at 28 days.

G. Core Compressive Strength Testing:

1. Sampling and Testing Procedures: ASTM C42/C42M.

2. Test Acceptance: In accordance with ACI 318.

3. Drill three cores for each failed strength test from concrete represented by failed strength test.

H. Maintain records of concrete placement. Record date, location, quantity, air temperature and test samples taken.

3.7 PATCHING

A. Allow Architect to inspect concrete surfaces immediately upon removal of forms.

B. Excessive honeycomb or embedded debris in concrete is not acceptable. Notify Architect upon discovery.

C. Patching Defective Areas: Repair and patch defective areas with cement mortar immediately after removal of forms, but only when acceptable to Architect.

1. Cut out honeycomb, rock pockets, voids over 1/2 inch diameter, and holes left by tie rods and bolts, down to solid concrete but, in no case to a depth of less than 1 inch. Make edges of cuts perpendicular to the concrete surface. Before placing cement mortar, thoroughly clean, dampen with water, and brush-coat the area to be patched with neat cement grout.

Proprietary patching compounds may be used when acceptable to the Architect.

2. For exposed-to-view surfaces, blend white portland cement and standard portland cement so that, when dry, patching mortar will match color of surrounding. Provide test areas at inconspicuous location to verify mixture and color match before proceeding with patching.

Compact mortar in place and strike-off slightly higher than surrounding surfaces.

D. Repair of Formed Surfaces: Remove and replace concrete having defective surfaces if defects cannot be repaired to satisfaction of Architect. Surface defects, as such, include color and texture irregularities, cracks, spalls, air bubbles, honeycomb, rock pockets, and holes left by tie rods and bolts; fins and other projections on surface; and stains and other discolorations that cannot be removed by cleaning.

1. Repair concealed formed surfaces, where possible, that contain defects that adversely affect the durability of the concrete. If defects cannot be repaired, remove and replace the concrete.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Cast-In-Place Concrete 03 30 00 - 8

E. Repair of unformed Surfaces: Test unformed surfaces, such as monolithic slabs, for smoothness and to verify surface plane to tolerances specified for each surface and finish. Correct low and high areas as herein specified. Test unformed surfaces sloped to drain for trueness of slope, in addition to smoothness, using a template having required slope.

1. Repair finished unformed surfaces that contain defects which adversely affect durability of concrete. Surface defects, as such, include crazing, cracks, in excess of 0.01 inch wide or which penetrate to reinforcement or completely through non-reinforced sections regardless of width, spalling, pop-outs, honeycomb, rock pockets, and other objectionable conditions.

2. Correct high areas in unformed surfaces by grinding, after concrete has cured at least 14 days.

3. Correct low areas in unformed surfaces during or immediately after completion of surface finishing operations by cutting out low areas and replacing with fresh concrete. Finish repaired areas to blend into adjacent concrete. Proprietary patching compounds may be used when acceptable to Architect.

4. Repair defective areas, except random cracks and single holes not exceeding one inch diameter, by cutting out and replacing with fresh concrete. Remove defective areas to sound concrete with clean, square cuts and expose reinforcing steel with at least 3/4 inch clearance. Dampen concrete surfaces in contact with patching concrete and brush with a neat cement grout coating or concrete bonding agent. Place patching concrete before grout takes its initial set. Mix patching concrete of same materials to provide concrete of the same type or class as original concrete. Place, compact and finish to blend with adjacent finished concrete. Cure in the same manner as adjacent concrete.

5. Repair isolated random cracks and single holes not over one inch in diameter by dry-pack method. Groove top of cracks and cut out holes to sound concrete and clean off dust, dirt and loose particles. Dampen cleaned concrete surfaces and brush with neat cement grout coating. Place dry-pack before cement grout takes its initial set. Mix dry-pack before cement grout takes its initial set. Mix dry-pack, consisting of one part Portland cement to 2- 1/2 parts fine aggregate using a No. 16 mesh sieve, using only enough water as required for handling and placing. Compact dry-pack mixture in place and finish to match adjacent concrete. Keep patched areas continuously moist for not less than 72 hours.

3.8 DEFECTIVE CONCRETE

A. Defective Concrete: Concrete not conforming to required lines, details, dimensions, tolerances or specified requirements.

B. Repair or replacement of defective concrete will be determined by Architect.

C. Do not patch, fill, touch-up, repair, or replace exposed concrete except upon express direction of Architect for each individual area.

3.9 SCHEDULE - CONCRETE TYPES AND FINISHES

A. Concrete for interior floor slabs-on-grade: TYPE A, non-air entrained. Include fibrous reinforcing in concrete mix for patching small areas in lieu of wire mesh at Contractor’s option.

B. Concrete for building footings and grade beams surrounding conditioned spaces: TYPE A, non-air entrained.

C. Concrete for footings and grade beams not surrounded by conditioned space and subject to freeze thaw: TYPE A, air entrained.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Cast-In-Place Concrete 03 30 00 - 9

D. Concrete for exterior concrete slabs: Type A, air entrained.

3.10 SCHEDULE – JOINT DEVICES

A. Interior Floor Slab Perimeter Scheduled to Receive Overlay Finish: Joint filler Type A set 1/8 inch below floor slab elevation.

B. Interior Floor Slab Perimeter Schedule to remain exposed: Joint filler Type B with sealant cover.

C. Joints at Locations Other than Scheduled Above: Joint filler Type A set 1/8 inch below floor slab elevation.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Concrete Finishing 03 35 00 - 1

SECTION 03 35 00

CONCRETE FINISHING

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Finishing concrete floors.

2. Floor surface treatment.

B. Related Sections:

1. Section 03 30 00 - Cast-In-Place Concrete: Prepared concrete floors ready to receive finish.

2. Section 03 39 00 - Concrete Curing.

3. Section 07 90 00 - Joint Protection.

1.2 REFERENCES

A. American Concrete Institute:

1. ACI 301 - Specifications for Structural Concrete.

2. ACI 302.1 - Guide for Concrete Floor and Slab Construction.

B. ASTM International:

1. ASTM E1155 - Standard Test Method for Determining Floor Flatness and of Levelness

Using the F-number System.

1.3 QUALITY ASSURANCE

A. Perform Work in accordance with ACI 301 and ACI 302.1.

1.4 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing Products specified in this section with minimum three years documented experience.

B. Installer: Company specializing in performing work of this section with minimum three years documented experience.

1.5 ENVIRONMENTAL REQUIREMENTS

A. Temporary Heat: Ambient temperature of 50 degrees F minimum.

B. Ventilation: Sufficient to prevent injurious gases from temporary heat or other sources affecting concrete.

1.6 COORDINATION

A. Coordinate the Work with concrete floor placement and concrete floor curing.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Concrete Finishing 03 35 00 - 2

PART 2 PRODUCTS – Not used

PART 3 EXECUTION

3.1 EXAMINATION

A. Verify floor surfaces are acceptable to receive the Work of this section.

3.2 FLOOR FINISHING

A. Finish concrete floor surfaces in accordance with ACI 301 and ACI 302.1.

B. Steel trowel surfaces receiving carpeting, resilient flooring, seamless flooring, thin set floor tile, and fluid applied flooring.

C. Steel trowel surfaces which are scheduled to be exposed.

D. Lightly hand or machine tool edges. Assure that edges are not depressed or chattered along bulkheads, formed edges, columns, and penetrations.

E. In areas indicated to slope to floor drains, maintain design floor elevation at walls; slope surfaces uniformly to drains at 1/8 inch per foot nominal as indicated on Drawings.

3.3 TOLERANCES

A. Measure for FF and FL tolerances for floors in accordance with ASTM E1155, within 48 hours after slab installation.

B. Finish concrete to achieve the following tolerances:

1. Under tile on mortar setting bed: F(F) 25 and F(L) 20.

2. Under thin set tile, resilient tile, carpet or other thin film flooring and exposed to view concrete in non-public areas: F(F) 35 and F(L) 25.

3. Under high tolerance floor systems where indicated: F(F) 50 and F(L) 30.

4. Exposed to view and foot traffic in public areas: F(F) 75 and F(L) 50.

3.4 DEFECTIVE WORK

A. Correct slab surface when actual FF or FL number for floor installation measures less than required.

B. Correct defects in defined traffic floor by grinding or removal and replacement of defective Work.

Areas requiring corrective Work will be identified. Re-measure corrected areas by same process.

C. Correct concrete floors slabs installed at the incorrect elevation by removal and replacement.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Concrete Curing 03 39 00 - 1

SECTION 03 39 00

CONCRETE CURING

PART 1 GENERAL

1.1 SUMMARY

A. Section includes initial and final curing of horizontal and vertical concrete surfaces.

B. Related Sections:

1. Section 03 30 00 - Cast-In-Place Concrete.

2. Section 03 35 00 - Concrete Finishing.

1.2 REFERENCES

A. American Concrete Institute:

1. ACI 301 - Specifications for Structural Concrete.

2. ACI 302.1 - Guide for Concrete Floor and Slab Construction.

3. ACI 308.1 - Standard Specification for Curing Concrete.

4. ACI 318 - Building Code Requirements for Structural Concrete.

B. ASTM International:

1. ASTM C171 - Standard Specification for Sheet Materials for Curing Concrete.

2. ASTM C309 - Standard Specification for Liquid Membrane-Forming Compounds for Curing

Concrete.

3. ASTM C1315 - Standard Specification for Liquid Membrane-Forming Compounds Having

Special Properties for Curing and Sealing Concrete.

4. ASTM D2103 - Standard Specification for Polyethylene Film and Sheeting.

1.3 SUBMITTALS

A. Product Data: Submit data on curing compounds, mats, compatibilities, and limitations.

1.4 QUALITY ASSURANCE

A. Perform Work in accordance with ACI 301, ACI 302.1 and ACI 318.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Deliver curing materials in manufacturer's packaging including application instructions.

PART 2 PRODUCTS

2.1 MATERIALS

A. Membrane Curing Compound: ASTM C309, Type 1, Class A or ASTM C1315 Type 1, Class A.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Concrete Curing 03 39 00 - 2

B. Absorptive Mats burlap-polyethylene, minimum 9 oz/sq yd bonded to prevent separation during handling and placing.

C. Water: Potable, not detrimental to concrete.

PART 3 EXECUTION

3.1 EXAMINATION

A. Verify substrate surfaces are ready to be cured.

3.2 INSTALLATION

A. Cure concrete in accordance with ACI 308.1.

B. Absorptive Mat: Saturate burlap-polyethylene and place burlap-side down over floor slab areas, lapping ends and sides; maintain in place for 7 days.

C. Membrane Curing Compound: Apply curing compound in one coat.

3.3 PROTECTION OF FINISHED WORK

A. Do not permit traffic over unprotected floor surface.

3.4 SCHEDULES

A. Floor slabs schedule to receive concrete overlay, topping or applied floor finish: Cure by absorptive mats.

B. Exterior Concrete Pavement: Membrane curing compound.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Masonry Mortaring and Grouting 04 05 03 - 1

SECTION 04 05 03

MASONRY MORTARING AND GROUTING

PART 1 GENERAL

1.1 SUMMARY

A. Section includes mortar and grout for masonry.

B. Related Sections:

1. Section 04 20 00 - Unit Masonry: Installation of mortar and grout.

1.2 REFERENCES

A. American Concrete Institute:

1. ACI 530 - Building Code Requirements for Masonry Structures.

2. ACI 530.1 - Specifications for Masonry Structures.

B. ASTM International:

1. ASTM C91 – Standard Specification for Masonry Cement.

2. ASTM C94/C94M - Standard Specification for Ready-Mixed Concrete.

3. ASTM C144 - Standard Specification for Aggregate for Masonry Mortar.

4. ASTM C150 - Standard Specification for Portland Cement.

5. ASTM C206 - Standard Specification for Finishing Hydrated Lime.

6. ASTM C270 - Standard Specification for Mortar for Unit Masonry.

7. ASTM C387/C387M - Standard Specification for Packaged, Dry, Combined Materials for

Mortar and Concrete.

8. ASTM C404 - Standard Specification for Aggregates for Masonry Grout.

9. ASTM C476 - Standard Specification for Grout for Masonry.

10. ASTM C780 - Standard Test Method for Preconstruction and Construction Evaluation of

Mortars for Plain and Reinforced Unit Masonry.

11. ASTM C1019 - Standard Test Method for Sampling and Testing Grout.

1.3 SUBMITTALS

A. Design Data: Submit design mix when Property specification of ASTM C270 is to be used, required environmental conditions, and admixture limitations.

B. Product Data: Submit product data on premix mortar and grout.

C. Test Reports:

1. Submit reports on mortar indicating conformance of mortar to property requirements of

ASTM C270 and test and evaluation reports to ASTM C780 for aggregate ratio and water content, air content, consistency and compressive strength.

2. Submit reports on grout indicating conformance of grout to property requirements of ASTM C476 and test and evaluation reports to ASTM C1019.

D. Manufacturer's Certificate: Certify products meet or exceed specified requirements.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Masonry Mortaring and Grouting 04 05 03 - 2

1.4 QUALITY ASSURANCE

A. Perform Work in accordance with ACI 530 and ACI 530.1.

1.5 ENVIRONMENTAL REQUIREMENTS

A. Cold Weather Requirements: In accordance with ACI 530.1 when ambient temperature or temperature of masonry units is less than 40 degrees F.

B. Hot Weather Requirements: In accordance with ACI 530.1 when ambient temperature is greater than 100 degrees F or ambient temperature is greater than 90 degrees F with wind velocity greater than 8 mph.

PART 2 PRODUCTS

2.1 MORTAR AND MASONRY GROUT COMPONENTS

A. Mortar Cement: ASTM C91, B. Portland Cement: ASTM C150, Type I, gray color.

C. Mortar Aggregate: ASTM C144, standard masonry type.

D. Hydrated Lime: ASTM C206, Type S.

E. Grout Aggregate: ASTM C404, fine and coarse.

F. Water: Clean and potable.

G. Calcium chloride is not permitted.

2.2 MIXES

A. Pre-packaged Mortar and Grout Mixes: ASTM C387/387M; At Contractor’s option use pre-packaged Mortar and Grout Mixes meeting specified requirements as manufactured by Spec Mix or equal. Mix and install pre-packaged mortar and grout mixes in accordance with manufactures instructions.

B. Mortar Mixes:

1. Mortar For Masonry in contact with earth: ASTM C270, Type M using Property specification.

2. Mortar For Other Masonry and Non-Structural Veneers: ASTM C270, Type S using Property specification.

3. Pointing Mortar: ASTM C270, Type N using Property specification.

C. Mortar Mixing:

1. Thoroughly mix mortar ingredients in accordance with ASTM C270 in quantities needed for immediate use.

2. Achieve uniformly damp sand immediately before mixing process.

3. Add mortar color to achieve uniformity of mix and coloration.

4. Re-temper only within two hours of mixing.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Masonry Mortaring and Grouting 04 05 03 - 3

D. Grout Mixes:

1. Grout for Bond Beams, CMU Lintels, Structural Masonry, and Filled Masonry:

a. 2,000 psi minimum strength at 28 days; 8-11 inches slump; mixed in accordance with ASTM C476 for Fine and Coarse grout.

2. Application:

a. Coarse Grout: For grouting spaces with minimum 4 inches dimension in every direction.

b. Fine Grout: For grouting other spaces.

E. Grout Mixing:

1. Transit mix grout in accordance with ASTM C94/C94M, modified to use ingredients complying with ASTM C476.

2. Site Mixed Grout: Thoroughly mix grout ingredients in quantities needed for immediate use in accordance with ASTM C476.

PART 3 EXECUTION

3.1 EXAMINATION

A. Request inspection of spaces to be grouted.

3.2 PREPARATION

A. Brace masonry for wet grout pressure.

3.3 INSTALLATION

A. Install mortar and grout in accordance with ACI 530.1 Specifications for Masonry Structures.

Remodeling Alanson Public School and Bus Garage

Anthony Esson, Architect Unit Masonry 04 20 00 - 1

SECTION 04 20 00

UNIT MASONRY

PART 1 GENERAL

1.1 SUMMARY

A. Section includes masonry units; reinforcement, anchorage, and accessories.

B. Related Sections:

1. Section 03 20 00 – Concrete Reinforcing: Reinforcing bars.

2. Section 04 05 03 - Masonry Mortaring and Grouting: Mortar and grout.

3. Section 07 21 19 – Foamed-in-Place Insulation: Foam fill insulation for masonry unit cores.

4. Section 07 84 00 - Firestopping: Firestopping at penetrations of masonry work.

5. Section 07 90 00 - Joint Protection: Rod and sealant at control joints and intersections in…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .