AL-1803-2751A.pdf
PDF 1 MB Posted
- Attached to
- Small Angle X-Ray Scattering Flight Tube
- Solicitation number
- BZ-2025-08
- Issued by
-
Department of Energy
About this file
This is an Engineering Specification Document (ESD) for a Small Angle X-Ray Scattering (SAXS) Flight Tube to be installed in the 12.3.1 beamline at the Advanced Light Source facility at Lawrence Berkeley National Laboratory. The technical specification provides detailed requirements for a flight tube approximately 4 meters long and 1 meter in diameter, designed to house a Dectris 6M vacuum-compatible x-ray detector with independent translation capabilities in X, Y, and Z directions within a vacuum environment.
Key technical specifications include: maintaining a vacuum pressure below 1×10-3 mbar, supporting detector motion with precise positioning (±100mm in X and Y, 2900mm in Z), incorporating two interchangeable beamstops, implementing a fully retractable detector cover, and complying with California Building Code seismic requirements. The document outlines comprehensive requirements for mechanical design, vacuum compatibility, motion performance, electrical components, and factory acceptance testing, with the subcontractor expected to provide detailed design proposals, CAD models, and comprehensive documentation demonstrating compliance with specified technical and operational parameters.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BZ-2025-08 QAv3.pdf | ||
| RFP BZ-2025-08 v2.pdf | ||
| BZ-2025-08 QAv2.pdf | ||
| LBNL_Cover.MOV | MOV file | |
| BZ-2025-08 QA.pdf | ||
| 3D CAD Model.zip | ZIP file | |
| RFP BZ-2025-08.pdf | ||
| Rep Cert Form.docx | DOCX document | |
| GP-Commercial Domestic.pdf | ||
| AL-1803-2752A.pdf | ||
| Sample Subcontract.docx | DOCX document | |
| GP-Commercial Foreign.pdf | ||
| Insurance Cert Instructions.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AL-1803-2751
Engineering Specification Document:
SAXS Flight Tube for the 12.3.1 Endstation
Table of Contents
1. REVISION HISTORY
2. TECHNICAL CONTACT
3. APPROVALS
4. ABBREVIATIONS AND ACRONYMS
5. APPLICABLE DOCUMENTS
6. INTRODUCTION
7. REQUIREMENTS DEFINITION
8. COORDINATE SYSTEM (CSYS)
9. SPECIFICATIONS
9.1. Spatial envelope and limitations
9.2. Beam geometry and alignment of the FT to the beam
9.3. Chamber specifications
9.4. Detector compatibility
9.5. Motion requirements
9.6. Beamstop specifications
9.7. Detector cover specifications
10. INTEGRATION
10.1. Units and hardware policy
10.2. CAD Integration
10.3. Seismic requirements
10.4. S&A
10.5. Lifting provisions
O ffi ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
6t h, D
C C
A ut h K ey : 4
8J
JB
X
ZN
9G
Downloaded by: Simon Adrian Morton at March 26, 2025 17:28:06
10.6. Electrical
10.7. Vacuum
11. FAT
11.1. General inspection
11.2. Determination of the positioning performance
12. LABELLING
13. STANDARDS AND CODES
14. GENERAL FABRICATION REQUIREMENTS
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
6t h, D
C C
A ut h K ey : 4
8J
JB
X
ZN
1. REVISION HISTORY
Rev. Revision Date Sections Affected Description of Change
A 02/25/2025 All Initial draft
2. TECHNICAL CONTACT
Simon Morton SAMorton@LBL.gov
3. APPROVALS
The following individual(s) shall approve this document:
Approver Project Role
Simon Morton Technical lead
Greg Hura Project lead
4. ABBREVIATIONS AND ACRONYMS
12.3.1 The existing beamline 12.3.1 at the Advanced Light Source, LBNL 6M DECTRIS PILATUS®3 X 6M x-ray detector 9M-V DECTRIS EIGER 2 X 9M-V vacuum compatible x-ray detector ALS Advanced Light Source CAD Computer-Aided Design CF ConFlat CMM Coordinate-Measuring Machine CSYS Coordinate System DEF Requirements definition ESD Engineering Specifications Document AL-1803-2751 FAT Factory Acceptance Test FDR Final Design Review FT Flight tube H Height dimension ID Identification KB Kirkpatrick–Baez mirror pair LBNL Lawrence Berkeley National Laboratory MIM Minimum incremental motion NA Not Applicable NRTL Nationally Recognized Testing Laboratory PDR Preliminary Design Review RE Responsible Engineer rms root-mean-squared S&A Survey and Alignment ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
6t h, D
C C
A ut h K ey : 4
8J
JB
X
ZN
9G mailto:SAMorton@LBL.gov
SAXS Small Angle Xray Scattering SFT SAXS flight tube SOW Statement Of Work AL-1803-2752 V. Version number W Width dimension W Tungsten
Additionally, the term “subcontractor” is used throughout this document to refer to the subcontractor/seller. All procurement awards are subcontracts of the University’s Prime Contract
No. DE-AC02-05CH11231 with the U.S. Government, represented by the Department of Energy, for management and operation of LBNL.
5. APPLICABLE DOCUMENTS
This section identifies applicable documents that are considered to be a part of this document.
All information contained in an applicable document shall be valid to the full extent, unless specifically noted within this document.
Number Rev. Title
27K813 C HEYS NEST FIDUCIAL POST
29G678 A COMPACT FIDUCIAL POST
1.2.4 Technical Specifications DECTRIS PILATUS®3 X 6M
1.8.3 Technical Specifications DECTRIS EIGER®2 X 9M-V
AL-1803-2752 A Statement of work: SAXS Flight Tube for 12.3.1 Endstation
6. INTRODUCTION
The purpose of this technical specification is to provide information needed by the subcontractor to complete the design, manufacture, and testing of a new SAXS Flight Tube (SFT) to be installed within the existing beamline 12.3.1 experimental hutch. The FT will be approximately 4m in length and 1m diameter; however the actual dimensions shall be proposed by the subcontractor based on optimal use of the available space. It is intended to house a Dectris 6M vacuum compatible detector and to translate it along the X, Y and Z directions within vacuum. The detector itself is outside the scope of supply.
The FT will be installed within an existing endstation hutch which cannot be disassembled or modified for access. Therefore, it is essential that all components are able to pass through the existing entryway. Motion of the FT will be required for initial alignment and for occasional realignment to a new optical axis if the upstream KB mirrors are retracted.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
6t h, D
C C
A ut h K ey : 4
8J
JB
X
ZN
Samples will be mounted on a SAXS sample environment cart directly in front of the FT. There shall be a gate valve near the sample end of the vacuum tube that will allow the vacuum tube to interface with small portable sample vacuum chambers. It shall also have a vacuum-interlock system to close the gate valve in the event of leaks and appropriate protection against over pressurization such as a pressure relief valve and burst disk.
The FT shall include additional motions for beamstops and a detector cover. The detector cover shall protect the entire detector face from damage, and it shall be movable in and out of the beam.
The scope of supply shall include the FT chamber components, support structure, internal mechanics and the actuator drives. Motor controllers, cabling, and motion controls shall be listed as an optional package, as detailed in the SOW.
Vacuum hardware including roughing pump, low vibration sustaining pump, gauges, vacuum controllers etc. shall also be detailed as an optional package.
The seismically certified floor mounting assembly is outside of the subcontractor’s scope of supply. However, the subcontractor shall supply sufficient information concerning mass and mass distributions to enable LBNL staff to design an appropriate seismic restraint system.
7. REQUIREMENTS DEFINITION
Shall, should, may, and will are used to define every requirement listed in this document. The definitions of these terms are as follows:
- Shall is a requirement that must be implemented
- Should indicates a desire and can be interpreted as ‘best effort’
- May indicates a desire and can be interpreted as ‘nice to have’
- Will is used to inform intent or declaration of purpose and is not a requirement
8. COORDINATE SYSTEM (CSYS)
The following CSYS will be used in this document:
The beamline CSYS, oriented such that the Z-axis is in the direction of the beam propagation from the source, and the Y-axis is normal to the floor, positive upwards. The positive X direction is outboard of the storage ring. X, Y, Z are designated transverse, vertical, and ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
6t h, D
C C
A ut h K ey : 4
8J
JB
X
ZN
longitudinal. Starting from the beamline CSYS, a sequence of three intrinsic rotations, RX, RY, RZ, also designated pitch, yaw and roll.
9. SPECIFICATIONS
9.1. Spatial envelope and limitations
The new SAXS flight tube will be installed within the existing 12.3.1 beamline endstation hutch
(Figure 1). The inner longitudinal dimension of the hutch is 6.695m along the beam axis. The space-claim for the FT begins 2.35m downstream from the inner face of the upstream wall leaving
<4.346m available for the tube. However, note that the upstream and downstream hutch walls are not parallel (Figure 2). A CAD model of the hutch and beam geometry can be provided upon request. Space and access on the outboard side is limited; note that the outboard hutch wall is not parallel to the beam axis. Clearances between the beam and hutch wall are covered in more detail in section 9.2.
Under normal operation all access to the tube and its contents shall occur on the inboard side. If access to the downstream end is required (or foreseen) by the subcontractor than the subcontractor shall leave sufficient space between the downstream end of the FT and the hutch wall to facilitate such access. The length of the flight tube should make best use of the available longitudinal space to maximize the available range of travel for the detector. The final dimensions of the FT spatial claim shall be confirmed in writing by LBNL at the time of the PDR.
The existing structure of the hutch cannot be disassembled or modified in any way to facilitate transportation, assembly, installation, or access, to the flight tube or any of its components; with the exception of labyrinth removal which is permissible for cable and utilities pulling (subject to compliance with ALS radiation shielding modification procedures). All access to the work site is via the existing hutch door (Figure 1). The inner dimensions of this door are 2032x1219mm (HxW).
The subcontractor shall design the assembly such that all components and equipment necessary to install and commission the FT can pass through this door.
Requirement
Primary access to the FT and its contents shall be via the inboard side
If access to the downstream end of the tube is required or envisioned, then sufficient space should remain between the tube and hutch wall to facilitate such access
All components and necessary equipment shall be able to pass through the existing entryway ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
6t h, D
C C
A ut h K ey : 4
8J
JB
X
ZN
Figure 1. The 12.3.1 hutch (nearside) and attached 12.2.2 hutch (farside) with 12.3.1 beam path indicated.
All access for FT assembly is via the nearside door.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
6t h, D
C C
A ut h K ey : 4
8J
JB
X
ZN
Figure 2 Plan view of the inboard 12.3.1 hutch (lower) and attached outboard 12.2.2 hutch (upper) with the locations of the 12.3.1 VFM, HFM, flight tube volume claim start, and alternate beam axes indicated
9.2. Beam geometry and alignment of the FT to the beam
The primary beam axis is parallel to the floor at a height of 1240mm above the floor. However, to allow sufficient space for seismic anchoring between the FT support structure and the floor the subcontractor’s scope of supply shall end 75mm above the floor level. See section 10.3 for seismic anchoring requirements. The support structure of the FT shall include XYZ adjustments suitable for aligning the FT to the beam axis with sufficient accuracy to meet the alignment specifications described in section 9.5.
A KB mirror pair is positioned upstream of the FT to provide variable beam focusing. It is envisioned that these mirrors will be individually retractable. This KB-retracted beam path will be for occasional use or to accommodate particularly unusual experimental geometries that require a descending beam path. Access to additional intermediate geometries between the “inserted”
VFM
HFM
Flight tube volume claim start
Both beam paths shown ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
6t h, D
C C
A ut h K ey : 4
8J
JB
X
ZN
and “retracted” geometries is not required. The subcontractor should provide sufficient adjustment in the Y and X directions to permit the flight tube to be realigned to the alternative beam axis by LBNL staff. This will entail a pitch rotation of 9mrad downwards about a point 2m upstream of the start of the flight tube volume claim and/or an inboard yaw rotation of 9mrad about a point 1.5m upstream of the start of the flight tube volume claim.
Realignment between alternative beampaths can be achieved via manual adjustment. Although
LBNL may consider subcontractor proposed motorized solutions as an additional option.
Beam path Distance from outboard hutch wall to beam axis @ start of volume claim
Distance from outboard hutch wall to beam axis @ downstream hutch wall
Beam height @ start of FT volume claim
Beam height @ end of FT volume claim
KB mirrors inserted
1143mm 1599mm 1240mm 1240mm
KB mirrors retracted
1129mm 1538mm 1222mm 1183mm
Table 9.2.a) Approximate geometry of the beam axis. Numbers are subject to final confirmation by LBNL at the PDR stage. Note that the flight tube support structure will terminate before reaching the floor, as documented in section 9.2 to allow space for LBNL supplied seismic floor anchoring
DEF Requirement Description Value Unit
Shall X minimum adjustment range of FT for alignment to primary beam path ±15 mm
Shall Y minimum adjustment range of FT for alignment to primary beam path ±25 mm
Shall Z minimum adjustment range of FT ±15 mm
Shall
Minimum sub-region of FT Y range over which fine adjustment is possible with sufficient precision to meet specifications in section 9.5
±12 mm
Should Additional X adjustment of FT upstream end required to accommodate alternate beam path +15 mm
Should Additional X adjustment of FT downstream end required to accommodate alternate beam path
+55 mm ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
6t h, D
C C
A ut h K ey : 4
8J
JB
X
ZN
Should Additional Y adjustment of FT upstream end required to accommodate the alternate beam path
-20 mm
Should Additional Y adjustment of FT downstream end required to accommodate the alternate beam path
-55 mm
9.3. Chamber specifications
The ultimate vacuum pressure shall be lower than 1×10-3 mbar.
A level of 10-2 mbar should be achieved within 4 hrs. with a provided pumping speed of 15 cu ft.
per minute on a roughing pump and a 300L/s turbo pump.
All vacuum-facing components shall use vacuum-compatible materials.
The flight tube modules and endcap shall be connected to each other with Viton O-rings captured in half- or full-dovetail grooves. Use of grease on O-rings shall be strictly prohibited.
Flange, port, valve, and bellow connections shall utilize standard ISO-F or ISO-KF centering rings in aluminum or stainless steel with Viton O-rings. Use of grease on O-rings shall be strictly prohibited.
Neither the maximum stress under a vacuum pressure of ≤1×10-3 mbar nor the assembly weight shall exceed the yield stress of the applicable material. An FEA analysis shall be provided by the subcontractor demonstrating compliance with ASME BVPC Section VIII Rules for Construction of
Pressure Vessels, Division 2.
Access doors shall be hinged and sealed with Viton O-rings.
The FT should have three evenly spaced standard 6” ISO flanges for a vacuum-pump connections located along the bottom of the vacuum chamber.
The FT system must comply with requirements of 10CFR851 with regard to pressure safety due to potential back-fill. Guidance for meeting the requirements of 10CFR851 with respect to vacuum chamber pressure safety are found in the Vacuum Systems Consensus Guideline for
Department of Energy Accelerator, BNL-81715-2008-IR, Brookhaven National Laboratory, Upton, NY, 09-Sep-2008. The FT system shall be designed as a Category II vacuum system due to potential back filling and the subcontractor shall provide protection against over-pressurization including an appropriately sized burst disk.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
6t h, D
C C
A ut h K ey : 4
8J
JB
X
ZN
Guidance for the design, construction, testing, operation, inspection and maintenance of vacuum vessel and associated components may also be found in the Vacuum Systems Consensus
Guideline for Department of Energy Accelerator, BNL-81715-2008-IR, Brookhaven National
Laboratory, Upton, NY, 09-Sep-2008.
9.4. Detector compatibility
The detector itself is outside the scope of supply. The FT shall be compatible with the Dectris
PILATUS®3 X 6M vacuum compatible x-ray detector. Compatibility requirements shall include the ability to support and translate the detector as specified within this document as well as the ability to meet all interface requirements specified by the manufacturer in “Technical
Specifications DECTRIS PILATUS®3 X 6M” v.1.2.4 and its successor versions including (but not limited to) mechanical, utility, electrical, environmental, interlocks, vacuum, and data interfaces.
Where onward connection to external interfaces is necessary (such as electrical, data, etc) the subcontractor shall include appropriate, and documented, interfaces that are external to the FT.
The 6M is currently not available “off-the-shelf” as a vacuum compatible model. The only detector that is vacuum compatible as standard (and currently available) is the 9M-V. Thus, the subcontractor shall (with the approval of LBNL), make appropriate assumptions about additional requirements for a vacuum compatible version of the 6M based on the manufacturer’s published
9M-V specifications as documented within “Technical Specifications DECTRIS EIGER®2 X 9M-V” version 1.8.3 and any successor versions. The FT shall be designed to accommodate the 9M-V as an alternative option to the 6M in the event that a vacuum compatible version of the 6M proves to be unavailable.
Requirements
The FT shall be compatible with the PILATUS®3 X 6M with additional requirements necessary for vacuum compatibility agreed with LBL
The FT shall be compatible with the DECTRIS EIGER®2 X 9M-V vacuum compatible detector
9.5. Motion requirements
The detector shall be capable of independent in-vacuum translation in the X, Y, and Z directions.
The X, Y and Z translations should be as large as possible subject to the spatial limitations of the beamline, exceeding the values below if possible and the FT should be sized accordingly. The X ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
6t h, D
C C
A ut h K ey : 4
8J
JB
X
ZN
and Y ranges should be asymmetric about the beam axis to provide the maximum possible displacement from the beam axis.
The detector shall be capable of independent in-vacuum translation in the X, Y, and Z directions
X, Y and Z detector axes shall be motorized
All detector axes shall include limit switches
The detector Z travel shall be protected by double sets of limit switches
All detector axes shall include absolute encoders
Should Detector Z minimum travel range 2900 mm
Should Detector X minimum travel range ±100 around center mm
Should Detector Y minimum travel range ±100 around center mm
Shall Detector Z movement resolution better than 0.5 mm
Shall Detector X movement resolution better than 100 μm
Shall Detector X movement resolution better than 100 μm
Shall Maximum static displacement in X or Y over the full Z translation range
100 μm
Shall Detector X-Y-Z stationary stability better than
5 μm
Shall Detector Z minimum movement speed exceeds
4.5 m/minute
9.6. Beamstop specifications
Translators for beamstops shall be attached to the carriage that the detectors sit on so that they translate in Z with the detector. The beamstop shall move independently of the detector in X and
Y directions. Two different beamstops shall be mounted and swapped by translating them as needed during operation
Requirements
The Subcontractor shall provide two beamstops interchangeable by translation within vacuum
The translators for the beamstops shall be attached to the detector Z carriage ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
6t h, D
C C
A ut h K ey : 4
8J
JB
X
ZN
The beamstops shall be no further than 3cm upstream of the detector face
The beamstops shall move independently of the detector in the X and Y directions
The beamstops may share an XY translation system
One beamstop shall have an embedded photodiode capable of measuring 10keV beam intensities to better than 0.1% accuracy
One beamstop shall include a beam visualization system with a resolution of better than 10μm
Cabling shall be provided to extract the beamstop signals from the flight tube
Shall beamstop X motion range 220 mm
Shall beamstop X motion resolution better than 5 μm
Shall beamstop Y motion range 20 mm
Shall beamstop Y motion resolution better than 5 μm
9.7. Detector cover specifications
A fully retractable cover over shall protect the entire detector face from damage when closed
The cover shall be between the detector and beamstop
10. INTEGRATION
10.1. Units and hardware policy
AL-1009-9880 specifies that the SI system of units shall be implemented for this Subcontract. All documents generated shall use the SI system, as shall fastener hardware, vacuum hardware, major components, and tooling.
Requirement
All hardware shall be Metric, except in specific cases for which a deviation request, subject to review and approval by LBNL, demonstrates the benefit to using Imperial ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
6t h, D
C C
A ut h K ey : 4
8J
JB
X
ZN
10.2. CAD Integration
The ALS experimental floor is crowded, and integration tends to be difficult and subject to complex spatial constraints. At the time of the FDR the Subcontractor shall supply a CAD model in a mutually agreed format that is suitable for validating the spatial constraints outlined above in 9.1 and 9.2.
Requirement
The final design spatial envelope shall be validated by integration in the beamline CAD model at the time of the FDR
10.3. Seismic requirements
The FT will operate in a geologically active area near the Hayward Fault; therefore, the seismic anchorage design and the equipment support frames shall comply with the California Building
Code.
Due to unique constraints, the seismic floor anchorage design shall be done by LBNL. To this purpose, LBNL will design a floor mounting plate following the floor mounting plate tapped hole layout proposed by the Subcontractor. LBNL incurs all associated costs, however the
Subcontractor shall provide the following parameters and implement all recommendations made by the LBNL Structural Engineer.
Requirements
The Subcontractor shall propose a floor mounting plate tapped hole layout to be reviewed and approved by LBNL
The Subcontractor shall provide the following parameters:
- The weight of the complete FT assembly as configured for operation, including the 6M detector and all necessary cabling and utilities distribution required for normal operation
- The overall height, width, and depth
- The dimensioned location for the center of gravity (height and in plan)
- The magnitude and location of all vacuum loads
The equipment support frames shall comply with the California Building Code
In addition, the Subcontractor shall provide calculations that show that the equipment support frames, including but not limited to the support structure, the vacuum chamber, and the internal mechanics, comply with the California Building Code. The design and calculations shall be reviewed and approved by the LBNL Structural Engineer. Because of the close proximity of the
Hayward Fault, the seismic load requirements specified by the building code for the ALS are high, typically around 0.37 g-force vertically and 1.00 g-force laterally, in any direction. LBNL may assist the Subcontractor in defining the seismic load requirements.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
6t h, D
C C
A ut h K ey : 4
8J
JB
X
ZN
10.4. S&A
LBNL S&A uses laser trackers to align beamline components at the ALS. The subcontractor shall develop and provide the S&A procedure. It shall be reviewed by LBNL to confirm that the procedure can be performed in the beamline.
The SAXS flight tube modules shall each have three fiducials visible from the inboard side, in locations to be reviewed and approved by LBNL in writing, each with datum related to the assembled cylindrical chamber axis, for installation at LBNL by LBNL S&A personnel.
Compact posts 29E064 or Heys nest 27K813 fiducial posts, or equivalent, (LBNL reserves the right to determine equivalency), shall be used
10.5. Lifting provisions
Access at the ALS is often restricted, and specialized lifting fixtures or attachment points may be needed. LBNL shall provide all information needed by the Subcontractor (e.g. list of available lifting equipment) to develop a suitable design and procedure by the time of the FDR.
All components shall have lifting provisions as required for assembly/disassembly and packing/transport per ASME B30 standard. They shall be capable of being hoisted by a manual crane with load limit of 1 ton (2000 lbs.) and maximum hook height of 2.67 m. The SAXS flight tube shall have a provision for a balanced lift of all chamber adaptor components when they are connected together.
Requirement
Installation and removal of the detector shall be possible at the beamline
Installation and removal of the detector shall be possible via an access port without splitting the primary tube
10.6. Electrical
The Subcontractor shall provide the system interconnect and wire diagram. Electrical safety will be reviewed before giving formal approval for initiation of manufacturing activities to ensure all
LBNL specifications are met.
All electrical components should be UL/NRTL Listed ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
6t h, D
C C
A ut h K ey : 4
8J
JB
X
ZN
Every electrical component shall be listed with the function, voltage and power requirements
All electrical components shall be subject to review and approval by LBNL
All system components shall have provisions for large wire grounding attachment points in the form of studs or threaded holes
10.7. Vacuum
A DN320 vacuum valve shall be included at the upstream end of the FT for connection to the beamline
An all-metal valve is not required, however if an O-ring sealed valve is envisioned then the O-ring shall face downstream
A vacuum interlock system shall be provided to close the gate valve in the even to a leak
The subcontractor shall, as detailed in the SOW, propose an optional package consisting of all additional vacuum hardware required for operation of the FT. This should include suitable pumps as required for roughing, sustaining baseline vacuum requirements with minimal vibration, vacuum gauges sufficient to cover the range from atmospheric pressure to baseline vacuum, controllers, and cables.
11. FAT
The Subcontractor shall develop a FAT procedure that demonstrates that all requirements listed throughout this specification are met in an environment that should be comparable to the ALS.
The FAT should be divided in four inspections: general inspection, vacuum acceptance, determination of the positioning performance of the controlled axes, and determination of the stability performance. FAT shall be reported in written form and an electronic copy of all results shall be provided
11.1. General inspection
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
6t h, D
C C
A ut h K ey : 4
8J
JB
X
ZN
The linear and/or angular travels of the motorized axes shall be measured
All hard stops shall be tested by direct collisions at maximum speed at least five times
11.2. Determination of the positioning performance
ISO 230 may be considered as guidelines for testing the positioning performance. The repeatabilities and parasitic error motions shall be evaluated by measurement of each of the individual axes. The sensors should be set as close as possible to the functional points, be mounted on a frame attached to the support structure and have a resolution and uncertainty better than 0.1× the requirements being measured. The Z carriage should be loaded with a mass that is representative of the detector and other necessary subsystems.
The repeatability of all controlled axes shall be evaluated at ten target positions by 5 unidirectional approaches from the hardstop, repeated by 5 unidirectional approaches from the other direction, and reported as bidirectional repeatabilities (min/max)
The MIM shall be evaluated and reported
The maximum translational speed shall be reported
12. LABELLING
The FT shall be serialized as indicated by LBNL
The serial number ID shall be engraved on black aluminum plates fixed to the support structure
13. STANDARDS AND CODES
Number Title ISO 230 Test code for machine tools
Cal. Code Regs., Title 24 2019 California Building Code
ASCE 7-16
Minimum Design Loads and Associated Criteria for Buildings and Other Structures
ISO 5817 Welding — Fusion-welded joints in steel, nickel, titanium and their alloys (beam welding excluded) — Quality levels for imperfections
10CFR851 Department of Energy Worker Safety and Health Program ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
6t h, D
C C
A ut h K ey : 4
8J
JB
X
ZN
BNL-81715-2008-IR Vacuum Systems Consensus Guideline for Department of Energy Accelerator
ASME BPVC.VIII.2-2023 AMSE Section VIII, Rules for Construction of Pressure Vessels, Division 2
14. GENERAL FABRICATION REQUIREMENTS
The components shall be free of burrs and sharp edges, dents, gouges, and scratches. The components shall be clean and free of dirt, corrosion, oil, and grease.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch
6t h, D
C C
A ut h K ey : 4
8J
JB
X
ZN