AL-1595-3099B.pdf
PDF 1 MB Posted
- Attached to
- ALS-U NEW AND UPGRADED BEAMLINES
- Solicitation number
- MG-05072024
- Issued by
-
Department of Energy
About this file
This document appears to be a Request for Information (RFI) for the ALS-U NEW AND UPGRADED BEAMLINES opportunity from the Department of Energy, issued by the Lawrence Berkeley National Laboratory (LBNL).
The RFI is seeking information from suppliers regarding the University of California's plans to upgrade and add new beamlines to the Advanced Light Source (ALS) facility. The RFI provides a timeline, with responses due by 05/17/2024 via email to mggrausz@lbl.gov. No other details about the required products, services, or evaluation criteria are included in this document. This appears to be the RFI document itself, without any attached files or additional information about the specific contract requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 29E064C.pdf | ||
| 27K813C.pdf | ||
| RFI Pink - ALS-U NEW AND UPGRADED BEAMLINES.pdf | ||
| AL-1595-3412B.pdf | ||
| AL-1595-2995B.pdf | ||
| Radiation Shielding Requirements Memo.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D
C
A
A
B
C
D
4 3 2 1 C R E O
P a r a m e t r i c
>>>LBNL:DRAWING:FORMAT:001<<<
62.5 62.5
M10 THREADED
GRANITE INSERTS
(BOTH SIDES)
S
BEAMLINE CSYS
TR
B
S
BEAMLINE CSYS
TR
BEAMLINE CSYS
R
S T
(FLOOR)
( )280
26.32
24.18
0.523�$�
0.065�$�
( )390
( )225
195 195
( )600
( )400 ( )400
( )390
D W G
N O
R E V
S H
A L
B
THIS DRAWING IS THE PROPERTY OF ERNEST ORLANDO LAWRENCE BERKELEY NATIONAL LABORATORY (LBNL) AND ANYTHING PRODUCED FROM THESE DRAWINGS IS SUBJECT TO LBNL'S INTELLECTUAL PROPERTY RIGHTS. THIS DRAWING IS LOANED ON A CONFIDENTIAL BASIS SUBJECT TO RETURN ON DEMAND AND NOTHING HEREIN MAY BE REPRODUCED, USED OR DISCLOSED
IN WHOLE OR PART WITHOUT PRIOR WRITTEN PERMISSION OF LBNL.
May 26 2023 9:13:40 AM PDTRELEASED AT cdroehrigRELEASED BY
May 26 2023 9:11:45 AM PDTCHECKED AT mbergeret,hpalvarezCHECKED BY
Armstrong, RobinAUTHOR
HEIGHT ADJUSTMENT.
CHANGE DESCRIPTION (SEE LBNL PDM FOR REV HISTORY)
ERNEST ORLANDO LAWRENCE
BERKELEY NATIONAL LABORATORY
UNIVERSITY OF CALIFORNIA
PROJECT NAME UNLESS OTHERWISE SPECIFIED
ADVANCED LIGHT SOURCE
TOLERANCE
X.�#�1.0 .X�#�0.1 .XX�#�0.05
FRACTIONS: �#� -/--
ANGLES: �#�1
MACH. SURFS.: 3.2um or better
REFERENCE
-THREADS ARE CLASS G or H
-BREAK EDGES 0.5 MAX, ON
MACHINED WORK
-REMOVE BURRS, WELD SPLATTER
& LOOSE SCALE
ALS-U - INSERTION DEVICE BEAMLINES
DRAWING UNITSDRW REF DOC
mm-kg-s EG-1000-0923
BEAMLINESTHIRD ANGLE SCALE
COSMIC 7.0.1. PINK BEAM SLIT/SCREEN
INTERFACE
1:12
PRINT NOT TO SCALE
REV ITEM NUMBERLIFECYCLE STATECATEGORY CODE SHEETSHEET SIZE
BAL-1595-3099ReleasedAL78201 OF 1C
SYNCHROTRON RADIATION FAN
NOTES:
101. ALL DIMENSIONS ARE IN MILLIMETERS (mm) AND VALUES ARE IN
SI UNITS. DIMENSIONS AND VALUES IN BRACKETS ARE U.S.
CUSTOMARY UNITS (inch) CONVERTED FROM MILLIMETERS / SI
UNITS.
SEE DETAIL Y
ELEVATION VIEW
INLET CONNECTION
DN100 CF FIXED FLANGE
TAPPED HOLES
LEAVE 160�n� CLEARANCE FOR BELLOWS
OUTLET CONNECTION
DN100 CF FIXED FLANGE
TAPPED HOLES
LEAVE 160�n� CLEARANCE FOR BELLOWS
PROTRUSION ZONE
SEE DETAIL Z
PLAN VIEW
DETAIL Z
SCALE 1:2
DETAIL Y
SCALE 1:2
SECTION A-A
SEE DETAIL Z
DETAIL Z
SCALE 1:2
SAMPLE 1 inch PLATE WITH 1 inch �n� HOLE PATTERN
FINAL PLATE TO BE APPROVED BY LBNLFRONT VIEW
B
BEAMLINE CSYS
R
S T
O ffi ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay
6t h, D C
C A ut h
K ey
: 8 6T
D 0I
YW
I9
Downloaded by: Barnardus Gerhardus van Loggerenberg at May 03, 2024 08:39:38
| Sheet 1 |
| Views |
| right_7 |
| top_8 |
| Z |
| Y |
| top_11 |
| Z |
| right_13 |
File details come from the government source that posted it. Updated .