AL-1595-2995B.pdf

PDF 1 MB Posted

Attached to
ALS-U NEW AND UPGRADED BEAMLINES
Solicitation number
MG-05072024
Issued by

About this file

This document is a Request for Information (RFI) issued by the Department of Energy on behalf of the Lawrence Berkeley National Laboratory (LBNL) for the ALS-U NEW AND UPGRADED BEAMLINES procurement.

The RFI seeks information from suppliers regarding the requirements for new and upgraded beamlines at the Advanced Light Source (ALS) facility. The RFI provides a timeline, with the RFI being released on 05/07/2024 and responses due by 05/17/2024. Responses should be submitted via email to mggrausz@lbl.gov. The RFI and associated documents, including instructions, are attached to the notification email. No other details about the specific products, services, or scope of work are provided in the RFI summary. This appears to be solely a request for information from potential suppliers, and not a full solicitation at this time.

View the file

Other files

File Type Posted
29E064C.pdf PDF
AL-1595-3099B.pdf PDF
27K813C.pdf PDF
RFI Pink - ALS-U NEW AND UPGRADED BEAMLINES.pdf PDF
AL-1595-3412B.pdf PDF
Radiation Shielding Requirements Memo.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D

C

A

A

B

C

D

4 3 2 1 C R E O

P a r a m e t r i c

>>>LBNL:DRAWING:FORMAT:001<<<

BEAMLINE CSYS

T

R

S

BEAMLINE CSYS

T

S

R

BEAMLINE CSYS

T

S

R

(FLOOR)1420

( )400

90 205

63 28 6.99

6.99

0.026�$�

0.026�$�

5.41

6.87

0.026�$�

0.033�$�

75 75

15 95

( )295

( )415

( )305

( )455

D W G

N O

R E V

S H

A L

B

THIS DRAWING IS THE PROPERTY OF ERNEST ORLANDO LAWRENCE BERKELEY NATIONAL LABORATORY (LBNL) AND ANYTHING PRODUCED FROM THESE DRAWINGS IS SUBJECT TO LBNL'S INTELLECTUAL PROPERTY RIGHTS. THIS DRAWING IS LOANED ON A CONFIDENTIAL BASIS SUBJECT TO RETURN ON DEMAND AND NOTHING HEREIN MAY BE REPRODUCED, USED OR DISCLOSED

IN WHOLE OR PART WITHOUT PRIOR WRITTEN PERMISSION OF LBNL.

May 25 2023 9:14:04 AM PDTRELEASED AT cdroehrigRELEASED BY

May 23 2023 11:08:03 AM PDTCHECKED AT hpalvarez,mbergeretCHECKED BY

Armstrong, RobinAUTHOR

HEIGHT ADJUSTMENT.

CHANGE DESCRIPTION (SEE LBNL PDM FOR REV HISTORY)

ERNEST ORLANDO LAWRENCE

BERKELEY NATIONAL LABORATORY

UNIVERSITY OF CALIFORNIA

PROJECT NAME UNLESS OTHERWISE SPECIFIED

ADVANCED LIGHT SOURCE

TOLERANCE

X.�#�1.0 .X�#�0.1 .XX�#�0.05

FRACTIONS: �#� -/--

ANGLES: �#�1

MACH. SURFS.: 3.2um or better

REFERENCE

-THREADS ARE CLASS G or H

-BREAK EDGES 0.5 MAX, ON

MACHINED WORK

-REMOVE BURRS, WELD SPLATTER

& LOOSE SCALE

ALS-U - INSERTION DEVICE BEAMLINES

DRAWING UNITSDRW REF DOC

mm-kg-s EG-1000-0923

BEAMLINESTHIRD ANGLE SCALE

COSMIC 7.0.1. WHITE-BEAM SLIT INTERFACE1:12

PRINT NOT TO SCALE

REV ITEM NUMBERLIFECYCLE STATECATEGORY CODE SHEETSHEET SIZE

BAL-1595-2995ReleasedAL78201 OF 1C

SYNCHROTRON RADIATION FAN

ELEVATION VIEW BEAM VIEW

NOTES:

101. ALL DIMENSIONS ARE IN MILLIMETERS (mm) AND VALUES ARE IN

SI UNITS. DIMENSIONS AND VALUES IN BRACKETS ARE U.S.

CUSTOMARY UNITS (inch) CONVERTED FROM MILLIMETERS / SI

UNITS.

SEE DETAIL Z

GRANITE STAND

(NOT IN SCOPE)

INTERFACE TO STAND

TO BE APPROVED BY LBNL

INLET CONNECTION

DN63 CF FIXED FLANGE

TAPPED HOLES

OUTLET CONNECTION

DN63 CF FIXED FLANGE

TAPPED HOLES

SECTION A-A

PLAN VIEW

SEE DETAIL Y

FRONT PROTRUSION ZONE

FRONT PROTRUSION ZONE

ELEVATION VIEW

DETAIL Z

SCALE 1:1

PLAN VIEW

DETAIL Y

SCALE 1:1

BEAMLINE CSYS

T

R

S

B

O ffi ci al ly R el ea se d to th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ay

5t h, D C

C A ut h

K ey

: K 7H

G

JD

RD

Downloaded by: Barnardus Gerhardus van Loggerenberg at May 03, 2024 08:39:49

Sheet 1
Views
right_4
top_5
right_6
Z
Y

File details come from the government source that posted it. Updated .