aka-fnsb-tanana1_plans.pdf
PDF 34 MB Posted
- Solicitation number
- 69056722B000024
About this file
This document outlines an Invitation for Bid for the AK FNSB TANANA(1), Tanana River Recreation Access Improvements project. The IFB, along with related plans and physical data documents, are provided in an attachment for interested bidders. The Department of Transportation Federal Highway Administration is the issuing agency seeking bids for improvements that include construction of a new boat launch, parking area, and access road at the project site along the Tanana River in Alaska. Bids are due by the date specified in the solicitation documents. The work required encompasses site preparation, paving, fencing and other infrastructure to develop and enhance public recreational access to the river.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRENT L COE Digitally signed by BRENT L COE Date: 2022.09.09 09:39:01 -07'00'
E
INDEX TO SHEETS
i A.GENERAL INFORMATION
� A.1 TITLE SHEET
1i A.2 INDEX TO SHEETS u A.3 PLAN SYMBOLS AND ABBREVIATIONS - A.4 VICINITY MAP N N
B. SUMMARY OF QUANTITIES
i;' B.1-3 SUMMARY OF QUANTITIES
� C. TYPICAL SECTIONS
� C.l TABULATION OF TYPICAL SECTION QUANTITIES
0 C.2-7 TYPICAL SECTIONS
D. PLAN-PROFILE
D.1 TABULATION OF PLAN QUANTITIES
D.2-8 PLAN AND PROFILE - SOUTH LATHROP STREET
ID D.9-10 PLAN AND PROFILE - NORTHLAKE LANE
.ID D.11-13 PLAN AND PROFILE - SHARED-USE TRAIL
D.14 SURVEY CONTROL
E. PARKING AREAS, INTERSECTION, AND APPROACHES
E.1-2
E.3 E.4-9 E.10
E.11
E.12-15 E.16 E.17
TABULATION OF PARKING AREAS, INTERSECTION,
AND APPROACHES QUANTITIES
NON-MOTORIZED BOAT LAUNCH RESTROOM
MOTORIZED BOAT LAUNCH AND PARKING AREA
SOUTH LATHROP STREET LEVEE ACCESS ROAD
PLAN-PROFILE
SANDURI AVENUE/ POMM ROAD AND SOUTH
LATHROP STREET INTERSECTION
SWIM BEACH PARKING AREA AND PATHWAY
APPROACH DETAILS
MODULAR CROSSING PAVING DETAILS
I F. EROSION CONTROL
1 F.1 TABULATION OF EROSION CONTROL QUANTITIES
� F.2-5 EROSION AND SEDIMENT CONTROL PLAN AND
� PLAN - SOUTH LATHROP STREET
1 F.6 EROSION AND SEDIMENT CONTROL PLAN AND
PLAN - NORTHLAKE LANE
F.7-8 EROSION AND SEDIMENT CONTROL PLAN AND ID
PLAN - SHARED-USE TRAIL ::: F.9 EROSION AND SEDIMENT CONTROL PLAN -
1 LEVEE ACCESS ROAD
g F.10 EROSION AND SEDIMENT CONTROL PLAN -
E MOTORIZED BOAT LAUNCH AND PARKING AREA
F.11 EROSION AND SEDIMENT CONTROL PLAN -
SWIM BEACH PARKING AREA AND PATHWAY -�
F.12 W157-17, TEMPORARY DIVERSION BERM
METHODS
F.13 W157-19, STABILIZED CONSTRUCTION EXIT
F.14 W157-21, FIBER ROLL
� G.DRAINAGE
G.1 TABULATION OF DRAINAGE QUANTITIES
,!ii G.2 62+62.92 CULVERT PLAN AND PROFILE
G.3 W251-l, PLACED RIPRAP AT CULVERT OUTLETS
G.4 STND 602-1, METAL PIPE CULVERT
ro C G.5 STND 602-2, METAL PIPE CULVERT COUPLING ro C
BAND /'!
� G.6 STND 602-3, METAL AND PLASTIC PIPE CULVERT
BEDDING
i G.7 STND 602-5, PLASTIC PIPE CULVERT
INDEX TO SHEETS (cont.)
H. TEMPORARY TRAFFIC CONTROL
H.1 TABULATION OF TEMPORARY TRAFFIC CONTROL
QUANTITIES
H.2 TEMPORARY TRAFFIC CONTROL PLAN
H.3 RAILROAD CROSSING DETOUR PLAN
H.4 STND 635-1, TEMPORARY TRAFFIC CONTROL
ADVANCE SIGNING
H.5 STND 635-5, TEMPORARY TRAFFIC CONTROL
ROAD CLOSURE LAYOUT (WITH FLAGGERS)
H.6 STND 635-6, TEMPORARY TRAFFIC CONTROL
SINGLE LANE CLOSURE LAYOUT (WITH FLAGGERS)
H.7 STND 635-7, TEMPORARY TRAFFIC CONTROL
SHOULDER LANE CLOSURE LAYOUT (WITH YIELD
SIGN)
H.8 STND 635-10, TEMPORARY TRAFFIC CONTROL
SHOULDER CLOSURE LAYOUT
H.9 STND 635-14, TEMPORARY TRAFFIC CONTROL
SIGN INSTALLATION WOOD POSTS
H.10 TEMPORARY TRAFFIC CONTROL SHARED ROADWAY
WITH PEDESTRIAN ZONE
I. PERMANENT TRAFFIC CONTROL
1.1-4 TABULATION OF PERMANENT TRAFFIC CONTROL
QUANTITIES
1.5-8 PERMANENT TRAFFIC CONTROL PLAN AND PLAN -
SOUTH LATHROP STREET
1.9 PERMANENT TRAFFIC CONTROL PLAN AND PLAN -
NORTHLAKE LANE
1.10-11 PERMANENT TRAFFIC CONTROL PLAN AND PLAN -
SHARED USE TRAIL
1.12 PERMANENT TRAFFIC CONTROL PLAN -
MOTORIZED BOAT LAUNCH AND PARKING AREA
1.13 PERMANENT TRAFFIC CONTROL PLAN -
SWIM BEACH PARKING AREA AND PATHWAY
1.14 GATE LAYOUT AND DETAILS
1.15 GATE SIGNING DETAILS
1.16 FENCE DETAILS
1.17 BOULDER DETAILS
1.18 PAVEMENT STRIPING AND MARKINGS
1.19 W634-1, PAVEMENT MARKINGS SYMBOLS
AND WORDS
1.20-22 SPECIAL SIGN PANEL DETAILS
1.23 SIGN OFFSET AND HEIGHT
1.24 SIGN POST EMBEDMENT
1.25 SIGN WIND FRAMING
J. UTILITIES
J.1 LEGEND
J.2 ESTIMATE OF QUANTITIES, GENERAL NOTES,
ABBREVIATIONS
J.3 NON-MOTORIZED BOAT LAUNCH ELECTRICAL PLAN
J.4 MOTORIZED BOAT LAUNCH ELECTRICAL PLAN
J.5 TYPICAL ONE-LINE DIAGRAM AND LCl & LC2
FEEDER SCHEDULES
J.6 PANEL SCHEDULE
J.7-10 ELECTRICAL DETAILS
J.11 CONTROL SCHEMATIC
K. WETLAND MITIGATION
K.l TABULATION OF WETLAND MITIGATION
QUANTITIES
K.2 WETLAND MITIGATION PLAN OVERVIEW
K.3 WETLAND MITIGATION TYPICAL SECTION AND
POINTS
L. SETTLEMENT MONITORING
L.1 SETTLEMENT MONITORING PLATE AND
INSTALLATION DETAILS
I STATE I PROJECT I SHEET
NUMBER
I AK I FNSB TANANA(l) I A.2
---�''"''\ -- OF AL. \\ :---�'<:,_ ....... �� '
t ���- · . I►- · · .T t
1 ,c:-,. �� -� I �� t� ··.*/
� ........ � fl ·. Paul Kendall : �
I%.·. CE-11665 . ·$,
t t ("'�; · · 71?.�/J?-, · \�0:\ \�O P,?OFESS\()I;\�\. --
INDEX TO SHEETS
Sheet and Description
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECION I SECTION J SECTION K
TYPICAL
SECTIONS
PLAN -
PROFILE
PARKING AREAS,
INTERSECTIONS, AND
APPROACHES
EROSION
CONTROL DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
UTILITIES WETLAND
MITIGATION ALLOWANCE Bid
Schedule
A1000 15101-0000 MOBILIZATION LPSM ALL
A1020 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A1040 15301-0010 CONTRACTOR QUALITY CONTROL AND
ASSURANCE LPSM ALL
A1060 15401-0000 CONTRACTOR TESTING LPSM ALL
A1080 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A1100 15702-5000 SOIL EROSION CONTROL, TEMPORARY
DIVERSION BERM LPSM All ALL
A1120 15703-2000 SOIL EROSION CONTROL, TEMPORARY
TURF ESTABLISHMENT ACRE 2.65 0.13 2.78
A1140 15705-0600 SOIL EROSION CONTROL, TEMPORARY
24-INCH CULVERT PIPE LNFT 252 252
A1160 15705-1000 SOIL EROSION CONTROL, TEMPORARY
48-INCH CULVERT PIPE LNFT 100 100
A1180 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 12,296 615 12,911
A1200 15706-1600 SOIL EROSION CONTROL,
STABILIZED CONSTRUCTION EXIT EACH 5 5
A1220 20101-0000 CLEARING AND GRUBBING ACRE 4.46 1.04 0.27 5.77
A1240 20104-0000 CLEARING ACRE 0.79 0.04 0.83
A1260 20301-0100 REMOVAL OF BOLLARD EACH 4 4
A1280 20301-1100 REMOVAL OF GATE EACH 2 2
A1300 20301-1900 REMOVAL OF PIPE CULVERT EACH 6 6
A1320 20301-2400 REMOVAL OF SIGN EACH 6 16 22
A1340 20302-0700 REMOVAL OF FENCE LNFT 76 51 127
A1360 20401-0000 ROADWAY EXCAVATION CUYD 6,217 3,071 464 9,752
A1380 20402-0000 SUBEXCAVATION CUYD 17,156 2,370 977 20,503
A1400 20411-0000 SELECT BORROW (Type B) TON 81,563 7,817 4,468 93,848
A1420 20411-0000 SELECT BORROW TON 5,306 6,859 608 12,773
A1440 20426-1000 DITCH, EXCAVATION CUYD 260 26 286
A1460 20701-0300 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE C
(NONWOVEN) SQYD 150 150
A1480 20701-0400 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE D
(WOVEN) SQYD 46,502 18,230 3,236 67,968
A1500 20703-0000 GEOGRID (BIAXIAL, TYPE III) SQYD 15,439 772 16,211
A1520 20801-0000 STRUCTURE EXCAVATION CUYD 154 8 162
A1540 20802-0000 FOUNDATION FILL CUYD 14 2 16
A1560 20803-0000 STRUCTURAL BACKFILL CUYD 109 6 115
A1580 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 1,809 181 1,990
MileStone: 100% Date Completed: In Progress Report Date: 08/29/22
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
-A ug
-2
:0
PM
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities
J:
\2
9\
T an an a R iv er R ec re at io na l A cc es s\
D es ig n\
D ra w in gs
B 1-
S U
M M
AR
Y
O F
Q U
A N
TI
TI
ES
.x ls m
]S he et
STATE PROJECT
B.1FNSB TANANA(1)AK
SHEET
NUMBER
TYPICAL
SECTIONS
PLAN -
PROFILE
PARKING AREAS,
INTERSECTIONS, AND
APPROACHES
EROSION
CONTROL DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
UTILITIES WETLAND
MITIGATION ALLOWANCE Bid
Schedule
A1600 21101-2000 ROADWAY OBLITERATION, METHOD 2 SQYD 80 2,765 285 3,130
A1620 21102-3000 ROADWAY OBLITERATION, METHOD 3 LPSM All ALL
A1640 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1 CUYD 2 2
A1660 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 CUYD 55 55
A1680 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 CUYD 77 77
A1700 25125-0000 BOULDER EACH 116 116
A1720 25126-0000 REMOVE AND RESET BOULDER EACH 36 36
A1760 30105-2000 SUBBASE GRADING B TON 29,200 600 1,440 1,562 32,802
A1780 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 7,657 4,817 624 13,098
A1800 30202-2100 ROADWAY AGGREGATE, METHOD 2,
SURFACE COURSE TON 80 4 84
A1840 31103-3000 STABILIZED AGGREGATE SURFACE
COURSE, CALCIUM CHLORIDE,
IMPORTED AGGREGATE TON 1,094 4,421 276 5,791
A1860 31214-0000 CALCIUM CHLORIDE FLAKE TON 20 82 5 107
A1880 31303-0000 AGGREGATE-TOPSOIL COURSE CUYD 151 15 166
A1900 40301-0000 ASPHALT CONCRETE PAVEMENT TON 3,328 1,688 251 5,267
A1920 60201-0800 24-INCH PIPE CULVERT LNFT 405 405
A1940 60201-1200 48-INCH PIPE CULVERT LNFT 100 100
A1960 60202-0200 18-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE CULVERT LNFT 223 223
A1980 60202-0400 24-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE CULVERT LNFT 58 58
A2000 60211-0600 END SECTION FOR 18-INCH
EQUIVALENT DIAMETER ARCH OR
ELLIPTICAL PIPE CULVERT EACH 2 2
A2020 60915-1000 WHEELSTOP, CONCRETE EACH 258 258
A2040 61901-2300 FENCE, SPLIT RAIL LNFT 364 364
A2060 61902-0900 GATE, METAL EACH 7 7
A2080 61921-1000 REMOVE AND RESET FENCE LNFT 300 300
A2100 62201-0350 BACKHOE HOUR 12 12
A2120 62201-0900 WHEEL LOADER, 2 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 12 12
A2140 62201-1200 BULLDOZER, 80HP MINIMUM
FLYWHEEL POWER HOUR 6 6
A2160 62201-1350 BULLDOZER, 200HP MINIMUM
FLYWHEEL POWER HOUR 6 6
A2180 62201-2100 COMPACTOR HOUR 12 12
A2200 62201-2750 MOTOR GRADER HOUR 12 12
A2220 62301-0000 GENERAL LABOR HOUR 60 60
-A ug -2
:0
PM
MileStone: 100% Date Completed: In Progress Report Date: 08/29/22
J:
\2
9\
T an an a R iv er R ec re at io na l A cc es s\
D es ig n\
D ra w in gs
B 1-
S U
M M
AR
Y
O F
Q U
A N
TI
TI
ES
.x ls m
]S he et
2)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.2FNSB TANANA(1)AK
TYPICAL
SECTIONS
PLAN -
PROFILE
PARKING AREAS,
INTERSECTIONS, AND
APPROACHES
EROSION
CONTROL DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
UTILITIES WETLAND
MITIGATION ALLOWANCE Bid
Schedule
A2240 62501-0000 TURF ESTABLISHMENT ACRE 5.30 0.27 5.57
A2260 62701-0000 SOD (REHABILITATION) SQYD 816 81 897
A2280 62701-0000 SOD (RESTABLISHMENT) SQYD 1,809 181 1,990
A2300 63302-0000 SIGN SYSTEM SQFT 672.58 672.58
A2320 63316-1000 REMOVE AND RESET SIGN EACH 22 22
A2340 63401-0100 PAVEMENT MARKINGS, TYPE A, SOLID LNFT 50,184 50,184
A2360 63405-0400 PAVEMENT MARKINGS, TYPE A,
RAILROAD SYMBOL EACH 2 2
A2380 63405-0450 PAVEMENT MARKINGS, TYPE A,
ACCESSIBILITY SYMBOL EACH 48 48
A2400 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 7 7
A2420 63502-1250 TEMPORARY TRAFFIC CONTROL,
TUBULAR MARKER, TYPE 42-INCH EACH 200 200
A2440 63503-1000 TEMPORARY TRAFFIC CONTROL,
PLASTIC FENCE (ORANGE) LNFT 5,026 251 5,277
A2460 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 681 34 715
A2480 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 500 500
A2500 63601-3000 SYSTEM INSTALLATION, ELECTRICAL LPSM All ALL
A2520 64603-0000 FIXTURE (BEACH ACCESS MAT
SYSTEM) EACH 1 1
A2540 64603-0500 FIXTURE, BICYCLE STORAGE RACK EACH 2 2
A2560 64603-1000 FIXTURE, VAULT TOILET EACH 3 3
-A ug -2
:0
PM
MileStone: 100% Date Completed: In Progress Report Date: 08/29/22
J:
\2
9\
T an an a R iv er R ec re at io na l A cc es s\
D es ig n\
D ra w in gs
B 1-
S U
M M
AR
Y
O F
Q U
A N
TI
TI
ES
.x ls m
]S he et
3)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.3FNSB TANANA(1)AK
subexcavated areas.
account for 16" of settlement in
Quantity includes additional material to
Borrow (Type B).
excavation material for use as Select
Conserve and process the roadway [2]
[3]
[2]
[2]
[3]
[1] of excavation.
Quantity will require approximately 20 CY subexcavated areas.
account for 16" of settlement in
Quantity includes additional material to
Borrow (Type B).
excavation material for use as Select
Conserve and process the roadway
Quantity includes subexcavation backfill.
[1]
FOOTNOTE:
[4]
[4]
PLAN QUANTITIES
TABULATION OF2
:4
P
M
J a n u a r y
D
.1 P la n
Q u a n ti te s
\1
T a n a n a R iv e r R e c r e a ti o n a l
A c c e s s \0
D e s ig n \0
D r a w in g s \D
.1 P la n
P r o f il e Q u a n ti ti e s .d g n
C h e c k e d b y
J G r a y
/2
D e s ig n e d b y
L
O v e r b e c k
/2
STATE PROJECT
NUMBER
AK FNSB TANANA(1) D.1
10.4 x 16 15705 -0600
15705 -1000
20301 -1900
20701 -0300
25101 -0100
25101 -0200
25101 -0400
60201 -0800
60201 -1200
60202 -0200
60202 -0400
60211 -0600
Station
ES
TI
M
A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C
A V A
TI
O N
S O
IL
E
R O
S
IO
N C
O N
TR
O
L, TE
PO
R A R Y
-I
N C H
C U
LV
ER
T
PI
PE
S O
IL
E
R O
S
IO
N C
O N
TR
L, TE
PO
R A R Y
-I
N C H
C U
LV
ER
T
PI
PE
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
S
EP
A R A
TI
O N
-S
TA
B
IL
IZ
A
TI
N
G
EO
TE
X
TI
LE
C
LA
S S
TY
PE
C
(N
N
W O
V
EN
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
-I
N C H
P
IP
E C
U
LV
ER
T
-I
N C H
P
IP
E C
U
LV
ER
T
-I
N C H
E Q
U
IV
A
LE
N T
D
IA
M
ET
ER
A
R C
H O
R E
LL
IP
TI
C A L
PI
PE
C U
LV
ER
T
-I N
C H
E Q
U
IV
A
LE
N T
D
IA
M
ET
ER
A
R C
H O
R E
LL
IP
TI
C A L
PI
PE
C U
LV
ER
T
EN
D S
EC
TI
O N
F O
R
8-
IN
H
EQ
U
IV
A
LE
N T
D
IA
M
ET
ER
A
R
H
R E
LL
IP
TI
C A L
PI
PE
C U
LV
ER
T
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD LNFT LNFT EACH SQYD CUYD CUYD CUYD LNFT LNFT LNFT LNFT EACH Lt Rt SLS 62+62.92 9 100 15° 25' 32" RT A, AS, P Temp. Cross Culvert SLS 62+62.92 1 Temp. Cross Culvert SLS 62+62.92 9 140 55 77 100 15° 25' 32" RT A, AS, P 2 2 Cross Culvert SLS 68+02.06 5 72 12° 26' 27" LT A, AS, P Temp. Cross Culvert SLS 68+02.06 1 Temp. Cross Culvert SLS 68+02.06 5 72 12° 26' 27" LT A, AS, P Cross Culvert SLS 71+59.15 7 106 5° 6' 1" LT A, AS, P Temp. Cross Culvert SLS 71+59.15 1 Temp. Cross Culvert SLS 71+59.15 7 19 106 5° 6' 1" LT A, AS, P Cross Culvert SLS 79+10.63 2 58 0° 0' 0" RT A, AS, P Cross Culvert SLS 80+44.25 2 60 90° 0' 0" RT A, AS, P Driveway Culvert SLS 80+96.12 1 Cross Culvert SLS 83+75.08 1 67 92° 28' 48" LT A, AS, P Driveway Culvert SLS 84+45.41 3 50 60 2° 46' 31" RT A, AS, P Cross Culvert NLL 101+65.53 6 74 20° 18' 7" LT A, AS, P Temp. Cross Culvert NLL 101+65.53 1 Temp. Cross Culvert NLL 101+65.53 6 19 74 20° 18' 7" LT A, AS, P Cross Culvert NLL 109+18.38 3 35 93 43° 45' 27" RT A, AS, P Cross Culvert SUT 18+58.69 1 9 10 2 30 2 6° 59' 27" RT A, AS, P Trail Cross Culvert SUT 18+61.03 1 Trail Cross Culvert See Sheet K.2 1 22 66 A, AS, P Cross Culvert
PROJECT TOTAL 154 252 100 6 150 2 55 77 405 100 223 58 2
Allowable Pipe Material
NOTE: A Aluminum
1. Aluminized steel pipe culvert minimum wall thickness is the larger of 0.064" or the AS Aluminized steel thickness required by the Std. 602-1 fill height table (steel). P Plastic
2. Aluminum pipe culvert minimum wall thickness is the larger of 0.060" or the thickness required by the Std. 602-1 fill height table.
3. Furnish metal end sections for those specified. See Std. 602-5 for acceptable cell class.
4. Not Used
5. Structural excavation quantity based on material excavated inside the vertical planes located 18 inches outside and parallel to the limits of footings or foundations.
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
J:
\2
9\
T an an a
R iv er R ec re at io na l A cc es s\
. D es ig n\
. D ra w in gs
G
.1 D ra in ag e_
Ta bu la tio n.
xl sx ]S he et
-A ug -2
4:
P M
L.
O ve rb ec k
7/
J.
G ra y 7/
D es ig ne d by
C he ck ed b y:
STATE PROJECT
G.1
SHEET
NUMBER
FNSB TANANA(1)AK
Note: The quantities shown hereon are approximate and are subject to field adjustments.
on a 2000 ft work zone.
Quantity is an approximation based [1]
FOOTNOTE:
[1]
QUANTITIES
TEMPORARY TRAFFIC CONTROL
TABULATION OF
:5
A
A u g u s t
H
.1 T e m p T ra ff ic Q u a n ti ti e s p n d a n c s e r v e r \P
R O
J E
C T
S \2
\1
T a n a n a R iv e r R e c r e a ti o n a l
A c c e s s \0
D e s ig n \0
D r a w in g s \H
.1 T e m p o r a r y T r a f f ic
C o n tr o l
Q u a n ti ti e s .d g n
C h e c k e d b y
J
G r a y
/2
D e s ig n e d b y
L
O v e r b e c k
/2
STATE PROJECT
NUMBER
AK FNSB TANANA(1) H.1
CLOSED
ROAD
AHEAD
END
DETOUR
END
DETOUR
DETOUR
W20-3
M4-8a
W20-3 construction area
Railroad crossing
DETOUR
M4-9R
W16-8P
DETOUR
M4-9L
W16-8P
ROAD
CLOSED
Van Horn Road
L a th r o p S tr e e t
Sheldon Avenue
Frank Avenue
Donald Avenue
Taxiway AvenueT ib r S tr e e t
Tamara Avenue
Sanduri Avenue
Railroad
P e g e r R o a d
Flood Control Levee / Saddle Road
C in c h
S tr e e t
Pomm Road
R11-2
M4-10L
ROAD
CLOSED
R11-2
USE
PEGER
USE
PEGER
Barricade, type 3
Barricade, type 3
CLOSED
AT
TAXIWAY AVE
S. LATHROP ST
CLOSED
AT
TAXIWAY AVE
S. LATHROP ST
CLOSED
ROAD
AHEAD
W20-3
W16-8P
DETOUR
M4-8
M6-3
USE
PEGER
CLOSED
AT
TAXIWAY AVE
S. LATHROP ST
LathropST
LathropST
LathropST"A" Channel
1500 FT
DETOUR
M4-8
W16-8P
LathropST
DETOUR
M6-3
LOCAL TRAFFIC ONLY
ROAD CLOSED
1/3 MILE AHEAD
M4-10R
DETOUR
R11-3a
CLOSED
ROAD
1000 FT
ROAD
CLOSED
500 FT
W20-3
M4-8
W16-8P
LathropST
DETOUR
1500 FT
DETOUR
M4-8
W16-8P
LathropST
DETOUR
M6-1
M4-8
W16-8P
LathropST
DETOUR
M5-1
W20-2
1500 FT
DETOUR
M4-8
W16-8P
LathropST
DETOUR
M6-3
M4-8
W16-8P
LathropST
DETOUR
M5-1 M4-8
W16-8P
LathropST
DETOUR
P e g e r R o a d
W20-2
Peger Lake
M4-8
W16-8P
LathropST
DETOUR
M6-3
1500 FT
DETOUR
W20-2
USE
PEGER
CLOSED
AT
TAXIWAY AVE
S. LATHROP ST
W16-8P
LathropST
W16-8P
LathropST
DETOUR
M4-9R
DETOUR
M4-9L
W16-8P
LathropST
DETOUR
M4-10L
M4-8
W16-8P
LathropST
DETOUR
M4-8
W16-8P
LathropST
DETOUR
W20-2
Barricade, type 3
M4-8a
200'
CLOSED
AT
TAXIWAY AVE
S. LATHROP ST
USE
PEGER
*Black text on white background
BORDER:
R = 1.5"
TH = 0.625"
*Black text on white background
BORDER:
R = 1.5"
TH = 0.625"
N
250'250'1000'
200'
1000'250'250'
60"
48"
.8
.8
DETOUR PLAN
RAILROAD CROSSING1
:1 a n u a r y
R a il r o a d C r o s s in g D e to u r p n d a n c s e r v e r \P
R O
J E
C T
S \2
\1
T a n a n a R iv e r R e c r e a ti o n a l
A c c e s s \0
D e s ig n \0
D r a w in g s \H
.3 R a il r o a d C r o s s in g T
T C
P .d g n
C h e c k e d b y
J G r a y
/2
D e s ig n e d b y
L
O v e r b e c k
/2
STATE PROJECT
NUMBER
AK FNSB TANANA(1) H.3
CENTERLINE DETAIL
TYPICAL PAVEMENT MARKING APPLICATION
CROSSWALK DETAIL
see detail
Crosswalk, On-street parking line when specified in plans
4" solid white edge yellow centerline
4" solid double
Minor approach
Major approach road
Edge of pavement when specified in plans
12" wide stop line markings when specified
Approach road pavement when specified in plans
4" solid white edge line
4" white parking marking
L a n e
T r a v e l
L a n e
T r a v e l
2'
(see note 3)
15' Approx.
D
16' 20' 24'
6.5'
2'
1.33'
4" solid white
4" solid yellow type A, white
Pavement markings on 2' centers
4" solid white
1.67'
13"14"13"
APPROACH TO RAILROAD CROSSING
RAILROAD DETAIL
PAVEMENT HATCHING
MARKING DETAIL
APPROACH TO RAILROAD CROSSING NOTE:
1. Apply MMA for all markings.
2. All markings solid white unless indicated otherwise.
3. Locate stop bar 15' from railroad track or 8' from gate, if present
4. Posted Limit D
30 MPH 225'
40 350'
50 475'
5. L = Driving lane width
NOTE:
1. Place edge line pavement markings at asphalt/concrete curb interface when curb is present.
2. Typical pavement marking widths are shown. Use wider pavement markings when specified on the plans.
8' yellow centerline
4" solid double
60'
CL
border
4" solid white
NO SCALE
2'
10'
20'
S h o u ld e r
S h o u ld e r
1 1/2"
1 1/2"
4"
4"
50' min.
2'
L/2
L
45°0'0" 3.33'
6'
2'
2'
MARKINGS
PAVEMENT STRIPING AND 9
:2 a n u a r y
S h e e t
I .1
\1
T a n a n a R iv e r R e c r e a ti o n a l
A c c e s s \0
D e s ig n \0
D r a w in g s \I
.1 P a v e m e n t
S tr ip in g a n d M a r k in g s .d g n
C h e c k e d b y
J
G r a y
/2
D e s ig n e d b y
L
O v e r b e c k
/2
STATE PROJECT
NUMBER
AK FNSB TANANA(1) I.18
NOTE:
1. Legend applies only to Plan Section J.
ESTIMATE OF QUANTITIES,
GENERAL NOTES,
ABBREVIATIONS
SHEET
NUMBERPROJECTSTATE
49 TH
CE-129735
GORDON DUFSETH
NON-MOTORIZED BOAT LAUNCH
ELECTRICAL PLAN
SHEET
NUMBERPROJECTSTATE
49 TH
CE-129735
GORDON DUFSETH
NUMBERPROJECTSTATE
49 TH
CE-129735
GORDON DUFSETH
MOTORIZED BOAT LAUNCH
ELECTRICAL PLAN
TYPICAL ONE-LINE DIAGRAM AND
LC1 & LC2 FEEDER SCHEDULES
PANEL SCHEDULES
ELECTRICAL DETAILS
ELECTRICAL DETAILS
File details come from the government source that posted it. Updated .