Air Monitor and ACM Sampling IDIQ Bid Sheet.xlsx

XLSX spreadsheet 80 KB Posted

Attached to
F999--IDIQ Air Monitoring & Environmental Consulting Services Supporting the VA NJ HCS East Orange & Lyons Campuses
Solicitation number
36C24225Q0108
Issued by

About this file

This is a bid sheet template for an IDIQ contract for air monitoring and environmental consulting services at VA New Jersey Healthcare System facilities in East Orange and Lyons. The sheet contains 17 line items covering services like Certified Industrial Hygienist support, air sampling technicians, project monitors, and various types of sample collection and analysis services including PCM, TEM, and PLM testing with different turnaround times (24-hour and 1-week). Each line item requires pricing across 5 contract years.

The associated solicitation (36C24225Q0108) is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under NAICS 562910 with a $25M size standard. Quotes are due by 1:00 PM EDT on February 7, 2025, with RFI requests due by January 31, 2025. The contract will provide asbestos air monitoring and environmental consulting services at VA facilities in East Orange and Lyons, NJ. Technical capability, past performance, and price are the evaluation factors. Required certifications include New York State Department of Labor Asbestos Handling License and certificates for technicians.

View the file

Other files

File Type Posted
36C24225Q0108_4 Amendment 002.docx DOCX document
Final NJ HCS Air Monitor and ACM Sampling IDIQ Bid Sheet.xls XLS spreadsheet
36C24225Q0108_3.docx DOCX document
Revised Air Monitor and ACM Sampling IDIQ Bid Sheet.xlsx XLSX spreadsheet
Sample of Anticipated Contract Instrumentation and Time Frame Period PricingTable.docx DOCX document
VAAR 852.219-75.docx DOCX document
36C24225Q0108_2.docx DOCX document
Statement of Work.docx DOCX document
Wage Determination No. 2015-4211 Essex - E. Orange.docx DOCX document
Wage Determination No. 2015-4209 Somerset - Lyons.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

New IDIQ VA NJ HCS East Orange & Lyons Air Monitoring, Sampling, and Other Enivronmental Services IDIQ - Bid Sheet

Item
No.:Description:Units:Est.

Annual Quantity: Price Per Unit (1st Year) Line item Total Dollar Value (1st Year) Price Per Unit (2nd Year) Line item Total Dollar Value (2nd Year) Price Per Unit (3rd Year) Line item Total Dollar Value (3rd Year) Price Per Unit (4th Year) Line item Total Dollar Value (4th Year) Price Per Unit (5th Year) Line item Total Dollar Value (5th Year)

1.0Provide services of a Certified Industrial Hygienist (CIH) during the asbestos air quality monitoring and sampling activities.HR50.0$ - 0$ - 0$ - 0$ - 0$ - 0
2.0Provide services of a Certified Air Sampling Technician during the asbestos air quality monitoring and sampling activities.HR50.0$ - 0$ - 0$ - 0$ - 0$ - 0
3.0Provide services of a Certified Inspector during the asbestos air quality monitoring and sampling activities.HR50.0$ - 0$ - 0$ - 0$ - 0$ - 0
4.0Provide services of a Certified Project Monitor during the asbestos air quality monitoring and sampling activities.HR250.0$ - 0$ - 0$ - 0$ - 0$ - 0
5.0Provide services of a Certified Project Designer during the asbestos air quality monitoring and sampling activities.HR50.0$ - 0$ - 0$ - 0$ - 0$ - 0
6.0Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7502 (Issue 2, Fourth Edition) of the sample with a 24-hour turnaround time.EA50.0$ - 0$ - 0$ - 0$ - 0$ - 0
7.0Provide air sample collection and AHERA TEM analysis of the sample with a 24-hour turnaround time.EA50.0$ - 0$ - 0$ - 0$ - 0$ - 0
8.0Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7502 (Issue 2, Fourth Edition) of the sample with a 1 week turnaround time.EA50.0$ - 0$ - 0$ - 0$ - 0$ - 0
9.0Provide air sample collection and AHERA TEM analysis of the sample with a 1 week turnaround time.EA50.0$ - 0$ - 0$ - 0$ - 0$ - 0
10.0Bulk samples of soil collected and analyzed by PLM method with a 1-week turnaround. The total number of samples to be collected from the soil areas shall be; <1000 square feet of soil – 3 samples; >1000 to <5000 square feet of soil – 5 samples; and >5000 square feet of soil – 7 samples. The soil samples shall be collected in a statistically random manner.EA50.0$ - 0$ - 0$ - 0$ - 0$ - 0
11.0Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 24-hour turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials.EA50.0$ - 0$ - 0$ - 0$ - 0$ - 0
12.0Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 1 week turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials.EA50.0$ - 0$ - 0$ - 0$ - 0$ - 0
13.0Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 24-hour turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking and other NOB materials.EA50.0$ - 0$ - 0$ - 0$ - 0$ - 0
14.0Provide hazardous material collection and NY ELAP Method 198.1 (PLM) testing for requested friable material with a 1-week turnaround time. Materials can include, but are not limited to ceiling tile, textiles, insulation and other friable materials.EA50.0$ - 0$ - 0$ - 0$ - 0$ - 0
15.0Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 1-week turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials.EA50.0$ - 0$ - 0$ - 0$ - 0$ - 0
16.0Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 1-week turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking, and other NOB materials.EA50.0$ - 0$ - 0$ - 0$ - 0$ - 0
17.04 hour response time premium to any of the above items.$ - 0$ - 0$ - 0$ - 0$ - 0

Total Dollar Value of Contract Year $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Total Dollar Value of Contract $ - 0

File details come from the government source that posted it. Updated .