Revised Air Monitor and ACM Sampling IDIQ Bid Sheet.xlsx
XLSX spreadsheet 82 KB Posted
- Solicitation number
- 36C24225Q0108
About this file
This is a bid sheet template for an IDIQ contract for air monitoring and environmental services at VA New Jersey Healthcare System facilities in East Orange and Lyons. The bid sheet contains 17 line items covering various environmental testing and personnel services across a 5-year period, including Certified Industrial Hygienist services, air sampling technicians, project monitors, and multiple types of material testing with different turnaround times (24-hour and 1-week). Specific services include Phase Contrast Microscopy (PCM) analysis, AHERA TEM analysis, soil sampling, and testing of various building materials like floor tiles, roofing materials, and insulation.
The solicitation (36C24225Q0108) is set aside for Service-Disabled Veteran-Owned Small Businesses under NAICS code 562910 with a size standard of $25 million. Quotes are due by 1:00 PM EDT on February 7, 2025, with RFIs due by January 31, 2025. Evaluation factors include technical capability (limited to 5 pages), past performance, and price. Contractors must possess active New York State Department of Labor Asbestos Handling License and certificates for technicians. The contract will be awarded to the responsible offeror providing the most advantageous offer to the government considering price and other factors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24225Q0108_4 Amendment 002.docx | DOCX document | |
| Final NJ HCS Air Monitor and ACM Sampling IDIQ Bid Sheet.xls | XLS spreadsheet | |
| 36C24225Q0108_3.docx | DOCX document | |
| Sample of Anticipated Contract Instrumentation and Time Frame Period PricingTable.docx | DOCX document | |
| VAAR 852.219-75.docx | DOCX document | |
| 36C24225Q0108_2.docx | DOCX document | |
| Air Monitor and ACM Sampling IDIQ Bid Sheet.xlsx | XLSX spreadsheet | |
| Statement of Work.docx | DOCX document | |
| Wage Determination No. 2015-4211 Essex - E. Orange.docx | DOCX document | |
| Wage Determination No. 2015-4209 Somerset - Lyons.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
New IDIQ VA NJ HCS East Orange & Lyons Air Monitoring, Sampling, and Other Enivronmental Services IDIQ - Bid Sheet
| Item | |||
| No.: | Description: | Units: | Est. |
Annual Quantity: Price Per Unit (1st Year) Line item Total Dollar Value (1st Year) Price Per Unit (2nd Year) Line item Total Dollar Value (2nd Year) Price Per Unit (3rd Year) Line item Total Dollar Value (3rd Year) Price Per Unit (4th Year) Line item Total Dollar Value (4th Year) Price Per Unit (5th Year) Line item Total Dollar Value (5th Year)
| 1.0 | Provide services of a Certified Industrial Hygienist (CIH) during the asbestos air quality monitoring and sampling activities. | HR | 50.0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2.0 | Provide services of a Certified Air Sampling Technician during the asbestos air quality monitoring and sampling activities. | HR | 50.0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3.0 | Provide services of a Certified Inspector during the asbestos air quality monitoring and sampling activities. | HR | 50.0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4.0 | Provide services of a Certified Project Monitor during the asbestos air quality monitoring and sampling activities. | HR | 250.0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 5.0 | Provide services of a Certified Project Designer during the asbestos air quality monitoring and sampling activities. | HR | 50.0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6.0 | Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7502 (Issue 2, Fourth Edition) of the sample with a 24-hour turnaround time. | EA | 50.0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 7.0 | Provide air sample collection and AHERA TEM analysis of the sample with a 24-hour turnaround time. | EA | 50.0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8.0 | Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7502 (Issue 2, Fourth Edition) of the sample with a 1 week turnaround time. | EA | 50.0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 9.0 | Provide air sample collection and AHERA TEM analysis of the sample with a 1 week turnaround time. | EA | 50.0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 10.0 | Bulk samples of soil collected and analyzed by PLM method with a 1-week turnaround. The total number of samples to be collected from the soil areas shall be; <1000 square feet of soil – 3 samples; >1000 to <5000 square feet of soil – 5 samples; and >5000 square feet of soil – 7 samples. The soil samples shall be collected in a statistically random manner. | EA | 50.0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 11.0 | Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 24-hour turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials. | EA | 50.0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 12.0 | Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 1 week turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials. | EA | 50.0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 13.0 | Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 24-hour turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking and other NOB materials. | EA | 50.0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 14.0 | Provide hazardous material collection and NY ELAP Method 198.1 (PLM) testing for requested friable material with a 1-week turnaround time. Materials can include, but are not limited to ceiling tile, textiles, insulation and other friable materials. | EA | 50.0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 15.0 | Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 1-week turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials. | EA | 50.0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 16.0 | Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 1-week turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking, and other NOB materials. | EA | 50.0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 17.0 | Additional Cost for Expeditated Test Results | EA | ||||||
| 18.0 | 4 hour response time premium to any of the above items. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Dollar Value of Contract Year $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Total Dollar Value of Contract $ - 0
File details come from the government source that posted it. Updated .