Summary
This is a LAP (Local Agency Program) Construction Agreement between the City of Fort Myers, Florida, and a contractor for mill and replace asphalt resurfacing improvements. The project involves asphalt roadway resurfacing at various street locations within the City, divided into two main packages: Package 1 covers mill and replace asphalt resurfacing, Package 2 covers mill and replace asphalt paving, with an alternate bid option for full depth reclamation method. The work shall commence soon after City Council approval and issuance of the Purchase Order, with all authorized work required to be completed within four (4) months from the date of the Purchase Order. All work must comply with City of Fort Myers standards, Florida Department of Transportation (FDOT) requirements, local regulations, and applicable project specifications. The contract documents include a Statement of Work, Bid Schedule/Schedule of Values, FDOT Construction Supplemental Conditions (Exhibit A), performance and payment bonds, certificates of insurance, and various certifications including human trafficking affidavit and lien releases.
The contract amount, specific pricing terms, and payment schedule are to be determined and inserted by procurement staff prior to execution. Payment shall be made in accordance with the contract documents for completion of the work, with invoicing requirements and payment dispute resolution procedures outlined in Article 39. The contractor must obtain and maintain comprehensive insurance coverage throughout the contract term, including workers' compensation, commercial general liability with minimum limits of $1,000,000 per occurrence and $5,000,000 aggregate, commercial automobile liability, and professional liability insurance. The contractor is required to comply with all applicable Florida statutes and federal laws, including E-Verify requirements, Florida Civil Rights Act provisions, Florida Public Records Law, human trafficking affidavit requirements effective July 1, 2024, and certification regarding boycotts of Israel. All contract amendments, change orders, and supplemental agreements must be executed in writing by authorized representatives of both parties, with the City required to approve or deny contractor-submitted change order quotes within 35 days per Florida Statute Section 255.077.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAP CONSTRUCTION AGREEMENT
between
CITY OF FORT MYERS, FLORIDA
and
>[Contractor]
Procurement staff, meet with department requesting solicitation to address the questionnaire at the end of this document and then search for “>” to add needed information. When complete right click over “Contents” on next line and update entire table.
Table of Contents
ARTICLE 1 - DEFINITIONS
ARTICLE 2 – TERM
ARTICLE 3 – CONTRACT DOCUMENTS
3.1. Order of Precedence
ARTICLE 4 – NOTICES
4.1. Notices by Contractor to City
4.2. Notices by City to Contractor
4.3. Change or Address of Record
ARTICLE 5 - STATEMENT OF WORK OF SERVICES / WORK
ARTICLE 6 – CONTRACT AMOUNT AND TIME
>6.1. Contract Amount (Remove if continuing contract)
ARTICLE 7 - AMENDMENTS/MODIFICATIONS/CHANGES IN WORK
ARTICLE 8 – NO THIRD-PARTY BENEFICIARIES
ARTICLE 9 - ASSIGNMENT, TRANSFER AND SUBCONTRACTS
ARTICLE 10 – REPRESENTATION OF THE CONTRACTOR
ARTICLE 11 – REPRESENTATION OF THE CITY
ARTICLE 12 - RELATIONSHIP BETWEEN PARTIES
ARTICLE 13 - OBLIGATIONS OF THE CONTRACTOR
13.1. Standards of Professional Service
13.2. Conflicts, Errors, or Discrepancies
13.3 – 13.4. Reserved
13.5. Discrimination
13.6. Name Change
13.7. Patents, Royalties and Copyrights
13.8. Licenses, Permits
13.9. Record Retention
13.10. Subcontractor
13.11. Contractor to Repair Property Damage Caused by the Contractor
13.12. Not to Divulge Certain Information
13.13. Responsibility for Estimates
13.14. Contractor’s Project Manager
13.15. Truth-In-Negotiations Certificate
13.16. Completion of Tasks
13.17. Reports
13.18. All Drawings
13.19. Qualified Personnel
13.20. Removal of Personnel
13.21. Reserved
13.22. City’s Construction Project Management Platform Software
13.23. Accessibility Requirements
13.24. Additional Services
ARTICLE 14 – OBLIGATION’S OF THE CITY
14.1. Designation of City’s Representative
14.2. Availability of City Information
14.3. Availability of City's Designated Representatives
14.4. Access to City Property
14.5. Plans Review
14.6. Performance of the Contractor
ARTICLE 15 – TIME AND SCHEDULE OF PERFORMANCE
15.1. Notice to Proceed / Purchase Order
15.2. Time of Performance
15.3. Contractor Work Schedule
15.4. Timely Accomplishment of Services
15.5. Failure to Perform in a Timely Manner
ARTICLE 16 –NOTICE OF CLAIM; WAIVER OF REMEDIES; NO DAMAGE FOR DELAY
16.1. Notice of Claims
16.2. Remedies and No Damages for Delay
ARTICLE 17 – INSURANCE
17.1. Insurance Terms and Conditions
17.2. Insurance Certificate Required
17.3. Insurance Coverages Required
ARTICLE 18 - INDEMNIFICATION / HOLD HARMLESS
ARTICLE 19 – LAWS
19.1. Governing Law / Venue
19.2. Antitrust
19.3. Conflict of Interest
>19.4. Continuing Contracts
19.5. Discrimination
19.6. E-Verify
19.7. Florida Civil Rights Act (FCRA)
19.8. Florida Public Records Law
19.9. Florida Public Entity Crimes
19.10. Human Trafficking
19.11. Immigration Laws
19.12. Inspector General
19.13. Scrutinized Companies
ARTICLE 20 – IMPROPER USE OF FACILITIES
ARTICLE 21 – WAIVER OF BREACH
ARTICLE 22 – OWNERSHIP OF DOCUMENTS
ARTICLE 23 - HEADINGS
ARTICLE 24 – RESERVATION OF RIGHTS
ARTICLE 25 - FAILURE TO ENFORCE
ARTICLE 26 - FORCE MAJEURE
ARTICLE 27 - RESERVED
ARTICLE 28 - SEVERABILITY
ARTICLE 29 –CONTINGENT FEE PROHIBITION
ARTICLE 30 - PURCHASE ORDERS
ARTICLE 31 – RESERVED
ARTICLE 32 – DELIVERY
ARTICLE 33 – ACCEPTANCE OF MATERIALS/SERVICES
ARTICLE 34 – RESERVED
ARTICLE 35 - RESERVED
>ARTICLE 36 – INTERNET/WEB-BASED SERVICES
>ARTICLE 37. SOFTWARE LICENSES
ARTICLE 38 - PRICE ADJUSTMENT
ARTICLE 39 – PAYMENT
39.1. Basic Services
39.2. Additional Services
39.3. Discounts
39.4. Invoicing
39.5. Method of Payment
39.6. Payment Dispute Resolution
39.7. Payment When Services are Terminated by the City
ARTICLE 40 -TERMINATION
40.1. For Convenience
40.2. For Cause
40.3. Non-Appropriation
ARTICLE 41 - DISPUTE RESOLUTION / LEGAL REMEDIES
ARTICLE 42 - CONTRACT EXECUTION
ARTICLE 43 – MISCELLANEOUS CLAUSES
43.1. Non-Exclusive Contract
43.2. Documents
43.3. Independent Contractor
43.4. Taxes
ARTICLE 44 - ACCEPTANCE
Exhibit A – FDOT CONSTRUCTION SUPPLEMENTAL CONDITIONS
Exhibit B– HUMAN TRAFFICKING AFFIDAVIT
Exhibit C – CERTIFICATE OF INSURANCE
Exhibit D – PAYMENT BOND
Exhibit E – PERFORMANCE BOND
Exhibit F – PROJECT SECURITY
Exhibit G – CERTIFICATION OF SUBLET WORK
Exhibit H – WARRANTY OF TITLE / LEIN RELEASE
This PROFESSIONALSERVICES AGREEMENT is made and entered into on the effective date (the date the last party signs it) between the City of Fort Myers, Florida, a municipal corporation in the STATE OF FLORIDA hereinafter referred to as the "City", and >[Contractor] hereinafter referred to as the
"CONTRACTOR".
RECITALS
WHEREAS, the City desires to obtain the Services of said Contractor to provide and perform Services as further described hereinafter concerning the Project to be referred to and identified as: >[Solicitation Title and Number (title, #)], the Contractor hereby agrees to provide and perform the services required and necessary to complete the services and work as set forth in these documents, and
WHEREAS, the Contractor hereby certifies that the Contractor has been granted and possesses valid, current licenses to do business in Lee County, Florida and in the City of Fort Myers issued by the respective State Boards and Government Agencies responsible for regulating and licensing the Services to be provided and performed by the Contractor pursuant to this Agreement; and
WHEREAS, the Contractor has reviewed the Services required pursuant to this Agreement and is qualified, willing and able to provide, perform or acquire all such services in accordance with the provisions, conditions and terms hereinafter set forth; and
NOW, THEREFORE in consideration of the mutual covenants, terms and provisions contained herein, the parties hereto agree that with the mutual acceptance of this Agreement, as indicated hereinafter by the execution of this Agreement by both parties, that a Contract shall exist between both parties consisting of:
ARTICLE 1 - DEFINITIONS
ADDITIONAL SERVICES any Additional Services that the Owner may request and authorize, in writing, which are not included in the Statement of Work of Services.
AMENDMENT/SUPPLEMENTAL AGREEMENT - A formal, written change to an executed contract that modifies, adds to, or deletes terms, conditions, Statement of Work, period of performance, pricing, or other provisions. [All Contract Amendments must be executed by authorized representatives of both the Contractor and the City to be valid and enforceable. Verbal agreements or informal communications shall not be considered binding Amendments.
Used for administrative changes to Professional Services or general service contracts. Not typically used for construction Statement of Work or PO quantity changes.
APPROVAL - When applied to Approval from the City, this term shall mean Approval which is, at a minimum, evidenced by a written document authored or initialed by the City and subject to the formalities imposed by specific provisions in this Contract.
BASIC SERVICES - refers to the Professional Services set forth and required pursuant to this Agreement, and as described in further detail in the attached "Statement of Work of Services", which is attached hereto and made a part of this Agreement.
CHANGE ORDER a written document executed by both parties to this Agreement setting forth such changes to the Statement of Work of Services as may be requested and authorized in writing by the City.
CITY the City of Fort Myers, a municipal corporation within the State of Florida, its officers, officials, agents, and representatives.
CONTRACT PRICE - The total monies payable by the City to the Contractor under the terms and conditions of the Contract Documents.
DAY - One (1) calendar day when used in the Contract, measured from midnight to the next midnight.
DEFECTIVE - Work that is unsatisfactory, deficient, or faulty; that fails to conform to the requirements of the Contract Documents; that does not meet applicable standards, tests, inspections, or approvals referenced in the Contract; or that has been damaged prior to final payment, unless such damage is the Agency Name's responsibility after Substantial Completion.
NOTICE TO PROCEED - A written notice given by City to the Contractor (with a copy to AE, if applicable) fixing the date on which the Contract Time will commence to run and on which the Contractor shall start to perform his obligations under the Contract Documents.
PROCUREMENT MANAGER - Chief Procurement Officer representing the City.
PROJECT MANAGER - The Contractor’s Project Manager shall be the individual designated by the Contractor, in writing, who shall serve as the primary point of contact and representative of the Contractor for all matters relating to the performance of services under this Agreement. The Contractor’s Project Manager shall be responsible for the day-to-day management, coordination, oversight, and execution of the Contractor’s obligations, including those performed by any Subcontractor.
The Contractor’s Project Manager shall:
A. Possess the authority to make decisions on behalf of the Contractor B. Ensure timely communication and coordination with the City’s Project Manager C. Promptly address any issues affecting performance, schedule, or quality D. Be accessible and responsive during the term of the Agreement.
The Supplier title shall not replace the City’s Project Manager without prior written notice to and approval by the City, which shall not be unreasonably withheld.
CONTRACTOR - the individual, firm or entity offering services which, by execution of this Agreement, shall be legally obligated, responsible, and liable for providing and performing any and all of the services, work, and materials, including services and/or the work of Subcontractors, required under the covenants, terms and provisions contained in this Agreement.
SERVICES - all services, work, materials, and all related professional, technical, and administrative activities that are necessary to perform and complete the services required pursuant to the terms and provisions of this Agreement.
SOLICITATION - An Invitation to Bid, Request for Proposals, Request for Statement of Qualifications, or any document used to obtain submissions for the purpose of entering a contract.
STATEMENT OF WORK - A written description in a contract detailing performance expectations and deliverables between the contracting parties. After the Contractor has been selected, the Statement of Work becomes the basis for the contract and must provide sufficient information to meet the entity’s needs and achieve successful outcomes, define the expectations of the parties, set price and payment schedules, and mitigate or avoid disputes.
SUBCONTRACTOR - A Subcontractor is any individual, firm, partnership, corporation, or other legal entity, other than an employee of the Contractor, that is contracted by the Contractor to perform a portion of the services, work, or tasks required under this Agreement. All Subcontractor must be approved in writing by the City prior to commencing any work related to this Agreement.
The Contractor shall: a) Be fully responsible for the performance, conduct, and compliance of all Subcontractor; b) Ensure that all Subcontractor are bound by the same terms, conditions, and obligations as set forth in this Agreement; c) Remain the sole point of contractual responsibility to the Agency Name, regardless of any subcontracted services. Use of a Subcontractor does not relieve the Contractor of any obligation or liability under this Agreement.
ARTICLE 2 – TERM
This Agreement will be in effect on the effective date and shall end __ days/years later, unless Amendments have otherwise been executed.
The City has the right to cancel or terminate this contract as described in these documents.
ARTICLE 3 – CONTRACT DOCUMENTS
The Contract Documents, which comprise the entire agreement between the City and the Contractor concerning the Services consist of this document plus: Attachment A-Statement of Work of Services, Attachment B-Bid Schedule/ Schedule of Values and also incorporate by reference all documents listed below:
3.1. Order of Precedence
In the event of any conflict, ambiguity, or inconsistency among the Contract Documents, the documents shall control in the following order of precedence, with the document highest in priority governing over any lower-listed document: (1) Duly executed Amendments, Change Orders, and Supplemental Agreements (in chronological order, most recent first); (2) This Professional Services Agreement, including all exhibits and attachments expressly incorporated herein; (3) Plans and Drawings, including approved revisions; (4) Addenda issued prior to receipt of Submittals; (5) The Solicitation (RFP/ITB) Documents, excluding the Contractor’s proposal; (6) The Contractor’s Proposal/Submittal, excluding any terms expressly rejected by the City; (7) The Purchase Order, if issued separately.
No provision of the Contractor’s Proposal shall modify or supersede the requirements of the Solicitation or Contract Documents unless expressly accepted in writing by the City in the executed Agreement or subsequent Amendment.
ARTICLE 4 – NOTICES
4.1. Notices by Contractor to City
All notices required and/or made pursuant to this Agreement to be given by the Contractor to the City shall be in writing and shall be given to the following electronic email addresses of record:
procurementservices@fortmyers.gov, cc@fortmyers.gov, and legalservice@fortmyers.gov.
Copy to:
City Attorney's Office, City of Fort Myers, 2200 Second Street, Fort Myers, FL 33901
4.2. Notices by City to Contractor
All notices required and/or made pursuant to this Agreement to be given by the City to the Contractor shall be made in writing and shall be provided electronically to the email address below:
Contractor’s Name: >[Contractor]
Point if Contact: >[contact]
Mailing Address: >[address]
Phone: >[phone] mailto:procurementservices@fortmyers.gov mailto:clerk@cityftmyers.com mailto:legalservice@fortmyers.gov
Email: >[email]
4.3. Change or Address of Record
Either party may change its address of record by written notice to the other party given in accordance with the requirements of this Article.
ARTICLE 5 - STATEMENT OF WORK OF SERVICES / WORK
The Contractor hereby agrees to provide and perform the Professional Services required and necessary to complete the services and work as set forth in these documents.
ARTICLE 6 – CONTRACT AMOUNT AND TIME
Contractor shall complete all Work as specified or indicated in the Contract Documents.
>6.1. Contract Amount
City shall pay Contractor for completion of the Work in accordance with the Contract Documents in the amount of Contract Amount >($xxxx.xx).
ARTICLE 7 - AMENDMENTS/MODIFICATIONS/CHANGES IN WORK
Amendments to this Contract may be made upon the mutual acceptance by both parties and shall only be valid when issued in writing as a properly executed [Amendment(s), Supplemental Agreement(s), or Change Order(s)] (as defined in the "Definitions" section). In the event of any conflicts between the requirements, provisions, and/or terms of this Contract and any written Amendment(s), Supplemental Agreement(s), or Change Order(s), then the latest executed Amendment(s), Supplemental Agreement(s), and/or Change Order(s) shall take precedence.
The City, without invalidating the contract, may order changes in the Work within the general Statement of Work of the contract consisting of additions, deletions, or other revisions, the Agreement price and time being adjusted accordingly. All such changes in the Work shall be authorized by a written Amendment to the contract and shall be executed under the applicable conditions of the contract upon Approval of City Council.
If the Contractor plans to make a claim for an increase in the Contract Price or an extension in the contract schedule term, it shall first give the City written notice within ten (10) calendar days after the occurrence of the event giving rise to such a claim. This written notice shall be given by the Contractor to the City, and a written Approval shall be secured from the Department and the Procurement Manager, City Council before proceeding to execute the Work, except in an emergency endangering life or property, in which case the Contractor shall immediately proceed. No claim for extra work will be considered valid by the City unless first submitted in writing. Section 255.077, Florida Statutes, requires the City to approve or deny Contractor-submitted Change Order quotes within 35 days. If no response is given, the quote is deemed automatically approved and payment is required upon completion. This deadline cannot be waived by contract.
Each such "Amendment", "Supplemental Agreement" or "Change Order" shall set forth a comprehensive, detailed description of: (1) the Statement of Work of the Additional Services requested; (2) the basis of compensation; and (3) the period of time and/or schedule for performing and completing said Additional Services.
ARTICLE 8 – NO THIRD-PARTY BENEFICIARIES
Both parties explicitly agree, and this Agreement states that no third-party beneficiary status or interest is conferred to, or inferred to, any other person or entity.
https://www.flsenate.gov/Laws/Statutes/2025/0255.077
ARTICLE 9 - ASSIGNMENT, TRANSFER AND SUBCONTRACTS
The Contractor shall not assign or transfer any of its rights, benefits, or obligations, except for transfers that result from:
9.1. the merger or consolidation of the Contractor with a third party; or
9.2. the disestablishment of the Contractor 's Professional practice and the establishment of the successor Contractor.
Nor shall the Contractor subcontract any of its service obligations hereunder to third parties without prior written Approval of the City. The Contractor shall have the right, subject to the City’s prior written Approval, to employ other persons and/or firms to serve as Subcontractor to City in connection with the Contractor performing services and work pursuant to the requirements of this Agreement. The Contractor must notify the Procurement Services Department of any change, complete a new vendor registration form, provide an updated W-9, provide an updated certificate of insurance, provide a new E-Verify Memorandum of Understanding, and provide written notification of such change on official company letterhead.
ARTICLE 10 – REPRESENTATION OF THE CONTRACTOR
In order to induce City to enter into this Agreement Contractor makes the following representations:
10.1. Contractor has familiarized themselves with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work.
10.2. Contractor has given City written notice of all conflicts, errors, or discrepancies that he has discovered in the Contract Documents, and the written resolution thereof by City is acceptable to Contractor.
ARTICLE 11 – REPRESENTATION OF THE CITY
The Contractor in providing and performing the services and work required pursuant to this Agreement, and Amendments thereto, shall only represent the City in the manner and to the extent specifically set forth in writing in this Agreement or Amendments thereto, and as provided in any written Supplemental Agreement(s), and Change Order(s) issued there under.
In the event the Contractor’s services or work involves administrative support services, the Contractor is not authorized to act on the City’s behalf, and shall not act on the City’s behalf, in such a manner as to result in change(s) to (1) the cost or compensation to be paid the construction Contractor, or (2) the time for completing the work as required and agreed to in the construction contract, or (3) the Statement of Work of the work set forth in the construction contract documents, unless such representation is specifically provided for, set forth and authorized in this Agreement or Amendment thereto.
The City will neither assume nor accept any obligation, commitment, responsibility or liability, which may result from representation by the Contractor, not specifically provided for and authorized as stated hereinabove.
ARTICLE 12 - RELATIONSHIP BETWEEN PARTIES
Nothing herein contained shall create or be construed as creating a partnership between the City and the Contractor or constitute the Contractor as an agent of the City. Contractor is and shall remain an independent Contractor, which term is generally understood and may be dictated by law.
ARTICLE 13 - OBLIGATIONS OF THE CONTRACTOR
The duties and obligations imposed upon the Contractor by this Agreement, and the rights and remedies available hereunder, shall be in addition to, and not a limitation of, any otherwise imposed or available by law or statute.
The obligations of the Contractor with respect to all the Basic Services and Additional Services authorized pursuant to this Agreement shall include, but not be limited to, the f
13.1. Standards of Professional Service
The work and/or services to be provided and/or performed by the Contractor and by any Subcontractor/Subcontractor engaged by the Contractor as set forth in the Statement of Work of Professional Services, shall be done in accordance with the generally accepted standards of Professional practice and in accordance with the applicable laws, rules, regulations, ordinances, codes, policies, standards or other guidelines issued by those governmental agencies which have jurisdiction over all or a portion of this project and which are in effect at the time the City approves this Agreement, or which may subsequently be changed or revised. Any subsequent change or revision to such laws, rules, regulations, ordinances, codes, standards or other guidelines which requires the Contractor to provide and/or perform work and/or services which are significantly different from that set forth in the Statement of Work of Professional Services, shall serve as a basis for the City to consider the development and issuance of a Change Order to provide for a change to, or Additional Services to the services set forth in the Agreement, and where applicable, additional compensation.
13.2. Conflicts, Errors, or Discrepancies
Contractor has given City written notice of all conflicts, errors, or discrepancies that he has discovered in the Contract Documents, and the written resolution thereof by City is acceptable to Contractor.
13.3 – 13.4. Reserved
13.5. Discrimination
Contractor certifies that they shall:
13.5.1. Implement an employment nondiscrimination policy prohibiting discrimination in the performance of the contract in the hiring, discharging, promoting or demoting, matters of compensation, or any other employment-related decision or benefit on account of actual or perceived race, ethnicity, color, religion, national origin, gender, disability, age, military status, sexual orientation, gender identity, gender expression, or marital or familial status.
13.5.2. Not discriminate in the performance of the contract on account of actual or perceived race, ethnicity, color, religion, national origin, gender, disability, age, military status, sexual orientation, gender identity, gender expression, or marital or familial status.
13.5.3. Provide a harassment-free workplace, with any allegation of harassment to be given priority attention and action by management.
13.5.4. Incorporate the foregoing requirements in all subcontracts related to its contract with the City.
13.6. Name Change
If a firms changes its legal business structure through a merger, acquisition, or sale; has a legal name change, a change in principal location of conducting business; a change in status with the Secretary of State filing, a change in officers, or any other change that affects the structure of the business; a change in the level of service being offered, the nature of the products or service offered; or any deviation from what was presented by the firm to the City when being considered for this contract; the firm shall immediately notify the City's Procurement Services Department at procurementservices@fortmyers.gov.
13.7. Patents, Royalties and Copyrights
The Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the Work, and if to the actual knowledge of the City, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by the City in the Contract Documents.
13.8. Licenses, Permits
13.8.1. The Contractor agrees to obtain and maintain throughout the terms of this Agreement all such licenses as are required to do business in the State of Florida and in Lee County, Florida, including, but not limited to, licenses required by the respective State Boards and other governmental agencies responsible for regulating and licensing the services provided and performed by the Contractor.
13.8.2. The Contractor shall be responsible for preparing all required applications and other supportive information necessary to assist the City in submitting for and obtaining all reviews, Approvals and permits, with respect to the Contractor design, drawings and specifications required by any governmental body having authority over the project. Any fees required for such reviews, Approvals or permits shall be covered by a check issued by the City and made payable to the respective governmental body upon the Contractor furnishing the City satisfactory documentation of such fees. The Contractor shall be similarly responsible for preparing all required applications and other supportive information necessary to assist the City in submitting for and obtaining any renewals and/or extensions of reviews, Approvals or permits that may be required while this Agreement is in effect. The City shall, at the Contractor request, assist in obtaining required signatures and provide the Contractor with all information known to be available to the City so as to assist the Contractor in the preparation and the City's subsequent submittal of any original, renewal or extension of required reviews, Approvals or permits.
13.9. Record Retention
Contractor will keep and maintain adequate records and documents applicable to the project at the Contractor's expense for a minimum of five (5) years, or the period required by applicable federal law, from date of final payment, unless the Contractor is notified in writing by the City of the need to extend the retention period. Books and accounts shall be open to investigation upon request.
The City shall be entitled to audit the books and records of a Contractor or any Subcontractor to the extent that such books and records relate to the performance of the contract or any subcontract.
The Contractor and its Subcontractor shall retain and maintain financial records and other records relating to the contract for a period of five (5) years from the date of final payment under the contract and by the Subcontractor for a period of five (5) years from the date of final payment under the subcontract or such longer period as may be required by law, whichever is later, pursuant to Florida Public Records Law Chapter 119. If any litigation, claim, negotiation, audit or other action involving the records has been started before the expiration of the 5-year period, the records must be retained until completion of the action and resolution of all issues which arise from it, or until the end of the regular 5-year period, whichever is later.
13.10. Subcontractor
The Contractor shall perform all of its obligations and functions under the Contract by means of its own employees, or by a duly qualified Subcontractor, which is approved in advance by the City. In the event a mailto:cfmpurchasing@cityftmyers.com
Subcontractor is employed, the Contractor shall continuously monitor the Subcontractor’s performance, shall remain fully responsible to ensure that the Subcontractor performs as required and itself perform or remedy any obligations or functions, which the Subcontractor fails to perform properly.
13.11. Contractor to Repair Property Damage Caused by the Contractor
The Contractor agrees to promptly repair and/or replace, or cause to have repaired and/or replaced, at its sole cost and expense and in a manner acceptable to and approved by the City, any property damage arising out of, or caused by, the misconduct or negligent acts of the Contractor, or of its Subcontractor. Contractor obligation under this sub-article does not apply to property damage caused in whole or in part by any other Contractor engaged directly by the City. If more than one Contractor is responsible for the damage, each would be responsible in proportion to their fault if only caused in part.
The City reserves the right, should the Contractor fail to make such repairs and/or replacement within a reasonable period of time, to cause such repairs and/or replacement to be made by others and for all costs and expenses associated with having such repairs and/or replacement done to be paid for by the Contractor, or by the Contractor reimbursing the City for all such costs and expenses.
13.12. Not to Divulge Certain Information
Contractor agrees, during the term of this Agreement, not to divulge, furnish or make available to any third person, firm, or organization, without City's prior written consent, or unless incident to the proper performance of Contractor obligations hereunder, or in the courts of judicial or legislative proceedings where such information has been properly subpoenaed, any non-public information concerning the services to be rendered by Contractor or any Contractor pursuant to this Agreement. The Contractor shall require all of its employees, Subcontractor, to comply with the provisions of this paragraph.
13.13. Responsibility for Estimates
In the event the services required, pursuant to this Agreement, include the Contractor preparing and submitting to the City any fees, the Contractor, by exercise of their experience and judgement, shall develop its best cost estimates and shall be held responsible and liable for the accuracy, completeness, and correctness of any and all such cost estimates within the level of accuracy defined by the Association for the Advancement of Cost Engineering (AACE) International for the current project stage. For the purposes of the Liability Provisions of this Article only, the Contractor estimate shall be considered valid and effective for a period of six (6) months from the date of the City's acceptance of the estimate.
13.14. Contractor’s Project Manager
The Contractor agrees to employ and designate, in writing, a qualified and, if required by law, a licensed Professional to serve as the Contractor's Project Manager. The Contractor's Project Manager shall be authorized and responsible to act on behalf of the Contractor with respect to directing, coordinating and administering all aspects of the work to be provided and performed under this Agreement and Amendment(s) thereto. The Contractor's Project Manager shall have the full authority to bind and obligate the Contractor on any matter arising under this Agreement and its Amendment(s) unless substitute arrangements have been furnished to the City in writing. The Contractor agrees that the Project Manager shall devote whatever time is required to satisfactorily direct, supervise and manage the work provided and performed by the Contractor throughout the entire period this Agreement is in effect. The person selected by the Contractor to serve as the Contractor's Project Manager shall be subject to prior Approval and acceptance of the City.
13.15. Truth-In-Negotiations Certificate
The City may request that the Contractor execute a "Truth-in-Negotiations Certificate". The Certificate shall state that wage rates and other factual unit costs supporting the compensation are accurate, complete and current at the time this Agreement is executed. The original Contract Price and any additions thereto shall be adjusted to exclude any significant sums by which the City determines the Contract Price was increased due to inaccurate, incomplete or non-current wage rates of other factual unit costs.
13.16. Completion of Tasks
Unless otherwise set forth in the Agreement, the Contractor shall be responsible for providing and performing whatever services, work, equipment, material, personnel, supplies, facilities, transportation and administrative support that are necessary and required to complete all of the tasks set forth in the section entitled "Statement of Work of Services" and Supplemental Agreements and Change Orders authorized. The compensation to be paid the Contractor, as set forth in "Compensation and Method of Payment" and Supplemental Agreements and Change Orders authorized thereto, shall be understood and agreed to adequately and completely compensate the Contractor for providing or performing whatever services, work, equipment, material, personnel, supplies, facilities, transportation and administrative support that are necessary and required to complete the tasks set forth in the 'Project Details' and Supplemental Agreements and Change Orders authorized thereto as stated above."
13.17. Reports
13.17.1. Progress Reports when requested by the City, the Contractor shall furnish such reports as required.
13.17.2. All reports and documents written for the City shall be submitted in an electronic format that is completely compatible to the City's software. All photos, exhibits, graphs, tables, etc. contained within any report or document shall be provided separately in a file format compatible to the City's software
13.18. All Drawings
The Contractor shall submit to the City, for review, through Procore an electronic PDF’s of each Shop Drawing, including fabrication, erection, layout, and setting Drawings, and such other Drawings as are required under the various sections of the Specifications. Similarly, the Contractor shall submit electronic PDF’s of manufacturer’s descriptive data for materials, equipment, and fixtures including catalog sheets showing dimensions, performance characteristics, and capacities; wiring diagrams and controls;
schedules; and other pertinent information as required. Those Drawings not acceptable will be returned to the Contractor for correction and resubmittal.
13.19. Qualified Personnel
The Contractor agrees that any work to be performed relate to a work which, under Florida Statutes, requires a license, certificate of authorization or other form of legal entitlement to engage in such work, to employ and/or retain only qualified personnel to be in responsible charge of all work to be provided pursuant to this Agreement.
The Contractor shall employ people to work at the City’s facilities who are neat, clean, well-groomed and courteous.
13.20. Removal of Personnel
The Contractor agrees, within thirty (30) calendar days of receipt of a written request from the City, to promptly remove and replace the Contractor's Project Manager, or any other personnel employed or retained by the Contractor, or personnel of the Subcontractor engaged by the Contractor to provide and/or perform services and/or work pursuant to the requirements of this Agreement, who the City shall request, in writing, be removed, which request may be made by the City with or without cause. However, notwithstanding the above, nothing herein shall interfere with the Contractor's right to terminate its employees or employees’ right to terminate their employment with the Contractor.
13.21. Reserved
13.22. City’s Construction Project Management Platform Software
For project archival purposes, the City will utilize 3rd-party Construction Project Management Platform software. The Platform is used to manage design document packages, construction documents (change orders, ASls, RFls, RFPs, field orders, field reports/observations, Contractor reports/observations, etc.), project financials, invoice management, quality/safety reports, close-out documents, and other project-related documents for records retention purposes.
The Contractor shall use the Platform and shall be provided access and training to accomplish document posting, distribution, and archiving for the purposes of review, comments, approval, periodic billings, and other project processes involving multiple parties (e.g. A/E teams, City stakeholders and departments, 3rd party Contractor, etc.).
13.23. Accessibility Requirements
Deliverables – Contractor shall ensure that all electronic deliverables provided under this Contract, including but not limited to reports, PDFs, presentations, forms, data visualizations, dashboards, online tools, and other digital or web-based content, comply with the Web Content Accessibility Guidelines (WCAG) 2.1 Level AA. Deliverables must be provided in accessible formats compatible with commonly used assistive technologies. Contractor shall promptly remediate any accessibility deficiencies identified by the City at no additional cost and shall provide corrected deliverables within a mutually agreed-upon timeframe.
13.24. Additional Services
Should the City request the Contractor to provide and perform Professional Services for this project, which are not set forth in the Statement of Work, the Contractor agrees to provide and perform such Additional Services as may be agreed to in writing by both parties to this Agreement.
Such Additional Services shall constitute a continuation of the Professional Services covered under this Agreement and shall be provided and performed in accordance with the covenants, terms, and provisions set forth in this Agreement and Amendment thereto.
Additional Services shall be administered and authorized as "Supplemental Agreements" or "Change Orders" under the Agreement. The Contractor shall not provide or perform, nor shall the City incur or accept any obligation to compensate the Contractor for any Additional Services unless, and until, a written "Supplemental Agreement" or "Change Order" shall have been agreed to and executed by both parties.
Each such "Supplemental Agreement" or "Change Order" shall set forth a comprehensive, detailed description of: (1) the Statement of Work of the Additional Services requested; (2) the basis of compensation; and (3) the period of time and/or schedule for performing and completing said Additional Services.
The duties and obligations imposed upon the Contractor by this Agreement, and the rights and remedies available hereunder, shall be in addition to, and not a limitation of, any otherwise imposed or available by law or statute.
ARTICLE 14 – OBLIGATION’S OF THE CITY
14.1. Designation of City’s Representative
The City agrees, after the execution of this Agreement, to promptly advise the Contractor, in writing, of the person designated to serve and act as the City’s Representative. Such notification shall be provided to the Contractor by the City’s Contract Administrator.
All services will be approved by the City’s Representative. All work modifications require written Approval by the City’s Representative. No work will proceed until authorized by the City’s Representative and the Contractor has received a purchase order (PO) from Procurement Services. At times Contractor will meet the City’s Representative at the worksite, at no cost, to verify information, requirements, make recommendations, or verify specifications.
The City’s Representative assigned to this project is >[NAME] and they can be reached after a NOTICE OF AWARD is issued at >[Contact Email] or >[Contact Phone].
14.2. Availability of City Information
14.2.1. Project Guidelines and Criteria
Guidelines to the Contractor regarding requirements the City has established, or suggests relative to the Project including, but not limited to, such items as: goals, objectives, constraints, and any special financial, budgeting, space, site, operational, equipment, technical, construction, time and scheduling criteria are set forth in "Project Guidelines and Criteria" is attached and made a part of this Agreement.
14.2.2. City to Provide Pertinent Reference Material
At the Contractor’s request, the City agrees to provide to the Contractor, at no cost, all pertinent information known to be available to the City to assist the Contractor in providing and performing the required services. Such information may include, but not be limited to: previous reports, plans, drawings and specifications, maps; property, boundary, easement, right-of-way, topographic, reference monuments, control points, plats and related survey data; data prepared, or services furnished by others to the City such as sub-surface investigations, laboratory tests, inspections of natural and man-made materials, property appraisals, studies, designs and reports.
14.3. Availability of City's Designated Representatives
The City agrees that the City Representative shall be available within a reasonable period of time, with reasonable prior notice given by the Contractor, to meet and/or consult with the Contractor on matters pertaining to the services to be provided and performed by the Contractor. The City further agrees to respond within a reasonable period-of-time to written requests submitted by the Contractor.
14.4. Access to City Property
The City agrees to provide the Contractor with access within a reasonable period of time to City property, facilities, buildings and structures, to enable the Contractor to provide and perform the required Services and work pursuant to this Agreement. Such rights of access shall not be exercised in such a manner, or to such an extent, as to impede or interfere with City operations, or the operations carried on by others under a lease, or other contractual arrangement with the City, or in such a manner as to adversely affect public health and safety. Such access may, or may not be, within the Contractor's normal office and/or field workdays and/or work hours.
14.5. Plans Review
If applicable, Plan reviews by City staff is only for conformance with the design concept of the project and for compliance with the information given in the contract documents, and shall not extend to means, methods, techniques, sequences, or procedures of construction or to safety precautions or programs incident. The review does not relieve the Contractor from responsibility for errors or omissions or from responsibility for having the design comply with the provisions of all codes having jurisdiction.
14.6. Performance of the Contractor
At the conclusion of this project, an evaluation of the Contractor's performance will be documented and submitted to FDOT. The Contractor will be evaluated in the following areas: Schedule, Management, and Quality. The Attachment 375-030-007 prescribes the process for evaluating and reporting Professional Services Contractor work performance. Attachment "Performance Evaluation of Contractor" assess schedule and management.
14.6.1. Contractor performance evaluations are required for projects above category two (per Florida Statue 287.017, cat 2 is $35,000).
14.6.2. Form 375-030-007 addresses policy.
14.6.3. Form Performance Evaluation of Contractor addresses management & schedule.
ARTICLE 15 – TIME AND SCHEDULE OF PERFORMANCE
15.1. Notice to Proceed / Purchase Order
Following the execution of this Agreement by both parties, and after the Contractor has complied with the insurance requirements set forth hereinafter, the City shall issue the Contractor a Written Notice to Proceed. Following the issuance of such Notice to Proceed, the Contractor shall be authorized to commence work, and the Contractor thereafter shall commence work promptly and shall carry on all such services and work as may be required in a timely and diligent manner to completion.
15.2. Time of Performance
Should the Contractor be obstructed or delayed in the execution or completion of its obligations under this Agreement and its Amendment(s), as a result of causes beyond the control of the Contractor, or its Subcontractor(s) and not due to their fault or neglect, the Contractor shall notify the City, in writing, within five (5) calendar days after the commencement of such delay, stating the cause(s) and requesting an extension of the Contractor’s time of performance. Upon receipt of the Contractor’s request for an extension of time, the City will determine with the Contractor, within 7 days, the length of extension and legitimacy of cause.
15.3. Contractor Work Schedule
The Contractor shall be required, as a condition of this Agreement, to prepare and submit to the City, on a monthly basis, commencing with the issuance of the Notice to Proceed, a Contractor’s Work Schedule. Said Schedule shall be updated at each pay request. The Work Schedule shall set forth the time and manpower scheduled for all of the various phases and/or tasks required to provide, perform and complete all of the services and work required for completion of the various phases, and/or tasks of the project services set forth and described in this Agreement, pursuant to this Agreement in such a manner that the Substantial Completion ’s planned and actual work progress can be readily determined. The Contractor’s Work Schedule of planned and actual work progress shall be updated and submitted by the Contractor to the City on a monthly basis.
15.4. Timely Accomplishment of Services
The timely performance and completion of the required services, work and materials is vitally important to the interests of the City. Time is of the essence for all of the duties and obligations contained in this Agreement and any Amendment thereto. The City may suffer damages in the event that the Contractor does not accomplish and complete the required services in a timely manner. The Contractor agrees to employ, engage, retain and/or assign an adequate number of personnel throughout the period of this Agreement so that all Basic Services and Additional Services shall be provided, performed and completed in a timely and diligent manner throughout.
15.5. Failure to Perform in a Timely Manner
Notwithstanding anything to the contrary in paragraph "Contractor Work Schedule" above, should the Contractor fail to commence, provide, perform and/or complete any of the services and work required pursuant to this Agreement in a timely and diligent manner, the City may consider such failure as justifiable cause to terminate this Agreement. As an alternative to termination, the City at its option, may, upon written notice to the Contractor, withhold any or all payments due and owing to the Contractor, not to exceed the amount of the compensation for the work in dispute, until such time as the Contractor resumes performance of his obligations in such a manner as to get back on schedule in accordance with the time and schedule of performance requirements set forth in the Agreement, or any Supplemental Agreement(s), or Change Order(s) or Amendment(s) issued thereto.
ARTICLE 16 –NOTICE OF CLAIM; WAIVER OF REMEDIES; NO DAMAGE FOR DELAY
16.1. Notice of Claims
16.1.1. The City's liability to Contractor for any claims arising out of or related to the subject matter of this contract, whether in contract or tort, including, but not limited to, claims for extension of construction time, for payment by the City of the costs, damages or losses because of changed conditions under which the work is to be performed, or for additional work, shall be governed by the following provisions:
16.1.1.1. All claims must be submitted as a Request for Change Order in the manner as provided herein;
16.1.1.2. The Contractor must submit a Notice of Claim to City and to the Engineer within 20 days of when the Contractor was or should have been aware of the occurrence of the event giving rise to the claim; and
16.1.1.3. Within 10 days of submitting its Notice of Claim, the Contractor shall submit to the City its Request for Change Order, which shall include a written statement of all details of the claim, including a description of the work affected. The Contractor agrees that the City shall not be liable for any claim that the Contractor fails to submit as a Request for Change Order as provided in this paragraph.
16.1.2. After receipt of a Request for Change Order, the City, in consultation with the Engineer, shall deliver to the Contractor its written determination of the claim. As to matters subject to the determination by the City (not actions for breach of contract or tort) the City's written decision shall be final unless the Contractor, within thirty (30) days of the Contractor's receipt of the City's determination, delivers to the City a written objection thereto. If, after good faith efforts to resolve the matter, the parties are unable to agree, the matter shall be submitted to arbitration pursuant to the Construction Industry Arbitration Rules of the American Arbitration Association.
16.2. Remedies and No Damages for Delay
For work the Contractor performs with its own forces, and in addition to the adjustments provided for in "Fee", the Contractor's exclusive remedy for delays in performance of the construction caused by events beyond its control, except for delays claimed to be caused by or attributable to the City or the Engineer, including claims based on breach of contract or negligence, shall be a claim submitted in compliance with
(1) above, for an extension of the scheduled construction time. In the event of a change in such work, the Contractor's claims for adjustments in the contract sum are limited exclusively to its actual costs for such changes plus 5% for profit. Except as set forth herein, the Contractor expressly agrees that the foregoing constitutes its sole and exclusive remedies for delays and changes in such work and eliminate any other remedies for claiming an increase in the Contract Price, delays, changes in the work,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .