AGE PWS.pdf

PDF 384 KB Posted

Attached to
Flight Operations Support
Solicitation number
80AFRC24SS002
Issued by

About this file

This notice is a sources sought synopsis for flight operations support services issued by the National Aeronautics and Space Administration Armstrong Flight Research Center. The synopsis requests capability statements from interested parties for aerospace ground equipment support services, aircraft operations support services, and aircraft flight crew support services. These services will be obtained through an indefinite delivery indefinite quantity contract vehicle. Capability statements are due no later than February 2, 2024 and should not exceed 15 pages. Interested parties should indicate their ability to perform all aspects of the effort and advise if the requirement is considered commercial. The synopsis also requests input on barriers and opportunities to engage underserved communities and subcontractors that employ members of underserved communities. Recommendations should be provided to enhance diversity and inclusion and encourage full participation in performing this requirement.

View the file

Other files

File Type Posted
AFCS PWS.pdf PDF
FOS IDIQ PWS.pdf PDF
AOS PWS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THE NATIONAL AERONAUTICS AND SPACE

ADMINISTRATION (NASA)

ARMSTRONG FLIGHT RESEARCH CENTER (AFRC)

EDWARDS, CA

PERFORMANCE WORK STATEMENT (PWS)

FOR

AEROSPACE GROUND EQUIPMENT AND PARTS

SUSTAINMENT SERVICES (AGEPS)

Revision

Dated November 1, 2023

TABLE OF CONTENTS

C.1 Overview

C.1.1 Introduction C.1.2 Objective C.1.3 Background C.1.4 Policies, Procedures, Directives, and Publications C.1.5 Definitions and Acronyms C.1.6 Automated Database and System Requirements

C.2 General Requirements C.2.1 Key Personnel

C.2.1.1 Site Manager Qualifications C.2.1.2 Quality Control / Safety Manager Qualifications

C.2.2 Employees C.2.3 Quality Control, Safety, and Records Management

C.2.3.1 Quality Requirements C.2.3.2 Central Library C.2.3.3 Quality Manual C.2.3.4 Test Equipment Inspection and Calibration C.2.3.5 Quality Control Plan C.2.3.6 Quality Assurance Surveys C.2.3.7 Non-conformance and Material Deficiency Reporting C.2.3.8 Contractor Safety Management C.2.3.9 Records Retention

C.2.4 Government Quality Assurance Branch C.2.4.1 Inspections and Audits C.2.4.2 Technical Monitors

C.2.5 Security C.2.5.1 Compliance with Security Requirements C.2.5.2 Property Loss C.2.5.3 Access C.2.5.4 Keys

C.2.6 Normal Duty Hours C.2.6.1 Work Outside Normal Duty Hours C.2.6.2 Core Hours

C.2.7 Government Furnished Property C.2.7.1 GFP Condition C.2.7.2 GFP Inventory C.2.7.3 Government Furnished Stock and Supplies C.2.7.4 Government Furnished Material (GFM) C.2.7.5 Commercial off the Shelf (COTS) Software

C.2.8 Documentation / Data Deliverables / Reports C.2.9 Contractor Employee Licensing, Certification, Specific Experience, & Uniform Requirements

C.2.9.1 Contractor Personnel Training C.2.9.2 Driver Licenses C.2.9.3 Forklift Certification C.2.9.4 Automotive Service Excellence (ASE) Certification C.2.9.5 Hazardous Material Certification C.2.9.6 NASA Systems Training (SAP, Supply, Disposal, Equipment, and Maximo)

C.2.10 Meetings with the Government C.2.11 Training and Education

C.2.11.1 Awareness Workshops about Aircraft Sustainment Services C.2.11.2 Lifting devices C.2.11.3 Flightline driver C.2.11.4 "Did You Know...?" Announcements

C.2.12 Service Request and Tracking C.2.13 Records and Reports C.2.14 Non-Routine Requirements

C.3 Aerospace Ground Equipment (AGE) Support C.3.1 Introduction

C.3.1.1 Critical/Emergency Mission Support C.3.1.2 Routine Mission Support C.3.1.3 AGE Equipment Failure During Operations C.3.1.4 Applicable Directives C.3.1.5 Performance Requirements C.3.1.6 AGE Tool Control/Foreign Objects Damage (FOD) Prevention

C.3.2 Quality Inspection C.3.3 AGE Technical Requirements

C.3.3.1 AGE Required Maintenance C.3.3.2 AGE Preventive Maintenance C.3.3.3 AGE Special Purpose/Utility Vehicle/Equipment C.3.3.4 Proof/Load Testing Utility and Special Purpose Vehicles/Equipment C.3.3.5 Load Test Fixture C.3.3.6 Hydraulic testing C.3.3.7 Operation of the AFRC Lead Acid AGE Shop C.3.3.8 Service of Aircraft Batteries C.3.3.9 Critical Lift Operators C.3.3.10 Aircraft and AGE Fueling Services C.3.3.11 N2 Servicing C.3.3.12 Pressure Vessel Support C.3.3.13 Portable Fire Extinguisher Inspection C.3.3.14 Equipment Painting C.3.3.15 Static Display Item Maintenance C.3.3.16 Ramp sweeping C.3.3.17 Material Requirements C.3.3.18 AGE Equipment Records C.3.3.19 AGE Emissions Reporting

C.3.3.20 AGE Contract Performance Reporting C.4 Provide monthly progress report per DRD-54. Purchase Request Processing Services

C.4.1 Parts and Supplies Fulfillment Process C.4.2 Parts and Supplies Acquisition C.4.3 Parts and Supplies Acquisition Export Control Identification and Classification

C.5 Aircraft Part Provisioning Services C.5.1 Aircraft Parts Receipts C.5.2 Aircraft Parts Warehousing C.5.3 Aircraft Parts Purchase Request Processing C.5.4 Aircraft Parts Repairs C.5.5 Aircraft Parts Pickup and Delivery C.5.6 Aircraft Parts Maintenance and Support

C.5.6.1 New Part records in NAMIS C.5.6.2 Aircraft on Ground (AOG) procedures C.5.6.3 Parts exceeding shelf life C.5.6.4 Vanishing vendors C.5.6.5 Salvage parts C.5.6.6 Parts Removed from Aircraft C.5.6.7 Parts Kits Purchases C.5.6.8 Flyaway kits C.5.6.9 Parts Storage C.5.6.10 Parts Disposal

C.6 Project Support C.7 Performance Measures

C.7.1 Basis of Performance C.7.2 Assessment Periods and Corrections C.7.3 Assessment Criteria

END OF SECTION C

Appendices Appendix A Policies, Procedures, Directives, and Publications Appendix B Acronyms and Abbreviations Appendix C AGE Definitions

C.1 OVERVIEW

C.1.1 INTRODUCTION

The NASA Armstrong Flight Research Center (formerly Dryden Flight Research Center) is focused on providing flight related research and development aircraft support. AFRC started operations in 1954 and has been at the forefront of flight development with the use of a variety of research aircraft. Currently, AFRC has 23 flyable aircraft which include, but are not limited to, F-18, F-15, B-200, T-34, GIII, C-20, DC-8, ER-2, Predator, Global Hawk, TG-14, Uninhabited Aircraft Systems (UAS), and other unique one of a kind experimental and research aircraft.

Some aircraft are production versions while some have been heavily modified to specifically support aerospace research programs.

AFRC considers all work areas high risk and involve substantial safety hazards. Associated risks include the handling of and potential exposure to hazardous materials. The safety of personnel, facilities and operations are paramount in conjunction with fulfilling the mission. It is NASA policy to avoid loss of life, personal injury or illness, property loss or damage, or harm to the environment in pursuit of its logistical support to the mission.

AFRC Quality Policy: "Our flight research products and services satisfy our customers every time."

Location of Contract Performance:

a. The main campus Armstrong Flight Research Center at Edwards, California 93523 (referred to in this document as AFRC Edwards).

C.1.2 OBJECTIVE

The objective of this requirement is to obtain Aircraft Sustainment and Ground Equipment Support Services at the Center to meet mission requirements. The Contractor shall provide the necessary expertise, capabilities, management, equipment, supplies, materials and personnel required to perform the Aerospace Ground Equipment and Parts Sustainment Services. Tasks will be principally performed at AFRC Edwards.

a. Aerospace Ground Equipment (AGE) Support Services consist of: Aircraft Support Services including critical/emergency and routine maintenance and mission support services, service of aircraft batteries, life support, proof load testing, fuel delivery, aircraft fueling, N2 servicing, AGE equipment training, equipment painting, fire extinguisher inspection, aircraft static display inspection, and ramp sweeping.

b. Aircraft Sustainment Services consist of: aircraft parts management and procurement, fleet and ground support equipment maintenance, equipment fueling, project support, and other support services

C.1.3 BACKGROUND

AFRC is NASA’s premier installation for aeronautic flight research and testing (reference http://www.nasa.gov/centers/armstrong/http://afrc.nasa.gov/). AFRC Edwards is located at Edwards Air Force Base (EAFB) in California at the western edge of the Mojave Desert, 80 miles north of metropolitan Los Angeles, approximately 30 miles northeast of Lancaster, California.

AFRC Edwards is on approximately 880 acres of land permitted from the United States Air Force.

There are currently approximately 1,200 Civil Servant and Contractor employees on-site occupying approximately 500,000 square feet of structural floor space at AFRC Edwards in direct support of the NASA Aeronautics, Human Exploration, and Science Mission Directorates.

Present-day facilities and infrastructure include: office buildings, mobile/modular offices, labs, warehouses, aircraft hangars, computer rooms, industrial shops, cafeteria, roads, parking lots, aircraft taxiways, aircraft staging areas, fences, and storage containers.

C.1.4 POLICIES, PROCEDURES, DIRECTIVES, AND PUBLICATIONS

The Contractor shall comply with all current applicable federal, state, and local laws and regulations, and NASA and AFRC policies, procedures, directives, and publications during performance of this contract. Reference Appendix A for a list of current applicable documents for this contract.

C.1.5 DEFINITIONS AND ACRONYMS

Definitions are included within this document. All acronyms and abbreviations for terms listed herein can be found in Appendix B.

C.1.6 AUTOMATED DATABASE AND SYSTEM REQUIREMENTS

The Contractor shall utilize Government provided software which is of the current standard type and version utilized at AFRC or otherwise approved by the COR.

C.2 GENERAL REQUIREMENTS

The Contractor shall perform all work required in accordance with the contract. The Contractor shall provide all labor, equipment and materials to perform the work, except for items listed on Attachment J-03, Government Furnished Property (GFP) list and Attachment J-04 Installation- Accountable Government Property (IAGP) list. The Contractor shall ensure the proper NASA Civil Servant approval or concurrence signature is on all applicable documents prior to processing the document. The Contractor shall escalate all high risk situations, failures of services, accidents, and potential critical failures of services to the Contracting Officer Representative (COR) immediately. It is mandatory that the Contractor obtain affirmative acknowledgment of this communication.

The Contractor shall propose approaches, methods, and technologies to achieve the results and develop the procedures and schedules to perform the work as defined herein. The required comprehensive result is for Aerospace Ground Equipment Support Services to support all Center requirements necessary to accomplish the mission.

C.2.1 KEY PERSONNEL

The Contractor shall provide on-site at least one (1) qualified Site Manager (SM) and one (1) qualified Quality Control / Safety Manager (QCSM).

Contracting Officer (CO) will provide review and concurrence of the SM and QCSM qualifications in accordance with NFS 1852.235-71 Key Personnel and Facilities. The Contractor shall provide resumes for the proposed SM and QCSM describing their experience with references and qualifications to the CO Data Requirements Description (DRD-02).

C.2.1.1 Site Manager Qualifications The SM shall have experience managing programs, contracts or operations similar in size and complexity to the activities of this contract. The Contractor shall provide site program management including planning, organizing, scheduling, staffing, directing, controlling, budgeting, forecasting, contract administration, procurement, pricing, reporting, and proposal preparation. The SM shall be empowered to lead this effort, to make day-to-day decisions related to all of the work performed under this contract and be responsible for the Contractor’s overall performance, including any subcontracted activities. The Contractor’s SM shall be the primary point of contact (POC) for technical direction from the COR to the Contractor, unless otherwise delegated in writing. The SM shall be the POC for resolving conflicts involving daily activities and the planning of future operations. The SM shall also oversee direction and administration of Contractor personnel assigned to this contract. The SM shall ensure timely and effective communications with NASA managers and technical personnel. The SM shall be responsible for periodic performance reviews and reports with/to the Government.

In addition to the above experience requirements, the SM shall have the following qualifications:

a. Knowledge of ISO9001 or AS9100.

b. Experience managing service quality, including setting appropriate metrics and remedying concerns to protect the Government.

c. Previous experience in management and leadership skills.

d. Evidence of interpersonal and communication skills used in conflict resolutions and establishing operating practices with employees and co-workers.

The SM in this context shall mean the individual with the direct responsibility for the overall management of the contract including ensuring personnel and deliverables meet cost and schedule objectives.

C.2.1.2 Quality Control / Safety Manager Qualifications The QCSM must have documented experience as a QC Manager or Safety Manager on contracts similar in size and complexity.

In addition to the above experience requirements, the QCSM shall have the following qualifications:

a. Knowledge of and experience implementing ISO9001 or AS9100.

b. Knowledge of and experience implementing Occupational Safety and Health Standards

29 Code of Federal Regulation (CFR) 1910.

c. Documented experience managing service quality, including setting appropriate metrics and remedying concerns to protect the Government.

d. Evidence of customer interfacing skills and conflict resolution abilities.

QCSM shall have full authority to act on behalf of the Contractor to address Quality Control matters and have the responsibility for developing, implementing and managing a quality control system designed to ensure performance consistent with contract requirements, Government specifications and performance goals. The QCSM shall record and track training/education of all Contractor employees.

C.2.2 EMPLOYEES

The Contractor shall ensure that Contractor personnel are United States Citizens or legal resident aliens. The Contractor shall ensure that Contractor personnel are trained and qualified to perform PWS requirements, to include the licensed and/or certified operation and/or testing of vehicles and/or equipment listed in Attachment J-03, Government Furnished Property and J- 04 Installation Government Accountable Property. Contractor personnel will be authorized to utilize Government vehicles to meet the requirements of the PWS.

The Contractor shall ensure that personal appearance of employees is neat and professional.

Except for management and administrative personnel, work clothing for Contractor employees shall display the Contractor’s name and logo and shall be in compliance with minimum clothing requirements as detailed in the Armstrong Center Procedure (AFOP)-7900.3-002, Aircraft Maintenance & Safety Manual. NASA issued identification badges shall be worn as prescribed by NASA regulations. The Contractor shall ensure that NASA issued badges are worn by its employees at all times on site, except in situations and locations where they can be a work place hazard.

In the performance of this contract, Contractor personnel may be required to fly on commercial aircraft or serve onboard Government owned aircraft and may be required to support deployments and off-site recovery of aircraft, both inside and outside the Continental United States (CONUS). For some assignments, selected Contractor personnel shall be required to possess a security clearance of Secret (reference Attachment J-08 DD-254) and others may be required to gain access to DoD systems.

FOREIGN TRAVEL

For any foreign program travel related to this contract, the Contractor shall comply with NASA Procedural Requirements (NPR) 9710.1, chapter 7.2 entitled Foreign Travel. The Contractor shall submit all foreign travel requests to the AFRC Foreign Travel Coordinator for review/approval a minimum of four weeks before the planned departure date, so that an electronic country clearance (eCC) can be obtained. The applicable program, project, agreement and/or contract should be referenced in the supporting documentation included with the request. Prior to commencing any official program foreign travel, Contractor employees shall also have successfully completed Foreign Travel Training described in section

7.2 of the NPR.

Information about attending Foreign Travel and paperwork required for travel submission can be found by contacting our Center Foreign Travel Coordinator. Travel will not be approved without completion of the required training, receipt of a country clearance, and submittal of any other supporting documentation as described in the NPR. Consult with the Contracting Officer or Foreign Travel Coordinator for additional information regarding review/approval of foreign travel requests.

The AFRC Foreign Travel Coordinator information can be located at the following link:

https://afrcshare.ndc.nasa.gov/orgs/XM/C/Pages/Portal.aspx.

C.2.3 QUALITY CONTROL, SAFETY, AND RECORDS MANAGEMENT

C.2.3.1 Quality Requirements The Contractor shall have a Quality Management System (QMS) that is certified to the applicable current version of the International Organization for Standardization's (ISO) ANSI/ISO/ASQ 9001/ American National Standards Institute / American Society for Quality Control for all tasks defined in this PWS.

The scope of the ISO compliance shall be relative to the requirements of this contract. ISO 9001certification shall be maintained throughout the contract period of performance. The quality program shall be coordinated with and approved by the COR. The quality program shall specifically document all areas where quality control inspections will be performed. The Government reserves the right to disapprove the quality system, or selected portions thereof, if it fails to comply with its documented requirements or exhibits significant adverse trends in product quality. The Contractor shall furnish all resources to ensure continuous implementation of an effective quality control program.

a. Should the Contractor not be ISO 9001certified at the time of contract award, the Contractor shall:

1. Become certified within nine (9) months after award of the contract.

2. Submit a plan outlining the path and time frame anticipated to become compliant, within one (1) month after contract award. The Contractor shall implement this plan, with milestones agreed upon by the Government.

3. Develop and implement an interim QMS, within one (1) month after contract award, which is compliant with all applicable ISO 9001requirements. An interim plan shall be developed within the same timeframe and shall be approved for use by the COR and NASA QA.

b. ISO certification shall have no bearing on the Government’s rights to administer or enforce contractual quality requirements. An assigned NASA QA Specialist shall periodically assess/audit Contractor compliance to its documented Quality system. The Contractor shall support the Government audit/surveillance of Contractor plans, procedures and processes when deemed necessary by the Government. These audits/surveillances will provide understanding and insight of processes and procedures that may have the potential to impact launch/landing schedules. Government audits/surveillances will include but are not limited to all disciplines and tasks which are involved with or support landing operations, hardware and software production and maintenance, safety and quality assurance, logistics, procurement and financial operations.

C.2.3.2 Central Library The Contractor shall develop and maintain a central library containing all the applicable Military Technical Orders (TO), Manufacturer’s Specifications and/or handbook of operations and/or maintenance manuals, Operating and Maintenance Instructions (OMI) and/or Operations and Maintenance Requirements and Specifications (OMRS), Maintenance Directives (MD) and any other material (i.e., processes, procedures, work instructions, Operational Instruction (OI), directives, etc.) used to carry out the tasks in this PWS. The Contractor’s quality systems processes, procedures, work instructions and all other documentation including media and data, which comprise the Contractor’s quality management system, shall be made available to the Government for their review and use. All data systems software shall be in an electronic data file format that is mutually agreed upon by both the Contractor and the Government.

C.2.3.3 Quality Manual The Contractor shall develop a Quality Manual that contains copies of all Contractor-developed and approved processes and procedures to operate, maintain, repair and provide accurate configuration control for all items listed in Appendix A, Applicable Policies, Procedures, Directives and Publications. This quality manual shall also contain a list of all applicable pre-existing processes, procedures, work instructions, configuration control documents, Military TOs, Manufacturer’s Specifications and/or handbook of operations and/or maintenance manuals, MDs, OMIs and/or OMRSs used by the Contractor in support of this PWS. The requirements and inspection practices shall be consistent with Armstrong Management System Documents (AMS), AFOP and Armstrong Organizational Procedures (AFOP). The Contractor shall provide a controlled copy of this manual to the CO and the COR. The Contractor’s Quality Manual shall be approved, at a minimum, by the Contract SM responsible for onsite operations and the QCSM. The CO, COR, AFRC Quality Assurance Branch (QA), Task Monitor (TM) or designated representative will formally review the Contractor’s Quality manual prior to implementation, and all changes thereafter, throughout the period of performance for this contract.

Upon request of the CO or COR, the Contractor shall provide any manuals, instructions, procedures, specifications, or similar control documents utilized in the reliability, maintainability and/or quality assurance of specified equipment. Any documents, databases or listings, electronic or otherwise, produced in response to this contract to include but not limited to any software programs, maintenance instructions or directives, and database listings associated with Fleet and AGE vehicles and equipment being maintained under this contract, shall not be proprietary to the Contractor or any subcontractor(s), and shall be considered government property.

C.2.3.4 Test Equipment Inspection and Calibration Test equipment utilized by the Contractor shall be of the required range, accuracy, functionality and type necessary for the items to be inspected and calibrated. Test equipment inspection and calibration shall be accomplished in accordance with AFOP-7900.3-002.

C.2.3.5 Quality Control Plan The Contractor shall implement a detailed Quality Control Plan showing how it will ensure the integrity of its Quality Management System, as referenced in the section entitled, “Quality Requirements”, of this PWS. The Contractor shall utilize, to the maximum extent possible, its own in-house Quality Assurance Program. The Contractor shall submit a comprehensive site-specific Quality Control Plan (QCP) consistent with NASA policies to the COR for approval (DRD- 03).

The Contractor shall review and update the QCP annually to effectively identify risks and appropriate mitigation to maintain quality of service and protect the health and safety of Armstrong personnel and the environment. The Contractor’s QCP shall reflect and incorporate quality processes and quality management practices identified below. Within four (4) hours of discovering a discrepancy or noncompliant work product or service safety, reliability, or functionality, the Contractor shall notify the COR and initiate investigative and corrective actions. Investigative actions shall identify the proximate and root cause(s) of noncompliance and the scope/population of noncompliant items. The Contractor shall implement corrective actions within 30 days of discovering the discrepancy, and submit a report on the improvement to the COR. The Contractor Quality Control performance shall continually be improved through: advocacy; awareness training; teaming and sharing of quality control tools, techniques and data.

The QCSM shall ensure the QCP is fully implemented and will serve as a focal point for quality related matters to the COR.

C.2.3.6 Quality Assurance Surveys The Contractor shall perform ISO audits annually to survey personnel, procedures, services, and operations assigned under this PWS, in order to verify compliance with accepted standards.

This shall include surveys of vendors, suppliers, and sub-contractors providing services to the Contractor. Surveys are generally not required for those vendors, suppliers, and sub-contractors who provide Department of Defense (DoD) or Federal Aviation Administration (FAA) certified parts or services. In such cases, a copy of the valid certification must be provided to the Contractor and be available for Government audit. The Contractor shall be responsible for quality assurance within its own organization and shall make recommendations to the responsible NASA AFRC management where surveys of vendors, suppliers, and sub-contractors are necessary or desirable to ensure quality, safety and applicable airworthiness.

C.2.3.7 Non-conformance and Material Deficiency Reporting Non-conformance is defined as a condition of any article, material, or service in which one or more characteristics do not conform to the specified requirements (e.g., noncompliance with drawings, specifications, fabrication, inspection process, and test document). This includes failures, discrepancies, deficiencies, defects, anomalies and malfunctions. The Contractor shall establish and implement a procedure for reporting and utilization by waiver of non-conforming articles, materials and equipment. The procedure shall include corrective action(s) to be taken.

The Contractor shall promptly correct conditions, which have resulted or might result in sub-standard or defective articles or materials. Such actions and procedures shall include preventive measures as well as correction of conditions, which have occurred. The Contractor shall document its efforts to correct existing deficiencies and to minimize future occurrences. For aircraft support equipment, the COR shall approve the procedures for non-conformance reporting and deficient material utilization-by-waiver. The COR will approve aircraft support equipment waivers or give direction if waiver is disapproved.

C.2.3.7.1 Customer Service and Conflict Management The Contractor shall proactively engage the customer to ensure mission requirements and customer expectations are understood in advance and requirements are satisfied with the service provided. Upon discovery of customer complaints, the Contractor shall follow procedures in the Quality Control Plan to take immediate corrective action, initiate process and service improvements, resolve outstanding issues and prevent recurrence. At no time will the

Contractor use a customer’s complaint or expectation as a reason or justification to circumvent the rules and regulations required under this contract.

C.2.3.8 Contractor Safety Management The Contractor shall establish, implement and maintain proactive safety management that complies with and incorporates the safety requirements of 29 CFR 1910. The Contractor shall submit a comprehensive site-specific Safety, Health and Environmental Management Plan (SHEMP) consistent with existing laws, regulations, policies and industry standards to the COR for approval (DRD-04).

C.2.3.8.1 Armstrong Safety Culture The success of NASA starts with an unwavering commitment to safety. The culture of NASA Armstrong is one of safe accomplishment of our missions, and this includes our logistics services management team. In the spirit of NASA’s commitment to safety, the Contractor shall implement the safety requirements of this section.

C.2.3.8.2 Safety Training, Activity Hazard Analysis and Communication The Contractor shall address required safety training and awareness in the SHEMP to ensure all employees have adequate knowledge to prevent accidents and mishaps. Training shall be documented, and records made available to the COR upon request.

Monthly Meetings – At a minimum, the Contractor shall hold monthly safety meetings for all employees.

Safety Briefings – Prior to commencement of hazardous work, the Contractor shall hold safety briefings with involved Contractor employees and all other affected personnel.

Prior to any new work activity, the Contractor shall develop, review, and approve a job specific Activity Hazard Analysis (AHA), to identify potential hazards and appropriate mitigation. The Contractor shall ensure employees are aware of the hazards and understand the mitigations approved. AHAs shall be made available to all Contractor employees. AHAs shall be available to the COR upon request.

C.2.3.8.3 Mishap and Hazard Reporting The Contractor shall submit each month a "Contractor's Monthly Accident Report", Form AFRC 80034 to the COR (DRD-41).

In the event of a mishap and/or accident requiring more than first aid, the Contractor shall report the mishap immediately to the COR. The Contractor shall also report the mishap within 24 hours by direct input into the NASA Mishap Information System (NMIS). NMIS can be found at: https://nmis.sma.nasa.gov/. The Contractor shall also report any hazards observed by employees into NMIS.

C.2.3.8.4 Hazardous Materials and Chemical Management

The Contractor shall use the Armstrong Chemical Management System (Chemical Cribs located at AFRC Edwards B4809, B4823 (external) for any chemicals brought on site needed for cleaning or other work on this contract. Safety Data Sheets (SDS) shall be readily accessible to Contractor and NASA personnel.

a. The Contractor shall be responsible for hazardous material requisitioning, identification, handling, processing and record keeping in accordance with applicable federal, state and local laws and regulations, and AFRC procedures. Within 45 days after contract award, the Contractor shall assemble and submit to the Safety and Environmental Office for review, all known records and SDS of hazardous materials including, but not limited to, Polychlorinated Biphenyl (PCB) equipment, chlorofluorocarbons (CFC) chillers, ozone-depletion substances (ODS) and radioactive sources.

b. The Contractor shall operate a chemical crib in conjunction with the AFRC chemical crib.

The Contractor shall obtain a Hazardous Materials Crib badge from the Safety and Environmental Office for all new employees prior to issuing chemicals to the employee.

c. The Contractor shall obtain approval in the form of a chemical license from the Safety and Environmental Office prior to procuring a chemical new to the inventory. The requisition of hazardous materials shall be in accordance with AFOP-8553.1-009 Environmental Management System Chemical Management. The Contractor shall renew all chemical licenses every two (2) years through the Safety and Environmental Office.

d. The Contractor shall maintain a current and accurate inventory of all products through the use of the AFRC Chemical Management System automated database. SDSs shall be readily accessible to employees and NASA personnel. A hard copy of product inventory and SDSs must be readily accessible in accordance with the U.S. Department of Labor (DOL): Occupational Safety & Health Administration (OSHA) Regulations (Standards - 29 CFR), Section 1910, Standard 1910.1200 Hazard Communication.

e. The Contractor shall store chemicals in approved hazardous materials storage lockers, and shall request, through the AFRC Chemical Management System, shelf-life extensions for expired chemicals that are still safe and effective. The storage of hazardous materials shall be in accordance with AFOP-8715.3-005 Hazard Management Procedure and AFOP-8553.1-007 Environmental Management System Chemical Management for Hazardous Materials.

f. The Contractor, shall submit to the COR the SDS and manufacturer’s instructions, and a statement of the Contractor’s intended use, location, purpose, and method of application, prior to the initial application or use of any hazardous materials. The Contractor shall obtain specific approval from the COR, prior to performing any initial work at AFRC on known or suspected hazardous materials.

g. The Contractor shall not perform any work on known asbestos containing materials, asbestos contaminated materials, materials that might release Polychlorinated Biphenyl (PCB) or chlorofluorocarbons (CFC), ozone-depletion substances (ODS), radioactive materials, radioactive sources, oil containing PCBs or lead paint without prior approval from the Safety and Environmental Office. The Contractor shall use and follow the guidelines of the AFOP-8553.1-007, and Executive Order 12856. All hazardous materials at AFRC shall be included in the AFRC Chemical Crib System. The AFRC Hazardous Material Officer provides technical direction concerning these processes.

h. The Contractor shall implement policies that will reduce emissions of ODSs, promote recycling of ODSs, and shall cease the acquisition of nonessential products containing or manufactured with ODSs. The Contractor shall maintain an inventory of all ODSs stored and used at AFRC, in accordance with Executive Order 13148.

i. The Contractor shall establish and maintain internal environmental compliance controls.

All work conducted shall be in compliance with applicable environmental requirements, including attendance of required training courses. Environmental protection problems shall be reported through the Contractor SM to the Government. The Contractor shall provide support, guidance, and assistance to its employees in interpreting environmental policies, requirements, and standards. The work performed under this contract shall include, but is not limited to, providing timely responses and appropriate remedial actions to address environmental requirements, recycling, and affirmative procurement.

j. Compliance with federal, state, and local air quality regulations is required. All equipment requiring a permit from the Los Angeles and/or Kern County Air Pollution Control District (APCD) must be obtained through the Safety and Environmental Office.

Coordination of this effort shall begin 90 days before the equipment is required on site.

Once the Safety and Environmental Office obtains the permit, it is the Contractor’s responsibility to comply with all operational conditions stated on the permit. These conditions include but are not limited to: ensuring the equipment has the best available air emissions control technology; maintaining quarterly records of fuel usage and hours of operation; maintaining records of paint and associated products usage, and records.

Paints and associated products must comply with the Volatile Organic Compounds (VOC) limits in accordance with Los Angeles and Kern County APCD. The Contractor shall submit to the Safety and Environmental Office a written Hazardous Communication plan (CFR 1910.1200) within 45 days from the start of the contract.

k. The Contractor shall comply with applicable federal, state, local and NASA/AFRC environmental management regulations, requirements, and standards regarding hazardous waste. The Contractor shall take all precautions in the performance of work under this contract to protect the safety and health of its employees, to protect the safety and health of all persons in or near the job site and to prevent damage to the environment, property, materials, supplies and equipment. The Contractor shall identify all wastes and waste producing supplies and their containers. All hazardous waste shall have either laboratory analysis data that documents the chemical content or a signed generators certification that documents the chemical contents of the waste prior to disposal. Unknown wastes shall be flagged, and attempts made for identification.

Identification assistance may be obtained through the Safety and Environment Office.

The Contractor shall make provisions for continuous contact with personnel working alone in hazardous locations or at remote areas. Contractor personnel shall wear or use Personal Protective Equipment (PPE) such as clothing, respiratory devices, protective shields, ear protection, eye protection, etc., appropriate to the task being performed in accordance to Federal, state, local and NASA regulations.

C.2.3.9 Records Retention The Contractor shall retain all records related to performance of this contract in accordance with NASA Procedural Requirements (NPR) 1441.1, NASA Records Management Program Requirements. These records include, but are not limited to: training records, certifications, licenses, shipping and receiving, property management, disposal, etc.

C.2.4 GOVERNMENT QUALITY ASSURANCE BRANCH

Ongoing surveillance will be conducted by the Government. All services rendered under this contract are subject to Government inspection. The Government's QA Surveillance Program is not a substitute for QC by the Contractor. Government QA personnel will advise the Contractor SM and document any deficiencies discovered. The Government QA Team will be led by the COR and assisted by surveillance team members, and all findings of satisfactory, unsatisfactory or non-performed work shall be administered as described in the Government’s Quality Assurance Surveillance Plan (QASP).

C.2.4.1 Inspections and Audits The Contractor shall be subject to NASA HQ audits, Center internal audits, including special audits, vulnerability assessments, functional / internal control reviews, and ongoing surveillance by the Government QA Team. The Contractor shall be responsive to findings and observations by generating corrective action plans for COR (or designee) review and approval within 30 days.

The Contractor shall then take corrective action in accordance with the approved corrective action plan, reference section “Assessment Periods and Corrections”. Investigative actions shall identify the proximate and root cause(s) of noncompliance and the scope/population of noncompliant items.

The Contractor shall support NASA inspections and audits as required.

C.2.4.2 Technical Monitors The Government will select NASA employees from various organizations that interact with the Contractor to participate in the QA Surveillance Program as TMs. TMs will report directly to the

COR with observations about the Contractor’s performance, these reports will be referenced by the COR in preparation for assessments of the Contractor’s performance to the CO.

C.2.5 SECURITY

C.2.5.1 Compliance with Security Requirements The Contractor shall comply with all NASA and local security requirements. In order to perform the requirements of the contract, some contract employees may require access to buildings or areas of buildings engaged in Communications Security (COMSEC) operations. The Contractor shall ensure all employees requiring COMSEC access complete COMSEC training and be COMSEC briefed by AFRC Protected Services Office.

Some Contractor employees shall be required to obtain and maintain a U.S. Government Secret security clearance due to the required handling of or exposure to classified material (Attachment J-08:DD-254).

C.2.5.2 Property Loss The Contractor shall submit to the COR, who will forward to the SEMO, a full report of lost, damaged, destroyed or stolen Government Property assigned to Contractor employees. The Contractor shall notify and file a report on NASA Form (NF) 598, “Property Survey Report" to the COR within 24 hours after discovery.

C.2.5.3 Access The Contractor shall obtain authorized access to controlled buildings and facilities and arrange for them to be opened and closed to accomplish work under this contract by coordinating with building / area managers, or by submitting a request to the COR if occurring outside normal duty hours.

C.2.5.4 Keys Keys may be issued to a limited number of Contractor personnel; however, it shall be the Contractor's responsibility to arrange for adequate security of the buildings and facilities occupied solely by the Contractor, at the end of each workday. The Contractor shall be responsible for the cost of replacing keys and/or locks that are furnished to and lost by Contractor personnel. If an entire key sequence is jeopardized causing the Government to re-key an entire group, department, or facility, the full cost shall be borne by the Contractor.

C.2.6 NORMAL DUTY HOURS

AFRC Edwards Normal Duty Hours are from 6:00 am to 5:30 pm Monday through Thursday the second week of the Government pay period, and then from 6:00 am to 5:30 pm Monday through Friday the first week, excluding federal holidays. Weekends and federal holidays are restricted for work unless otherwise directed by the CO. AFRC is currently operating under this flexible work schedule, permitting employees to work 80 hours in 9 days (known as a 9/80 schedule) and have a non-work day every other Friday. The Center is closed every other Friday.

The Contractor's work shifts shall take place during Normal Duty Hours, except as requested and approved per paragraph "Work Outside Normal Duty Hours" below.

Except for specific aircraft support, where the Normal Duty Hours are from 6:00 am to 5:30 pm Monday through Friday.

C.2.6.1 Work Outside Normal Duty Hours All work is normally accomplished in accordance to Center standard working hours, certain situations may require Contractor personnel to perform their duties at times other than the standard shift. Work outside normal duty hours requires the COR concurrence and CO approval.

The Contractor shall request approval to work outside normal duty hours at least five (5) calendar days prior to such work to allow arrangements to be made by the Government to oversee the work. The Contractor shall include in the request: the specific dates, hours, location, type of work to be performed, and justification why the work cannot be performed during Normal Duty Hours. Based on the justification provided, the CO may approve work outside normal duty hours.

Mission support personnel staffing requirements should be considered flexible as the Contractor must consider mission slips, extensions, surge requirements, deployments, and advanced scheduled operations. These changes do not immediately cause overtime situations if the scheduling can be adjusted accordingly. Provisions can be made for second, third or split shift operations or a non-standard workweek to meet programmatic requirements. Requests and justifications for shift adjustments shall be submitted in writing to the COR and shall only be accomplished with the concurrence and authorization of the CO or the COR.

C.2.6.2 Core Hours Core Hours are the hours within Normal Duty Hours during which all flexible work schedules overlap. Regularly scheduled meetings shall be held during Core Hours to maximize participation. Core Hours are 8:00 am to 3:00 pm on days with Normal Duty Hours.

C.2.7 GOVERNMENT FURNISHED PROPERTY

The Government will provide all GFP listed in Attachment J-03 and IAGP listed in Attachment J-

04. The Contractor shall provide all other necessary vehicles and equipment to perform the work under this Contract.

C.2.7.1 GFP Condition Should the Contractor choose to use all or part of the GFP, periodic servicing, maintenance, and repair of the items shall be provided at no cost to the Government (facility maintenance will be the responsibility of the Government). The total or partial breakdown or failure of the GFP shall not relieve the Contractor of responsibility to fully perform the work of the contract. On completion or termination of the contract, all GFP shall be returned to the Government in the same condition as received, except for normal wear and tear.

GFP listed in Attachment J-03 that becomes worn to the point of unserviceability shall be returned to the Government and the replacement of the property shall be the responsibility of the Contractor at no cost to the Government; Contractor Property so acquired shall remain the property of the Contractor. The Contractor shall be responsible for the cost of any repairs or replacement caused by negligence or abuse by the Contractor or the Contractor’s employees.

C.2.7.2 GFP Inventory The Contractor shall conduct an inventory and assessment before commencing work to determine the exact number and serviceability of GFP. The Contractor shall certify inventory findings, assume accounting responsibility, and subsequently report inventory discrepancies to the COR (DRD-01). GFP shall not be removed from NASA AFRC, without prior written approval by the CO.

C.2.7.3 Government Furnished Stock and Supplies The Contractor shall be accountable for the inventory for all Program Stock, Stores Stock and Emergency Management Supplies and control changes in the SAP/MMI database to reflect changes during day-to-day business at the Center. Prior to contract start, the Government will provide current lists of the following items, which shall be subject to the GFP Joint Inventory:

a. Government Furnished Property List (Attachment J-03)

b. Installation Accountable Government Property list (Attachment J-04)

c. Sample list of Emergency Supply (Attachment L-2)

d. Sample list of Program Stock (Aircraft Parts) in NASA Aircraft Management Information

System (NAMIS) (Attachment L-3)

C.2.7.4 Government Furnished Material (GFM) Government furnished materials will be provided to the Contractor at the start of this contract.

Should the Contractor choose to use the GFM, an inventory and assessment shall be conducted to determine what materials are available, the exact amount and serviceability of GFM. The Contractor shall certify inventory findings, assume and manage accounting responsibility, and subsequently report inventory discrepancies to the COR (DRD-01). On depletion of material provided to the Contractor by the Government, the Contractor shall furnish all material to perform the work of the contract and shall be reimbursed for the items specified in the PWS.

C.2.7.5 Commercial off the Shelf (COTS) Software The Government will provide a limited number of computer systems for use by the Contractor, subject to all NASA IT requirements. If the Contractor should provide any software to the Government, or desire to install software on any Government owned or operated equipment as part of this contract, it shall be commercially available off-the-shelf software and may be installed only with the written approval of the NASA Chief Information Officer (CIO) and CO.

C.2.8 DOCUMENTATION / DATA DELIVERABLES / REPORTS

The Contractor shall develop the required deliverable documentation referenced throughout this PWS and the associated DRDs as described in Attachment J-02. All correspondence, reports, plans, processes and contract related data shall be in an electronic format consistent with software versions at AFRC. Plans and processes generated by the Contractor shall not contain Contractor’s logo or name. All data and documents generated by the Contractor under this contract are Government Property. The Contractor shall archive electronic copies of all reports.

C.2.9 CONTRACTOR EMPLOYEE LICENSING, CERTIFICATION, SPECIFIC EXPERIENCE, & UNIFORM

REQUIREMENTS

C.2.9.1 Contractor Personnel Training The Contractor shall develop (when necessary), document, and implement a training and certification process that assures all Contractor personnel are properly trained, qualified and certified for the tasks they are required to perform to include the operation of special purpose Government equipment. This is the responsibility of the Contractor; the Government will not pay for required licenses or related training. The Contractor upon award shall submit verification of such licenses and certifications to the COR prior to initiation of work and immediately upon any applicable personnel change thereafter. All licenses and certifications shall be documented and remain current throughout the contract term.

C.2.9.2 Driver Licenses For all positions requiring driver licensing, the Contractor shall maintain a minimum of one person with a current license at all times and employ that person on site in a capacity requiring the license. The Contractor shall comply with this requirement at the commencement of the contract.

a. Class C All Contractor and Sub-Contractor employees that operate Government Owned vehicles on or off the Center, shall hold a valid State-issued driver license, and any other licenses that may be required by state, local or Federal Government for the purpose of contract performance. Privately owned vehicles shall require automotive registration, insurance and a vehicle pass to gain access to EAFB. No Privately Owned Vehicles (POVs) are allowed within Government Owned Vehicle (GOV) only areas of the Center. All Contractor owned vehicles shall be identifiable (signage with the Contractor’s name and NASA logo) while operating on Center (DRD-28).

b. Class A

The Contractor shall ensure, that all Contractor and Sub-Contractor employees that operate vehicles on or off the Center, have sufficient Class A licensed drivers to operate Fleet/AGE/Special Purpose/Utility Vehicles/Equipment/Semi Truck and Trailer as required. Contractor shall maintain properly licensed and trained drivers to transport N2, oxygen, fuel and other hazardous chemicals as required.

c. Class A with Hazardous Material (HAZMAT) Endorsement The Contractor shall ensure that all truck drivers handling and transporting N2/Liquid Oxygen (LOX)/ Gaseous Oxygen (GOX) have a current commercial class "A" California State-issued driver license with a HAZMAT Endorsement (DRD-28).

d. Flight Line Driver Contractor personnel driving on the flight line and controlled movement areas (lakebeds) must possess a flight line driver’s license.

C.2.9.3 Forklift Certification The Contractor shall ensure employees operating forklifts have completed the necessary forklift training and certification (DRD-28). The Contractor shall comply with this requirement at the commencement of the contract.

C.2.9.4 Automotive Service Excellence (ASE) Certification The Contractor shall provide ASE certified automotive technicians and parts specialists for in-house vehicle maintenance, repairs, and services (DRD-28). The Contractor shall comply with this requirement at the commencement of the contract.

C.2.9.5 Hazardous Material Certification The Contractor shall be certified in hazardous materials and perform the functions involved with handling of hazardous materials in compliance with DOT Regulations 49 CFR 172.704 (DRD-28).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .