Amendment_1.docx
DOCX document 33 KB Posted
- Solicitation number
- AG-9JGP-S-16-0047
About this file
Amendment 1 Correct Schedule Header
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_7.docx | DOCX document | |
| Amendment_6.docx | DOCX document | |
| Amendment_5_with_attachments.docx | DOCX document | |
| Amendment_4.pdf | ||
| Amendment_3_with_attachments.docx | DOCX document | |
| Amendment_2.doc | DOC document | |
| Attachment_4_Drawings_Final.pdf | ||
| Attachment_5_SectionJ_Fire_Plan.doc | DOC document | |
| Attachment_2_Water_Sewer_specs.pdf | ||
| Solicitation_Zephyr__Cove.docx | DOCX document | |
| Attachment_3_Electric_specs.pdf | ||
| Attachment_6_wages_NVDouglas.pdf | ||
| Attachment_1_FP-03_Supplemental_Specs.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1. CONTRACT ID CODE |
| PAGE OF PAGES |
| 1 |
| 4 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| 1 |
| 03/01/2016 |
| 774207 |
| 6. ISSUED BY |
| CODE |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
USDA Forest Service Central California Acquisition Service Area Tahoe National Forest 631 Coyote Street Nevada City, CA 95959
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) |
| (X) |
| 9A. AMENDMENT OF SOLICITATION NO. |
| |X| |
| AG-9JGP-S-16-0047 |
9B. DATED (SEE ITEM 11)
February 26, 2016
| |_| |
| 10A. MODIFICATION OF CONTRACT/ORDER NO. |
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
|X| The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers |_| is extended, |X| is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. (TO BE FILLED OUT BY THE CONTRACTING OFFICER)
| (X) |
| A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN |
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
| |_| |
| C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: |
| |_| |
| D. OTHER (Specify type of modification and authority) |
E. IMPORTANT: Contractor is not, |X| is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Amendment 1 is to correct Header information on Schedule of Items. Project: Zephyr Cove Resort Corral and Bike Path.
Unit: LTBMU; Sol No: AG-9JGP-S-16-0047. Correction have been made on attached Schedule. Use this version in your proposal.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
| OLAINE T. MARTINEZ |
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
| March 1, 2016 |
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
| 30-105 |
| STANDARD FORM 30 (REV. 10-83) |
Prescribed by GSA
FAR (48 CFR) 53.243
SECTION B
PART 1: SCHEDULE OF ITEMS
SUPPLIES/SERVICES & PRICES/COSTS
Project:
Unit:
Sol No:
Zephyr Cove Resort Corral and Bike Path
LTBMU
Sol No: AG-9JGP-S-16-0047
| Item No. |
| Description |
| Method of Measure |
| Unit |
| Quantity |
| Unit Price |
| Total Price |
Base 1a-1j
| 1a |
| 15101 Mobilization |
| LS |
| LS |
| 1 |
| $ |
| $ |
| 1b |
| 15201 Construct survey and Staking, Method II, Tolerance B |
| LS |
| LS |
| 1 |
| $ |
| $ |
| 1c |
| 15701 Erosion Control BMPs |
| LS |
| LS |
| 1 |
| $ |
| $ |
| 1d |
| 20207 Tree Removal (greater than 8” dbh.) |
| AQ |
| EA |
| 3 |
| $ |
| $ |
| 1e |
| 20304 Removal of Structure and obstructions |
| LS |
| LS |
| 1 |
| $ |
| $ |
| 1f |
| 20401 Roadway Excavation, Earthwork and Fine Grading, Compaction B, Tolerance B. |
| AQ |
| SF |
| 19,500 |
| 1g |
| 20402 Infiltration Basin Construction, compaction B. |
| AQ |
| EA |
| 4 |
| 1h |
| 21104 Roadway Obliteration, Method 1 |
| AQ |
| AC |
| .5 |
| 1i |
| 30101 Aggregate Base, Cal Trans 3.4” Class 2, Compaction D |
| AW |
| TON |
| 440 |
| 1j |
| 40301 Asphalt-Cal Trans ½” Max Medium ‘B’ Type |
| AQ! |
| TON |
| 305 |
SUBTOTAL BASE 1a-1j
OPTIONAL ITEM 2 (2a-2l)
| 2a |
| 15101-B Mobilization |
| LS |
| LS |
| 1 |
| 2b |
| 15201-BConstruction survey and Staking, Method II, Tolerance B |
| LS |
| LS |
| 1 |
| 2c |
| 15701-B Erosion Control BMPs |
| LS |
| LS |
| 1 |
| 2d |
| 20102-B Clearing and Grubbing |
| AQ |
| AC |
| .6 |
| 2e |
| 20207-B Tree Removal (greater than 8” dbh) |
| AQ |
| EA |
| 15 |
| 2f |
| 20402-B Roadway Excavation, Earthwork and Fine Grading, Compaction B, Tolerance B |
| AQ |
| SF |
| 21,000 |
| 2g |
| 20405-BInfiltration Basin Construction, Compaction B |
| AQ |
| EA |
| 5 |
| 2h |
| 30101-B Aggregate Base, CalTrans ¾” Class 2, Compaction D |
| AQ |
| TON |
| 470 |
| 2i |
| 40301-BAsphalt-CalTrans ½” Max Medium ‘B’ Type |
| AQ |
| TON |
| 290 |
| 2j |
| 63301-B Sign Placement |
| AQ |
| EA |
| 10 |
| 2k |
| P63406-B Pavement Markings |
| LS |
| LS |
| 1 |
| 2l |
| 63601-B Pedestrian Signal at Campground Road |
| LS |
| SL |
| 1 |
Subtotal Optional Item 2a-2l
SECTION B (Continue)
SUPPLIES/SERVICES & PRICES/COSTS
Project:
Unit:
Sol No:
Zephyr Cove Resort Corral and Bike Path
LTBMU
Sol No: AG-9JGP-S-16-0047
| Item No. |
| Description |
| Method of Measure |
| Unit |
| Quantity |
| Unit Price |
| Total Price |
| Optional Items |
| The following are individual Option Items 3-23. |
| 3 |
| 61904 Install Barrier Boulders |
| AQ |
| EA |
| 50 |
| 4 |
| 63406 Pavement Markings |
| LS |
| LS |
| 1 |
| 5 |
| 63301 Sign Placement |
| AQ |
| EA |
| 5 |
| 6 |
| 20305 Removal of structures and Obstructions (optional building removal) |
| LS |
| LS |
| 1 |
| 7 |
| 20403 Native Road-Re-Alignment (includes removal of existing road), Compaction B |
| AQ |
| LF |
| 500 |
| 8 |
| 60201 Swale Construction and Culvert installation, Bedding, backfill, compaction Method A |
| AQ |
| LF |
| 130 |
| 9 |
| 55201 Manure Storage Building, slab to be Class C, 300 psi |
| LS |
| LS |
| 1 |
| 10 |
| 55202 Concrete Settling Basin, Class C, 3000 psi |
| LS |
| LS |
| 1 |
| 11 |
| 20404 Corral Runnoff Infiltration Basin, Compaction B |
| AQ |
| SF |
| 2,200 |
| 12 |
| 20405 Diversion Berm, Compaction B |
| AQ |
| LF |
| 550 |
| 13 |
| 30102 East Road and Loading Area-Aggregate Base CalTrans ¾” Class 2, Compaction D |
| AQ |
| TON |
| 90 |
| 14 |
| 20406 West road and Loading Area –Compacted Native surface, compaction B, Finishing A, Tolerance B. |
| AQ |
| SF |
| 6400 |
| 15 |
| 20407 Turn-around area –Compacted Native Surface Compaction B, Finishing A, Tolerance B |
| AQ |
| SF 5000 |
| 16 |
| 20408 3’ Wide Horse Trail- Compacted Native surface, Compaction B, Finishing A Tolerance B. |
| AQ |
| AF 750 |
| 17 |
| 61101 Waterline 2” HDPE DR 11; trenching, installation, bedding, and backfill |
| AQ |
| LF |
| 732 |
| 18 |
| 61102 Backflow Preventer, includes electric and heater |
| AQ |
| EA |
| 1 |
| 19 |
| 61201 Sewer backfill and cleanouts |
| AQ |
| LF |
| 150 |
| 20 |
| 61202 2-RV sewer service connections; includes lateral to building service (11LF) |
| LS |
| LS |
| 1 |
| 21 |
| 61103 Standard Spigot with valve and box, include 1: lateral from Backflow Preventer and additional valve and box for future building service |
| AQ |
| LS |
| 1 |
SECTION B (Continue)
SUPPLIES/SERVICES & PRICES/COSTS
Project:
Unit:
Sol No:
Zephyr Cove Resort Corral and Bike Path
LTBMU
Sol No: AG-9JGP-S-16-0047
| 22 |
| 83801 2” Underground Electrical Line; includes trenching, conduit, wire, two blank 2” conduits, main junction box and backfill |
| AQ |
| LF |
| 340 |
| 23 |
| 63602 double RV 30 Amp electric service pedestal; includes lateral from Junction Box (20LF) |
| AG |
| LS |
| 1. |
Total
Notes:
PRICE SUBMITTED BY
Signature:
| Vendor Name |
| 1) Respondent must price each item to be considered for award. |
2) Responses for quantities less than those listed may be rejected.
3) Optional Items may be awarded up to 30 April 2016. Vendors shall hold prices through 30 April, 2016.
4) If award is made in excess of $30,000, bonds will be required. (See Section I.)
5) If response is greater than $150,000, include bid bond =20% of the total price.
(6) Following are abbreviation definitions from FP-03, Section 109 that may appear in the "Unit" column of the Schedule of Items; AC=Acre, CQ=Contract Quantity, CY= Cubic Yard, EA=Each, GAL=Gallon, HR=Hour, LF=Linear Foot, LS=Lump Sum, MI=Mile, LB=Pound, SF=Square Foot, SY=Square yard, ST=Station, TON=Ton. CQ and LS will be measured and paid as stated in FP-03, Section 109-02. All other Units will be paid according to FAR clause 52.211-18, Variation in Estimated Quantity.
PRICE SUBMITTED BY
Signature:
Phone:
Vendor Name
Fax:
Address
Email:
DUNS Number:
Contact: