011100-S.DOC

DOC document 41 KB Posted

Attached to
Replacement of Roof
Solicitation number
AG-9JGP-S-15-0059
Issued by

About this file

Specs

View the file

Other files

File Type Posted
SF30_Sol_Mod_1.doc DOC document
077253_Roof_Accessories.docx DOCX document
Const_Est_to_19_items.xls XLS spreadsheet
AG9JGPS150059.doc DOC document
DavisBacon03-24-15.xlsx XLSX spreadsheet
SO_ROOF.pdf PDF
077253_SNOW_SPLITTERS.docx DOCX document
077123_Gutters_and_Downspouts.docx DOCX document
074113_Preformed_Metal_Roof_Panels_SO.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA FOREST SERVICE PROJECT SPECIFICATIONS

SECTION 011100

SUMMARY of work

PART 1 - GENERAL

1.01 summary

A. Work for this project consists of: removal and disposal of existing metal roof on the main Supervisor’s Office building. Placement of formed metal roofing and all related items will comply with Specification 074113.

B. Furnish and install a seamless gutter system over the lobby entrance as shown on drawings.

C. Two snow splitters to protect windows from breezeway roof.

1.02 location

A. The Plumas National Forest Supervisor’s Office (SO) is in Quincy, CA. From Oroville, CA head north on CA-70 for 5.6 miles and take a slight right towards Quincy, CA. Continue on CA-70 through the Feather River Canyon for 78 miles. When you reach Quincy, turn left onto W Main St. After 0.5 miles, turn left at the street before the stop light to get onto the eastbound one way road. The SO will be on the immediate right at 159 Lawrence St.

1.03 GENERAL SITE CONDITIONS AND WEATHER

B. Spec. Writer: EDIT paragraph below specific to the site.

A. The elevation of the Supervisor’s Office in Quincy, CA is approximately 3,500 feet above sea level. The construction site at this elevation typically experiences heay rainfall and snow in the months of November through April.

1.04 Spec. Writer: edit paragraph below specific to the site. Coordinate blasting permission with section 02300.

1.04 USE OF PREMISES

A. spec writer: Delete this Article if Owner places strict limitations on Contractor's use of premises, and use Division 1 Section "Work Restrictions" instead. Expand Article if Owner's restrictions are minor. See the Evaluations in Division 1 Section "Work Restrictions.”

spec writer: Retain paragraph below if Project is on a vacant site or in an unoccupied building being renovated and there are no Owner-occupancy requirements. Revise to suit Project.

A. General: Contractor shall have full use of area surrounding buildings for construction operations, including use of Project site, during construction period. Contractor's use of premises is limited only by the Government's right to perform work or to retain other contractors on portions of Project.

B. Contractor shall at all times conduct his or her operations to ensure the least inconvenience to the public and employees. Partial building closure will be permitted, when required, upon written approval of the Contracting Officer (CO).

C. Confine storage of materials to areas as approved by the CO.

D. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public and government employees during all construction operations. Contractor shall minimize disturbance of all undisturbed areas.

E. Preservation of Natural Features: Confines all operations to work limits of the project. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

1. Provide temporary barriers to protect existing trees and plants and root zones.

2. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with CO and remove agreed-on roots and branches that interfere with construction.

3. Do not fasten ropes, cables, or guys to existing trees.

D. Existing Utilities: Notify CO and utility companies of proposed locations and times for excavation.

1. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.

2. Interruption of Existing Utility Service: Notify CO, 48 hours in advance of any interruption of existing utilities.

1.05 spec writer Insert additional paragraphs to specify minor restrictions on Contractor's use of premises or to specify minor limitations because of Owner occupancy.

1.05 MEALS AND LODGING

A. Meals and lodging are commercially available in the Town of Quincy. Meals or lodging will not be available at Forest Service facilities.

1.06 camping

A. The work is most likely expected to take place during campground closure period. Camping in campgrounds will not be permitted.

1.07 construction sequence

A. There is no specified construction sequence or season for this project.

B. Depending on conditions, normal fire restrictions may apply to activities associated with this project.

1.08 Field verification

A. Field verify all new and existing dimensions affecting the work of this contract before ordering products. Dimensions on drawings are approximate.

No special permits shall b1st - Barry Bonds by the Beijing Ducks, Hal Nixon

2 2nd - Alex Rodriguez by the Seoul Jets, Chad Oswalt

3 3rd - Sammy Sosa by the Caracas Crash, Dan Jenkins

4 4th - Pedro Martinez by the Mexico City Diablos, Frank Palmer

5 5th - Vladimir Guerrero by the San Juan Roughriders, Art Keaton

6 6th - Randy Johnson by the Tokyo Fighting Carp, Ed Mixer

7 7th - Jason Giambi by the Vancouver Mounties, Ben Lemon

8 8th - Curt Schilling by the Osaka Samurai, Greg Quarry

PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) pART 4 – mEASUREMENT AND pAYMENT

4.01 This item is considered incidental to other items of construction and no separate measurement and payment shall be made.

END OF SECTION 011100

SUMMARY OF WORK 011100