HETF_Final_ SOW.docx

DOCX document 48 KB Posted

Attached to
Installation of six ground mounted photo voltaic solar arrays
Solicitation number
AG-9AD6-S-12-0002
Issued by

About this file

Photo Voltaic Solar Array Installation Statement of work

View the file

Other files

File Type Posted
HETF_PV_Installation_Schedule_of_Items.docx DOCX document
HETF_Davis-Bacon_Mar_2012.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

HAWAII EXPERIMENTAL TROPICAL FOREST

PHOTO VOLTAIC SOLAR ARRAY INSTALLATION

United States Department of Agriculture US Forest Service Pacific Southwest Research Station Institute of Pacific Islands Forestry (IPIF) Hilo, HI

July 2012

Contacts:

David Oldenburg, Facilities Site Manager
US Forest Service
60 Nowelo Street
Hilo, HI 96720
Phone: 808-933-8121, ext 110
Cell: 808-738-6058
Email: dholdenburg@fs.fed.us
Fax: 808-933-8120
Joseph J. Brown, Contracting OfficerPacific Southwest Research Station
800 Buchanan Street
West Annex Building
Albany, CA 94701-0245
Phone: 510-559-6485
Fax: 510-559-6440

I. GENERAL

A. SCOPE OF WORK: This project includes the installation of six ground mounted photo voltaic solar arrays and all necessary equipment to tie into an existing back-up diesel generator system. Four arrays are composed of 15 Solon 230 watt PV modules each and two arrays are composed of 16 Astropower 110 watt PV modules each. The major components of the system will be Government furnished and are ready for installation. The Contractor is responsible to determine what additional parts and materials are needed to make a complete and workable system according to the plans and specifications. The project is located at the Hawaii Experimental Tropical Forest, Laupahoehoe Administrative Site, 36-645 Spencer Road, Laupahoehoe, HI 96764. All work shall be coordinated with the Contracting Officer’s Representative (COR).

B. GOVERNMENT FURNISHED INFORMATION AND MATERIALS: Government furnished materials include the PV panels, rack mounting system, inverters and charge controllers. It does NOT include the poles for mounting the racks, wiring, conduit and fittings, stainless steel straps and ground rods. These materials can be purchased locally. A detailed list of furnished materials is included under Section III of this Statement of Work. The Contractor and the COR shall jointly check the inventory of furnished materials prior to the start of work and shall document in writing that all the listed items are there and note the condition of those items. In the event that any items are missing or are damaged, the disposition shall be documented and the Government shall be responsible for the repair or replacement of the item. Once the Contractor and COR have inventoried the items and documented their condition, the Contractor shall become responsible for securing and protection of the items from damage until project completion and acceptance.

C. PHASING OF WORK: Work to be completed in two phases so no disruption of existing power will occur at the Administrative Building. Phase 1 will include installation of all poles, conduits, wiring for all 6 arrays but only the new 230 Watt modules will be installed on the first four poles. These panels will be made operational to provide power to the Administration Building prior to the removal of the system at the pump house. One 4 hour period without power will be allowed for the switchover to occur. Phase 2 will include the removal and re-installation of the pump house system at the new site.

D. SUBMITTALS: Provide 2 sets of submittals for all new equipment and materials incorporated into the project furnished by the Contractor. Allow 7 days for Government review of submittals.

E. WASTE: All waste products and materials shall become the property of the Contractor and removed from Government property and not placed in Government trash receptacles or dumpsters. No burning of waste materials on site shall be permitted. Recycling of waste materials is encouraged. The contractor is encouraged to recycle waste material; prior approval by COR is required. Contractor is responsible for disposing of all waste in compliance with federal, state, and local laws, regulations, and standards.

F. TEMPORARY FACILITIES: The Contractor shall provide sanitary facilities for contractor’s employees. No electrical service, potable water, or other utilities are available on the site. Contractor shall provide generators and other equipment necessary for completion of work.

G. PRECONSTRUCTION CONFERENCE: The preconstruction conference will be held for the Contractor to demonstrate plans and schedules to accomplish the project. Informal telephone technical reviews between the Contractor and the COR are encouraged.

H. CODES AND STANDARDS: All work shall comply with the National Electrical Code and any local electrical codes currently in force for the Island of Hawaii. Materials, equipment and other components shall be commercial or industrial grade selected to provide for minimum operating and maintenance cost.

I. CONTRACTORS LICENSES AND CERTIFICATIONS: All high voltage wiring shall be performed by a licensed Electrical Contractor (C-13) licensed in the State of Hawaii. All low voltage DC solar power installation and wiring shall be performed by a Solar Power Systems Contractor (C-60) licensed in the State of Hawaii. Contractor shall provide proof of license.

J. WARRANTY, TECHNICAL SERVICES AND REPAIR WORK: After installation, the Contractor shall provide warranty and technical support services that are based on the Island of Hawaii. The Contractor will not be responsible for the warranty of the parts provided by the Government.

K. QUALITY CONTROL: Contractor shall be responsible for all aspects of quality control of the work. Contractor shall provide for supervision of any and all subcontractors at all times.

L. SAFETY PLAN: Contractor to provide a written safety plan outlining how they will address safety aspects of this project to include requirements for personal protective equipment (PPE)

M. PERMITS AND INSPECTIONS: The Contractor is responsible for obtaining any required electrical permits and shall have all work inspected by a licensed electrical inspector licensed in the State of Hawaii. A certificate of completion issued by a licensed electrical inspector is required for final payment.

II. WORK ITEMS (see phasing of work under item I.C

A. Installation of Ground Mount Poles and Racks

A.1 Poles - Contractor to furnish and install six (6) 10.5 feet, 8 inch diameter, schedule 80 galvanized steel pipes for rack installation as detailed on the drawings. This pipe is available from local suppliers on the Island in 21 foot lengths. Provide certification of the pipe thickness and galvanization. Treat any cut ends or nicks to the pipe with appropriate treatment to prevent rust.

A.2 Pole Locations and Foundation Excavation - A flat area has been excavated on site for the placement of the PV poles and racks as shown on the included drawings. The Contractor is responsible for the final location and marking the pole locations in this excavated area for optimum sun exposure and prevention of winter shadows from one rack to another. Once the pole locations have been marked and approved in writing by the COR, the Contractor shall excavate the pole foundations to no less than mimimum dimensions shown on the plans. The concrete must be placed against natural ground. Any over excavation of the hole requiring additional concrete will be the responsibility of the Contractor. The COR shall approve the pole foundations in writing prior to placement of concrete.

A.3 Trenches for Conduits – The Contractor is responsible for trenching and installation of all underground conduits required for this installation. All conduit depths and turns in direction must meet the National Electrical Code and local code requirements.

A.4 Concrete - The Contractor is responsible for the ordering, payment, and placement of the concrete. Concrete to be a minimum of 3000 psi, minimum 3/4” aggregate with a maximum slump of 4 inches. If a pump truck is used, the aggregate size and slump may be adjusted with prior approval of the COR. No water will be added to the concrete at the site without the approval of the COR.

A.5

A.6 Landscape Fabric and Gravel - After allowing a minimum of three days for the pole foundations to cure, the Contractor will backfill, slope the area to drain and install Government furnished landscape fabric and gravel as per the drawings.

A.7 Installation of Government Furnished PV Racks and Modules - The Contractor shall allow a minimum of 7 days for the concrete to cure The Contractor shall provide any materials necessary for the completion of the installation of the PV racks and modules that are not included on the list of Government Furnished Materials list.

A.8 Hardware - All hardware for mounting equipment to the masts and racks shall be stainless steel. All galvanized steel switches to be painted with epoxy paint with any nicks touched up with the same paint after installation.

B. Installation of Wiring, Inverters and Other Equipment

B.1 Wiring – Contractor to furnish all wiring, conduit, fittings and other components required for a complete installation. All wiring to be the size and type as shown on the drawings. All wiring to be new with certifications provided to the COR prior to installation. A licensed electrician shall verify all wiring sizes prior to installation and if changes are required to meet the current National Electrical Code, a change order will be initiated.

B.2 Inverters, Charge Controllers, and Other Equipment - Installation of inverters and charge controllers as well as all other equipment shall be installed as per manufacturer’s instructions, standard PV industry practices. All installations must meet the current National Electrical Code.

B.3 Batteries – Recycle existing batteries located at the generator building in accordance with C.3 and install new Government furnished replacement batteries. Utilize generator system to provide initial charge to new Government furnished batteries.

Removal and Reinstallation of Existing Solar Panels and Equipment

C.1. Remove 32 existing Astropower PV modules from the roof of the pump house building shown on the site map and reinstall on two new ground mounted racks near the generator building as shown on the drawings. Remove and reinstall one inverter from the pump house to a new location in the generator building.

C.2 Remove all electrical wiring associated with the existing pump house PV system, conserve and utilize any used materials in the new installation provided there is no damage to the materials and a certified electrician certifies the items to be in a “like new” condition. This certification must be provided in writing to the COR prior to the incorporation of the used materials into the new installation. Only used materials from the project site will be permitted to be incorporated into this project. All other parts and materials furnished by the Contractor shall be new.

C.3 Remove existing batteries from the generator building and recycle. Batteries in the pump house building are to remain. Plug and seal any holes in the pump house building resulting from the removal of conduits and other equipment in a manner approved by the COR.

D. System Testing, Commissioning and Warranties

D.1 System Testing, Demonstration and Commissioning – Before final payment is made, the Contractor shall schedule and conduct a formal demonstration of the operation and maintenance of the entire system for Forest Service maintenance personnel. This is to include the integration and cycling of the back up generator system.

D.2 As Built Drawings and Operating Manuals – Before final payment is made, the Contractor shall furnish as built drawings in DWG and PDF formats showing the final locations of all underground and above ground conduits, wire sizes, equipment locations and all elements making up this installation. 2 copies of a comprehensive operations and maintenance manual shall be furnished both in hard copy in a binder and pdf PDF format . This manual shall include procedures for the complete operation and maintenance of the system from start up to shut down to include trouble shooting suggestions in the case of system failure . The manual will also include a schedule of routine maintenance.

D.3 Warranty of Contractors Work – the Contractor shall provide a one year warranty on any materials and equipment furnished by the Contractor and any part of the installation that was the direct responsibility of the Contractor. Contractor is not responsible for failure of Government furnished equipment unless failure is the result of damage by the Contractor.

III. List of Government Furnished Activities and Materials

· Excavation of holes for PV pole foundations

· Concrete and reinforcing steel for pole foundations

· Pump truck for pumping concrete for pole foundations

· Furnishing and installation of landscape fabric and gravel for PV array area

· Parts to be removed from pump house and reinstalled on ground mounted racks

32 – Astropower, AP-110 modules (110 watts), 65” x 39 1/2” x 2”

· Equipment to be removed from pump house and reinstalled in generator building:

1 - Outback Power Systems Inverter, 18” x 8” x 10”

· Equipment purchased by the Forest Service from the SunWize company, furnished and to be picked up by the Contractor at the Pacific Southwest Research Station office at 60 Nowelo Street, Hilo, HI 96720:

Item No/Description Quantity Unit

716029 2 EA

CMBNR 150/600V 20A 6/4P N3R PA

MNPV6 MIDNITE SOLAR

715059 8 EA

CB 15A-1P 150VDC DIN

OBB-15-150VDC-DIN OBK

715014 2 EA

CB 100A 125VDC PNL

OBB-100-125VDC-PNL OBK

962580 2 EA

MOUNT TOP GS 1 ASTROPOWER 110

TPM16-C-AST-A110-HGS-AA-TRH

704LUG#4-#14DB 50 EA

LUG AROUND LAY-IN 14-4 CU/TN

7878667715 T&B CULL4-14TP

851 WAS#10LOCKET 150 EA

WASHER #10 SS LOCK W/EXTERNAL

TEETH

851SCW1032X.523 150 EA

SCREW 10-32X1/2 SS410 PAN PHL

SELF TAP TYPE-23

851-1019 150 EA

NUT 10-32 SS HEX KEP LOCKNUT

W/INT EXT TOOTH WASHER

704LUG#4-#14DB 100 EA

LUG GROUND LAY-IN 14-4 CU/TN

78378667715 T&B CULL4-14TP

124007 60 EA

MOD 230W 36.35V 8.75A AL GL SI

BLACK 230/15 230Wp SOLON

796005 20 EA

CABLE ASSY #10 120” M NEU/F

29501271 SWT SOLARLOK

716029 4 EA

CMBNR 150/600V 20A 6/4P N3R PA

MNPV6 MIDNITE SOLAR

962599 4 EA

MOUNT TOP GS 15 SOLON 230

TPM15-G-SOL-P230/15-HGS-AA-TRH

715059 20 EA

CB 150A-1P 150VDC DIN

OBB-15-150VDC-DIN OBK

720SWT100AU3P3R 4 EA

SWITCH 100A 3P 600VDC UNFUSED

HU363RB NEMA 3R SQUARE D

715217 4 EA

FM80-150VDC CHARGE CONTROLLER

FLEXMAX 80 12-60VDC

715175 4 EA

CB 80A 150VDC PNL

OBB-80-150VDC-PNL OBK

715014 4 EA

CB 100A 125VDC PNL

OBB-100-125VDC-PNL OBK

715192 2 EA

FW-BBUS BREAKER BUS BAR 500A

2X250A, 3X125A OR 4X80A BRKR

715190 2 EA

FW-MP MOUNTING PLATE-ALUM

FOR 2 FX INVERTERS

715089 1 EA

CABLE 6’ W/RJ45 CONN

OBCATV-6 OUTBACK

715126 1 EA

CONTROLLER W/RS 232 BLK SQPM

MATE2 OUTBACK

715093 1 EA

COMMUNICATIONS MANAGER

HYB10 OUTBACK

715217 1 EA

FM80-150VDC CHARGE CONTROLLER

FLEXMAX 80 12-60VDC

720SWT60ANF3P 2 EA

SWITCH 60A 3P 600V NON-FUSIBLE

HU362RB NEMA 3R SQD

715189 1 EA

FW1000-DC ALUM, ENCL.FOR 3-4

FS INCL SHUNT, TBB-W,GBB, TBB-R

IV. PERIOD OF PERFORMANCE

The period of performance shall start within 15 days from issuance of the Notice to Proceed and shall be completed within 60 days after the start work date. The Contractor shall provide a proposed progress schedule at the pre-construction meeting.

V. HOURS OF PERFORMANCE

Normal work hours shall be between the hours of 7:00 AM to 6:00 PM, Monday – Friday. Contractor shall coordinate any work outside of these hours with the Contracting Officer’s Representative (COR).

VI. SAFETY

Contractor is responsible for compliance with OSHA standards during execution of work. Work activities shall be planned and executed as to pose no safety hazard to Forest Service employees or to the public. Contractor to submit a written safety plan to the COR prior to the start of work. Plan to include safety measures that will be required related to the work activities to be encountered on the site. Plan shall include requirements for Personal Protective Equipment (PPE).

VII. GOVERNMENT POINTS OF CONTACT

The Government technical point of contact is David Oldenburg, 808-933-8121, ext 110, cell 808-738-6058. David Oldenburg will serve as the Inspector and Susan Litteral, will serve as the Contracting Officer’s Representative.

VIII. NON-PERSONAL SERVICE STATEMENT

All of the contractor’s employees performing services as described shall be controlled, directed, and supervised at all times by the Contractor. Contractor’s Superintendent shall ensure that employees under the Contractor’s hire properly comply with the performance work standards outlined in this statement of work. The work set forth may not be interpreted or implemented in any manner that results in the contractor creating or modifying Federal Policy. The Government will perform the final inspection and acceptance of completed work.