HETF_Davis-Bacon_Mar_2012.docx
DOCX document 13 KB Posted
- Solicitation number
- AG-9AD6-S-12-0002
About this file
Photo Voltaic Solar Array Installation Davis-Bacon Wages
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HETF_PV_Installation_Schedule_of_Items.docx | DOCX document | |
| HETF_Final_ SOW.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: HI120001 03/30/2012 HI1 Superseded General Decision Number: HI20100001 State: Hawaii Construction Types: Building, Heavy (Heavy and Dredging), Highway and Residential
ELEC1186-001 02/19/2012
Rates Fringes Electricians:
Electricians................$ 40.55 24.99
LABO0368-001 08/29/2011
Rates Fringes
Laborers:
Driller.....................$ 31.30 15.91 Final Clean Up..............$ 21.70 11.47 Gunite Operator & High Scaler......................$ 30.80 15.91 Laborer I...................$ 30.30 15.91 Laborer II..................$ 27.70 15.91 Laborer I:
Concrete:
Mixing, handling, conveying, pouring, vibrating, otherwise placing of concrete or aggregates or by any other process Pipelayer performing all services in the laying and installation of pipe from the point of receiving pipe in the ditch until completion of operation, including any and all forms of tubular material,
File details come from the government source that posted it. Updated .