AG-9AC7-S-12-0035.pdf
PDF 204 KB Posted
- Attached to
- Haypress Trail Bridge Replacement Federal contract opportunity
- Solicitation number
- AG-9AC7-S-12-0035
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Haypress Amendment3.pdf | ||
| Haypress Solicitation 1442 only.doc | DOC document | |
| Haypress Amendment2.pdf | ||
| DBWD CA120009 Mod 8 dtd 8.3.12.pdf | ||
| Haypress Amendment1.pdf | ||
| CA9_07132012dvb.pdf | ||
| GeneralNotes.docx | DOCX document | |
| CA9 Mod 6 06012012_dvb.pdf | ||
| Special Contract Requirements.pdf | ||
| Fire_Plan.pdf | ||
| Maps Drawings.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Haypress Trail Bridge Replacement, Six Rivers NF Page 1 of 26 Solicitation: AG-9AC7-S-12-0035
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
AG-9AC7-S-12-0035
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE
ISSUED
07/09/2012
PAGE OF
PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
591533
6. PROJECT NO.
05NC101255199
7. ISSUED BY CODE 8. ADDRESS OFFER TO
Northern California Acquisition Service Area 3644 Avtech Parkway Redding, CA 96002
Same as Block 7
9. FOR INFORMATION
CALL:
A. NAME
Pamela J. Vilhauer
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
(530) 226-2454
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
HAYPRESS TRAIL BRIDGE REPLACEMENT
Klamath National Forest Administrated by Six Rivers National Forest Siskiyou County, California
Estimate Price Range is between $100,000 and $250,000.
Duns:________________________
Tax ID: _______________________
Email: ________________________
11. The Contractor shall begin performance within 5 calendar days and complete it within 154 calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and _0 copies to perform the work required are due at the place specified in Item 8 by 04:30 pm (hour) local time August 8, 2012 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Computer Generated Prescribed by GSA FAR (48 CFR) 53.236-1(e)
Haypress Trail Bridge Replacement, Six Rivers NF Page 2 of 26
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item
14)
CODE FACILITY CODE
17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within 60 calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE 9AC7 27. PAYMENT WILL BE MADE BY
Northern California Acquisition Service Area Redding Office Redding, CA 96002
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
PAMELA J. VILHAUER
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)
Haypress Trail Bridge Replacement, Six Rivers NF Page 3 of 26
TABLE OF CONTENTS
PART I
SECTION A - SOLICITATION, OFFER, AND AWARD
TABLE OF CONTENTS
SECTION B – SCHEDULE OF ITEMS
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SECTION E – INSPECTION AND ACCEPTANCE
SECTION F – DELIVERIES OR PERFORMANCE
SECTION G - CONTRACT ADMINISTRATION DATA
PART II
SECTION I – CONTRACT CLAUSES
PART III
SECTION J – LIST OF ATTACHMENTS
PART IV
SECTION K – REPRESENTATIONS AND INSTRUCTIONS
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES
INSTRUCTIONS FOR SUBMISSION OF OFFERS
SECTION M – EVALUATION FACTORS FOR AWARD
SEPARATE:
SPECIFICATIONS (SEE LIST OF SPECIFICATIONS)
DRAWINGS (SEE LIST OF ATTACHMENTS, PAGE 16)
FIRE PLAN
DAVIS BACON WAGE DETERMINATION
Haypress Trail Bridge Replacement, Six Rivers NF Page 4 of 26
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS SCHEDULE OF ITEMS
Name of Offeror or Contractor
ITEM NO. DESCRIPTION METHOD OF
MEASURE
QUANTITY PAY UNIT UNIT
PRICE
TOTAL
Haypress Trail Bridge Replacement
15101 Mobilization LS 1
15205 Bridge Survey and Staking LS 1
20102 Clearing and Grubbing LS 1
20304 Removal of Existing Truss LS 1
25703 Alternate Retaining Wall EA 4
56401 Elastomeric Bearing Device EA 4
57101 Prefabricated Bridge Superstructure, Design Fabricate, Deliver and Install
LS 1
TOTAL ALL ITEMS $
B-2 NOTE:
Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 15101 Mobilization.
Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
Haypress Trail Bridge Replacement, Six Rivers NF Page 5 of 26
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
PART I - THE SCHEDULE
SIX RIVERS NATIONAL FOREST
UKONOM RANGER DISTRICT
HAYPRESS TRAIL BRIDGE REPLACEMENT
C-1 GENERAL SPECIFICATIONS
C-1.1 - SCOPE OF CONTRACT
The intent for this contract is to secure services for replacing an existing steel truss trail bridge that was damaged in 2007 by a large tree falling across it on the Ukonom District of the Klamath National Forest that is administered by Six Rivers National Forest. The primary work items include: removal of the existing bridge, surveying, installation of a new bridge, installing retaining walls adjacent to the existing abutments, clearing and grubbing to remove debris near the abutments, removal of approximately 6 downed trees on the trail near the bridge, logging out approximately ½ mile of trail, and falling designated hazard trees at the project site. The Schedule of Items and the Plan sheets contain the full listing of included work; the General Notes further describes and clarifies the work.
The existing abutments and ends of the bridge deck are covered with soil and debris. A site survey is not available and the contract design is based on a field trip that indicates the bridge was built based on drawings for the existing truss. No drawings have been found for the abutments, so the dimensions shown on the drawings are estimated.
It is anticipated that the construction sequence will be broken down into stages. Stage 1 will require the contractor to clear the existing abutments, provide a site survey and detailed field verification of the abutment dimensions, and horizontal and vertical alignment. Once these dimensions are verified, and the Forest Service has accepted the survey, condition and structural capacity of the abutments, the contractor can proceed with ordering the design and fabrication of the bridge truss. After the bridge has been fabricated, stage 2 would include air lifting the existing bridge out and installing the new bridge. Other items or work would be incorporated into the various stages.
Unless otherwise provided, the Contractor shall furnish all labor, transportation, equipment, tools, supervision, materials and any incidentals necessary to accomplish work on the Ukonom District administered by the Six Rivers National Forest.
The contractor shall carefully examine the existing conditions and information, shall become familiar with the nature and location of the work, the conformation of the ground slopes and terrain, the nature of the soil and subsoil condition, nature and extent of the materials that will be encountered during the construction operations and any existing site conditions that may affect the project, prior to the beginning of work.
C-1.2 - PROJECT LOCATION AND ACCESS
C-1.2-1 - Location
The project area is located within the Marble Mountain Wilderness Area and is located on the Ukonom District of the Klamath Rivers National Forest administered by the Six Rivers National Forest. The project location is approximately 7 miles in off the closest road along the Wooley
Haypress Trail Bridge Replacement, Six Rivers NF Page 6 of 26
Creek Trail (#5832). The legal location is in Township12 North, Range 7 East, and Section 16 along the Humboldt Meridian. The geographic coordinates are Latitude 41.43325° N, Longitude 123.38061° W, and elevation 1,300 feet. Project lies within Siskiyou County near the town of Somes Bar, California. Refer to Section J for site-specific location maps.
C-1.2-2 - Access
From Eureka, California travel Highway 101 north to Arcata and take Highway 299 east to the town of Willow Creek, and then take Highway 96 North to the past the town of Orleans and approximately another 10 miles to the town of Somes Bar. From here travel east along the Salmon River Road approximately 3 miles to the Wooley Creek Trailhead. The project site is approximately 7 miles up the trail, approximately ¼ mile northeast of the private inholdings referred to “Wooley Camp” on the maps. Refer to the Location Maps in Section J for details.
C-1.3 – OPERATING SEASON
Seasonal restrictions require no contract activities from January 1st to August 31st. After October 15 wet weather operation restrictions shall apply and work shall be tightly controlled and monitored for erosion control and erosion preventative measures. At the Forest Service discretion, work may be suspended for winter weather when conditions warrant.
C-1.4 - EQUIPMENT
All equipment shall be suitable for the purpose intended and shall meet all requirements of the Occupational Safety and Health Act. The Contracting Officer may order the removal or require the replacement of any unsatisfactory equipment.
In the staging area all vehicles and machinery shall have flashing lights or rotary beacons operated continuously while work is in progress. All equipment shall be equipped with a standard slow moving vehicle emblem. Truck headlights shall be on while operated. Backup warning devices shall be required on self-propelled equipment in excess of 8,000 pounds gross vehicular weight.
Vehicles and machinery not currently in use shall be parked off the traveled way at the approved location to minimize interference with normal use of the road and trailhead.
C-1.5 - EQUIPMENT CLEANING
To prevent the spread of the root disease Phytophora lateralis in the Port Orford cedar (POC) and to prevent the spread of non-native plant species and invasive weeds, the following will be required on the Ukonom Ranger District administered by the Six Rivers National Forest.
Unless otherwise agreed, Contractor shall clean all vehicles and equipment before entry into the district unless Forest Service waives the cleaning requirement in writing. Thereafter, all vehicles and equipment that leave the district or enter infected portions of the district must be cleaned prior to their reentry, unless waived by the Forest Service. All cleaning of vehicles or equipment shall be done at sites agreed to by Forest Service and the Contractor. The water used for washing will be from a source in non-infected drainages. Forest Service shall inspect all equipment prior to entry, as appropriate and determined necessary. Forest Service will determine infected and uninfected areas. Cleaning shall include the removal of soil by steam cleaning or use of high-pressure water spray.
Haypress Trail Bridge Replacement, Six Rivers NF Page 7 of 26
C-2 STANDARD SPECIFICATIONS
C-2.1 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-03 U.S. Customary Units) is included in this solicitation by reference only. The requirements contained in these Standard Specifications are hereby made part of this Solicitation and any resultant contract.
C-2 SUPPLEMENTAL PROJECT SPECIFICATIONS
Supplemental Specifications are applicable to this Solicitation and any resultant contract. Special Project Specifications reference the Standard Specifications and delete, supplement or substitute information contained therein. See the Table of Contents under Supplemental Specifications for Construction of Roads and Bridges on Federal Highway Projects contained within for a full listing.
AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
Haypress Trail Bridge Replacement, Six Rivers NF Page 8 of 26
SECTION D--PACKAGING AND MARKING
For this Solicitation, there are NO clauses in this Section.
SECTION E--INSPECTION AND ACCEPTANCE
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
Clause Number
Title Date
52.246-12 Inspection of Construction AUG 1996
FINAL CLEANUP
Before final acceptance, all areas occupied by the Contractor in connection with the work shall be cleaned of all Contractor's rubbish, excess materials, temporary structures, and equipment, and all parts of the work area shall be left in a neat and presentable condition.
SECTION F--DELIVERIES OR PERFORMANCE
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
Clause Number
Title Date
52.242-14 Suspension of Work APR 1984
FAR 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK (APR 1984)
AGAR 452.236-75 MAXIIMUM WORKWEEK-CONSTRUCTION (NOV 1996)
Within five calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:
(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and
(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work.
The maximum workweek that will be approved is 7 days.
http://www.arnet.gov/far/ http://www.usda.gov/procurement/policy/agar.html http://www.arnet.gov/far/ http://www.usda.gov/procurement/policy/agar.html
Haypress Trail Bridge Replacement, Six Rivers NF Page 9 of 26
SECTION G--CONTRACT ADMINISTRATION DATA
DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE
The Contracting Officer designates the Contracting Officer's Representative(s) (COR). The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract.)
On all matters that pertain to the contract terms, the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
SECTION H--SPECIAL CONTRACT REQUIREMENTS
MOISTURE SENSITIVE SOILS
Contractors are cautioned that the roadway structure is designed so that the completed road will support highway legal loads during a limited use season. Construction equipment often subjects the uncompleted roadway structure to loadings it is not designed to support. This is especially critical during periods of excessive moisture. Materials on this project are sensitive to excessive moisture and will require careful selection and scheduling of equipment to permit efficient operation. Any damage resulting from operations, which renders the material unsuitable for use or results in potential siltation of streams, will be corrected by the Contractor at Contractor's expense.
AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held within 10 days after the date of contract award. The conference will be held at a mutually agreeable location.
AGAR 452.236-77 EMERGENCY RESPONSE (NOV 1996)
(a) Contractor's Responsibility for Fire Fighting. (1) The Contractor, under the provisions of FAR clause 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. (2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents or employees.
Haypress Trail Bridge Replacement, Six Rivers NF Page 10 of 26
(b) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
( c) Contractor's Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to fire fighting). An equitable adjustment for the temporary use of employees and equipment will be made under the CHANGES clause, FAR 52.243-4.
LANDSCAPE PRESERVATION
The Contractor shall give attention to the effect of contract operation upon the landscape, shall take care to maintain natural surroundings undamaged, and shall conduct the work at all times in compliance with the following requirements.
a. Prevention of the Landscape Defacement. The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawns, or other natural features or any other improvements in the work area unless specifically authorized by the Contracting Officer. Unless otherwise provided herein, the Contractor shall confine contract operations to within the areas designated in contract documents.
b. Protection of Streams, Lakes, and Reservoirs. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes, small ponds, and reservoirs with fuels, oils, bitumens, calcium chloride, silt, or other harmful materials. Mechanical equipment shall not be operated in live streams without written approval of the Contracting Officer.
CONTRACTOR'S USE OF EXISTING ROADS
The Contractor is authorized to use roads in the immediate construction project area for performance of work under this contract. The authorization is limited to roads necessary for direct access between the construction area and storage sites, disposal areas, and other work areas designated in the contract.
The roads authorized for use will be subject to the following general conditions:
(1) State laws governing traffic rules and equipment requirements on State and County Highways.
(2) Federal Regulations contained in 36 CFR 261.12. These regulations prohibit use in excess of
State Codes for weight and size, damaging a road while using it, and blocking a road open to use by others.
The Contractor shall be responsible for and perform road maintenance commensurate with his use of Forest Service roads in the construction area.
Haypress Trail Bridge Replacement, Six Rivers NF Page 11 of 26
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
Clause No Title Date
52.202-1 DEFINITIONS JAN 2012
52.203-3 GRATUITIES APR 1984
52.203-5 COVENANT AGAINST CONTINGENT FEES APR 1984
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT SEPT 2006
52.203-7 ANTI-KICKBACK PROCEDURES OCT 2010
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY JAN 1997
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY JAN 1997
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS OCT 2010
52.204-4 PRINTED OR COPIED DOUBLE- SIDED ON POSTCONSUMER FIBER CONTENT PAPER MAY 2011
52.204-7 CENTRAL CONTRACTOR REGISTRATION FEB 2012
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS
DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT
DEC 2010
52.211-18 VARIATION IN ESTIMATED QUANTITY APR 1984
52.215-2 AUDIT AND RECORDS -- NEGOTIATION OCT 2010
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS JAN 2011
52.219-27 NOTICE OF SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE NOV 2011
52-219-28 52.222-3
POST AWARD SMALL BUSINESS PROGRAM REREPRESENTATION
CONVICT LABOR
JUN 2007
JUN 2003
52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT – OVERTIME COMPENSATION JUL 2005
52.222-6 DAVIS-BACON ACT JUL 2005
52.222-7 WITHHOLDING OF FUNDS FEB 1988
52.222-8 PAYROLLS AND BASIC RECORDS JUN 2010
52.222-9 APPRENTICES AND TRAINEES JUL 2005
52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS FEB 1988
52.222-11 SUBCONTRACTS (LABOR STANDARDS) JUL 2005
52.222-12 CONTRACT TERMINATION – DEBARMENT FEB 1988
52.222-13 COMPLIANCE WITH DAVIS-BACON AND RELATED ACT REGULATIONS FEB 1988
52.222-14 DISPUTES CONCERNING LABOR STANDARDS FEB 1988
52.222-15 CERTIFICATION OF ELIGIBILITY FEB 1988
52.222-21 PROHIBITION OF SEGREGATED FACILITIES FEB 1999
52.222-26 EQUAL OPPORTUNITY MAR 2007
52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION FEB 1999
52.222-35 EQUAL OPPORTUNITY FOR VETERANS SEPT 2010
52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES JUN 1998
52.222-37 EMPLOYMENT REPORTS VETERANS SEPT 2010
52.222-50 COMBATING TRAFFICKING IN PERSONS FEB 2009
Haypress Trail Bridge Replacement, Six Rivers NF Page 12 of 26
52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION JAN 2009
52.223-1 BIOBASED PRODUCT CERTIFICATION DEC 2007
52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION
CONTRACTS
DEC 2007
52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (ALTERNATE I) JUL 1995
52.223-6 DRUG-FREE WORKPLACE MAY 2001
52.223-15 ENERGY EFFICIENCY IN ENERGY-CONSUMING PRODUCTS DEC 2007
52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND CONSTRUCTION
CONTRACTS
MAY 2008
52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING AUG 2011
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES JUN 2008
52.227-1 AUTHORIZATION AND CONSENT DEC 2007
52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT DEC 2007
52.227-4 PATENT INDEMNITY – CONSTRUCTION CONTRACTS DEC 2007
52.228-2 ADDITIONAL BOND SECURITY OCT 1997
52.228-11 PLEDGES OF ASSETS JAN 2012
52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS OCT 1995
52.228-14 IRREVOCABLE LETTER OF CREDIT DEC 1999
52.228-15 PERFORMANCE AND PAYMENT BONDS – CONSTRUCTION OCT 2010
52.229-3 FEDERAL, STATE, AND LOCAL TAXES APR 2003
52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS SEP 2002
52.232-9 LIMITATION ON WITHHOLDING OF PAYMENTS APR 1984
52.232-17 INTEREST OCT 2010
52.232-23 ASSIGNMENT OF CLAIMS JAN 1986
52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS OCT 2008
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – CENTRAL CONTRACTOR REGISTER OCT 2003
52.233-1 DISPUTES – ALTERNATE I (DEC 1991) JULY 2002
52.233-3 PROTEST AFTER AWARD AUG 1996
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM OCT 2004
52.236-2 DIFFERING SITE CONDITIONS APR 1984
52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK APR 1984
52.236-5 MATERIAL AND WORKMANSHIP APR 1984
52.236-6 SUPERINTENDENCE BY THE CONTRACTOR APR 1984
52.236-7 PERMITS AND RESPONSIBILITIES NOV 1991
52.236-8 OTHER CONTRACTS APR 1984
52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS
APR 1984
52.236-10 OPERATIONS AND STORAGE AREAS APR 1984
52.236-11 USE AND POSSESSION PRIOR TO COMPLETION APR 1984
52.236-12 CLEANING UP APR 1984
52.236-13 ACCIDENT PREVENTION – Alternate I (NOV 1991) NOV 1991
52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS APR 1984
52.236-17 LAYOUT OF WORK APR 1984
52.236-26 PRECONSTRUCTION CONFERENCE FEB 1995
52.242-13 BANKRUPTCY JUL 1995
52.243-4 CHANGES JUN 2007
Haypress Trail Bridge Replacement, Six Rivers NF Page 13 of 26
52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS DEC 2010
52.245-1 GOVERNMENT PROPERTY APR 2012
52.245-2 GOVERNMENT PROPERTY INSTALLATION OPERATION SERVICES APR 2012
52.246-21 WARRANTY OF CONSTRUCTION – (APR 1984) MAR 1994
52.248-3 VALUE ENGINEERING – CONSTRUCTION OCT 2010
52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE) – Alternate I (SEP 1996) APR 2012
52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) APR 1984
52.253-1 COMPUTER GENERATED FORMS JAN 1991
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.232-70 REIMBURSEMENT FOR BOND PREMIUMS – FIXED-PRICE CONSTRUCTION CONTRACTS NOV 1996
452.236-72 USE OF PREMISES NOV 1996
452.236-73 ARCHEOLOGICAL OR HISTORIC SITES FEB 1988
452.236-74 CONTROL OF EROSION, SEDIMENTATION AND POLLUTION NOV 1996
FAR 52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (SEP 2010)
(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984
( 46 U.S.C. App. 1702), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the
Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if— https://www.acquisition.gov/far/current/html/Subpart%202_1.html#wp1145508 http://uscode.house.gov/
Haypress Trail Bridge Replacement, Six Rivers NF Page 14 of 26
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the Buy American Act (41 U.S.C. 10a - 10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: NONE]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
http://uscode.house.gov/ http://uscode.house.gov/ https://www.acquisition.gov/far/current/html/Subpart%2012_5.html#wp1077123
Haypress Trail Bridge Replacement, Six Rivers NF Page 15 of 26
(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
FOREIGN AND DOMESTIC CONSTRUCTION MATERIALS PRICE COMPARISON
Construction Material Description Unit of Measure Quantity Price (Dollars)* Item 1:
Foreign construction material _______ _______ _______ Domestic construction material _______ _______ _______ Item 2: _______ _______ _______ Foreign construction material _______ _______ _______ Domestic construction material [List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
FAR 52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds –
(1) To unsuccessful bidders as soon as practicable after the opening of bids, and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3 Million, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
Haypress Trail Bridge Replacement, Six Rivers NF Page 16 of 26
AGAR 452.209 – 71 REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID TAX
LIABILITY OR A FELONY CONVICTION (DEVIATION 2012-01) (FEB 2012) (Alternate 1 Feb 2012)
(a) This award is subject to the provisions contained in the Consolidated Appropriations Act, 2012 (P.L.
No. 112-74), Division E, Sections 433 and 434 regarding corporate felony convictions and corporate federal tax delinquencies. Accordingly, by accepting this award the contractor acknowledges that it
(1) does not have a tax delinquency, meaning that it is not subject to any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, and
(2) has not been convicted (or had an officer or agent acting on its behalf convicted) of a felony criminal violation under any Federal law within 24 months preceding the award, unless a suspending and debarring official of the United States Department of Agriculture has considered suspension or debarment of the awardee, or such officer or agent, based on these convictions and/or tax delinquencies and determined that suspension or debarment is not necessary to protect the interests of the Government.
(b) If the awardee fails to comply with these provisions, the Forest Service may terminate this contract for default and may recover any funds the awardee has received in violation of sections 433 or 434.
AGAR 452.228-70 ALTERNATIVE FORMS OF SECURITY (NOV 1996)
If furnished as security, money orders, drafts, cashier's checks, or certified checks shall be drawn payable to: USDA Forest Service.
ORDER OF PRECEDENCE--CONSTRUCTION
Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The Schedule (excluding the specifications); i.e. Sections A, B, D, E, F, G, and H
(2) Representations and Other Instructions; i.e. Sections K, L, and M
(3) Contract Clauses; i.e. Section I
(4) Other Documents, Exhibits, and Attachments; i.e. Section J
(5) Special Project Specifications
(6) Standard Specifications; i.e. Section C (including FAR clauses)
(7) (a) Drawings, figured dimensions over scaled dimensions.
(b) Drawings, large scale contract drawings over small scale contract drawings.
(c) Schedules on contract drawings over any conflicting notations on contract drawings.
(8) Shop Drawings
Haypress Trail Bridge Replacement, Six Rivers NF Page 17 of 26
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
The following attachments are made a part of this solicitation and any resultant contract.
Complete the following list.
Title Pages
1. General Notes 2
2. Special Contract Requirements 31
3. Project Drawings (Separate) 7
Page No Description
1 Six Rivers Location Map 1
2 Construction Drawings Index Sheet 1
3 Retaining Wall Drawing 1
4 Plan and Elevation Drawing` 1
5 Bearing Details 1
6 Run Plank Detail Drawing 1
7 Cleaning and Grubbing Log Out Drawing 1
4. Project Maps 3
5. DOL Wage Decision No.
6. Fire Protection and Suppression 5
NOTE: IN COMPLIANCE WITH THE PAPER REDUCTION ACT, SECTIONS K, L, AND M, WHICH
APPLY ONLY TO THE SOLICITATION PHASE, ARE NOT DUPLICATED AFTER CONTRACT
AWARD. HOWEVER, SECTION K WILL BE INCORPORATED BY REFERENCE INTO THE
RESULTING CONTRACT.
Haypress Trail Bridge Replacement, Six Rivers NF Page 18 of 26
PART IV--REPRESENTATIONS AND INSTRUCTIONS
SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF
OFFERORS OR RESPONDENTS
FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE
(FEB 1998)
This solicitation incorporates one or more provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a provision may be accessed electronically at this/these address(es):
www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html
FAR 52.204-6 DATA UNIVERSAL NUMBERING SYSTEM (DUNS) NUMBER (APR 2008)
(a) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS number or “DUNS+4” that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number is a nine-digit number assigned by Dun and Bradstreet, Inc. The DUNS+4 is the DUNS number plus a 4-character suffix that may be assigned at the discretion of the offeror to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see Subpart 32.11) for the same concern.
(b) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number—
(i) Via the Internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company legal business name.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(iii) Company physical street address, city, state and ZIP Code.
(iv) Company mailing address, city, state and ZIP Code (if separate from physical).
(v) Company telephone number.
(vi) Date the company was started.
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
DUNS Number: ____________________________
Pursuant to AGAR 419.508, the contracting officer shall insert the following provision 452.219-70 (January 2005), in solicitations that are set aside for small businesses, but for which FAR 4.1202 has directed that FAR 52.219-1 not be included in the solicitation.
http://acquisition.gov/far/current/html/Subpart%2032_11.html#wp1043964 http://acquisition.gov/far/current/html/%20http:/fedgov.dnb.com/webform
Haypress Trail Bridge Replacement, Six Rivers NF Page 19 of 26
AGAR 452.209 – 70 REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID
DELINQUENT TAX LIABILITY OR A FELONY CONVICTION (Deviation 2012-01) (FEB 2012) Alternate 1 (Feb 2012).
(a.) Awards made under this solicitation are subject to the provisions contained in the Consolidated Appropriations Act, 2012 (P.L. No. 112-74), Division E, Sections 433 and 434 regarding corporate felony convictions and corporate federal tax delinquencies. To comply with these provisions, all offerors must complete paragraph (1) of this representation, and all corporate offerors also must complete paragraphs (2) and (3) of this representation.
(b) The Offeror represents that –
(1) The Offeror is [ ], is not [ ] (check one) an entity that has filed articles of incorporation in one of the fifty states, the District of Columbia, or the various territories of the United States including American Samoa, Federated States of Micronesia, Guam, Midway Islands, Northern Mariana Islands, Puerto Rico, Republic of Palau, Republic of the Marshall Islands, U.S. Virgin Islands. (Note that this includes both for-profit and non-profit organizations.)
If the Offeror checked “is” above, the Offeror must complete paragraphs (2) and (3) of the representation. If Offeror checked “is not” above, Offeror may leave the remainder of the representation blank.
(2) (i) The Offeror has [ ], has not [ ] (check one) been convicted of a felony criminal violation under Federal or State law in the 24 months preceding the date of offer.
(ii) Offeror has [ ], has not [ ] (check one) had any officer or agent of Offeror convicted of a felony criminal violation for actions taken on behalf of Offeror under Federal law in the 24 months preceding the date of offer. Attachment 1 AGAR Advisory 104 Attachment 1, AGAR Advisory 104 Page 3 of 4
(3) The Offeror does [ ], does not [ ] (check one) have any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability.
Haypress Trail Bridge Replacement, Six Rivers NF Page 20 of 26
SECTION L-- INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE
(FEB 1998)
This solicitation incorporates one or more provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a provision may be accessed electronically at this/these address(es):
www.arnet.gov/far/ or www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
Clause Number
Title Date
52.215-1 INSTRUCTIONS TO OFFERORS – COMPETITIVE ACQUISITION JAN 2004
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE
EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION
Goal for Minority Participation for Each Trade
6.6%
Goal for Female Participation for Each Trade
6.9%
(e) As used in this Notice, and in any contract resulting from this solicitation, the “covered area” is Orleans, California, Siskiyou County
FEB 1999
52.236-28 PREPARATION OF PROPOSALS – CONSTRUCTION OCT 1997
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.204-70 INQUIRIES FEB 1988
FAR 52.211-3 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA INDEX OF FEDERAL
SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS
(JUN 1988)
The specifications cited in this solicitation may be obtained from:
Specification Address Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03 Publication No. FHWA-FLH-03-002
Superintendent of Documents U.S. Government Printing Office Washington, DC 20402
Construction of Trails
(EM 7720-103) (SEPT 1996)
Stock No. ISBN 0-16-048802-8
Or you may access them from: http://www.fs.fed.us/database/acad/welcome.htm.
Haypress Trail Bridge Replacement, Six Rivers NF Page 21 of 26
Specification Address AASHTO Standards American Association of State Highway and Transportation Officials
341 National Press Building Washington, DC 20024
ACI American Concrete Institution Box 19150 Redford Station Detroit, MI 48219
ASTM Standards American Society for Testing Materials 1916 Race Street Philadelphia, PA 19103
(215) 199-5462
AWPA American Wood Preservers Association PO Box 849 Stevensville, MD 21666
FS Federal Specifications (GSA) Building 197, Washington Navy Yard, SE Washington, DC 20407
MUTCD Manual on Uniform Traffic Control Devices Superintendent of Documents U.S. Government Printing Office Washington, DC 20402
WCLIB West Coast Lumber Inspection Bureau PO Box 23145 Portland, OR 97223
WWPA Western Wood Products Association (Grading Rules) 1500 Yeon Building Portland, OR 97204
The request should identify the solicitation number and the specification requested by date, title, and number, as cited in the solicitation.
*NOTE: COMPLETE RETURN PACKAGE WITH ORIGINAL SIGNATURES MUST BE HARD COPIED
MAILED OR HAND DELIVERED TO:
Attn: Pamela J. Vilhauer Northern California Acquisition Service Area Redding Office 3644 Avtech Parkway Redding, CA 96002.
Project Name: ______________________
FAR 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a firm fixed price contract resulting from this solicitation.
FAR 52.225-10 NOTICE OF BUY AMERICAN ACT REQUIREMENT—CONSTRUCTION MATERIALS
(FEB 2009)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American Act—Construction Materials”…
This is the start of the file's text. The full file is on GovTribe.