Attachment_2_Big_Mdws_Trail_Bridge_ _Boardwalk_Dwgs_Complete_Set.pdf
PDF 3 MB Posted
- Attached to
- BIG MEADOWS TRAIL BRIDGE REPLACEMENT Federal contract opportunity
- Solicitation number
- AG-9AB5-S-15-0035
About this file
Attachment 2 Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_2_Big_Meadows.pdf | ||
| Amend_1_Big_Meadows.pdf | ||
| Attachment_5_Bid_Bond_SF-24.pdf | ||
| Attachment_1_Big_Meadows_Trail_Bridge_and_Boardwalk_Specification.pdf | ||
| AG-9AB5-S-15-0035_SQF_Big_Mdw_Trailbridge.pdf | ||
| Attachment_4_Wage_Determination.txt | TXT text file | |
| Attachment_3_Fire_Plan_080212_w_PAL_data_HL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B I G
M
D W
S
T
R A
I L
B
R I D
E
O A
R D
W A
L K
H U
L A
K
R
N
G E
R
D
I S
T R
I C
BIG MDWS TRAIL BRIDGE &
BOARDWALK
GENERAL NOTES
MDRIOS
2/11/2015
AS NOTED
NOTES:
• HAUL ROUTES FOR MATERIALS AND WORK ZONES SHALL BE SIGNED IN ACCORDANCE WITH CURRENT
MUTCD STANDARDS.
• A CONSTRUCTION SCHEDULE AND TEMPORARY TRAFFIC CONTROL PLAN SHALL BE SUBMITTED AND
APPROVED BY C.O.R. PRIOR TO CONSTRUCTION.
• ALL TRAFFIC CONTROL DEVICES ARE INCIDENTAL TO THIS CONTRACT.
• SAMPLING AND TESTING OF STRUCTURAL CONCRETE IS INCIDENTAL TO PAY ITEM 552(01). CONCRETE SHALL
BE TESTED FOR UNIT MASS, SLUMP, TEMPERATURE, AIR CONTENT, AND COMPRESSIVE STRENGTH IN
ACCORDANCE WITH SECTION 552.09, 552.19, AND TABLE 552-9.
• WATER FOR CONSTRUCTION IS INCIDENTAL TO THIS CONTRACT.
• CONCRETE DEBRIS AND AND ANY OTHER TRASH GENERATED DUE TO CONSTRUCTION SHALL BE DISPOSED
OFF FOREST SERVICE LAND.
• CLEANING OF EQUIPMENT FOR NOXIOUS WEEDS AND SANITATION FACILITIES ARE INCIDENTAL TO PAY ITEM
151(01).
• HORIZONTAL AND VERTICAL CONTROLS ARE SHOWN ON SHEET 9.
• DISPOSE OF CONSTRUCTION SLASH BY DECKING AND PILING AT THE STAGING AREA.
ESTIMATED BOARDWALK QUANTITIES
PAY ITEM
NO.
ITEM DESCRIPTION
METHOD OF
MEASUREMENT
ESTIMATED
QUANTITY
208(01)
STRUCTURAL EXCAVATION A.Q. 10 C.Y.
208(02)
STRUCTURAL BACKFILL A.Q. 5 C.Y.
552(01) STRUCTURAL CONCRETE, CLASS A (AE)
A.Q. 20 C.Y.
554(01)
REINFORCING STEEL A.Q.
1,200 LBS
557(01)
TREATED STRUCTURAL TIMBER BOARDWALK WITH GLUED LAMINATED BEAMS A.Q. 60 L.F.
564(01)
ELASTOMERIC BEARING DEVICE A.Q. 24
ESTIMATED BRIDGE QUANTITIES
PAY ITEM
NO.
ITEM DESCRIPTION
METHOD OF
MEASUREMENT
ESTIMATED
QUANTITY
151(01) MOBILIZATION (INCLUDES BONDING COSTS)
L.S.Q. 1
201(01)
CLEARING AND GRUBBING L.S.Q. 1
203(05)
REMOVAL OF STRUCTURES AND OBSTRUCTIONS L.S.Q.
208(01)
STRUCTURAL EXCAVATION
A.Q.
53 C.Y.
208(02)
STRUCTURAL BACKFILL
A.Q.
43 C.Y.
552(01) STRUCTURAL CONCRETE, CLASS A (AE)
A.Q. 27 C.Y.
554(01)
REINFORCING STEEL A.Q.
2,500 LBS
564(01)
ELASTOMERIC BEARING DEVICE A.Q. 4
557(01)
PREFABRICATED BRIDGE SUPERSTRUCTURE - DESIGN, FABRICATE, DELIVER AND INSTALL*
L.S.Q. 1
NOTE:
• TIMBER DECK PLANKS AND TIMBER RUN PLANKS
SHALL BE INCLUDED IN PAY ITEM 571(01)
BEST MANAGEMENT PRACTICES TO BE INCORPORATED WITH THIS PROJECT
BMPs as described in the “National Best Management Practices for Water Quality Management on National Forest System Lands” have been effective in protecting beneficial uses. Visual field surveys have indicated that these BMPs, where properly implemented, have adequately protected and minimized the impacts to acceptable levels. Past deficiencies in the implementation of these BMPs have been the cause for the erosion problems associated to roads and skid trails.
The purpose of this set of Best Management Practices (BMPs) is to avoid, minimize, or mitigate adverse effects to soil, water quality, and in-stream riparian resources that may result from road management activities. Road management activities include travel route planning, design, construction, operation, maintenance, reconstruction, storage, and decommissioning.
Other transportation-system-related activities include stream and waterbody crossings, snow removal, parking areas, and equipment refueling and servicing areas.
• Road-5. Temporary Roads
Objective Avoid, minimize, or mitigate adverse effects to soil, water quality, and riparian resources from the construction and use of temporary roads.
• Road-7. Stream Crossings
Objective Avoid, minimize, or mitigate adverse effects to soil, water quality, and riparian resources when constructing, reconstructing, or maintaining temporary and permanent waterbody crossings.
• Road-9. Parking and Staging Areas
Objective Avoid, minimize, or mitigate adverse effects to soil, water quality, and riparian resources when constructing and maintaining parking and staging areas.
• Road-10. Equipment Refueling and Servicing
Objective Avoid or minimize adverse effects to soil, water quality, and riparian resources from fuels, lubri- cants, cleaners, and other harmful materials discharging into nearby surface waters or infiltrating through soils to contaminate groundwater resources during equipment refueling and servicing activities.
• WatUses-3. Administrative Water Developments
Objective Avoid, minimize, or mitigate adverse effects to soil, water quality, and riparian resources when developing and operating water sources for Forest Service administrative and resource management purposes.
Note: Please refer to the “National Best Management Practices for Water Quality Management on National Forest System Lands” April 2012, for full description of the BMPs listed above.
W
S
T
R A
I L
B
R I D
A
R D
W A
L K
H U
K
N
G E
R
D
I S
T R
I C
T
BIG MDWS TRAIL BRIDGE &
BOARDWALK
TRAIL SITE PLAN
MDRIOS
2/11/2015
AS NOTED
NN
EXISTING BRIDGE CROSSING
FOREST RD 14S11
EQUIPMENT AND MATERIALS
STAGING AREA
EXCESS MATERIAL HERE AND AS
DIRECTED BY THE C.OR.
PUBLIC TRAIL HEAD
(will remain open)
VEHICLE ENTRANCE
PROJECT SITE
10'-0"
8'-0"
6'-0"
15'-0"
CLEARING LIMITS
NOT TO SCALE
OVERVIEW LIMITS
FALLEN TREES LIMITS
TRIM BRANCHES
FLUSH WITH TRUNK
CUT FLUSH WITH
GROUND
CUT ALL LOGS ALONG THE PATH OF
THE TRAIL AND SCATTER AS
INDICATED BY PROJECT ENGINEER
DOWNHILL
UPHILL
TRAILBED
TRAILWAY
CLEARING LIMIT
UPHILL
CLEARING LIMIT
DOWNHILL
VERTICAL CLEARING LIMIT
10' TO 15' DEPENDING ON
BOARDWALK ELEVATION
POSSIBLE LIMBS ON
PATH
TRAIL
BRIDGE
TRAIL
BRIDGE
BOARDWALK
BOARDWALK
STOCK
CROSSING
B
W
S
T
R A
I D
A
R D
W A
L K
H U
K
E
R
A N
G E
R
D
I S
T R
I C
T
BIG MDWS TRAIL BRIDGE &
BOARDWALK
CLEARING LIMITS
MDRIOS
2/11/2015
AS NOTED
NN
3 x 12 x 6'-11" Deck planks
Sym. about ~C of DECK
Girder (6 3/4" x 10 1/2")
2x6 Rails
4x6 x 5'-7" Posts
6x6 Curb
NOTE: DECK, CURB AND RAILING NOT SHOWN
3X10 BLOCKING
LENGTH 5'-9 1/2"
GIRDER
OFFSET BLOCKING
6" FROM ℄RAILPOST
4X6 POST
2-30D SPIKES EACH
SIDE (TOT. 4 EA. END)
6"
AA
1'-1 1/2"
1'-1 1/2"
10 3/4"
4'-6"
3'-0"
6"
2 1/2"
TYPICAL CROSS SECTION
SCALE: 1/2" = 1'-0"
SECTION A-A
SCALE: 1/2" = 1'-0"
BLOCKING
4x6-3/4
CONCRETE
PIER
℄ PIER @ 23 DEGREES
℄ DECK
3x12 DECK PLANKS, INSTALL
WITH A MAX. OF 1/2" SPACE
BETWEEN PLANKS
4x6 POST, TYP.
2x6 RAILS
FILL MATERIAL, TYP.
6x6 CURB
NOTE:
FIELD CUT THE PLANKS FOR THE TURN IN THE
BOARDWALK.
FIELD CUT THE BLOCKING TO MAKE TIGHT
CONNECTION WITH THE GLUELAMS ON THE TURN.
FIELD CUT THE 6x6 CURB TO MAKE TIGHT
CONNECTION WITH ONE ANOTHER ON THE TURN.
FIELD CUT THE 2x6 RAILS TO MAKE TIGHT
CONNECTION WITH ONE ANOTHER ON THE TURN.
4'-0" 4'-0"
2'-0"
4'-0"
8'-8"
1'-4"
4'-0" 4'-0" 2'-7 21/32"
2'-7 17/32"
4'-0"
BLOCKING,
TYP.
PLAN
SCALE: 1/4" = 1'-0"
ABUTMENT #1
PIER #1
2x6 Rails
4x6 Posts, typ.
6x6 Curb, typ.
3x12 Deck planks, install with a max. of 1/2" space between planks
ELEV. 7619.85
ELEV. 7621.35
ELEV. 7620.22
SOIL FOUNDATION:
FOOTINGS AND PIERS SHALL BEAR ON UNDISTURBED SOIL.
FOUNDATION MATERIAL SHALL BE COMPACTED IN
ACCORDANCE WITH SECTION 208.11(VISUAL DISPLACEMENT)
PRIOR TO PLACEMENT OF CONCRETE.
USE SUITABLE MATERIAL FOR BACK FILL.
ABUTMENT, COORDINATE
ELEVATION WITH TRAIL
BRIDGE DESIGN
4'-0" 4'-0" 2'-7 21/32"
1'-0"
4 1/2"
1'-6"
1'-0"
READ NOTE ABOVE
ELEVATION
SCALE: 1/4" = 1'-0"
ABUTMENT #1
PIER #1
3' MIN.
DEPTH.
GENERAL NOTES:
Designed
Drawn
Checked
Approved:
Date
Date
Date
Date
U. S. Department of Agriculture Forest Service
Sequoia National Forest Region Five
STANDARD 6'-0" PEDESTRIAN BOARDWALK
Plan and Elevation
SCALE: As Noted
BOARDWALK SHEET: 1 OF 4 5 OF 13
Steven Ray
Steven Ray
Marcos D Rios
CONCRETE
PIER
℄ PIER @ 23
DEGREES
℄ DECK
3x12 DECK PLANKS, INSTALL
WITH A MAX. OF 1/2" SPACE
BETWEEN PLANKS
4x6 POST, TYP.
2x6 RAILS
6x6 CURB
FILL MATERIAL, TYP.
BEARING PADS
ANCHOR
BOLTS
GLUELAM
BEAMS
12'-7 21/32"
10'-2 3/4"
# 1
# 3
# 4
NOTE:
• GLUELAM # 1 LENGTH 12'-7 1/2 "
• GLUELAM # 2 LENGTH 12'-7 1/2"
• GLUELAM # 3 LENGTH 10'-2 3/4"
• GLUELAM # 4 LENGTH 10'-2 3/4"
• ALL OTHERS ARE 10'-0"
NOTE:
• FIELD CUT THE PLANKS FOR THE TURN IN THE
BOARDWALK.
• FIELD CUT THE BLOCKING TO MAKE TIGHT CONNECTION
WITH THE GLUELAMS ON THE TURN.
• FIELD CUT THE 6x6 CURB TO MAKE TIGHT CONNECTION
WITH ONE ANOTHER ON THE TURN.
• FIELD CUT THE 2x6 RAILS TO MAKE TIGHT CONNECTION
WITH ONE ANOTHER ON THE TURN.
PLAN
SCALE: 1/4" = 1'-0"
# 2
PIER #1
ABUTMENT #1
3x12 DECK PLANKS, INSTALL
WITH A MAX. OF 1/2" SPACE
BETWEEN PLANKS
4x6 POSTS
2x6 RAILS
FILL MATERIAL, TYP.
10'-0" 10'-0" 10'-0" 10'-0"
PLAN
SCALE: 1/4" = 1'-0"
ABUTMENT #3
PIER #5
PIER #4PIER #3
PIER #2
Designed
Drawn
Checked
Approved:
Date
Date
Date
Date
U. S. Department of Agriculture Forest Service
Sequoia National Forest Region Five
STANDARD 6'-0" PEDESTRIAN BOARDWALK
Plan View
SCALE: As Noted
BOARDWALK SHEET: 2 OF 4 6 OF 13
Steven Ray
Steven Ray
REMOVED
PORTION
REMOVED
PORTION
REMOVED
PORTION
REMOVED
PORTION
FILLED
PORTION
1 3/8"
1'-1 5/8"
2'-0"
2 13/32"
2'-0"
2 13/32"
2'-0"
2 13/32"
1'-0"
1 3/16"
MIN.
DEPTH
NOTE:
• FOOTINGS AND PIERS SHALL BEAR ON UNDISTURBED SOIL.
• FOUNDATION MATERIAL SHALL BE COMPACT IN ACCORDANCE
WITH SECTION 208.11 (VISUAL DISPLACEMENT) PRIOR TO
PLACEMENT OF CONCRETE.
• USE SUITABLE MATERIAL FOR BACK FILL.
ELEV. 7618.63
ELEV. 7617.00
BACK FILL AND
COMPACT TO 7:1
11'-0"
1'-0"
3'-7"
2'-6"
1'-1 3/4"
FIELD CUT RAILS TO MAKE
SMOOTH CONNECTION, TYP.
ELEVATION
SCALE: 1/4" = 1'-0"
8'
ABUTMENT #3
PIER #5
PIER #4
PIER #3
PIER #2
ELEV. 7620.18
APROXIMATE
REFERENCE
GRADE LINE
1.5'
2'
3'
2.5'
MIN.
DEPTH
MIN.
DEPTH
MIN.
DEPTH
1'-0"
MIN.
DEPTH
2 3/4"
2 3/4"
1 3/8"
SAME CONNECTING
CONFIGURATION
FOR ALL RAILING
SPLICE.TYP.
REDWOOD RAILING SPLICE
SCALE: 3/4" = 1'-0"
1 3/8"
NOTE:
APPROXIMATE PIER HEIGHT*
• PIER #1 = 8.5'
• PIER #2 = 8.0'
• PIER #3 = 6.0
• PIER #4 = 4.6'
• PIER #5 = 3.0'
* FIELD VERIFIED
Designed
Drawn
Checked
Approved:
Date
Date
Date
Date
U. S. Department of Agriculture Forest Service
Sequoia National Forest Region Five
STANDARD 6'-0" PEDESTRIAN BOARDWALK
Elevation and Railing Details
SCALE: As Noted
BOARDWALK SHEET: 3 OF 4 7 OF 13
Steven Ray
Steven Ray
#4 @ 1'-0"± O.C.
LENGTH VARIES WITH
PIER HEIGHT (tot 27)
#4 x 8'-2"
SYMM. ABOUT
℄ BRIDGE
1/2" X 6 3/4" X 4 1/2" ELASTOMERIC
BEARING PAD, 60D HARDNESS.
SECURE TO CONCRETE WITH
EPOXY ADHESIVE.
3/4"Ø X 1'-0" BOLT
W/ WASHER & NUT
PIERS 3-5 PLAN VIEW
SCALE: 1/2" = 1'-0"
2"
2"
6 3/4"
5 25/32" 5 25/32"1'-0 7/16"
7 1/2" # 1
4'-3"
#4 @ 1'-0"± (tot. 9)
6X6 CURB
#4 @ 1'-0"± (tot. 9) pair
13"
#4 x 8'-2" (tot. 6)
L4"x4"x1/4"x0'-41/2"
3/4"Ø X 1'-0" BOLT W/
FLAT WASHER, LOCK
WASHER & NUT
1/2"Ø X (6 3/4" + 5") HEX
BOLTS W/ FLAT WASHERS,
LOCK WASHER & NUT
1/2"Ø X 1'-0" LAG
SCREW, @ 4'-0" O.C.
13"4 1/2" CLR.
2"CLR.
2" 6"
ABUTMENT #3 ELEVATION
SCALE: 3/4" = 1'-0"
1'-0"
1 3/16"
CLR.
1'-0"
#4 x 20", QUANTITY VARIES
WITH PIER HEIGHT
3/4"Ø X 1'-0" BOLT W/
FLAT WASHER, LOCK
WASHER & NUT
6X6 CURB
L4"x4"x1/4"x0'-41/2"
1/2"Ø X 1'-0" LAG
SCREW, @ 4'-0" O.C.
#4 x 8'-2" (tot. varies)
LENGTH VARIES WITH
PIER HEIGHT (tot. 27)
PIER HEIGHT VARIES
1'-0" TYP.
PIERS 3-5 ELEVATION
SCALE: 3/4" = 1'-0"
2'-0"
2 13/32"
# 1
#4 @ 1'-0"± (tot. 9)
#4 x 8'-2"
SYMM. ABOUT
℄ BRIDGE
1/2" X 6 3/4" X 4 1/2"
ELASTOMERIC BEARING
PAD, 60D HARDNESS.
SECURE TO CONCRETE
WITH EPOXY ADHESIVE.
3/4"Ø X 1'-0" BOLT
W/ WASHER & NUT
ABUTMENT #3 PLAN VIEW
SCALE: 1/2" = 1'-0"
3'-5 1/2"
4'-3"
6 3/4"
6 17/32"5 15/32" 9"
7 1/2"
2"
2"
#4 x 20", QUANTITY VARIES
WITH PIER HEIGHT
#4 x 8'-2" (tot. varies)
LENGTH VARIES WITH
PIER HEIGHT (tot. 27)
PIER HEIGHT VARIES
3/4"Ø X 1'-0" BOLT W/
FLAT WASHER, LOCK
WASHER & NUT
6X6 CURB
L4"x4"x1/4"x0'-41/2"
1/2"Ø X 1'-0" LAG
SCREW, @ 4'-0" O.C.
PIER #2 ELEVATION
SCALE: 3/4" = 1'-0"
1'-1 5/8"
1 3/8"
# 2
#4 @ 1'-0"± O.C.
LENGTH VARIES WITH
PIER HEIGHT (tot 27)
#4 x 8'-2"
SYMM. ABOUT
℄ BRIDGE
1/2" X 6 3/4" X 4 1/2" ELASTOMERIC
BEARING PAD, 60D HARDNESS.
SECURE TO CONCRETE WITH
EPOXY ADHESIVE.
3/4"Ø X 1'-0" BOLT
W/ WASHER & NUT
PIER #2 PLAN VIEW
SCALE: 1/2" = 1'-0"
6 3/4"
5 3/4" 7 5/8"
10 5/8"
7 1/2"
2"
2"
# 2
8'-6"
4'-3"
5/8"Ø x 1" SLOTTED HOLE
FOR 1/2" HEX BOLT
L4"x4"x1/4"x 0'-4~8"
7/8"Ø HOLE 7/8"Ø HOLE
CONCRETE
ABUTMENT / PIER
L4"x4"x1/4"x
0'-4~8" (2 AT EA. END
OF GIRDER) 3/4"Ø x 5" LAG BOLTS
W/ WASHERS
GIRDER
END VIEW OF GIRDER
4"
GIRDER BRACKET
SCALE: 3/4" = 1'-0"
2"
4"
2 1/2"
4 1/2"
2 1/4"
2 1/2"
Designed
Drawn
Checked
Approved:
Date
Date
Date
Date
U. S. Department of Agriculture Forest Service Sequoia National Forest Region Five
STANDARD 6'-0" PEDESTRIAN BOARDWALK
Abutment and Railing Details
SCALE: As Noted
BOARDWALK SHEET: 4 OF 4 8 OF 13Steven Ray
Steven Ray
Marcos D Rios
8'-6"
| TITLE SHEET |
| GENERAL NOTES |
| TRAIL SITE PLAN |
| CLEARING LIMITS |
| STANDARD FOOT BRIDGE 1 OF 4 |
| STANDARD FOOT BRIDGE 2 OF 4 |
| STANDARD FOOT BRIDGE 3 OF 4 |
| STANDARD FOOT BRIDGE 4 OF 4 |
| R-1657 Combined |
File details come from the government source that posted it. Updated .