Synopsis.docx
DOCX document 18 KB Posted
- Attached to
- South Big Bear Stewardship Federal contract opportunity
- Solicitation number
- AG-9A40-S-15-0017
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF-30_Amendment_3.pdf | ||
| Amendment_No._2_SF-30.pdf | ||
| Attendance_Sheet_001.pdf | ||
| SF_30.pdf | ||
| Instructions_For_the_Preparations_of_Technical_and_Business_Proposals.pdf | ||
| Pre-bid_tour_notest.pdf | ||
| Fire_Plan.pdf | ||
| Appendix_B_Timber_Removal.pdf | ||
| Appendix_C_Road_Maintenance_Specifications.pdf | ||
| Maps.pdf | ||
| Appendix_A_Technical_Specs.pdf | ||
| Spec_842_corrugated_metal_flume_Detail_.pdf | ||
| 813_SpotSurfacing.pdf | ||
| Wage_Determination.pdf | ||
| Map_legend.pdf | ||
| SOW.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Synopsis:
Solicitation Number:
AG-9A40-S-15-0017
Name of Project:
South Big Bear Stewardship
NAICS Code:
115310 $17.5 million
DESCRIPTION OF WORK:
The purpose of the South Big Bear Hazardous Fuel Reduction (HFR) IRSC Stewardship contract is to reduce forest fuels and attain both horizontal and vertical fuel separation in forested stands within the treatment units using various techniques of fuel reduction, green tree thinning, and yarding of fuels. Work includes, but is not limited to, all labor, management, supervision, tools, materials, equipment, incidental engineering and transportation necessary to perform the stated purpose of this statement of work and may include, cutting, piling and removal of; standing and downed trees, dead and live brush, limbs and designated live conifers, existing slash and forest debris resulting from current and prior operations and/or events. Potential equipment that will be required to accomplish all work requirements include but are not limited to: rubber tired skidder with grapples and “bull line”, mobile chipper, “small” mobile cable yarder or helicopter, masticators, chainsaws, and directional felling equipment. Road maintenance and road decommissioning are also included as mandatory projects within the project area. The contract will include provisions for timber removal.
Solicitation Issue Date: (Post Date) July 23, 2015
Response Date: (Close Date) August 24, 2015
Set Aside:
Full and open
Classification Code:
F
Contracting Office Address:
1600 Tollhouse Road Clovis, CA 93611
Place of Performance:
Project Location – The project is located on the Mountain Top Ranger District, San Bernardino National Forest; the project area is situated directly south of Big Bear Lake, California.
Primary Point of Contact:
Patrick Gallegos Contracting Officer pgallegos@fs.fed.us
File details come from the government source that posted it. Updated .