L-2.3.pdf

PDF 133 KB Posted

Attached to
RECOVERY - Gerle Creek Campground Rehabilitation
Solicitation number
AG-9702-S-10-0526
Issued by

About this file

Attachment 2 - 8

View the file

Other files

File Type Posted
Gerle Creek Campground Drawing Set.pdf PDF
AG-9702-S-10-0526-000001 Part I.pdf PDF
AG-9702-S-10-0526-000001 Part II.pdf PDF
Attachment 4 - wage determination.pdf PDF
AG-9702-S-10-0526 Part II.docx DOCX document
L-1.0.pdf PDF
L-2.5.pdf PDF
L-0.0.pdf PDF
L-2.1.pdf PDF
L-2.4.pdf PDF
Attachment 1 - Specifications.pdf PDF
L-2.0.pdf PDF
Attachment 6 - Response to Evaluation Factors.pdf PDF
L-2.2.pdf PDF
L-0.0 Signed.pdf PDF
AG-9702-S-10-0526 Part I.pdf PDF
Attachment 5 - SF 24.pdf PDF
L-0.1.pdf PDF
Attachment 3 - Fire Plan_jun2006.pdf PDF
L-0.2.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCALE:

TIMBER STAIRWAY PLAN

3/4" = 1'-0"

SCALE:

TIMBER STAIRWAY SECTION

3/4" = 1'-0"

SCALE:

TIMBER STAIRWAY SECTION/ELEVATION

3/4" = 1'-0"

DAYLIGHT FILL

WOOD STEPS

COMPACTED NATIVE

MATERIAL

EXISTING GROUND

HAND-PLACED RIP

RAP CLASS II UTILIZE

LARGEST ROCK IN

KEY. ROCK SHALL

NOT PROTRUDE

ABOVE WOOD STEPS5'

1' MIN

4"

1'-1" 2"

2'

HOLE IN TIMBER

DRILLED FOR REBAR

4" X 8" TIMBER BASE

FRAME FOR WOOD

STEPS

TREAD

# 4 REBAR ANCHOR

DRIVEN THROUGH

DRILLED HOLES IN

TIMBERS TYP

WOOD STEP TREAD

6" X 8" SRS PTDF

SLOPE

8"

TIMBER BASE FRAME

FOR WOOD STEPS

NOTES:

1. REBAR SHALL BE DRIVEN DOWN 1" AND THEN CAULKED WITH ELASTOMERIC SEALANT: ONE PART

NON-ACID-CURING SILICONE TYPES; GRADE NS;CLASS 25 AND SHALL BE BROWN OR CLEAR IN COLOR.

2. 6" X 8" SOFT WOOD LUMBER SHALL BE PRESSURE TREATED WITH CHROMATED COPPER ARSENATE (CCA).

A LIGHT GREEN COLOR IS TO BE ADDED TO THE TREATMENT.

3. SAW CUT ENDS SHALL BE RETREATED WITH (CCA)

8"

5' LANDING BETWEEN SETS OF 3 STEPS TYP

SLOPE

SCALE:

BARRIER ROCK

3/4" = 1'-0"

BURY ROCK TO GREATEST

HORIZONTAL DIMENSION

ASPHALT CONCRETE PAVEMENT

FG

NOTES:

1. MAX DISTANCE BETWEEN ROCKS SHALL BE 2'

2. BARRIER LOCATIONS ARE SHOWN ON LAYOUT PLAN.

ROCK

3'-0" MIN

2'

(E) GROUND5'

COMPACT FILL

AGG BASE

FG AT 3:1 SLOPE

FG EMBANKMENT AT 2:1 SLOPE

SCALE:

AGGREGATE BASE WALKWAY

3/4"=1'-0"

0% SLOPE

SCALE:

CMP CULVERT INSTALLATION DETAIL

X"=1'-0"

AB B

COMPACT BACKFILL MATERIAL

CMP CULVERT. SEE LAYOUT PLAN FOR

DIAMETER

BEDDING MATERIAL

(E) SOIL

SCALE:

CMP CULVERT SECTION - BACKFILL METHOD

X"=1'-0"

CMP CULVERT SCHEDULE

A B 18" 18" 24" 24"

36" 36"

ORIGINAL GROUND OR STREAM BED

NOTES:

1. DO NOT RAISE OUTLET ABOVE EXISTING GRADE OR DRAINAGE BED

2. MINIMUM COVER OVER CULVERT AT SHOULDER SHALL BE 12 INCHES

BELOW SUBGRADE FOR SURFACED AND 18 INCHES BELOW

SUBGRADE FOR UNSURFACED.

L-2.3

ROAD

CL CMP CULVERT

PROFILE GRADE

2' MAX

TYP

COMPACTED NATIVE FILL

SCALE:

STREET MARKING - DIRECTIONAL ARROW

X"=1'-0"

4'-4" 5'

6"

9'-4"

PAINT ARROW WHITE

L-2.3

SEE DETAILS

D E

TA

IL

S

08 10

U S

FS

x3

4) .d w g

SHEET OF

SCALE:

DRAWING

DATE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECT NO:

N A

M E

P

R O

JE

C

T

FO

R

E S

T:

D R

A W

IN

G

N A

M E

PACIFIC

REGION

SOUTHWEST

R5

NO. DATE REVISIONS

SERVICE

U S D A

FOREST

DISTRICT RANGER

FOREST ENGINEER

FOREST SUPERVISOR

FOREST RECREATION

OFFICER

E

LD

O R

A D

O N

A

TI

O N

A L

FO

R

E S

T

G E

R

LE

C R

E E

K C

A M

P G

R O

U N

D R

E H

A B

IS

VJ

IS

04/01/2010

9 6

File details come from the government source that posted it. Updated .