AG-9702-S-10-0526-000001 Part II.pdf

PDF 42 KB Posted

Attached to
RECOVERY - Gerle Creek Campground Rehabilitation
Solicitation number
AG-9702-S-10-0526
Issued by

About this file

Summary of Changes

View the file

Other files

File Type Posted
Gerle Creek Campground Drawing Set.pdf PDF
AG-9702-S-10-0526-000001 Part I.pdf PDF
Attachment 4 - wage determination.pdf PDF
AG-9702-S-10-0526 Part II.docx DOCX document
L-1.0.pdf PDF
L-2.5.pdf PDF
L-2.3.pdf PDF
L-0.0.pdf PDF
L-2.1.pdf PDF
L-2.4.pdf PDF
Attachment 1 - Specifications.pdf PDF
L-2.0.pdf PDF
Attachment 6 - Response to Evaluation Factors.pdf PDF
L-2.2.pdf PDF
L-0.0 Signed.pdf PDF
AG-9702-S-10-0526 Part I.pdf PDF
Attachment 5 - SF 24.pdf PDF
L-0.1.pdf PDF
Attachment 3 - Fire Plan_jun2006.pdf PDF
L-0.2.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-9702-S-10-0526-000001

Gerle Creek Campground Rehabilitation

SUMMARY OF CHANGES

A. Section B – Schedule of Items

Item 2621

The estimated quantity of this item has changed from 12 to 14.

Item 2720-A

The estimated quantity of this item has changed from 40 to 64

Item 2720-B

The estimated quantity of this item has changed from 40 to 48

Item 2720-C

The estimated quantity of this item has changed from 20 to 24

The following Items have been deleted:

13010 (Single Unit)

2841-C

The following items have been added:

ITEM NUMBER AND DESCRIPTION

METHOD OF

MEASURE

EST.

QUANITY

UNIT

2110-A CLEARING & GRUBBING – BRUSH, TREES <6” AND

THEIR STUMPS

LSQ 1 LS

2110-B CLEARING & GRUBBING – TREES >6” TO 30” AND

THEIR STUMPS

AQ 10 EA

2621-A ASPHALT AQ 1,300 TON

2621-B ASPHALT-PATCHING AQ 2 TON

2841-A BARRIER ROCK – EXISTING ROCKS TO BE RESET DQ 150 LS

2621-B BARRIER ROCK – ROCKS GENERATED AND

HAULED FROM ROCK SOURCES

DQ 600 LS

2870-H CAMPSITE – NEW FURNISHINGS – FOOD STORAGE

LOCKER

AQ 2 EA

2870-I CAMPSITE – REUSED FURNISHINGS – TABLES AQ 47 EA

15251 WATERLINE & APPURTENANCES LSQ 1 LS

13010-A PRECAST VAULT TOILET – DOUBLE UNIT (Option) LSQ 4 EA

13010-B PRECAST VAULT TOILET – SINGLE UNIT (Option) LSQ 4 EA

The following Items have been changed to Options:

2841-A

2841-B

2870-B

2870-C

2870-D

B. Section H – Special Contract Requirements

Local clauses have been added as follows:

Emergencies Fire Plan

[XX ]See Section J, Fire Plan

[ ]Not applicable; however, Contractors are required to comply with State law during fire season.

Area of Responsibility for Fire. Unless otherwise noted elsewhere in the contract, the following define the limits of a contractor's area of responsibility for fire under the terms of the Fire Plan

(Section J):

[ ](a) Trail Construction - 100 meters on either side of the centerline

[ ](b) Construction of Structures - 100 meters around the perimeter of the project

[ ](c) Road Construction - 400 meters on either side of the centerline

[XX ](d) Special for this project: 300 FEET AROUND THE PERIMETER OF

CAMPGROUND, WATER SOURCE, BORROW SITES AND DISPOSAL AREAS.

Utility Services

WATER FOR CONSTRUCTION ACTIVITIES IS AVAILABLE, SEE LOCATION

MAP.

Superintendence by Contractor In addition to Clause 52.236-6, the following applies: The name and the specific authorities of the foreman or superintendent must be designated in writing to the Contracting Officer. The

Contractor may use his/her own prepared letterhead stationery or a "Designation of Contractor's

Representative" form available from the Contracting Officer. If the Contractor or the designee is not present when work is being performed on the contract, a Suspend Work Order may be issued with contract time continuing to run. The Contractor shall have a person on-site that is fully conversant in the English language.

Loss, Damage or Destruction Equipment Furnished with Operator. The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment.

Other. Even though this contract may provide for performing services at the direction of

Government personnel, the contract is not for personal services, and neither the Contractor nor his or her personnel are Government employees. The Government assumes no liability for injury occurring to Contractor personnel or to third parties, or for loss, damage, or destruction involving third parties' property as a result of the Contractor's operation. Except that the Government is liable for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of

Government employee(s) acting within the scope of their employment.

Camping Permit Compliance Contractor shall comply with all terms and conditions of any camping permit issued to allow use of premises. Any non-compliance will result in suspension of work until compliance is achieved.

Archaeological and Historic Sites Location of known archaeological, historic, or pre-historic materials--such as Amerind artifacts and/or historic mining, logging, or fur trapping remains protected by the American Antiquities

Act (l6 USC 433)--will be identified for the contractor before work commences.

Spill Plan If the total oil or oil products storage exceeds 1,320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare and implement a Spill Prevention and

Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112), including certification by a registered professional engineer. The Contractor under the direction of the Contracting Officer, or in the absence of said officer, acting independently, shall immediately take action to contain and clean up, without expense to the Government, all petroleum products spills on or in the vicinity of the project which are caused by the Contractor's employees directly or indirectly as a result of contract operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government for the containment and clean up of petroleum products spills caused by Contractor's employees or resulting from contract operations.

The Contractor shall immediately report all petroleum products spills to the Contracting Officer.

Equipment Cleaning All off-road equipment used on this project shall be washed before moving into the project area so that the equipment is free of soil, seeds, vegetative material, or other debris that could contain or hold seeds of noxious weeds. “Off-road equipment” includes all logging and construction equipment and such brushing equipment as brush hogs, masticators, and chippers; it does not include log trucks, chip vans, service vehicles, water trucks, pickup trucks, and similar vehicles not intended for off-road use.

Equipment will be considered clean when visual inspection does not reveal soil, seeds, plant material, or other such debris. Disassembly of equipment components or specialized inspection equipment is not required. Contractor shall notify the Contracting Officer at least five days in advance of moving equipment in so that arrangements can be made for inspection.

If the project area is known to contain noxious weeds, the equipment shall be cleaned before moving to other Forest Service system lands which do not contain noxious weeds.

C. Section F – Deliveries or Performance

FAR 52.211-10

The period of performance is corrected to 402 days.

D. Section J – List of Attachments

Attachment 2, Plans and Drawings, has been updated and now consists of 15 pages.

E. All other terms and conditions remain unchanged.

File details come from the government source that posted it. Updated .