L-0.1.pdf
PDF 45 KB Posted
- Attached to
- RECOVERY - Gerle Creek Campground Rehabilitation
- Solicitation number
- AG-9702-S-10-0526
About this file
Attachment 2 - 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Gerle Creek Campground Drawing Set.pdf | ||
| AG-9702-S-10-0526-000001 Part I.pdf | ||
| AG-9702-S-10-0526-000001 Part II.pdf | ||
| Attachment 4 - wage determination.pdf | ||
| AG-9702-S-10-0526 Part II.docx | DOCX document | |
| L-1.0.pdf | ||
| L-2.5.pdf | ||
| L-2.3.pdf | ||
| L-0.0.pdf | ||
| L-2.1.pdf | ||
| L-2.4.pdf | ||
| Attachment 1 - Specifications.pdf | ||
| L-2.0.pdf | ||
| Attachment 6 - Response to Evaluation Factors.pdf | ||
| L-2.2.pdf | ||
| L-0.0 Signed.pdf | ||
| AG-9702-S-10-0526 Part I.pdf | ||
| Attachment 5 - SF 24.pdf | ||
| Attachment 3 - Fire Plan_jun2006.pdf | ||
| L-0.2.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
L-0.1
NTS
G E
N E
R A
L N
O
TE
S
M A
TE
R
IA
LS
Q
U A
N
TI
TI
E
S
02 10
U S
FS
x3
4) .d w g
SHEET OF
SCALE:
DRAWING
DATE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT NO:
N A
M E
P
R O
JE
C
T
FO
R
E S
T:
D R
A W
IN
G
N A
M E
PACIFIC
REGION
SOUTHWEST
R5
NO. DATE REVISIONS
SERVICE
U S D A
FOREST
DISTRICT RANGER
FOREST ENGINEER
FOREST SUPERVISOR
FOREST RECREATION
OFFICER
E
LD
O R
A D
O N
A
TI
O N
A L
FO
R
E S
T
G E
R
LE
C R
E E
K C
A M
P G
R O
U N
D R
E H
A B
IS
VJ
IS
04/01/2010
GENERAL NOTES:
EROSION CONTROL
1. CONTRACTOR SHALL SUBMIT AN EROSION CONTROL PLAN TO THE CO FOR APPROVAL PRIOR TO START OF DEMOLITION AND EARTH WORK
OPERATIONS
2. EROSION CONTROL SHALL BE INSPECTED FROM TIME TO TIME TO ENSURE FUNCTIONALITY. CONTRACTOR SHALL TAKE CORRECTIVE ACTIONS TO
ENSURE EROSION CONTROL IS WORKING PROPERLY AT ALL TIMES.
3. CONTRACTOR SHALL REMOVE TEMPORARY EROSION CONTROL UPON COMPLETION OF PROJECT.
4. TEMPORARY EROSION CONTROL SHALL BE CONSIDERED INCIDENTAL TO OTHER PAID WORK IN THIS CONTRACT.
DEMOLITION
7. EXISTING CAMP UNIT FURNISHINGS TO BE REMOVED AS SHOWN ON DEMOLITION PLAN. [CAMP UNIT FURNISHINGS TO BE STOCKPILED SHALL BE
MARKED BY NFS.]
8. THE CONTRACTOR SHALL DISPOSE OF ALL DEMOLISHED ITEMS THE FS DOES NOT WISH TO RETAIN OFF NFS LAND. ALL ITEMS (CAMP
FURNISHINGS) TO BE RETAINED SHALL BE STOCK PILED AT CRYSTAL BASIN STATION.
9. THE SLASH WILL BE DISPOSED AT SITE SHOWN ON DWG. THE SPECIFIC SITE SHALL BE DETERMINED BY NFS. THE SLASH PILE SHALL BE
CONSOLIDATED, FREE OF ROCK AND DIRT. STUMPS SHALL BE REMOVED OFF OF NFS LAND.
CONSTRUCTION
10. ALL REDWOOD SHALL BE CONSTRUCTION HEART GRADE.
11. ALL VAULT TOILETS SHALL BE CXT ACCESSIBLE DOUBLE OR SINGLE UNIT CASCADIAN CONCRETE PRECAST VAULT TOILETS OR EQ. SEE DWG
12. WATER LINE WITH APPURTENANCES SHALL BE REPLACED AND LOCATED IN EXISTING WATERLINE TRENCH. APPURTENANCES INCLUDE: SHUT OFF
VALVES, DRAIN LINES, FITTINGS AND ANY OTHER ITEMS NECESSARY TO REESTABLISH THE WATER SYSTEM.
13.CONTRACTOR SHALL MAINTAIN EXISTING VEGETATION BETWEEN CAMPSITES
14. ALL TREES GREATER THAN 6" TO BE REMOVED SHALL BE MARKED ON THE GROUND BY THE FS PRIOR TO REMOVAL.
15. ALL SPURS WILL BE REALIGNED. SPURS SHALL BE RIPPED AS SHOWN IN DRAWINGS. SCARIFIED ASPHALT PULVERIZED TO 4" OR LESS MAY BE
UTILIZED AS FILL. PULVERIZED FILL SHALL NOT BE VISIBLE ON FINISH GRADE. ANY SPUR MATERIAL > 4" SHALL BE REMOVED FROM NFS LAND.
16. APPROXIMATE LOCATION OF CAMPSITES, CAMP TENT PADS, AND CAMP FURNISHINGS (TABLES, CAMPFIRE RINGS,GRILLS, AND FOOD STORAGE
LOCKERS) SHALL BE MARKED ON THE GROUND BY THE FS; HOWEVER, GRADE STAKING TO MEET SPECIFICATIONS IS THE RESPONSIBILITY OF THE
CONTRACTOR.
17. ALL CAMP UNITS (EXCEPT DOUBLE UNITS) SHALL BE ENLARGED TO 1200 SQ FT AS MARKED ON THE GROUND BY THE FS PRIOR TO PREPARATION.
EACH UNIT SHALL CONTAIN 1 FOOD STORAGE LOCKER, 1 TABLE, 1 GRILL AND 1 CAMPFIRE RING. CAMP UNITS SHALL BE GRADED TO 2% (3% WHERE
DETERMINED NECESSARY BY NFS) OR LESS SLOPE WITH OBSTACLES REMOVED.
18.DOUBLE UNITS SHALL BE ENLARGED TO 2400 SQ FT AND SHALL BE MARKED ON THE GROUND BY THE FOREST SERVICE PRIOR TO PREPARATION.
EACH DOUBLE UNIT SHALL CONTAIN 2 FOOD STORAGE LOCKERS, 2 TABLES, 1 GROUP GRILL AND 1 GROUP CAMPFIRE RING. CAMP UNITS SHALL BE
GRADED TO 2% OR LESS SLOPE WITH OBSTACLES REMOVED.
19. THE BORROW SOURCE IS COMMERCIAL: "MOUNTAIN AGGREGATES". THE LOCATION IS SHOWN ON COVER SHEET DWG.
20.THE SOURCE OF BARRIER ROCKS (APPROXIMATELY 1500 ROCKS) TO BE PLACED SHALL BE:
20.1. THOSE GENERATED ON SITE (WITHIN CONSTRUCTION AREAS) IF THEY ARE OF SUFFICIENT SIZE.
20.2. ADDITIONAL BARRIER ROCKS NEEDED TO COMPLETE THE PROJECT WILL BE AVAILABLE IN A LOCATION AS SHOWN ON COVER SHEET.
21.BARRIER ROCK MEETING SIZE DIMENSIONS SHOWN ON DETAIL 1/L-2.0 SHALL BE PLACED IN LOCATIONS AS SHOWN ON DWG UNLESS SUFFICIENT
BARRIER EXISTS.
22.ROAD SHALL BE REPAIRED WHERE NEEDED AND ENTIRE ROAD SHALL RECEIVE 2-1/2" A/C OVERLAY. SEE DWG.
MISCELLANEOUS
23.SITE SURVEY WILL BE PROVIDED BY FS LATE SPRING 2010.
24.CONTOUR INFORMATION IS APPROXIMATE AND SUBJECT TO CHANGE BASED ON FORTHCOMING SURVEY. THE CURRENT GRADES ARE GIVEN AS
GUIDELINES FOR ESTIMATING PURPOSES
25.ACTUAL CONFIGURATIONS AND QUANTITIES SHOWN ON NFS DWG MAY VARY.
GENERAL SYMBOLS
DETAIL NUMBER
DETAIL SHEET
ALIGN
FLUSH
SECTION ARROW - DIRECTION OF CUT
CAMP UNIT (GENERAL SITE AND #)
ABBREVIATIONS:
AGG AGGREGATE LS LUMP SUM
AQ ACTUAL QUANTITY LSQ LUMP SUM QUANTITY
CENTERLINE LOW LIMIT OF WORK
CO CONTRACTING OFFICER MAX MAXIMUM
CON HRT CONSTRUCTION HEART MIN MINIMUM
CONC CONCRETE NIC NOT IN CONTRACT
CIP CAST IN PLACE NFS NATIONAL FOREST SYSTEM
CY CUBIC YARD PTDF PRESSURE TREATED DOUGLAS FIR
DIA DIAMETER R RADIUS
DWG DRAWINGS SIM SIMILAR
EA EACH SPECS SPECIFICATIONS
EQ EQUAL TYP TYPICAL
(E) EXISTING
FV FIELD VERIFY
FG FINISH GRADE
FS FOREST SERVICE
FOHC FREE OF HEART CENTER
GALV GALVANIZED
CL
XX
XX
XX
XX
SCHEDULE OF ITEMS
ITEM # DESCRIPTION METHODS OF
MEASUREMENT UNIT QUANTITY
1900 MOBILIZATION LSQ LS 1
2110 CLEARING & GRUBBING LSQ LS 1
2111 - A DEMOLITION - VAULT TOILETS AQ EA 6
2111 - B DEMOLITION - WATERLINES, FAUCETS, & VALVES LSQ LS 1
2111 - C
DEMOLITION - CAMP UNITS: TABLES, FIRERINGS, GRILLS, FOOD
STORAGE LOCKERS, & CAMP UNIT MARKERS LSQ LS 1
2111 - D DEMOLITION - REDWOOD BARRIERS LSQ LS 1
2111 - E (OPTION) LEAD PAINT REMOVAL LSQ LS 1
2111 - F (OPTION) ASBESTOS VENT REMOVAL LSQ LS 1
2210 - A EARTHWORK LSQ LS 1
2210 - B EARTHWORK - BORROW DQ CY 1000
2270 RIP RAP - HAND PLACED LSQ LS 1
2610 ASPHALT AQ TON 1550
2610 ASPHALT - ROAD PATCHING AQ TON 2
2620 AGGREGATE BASE AQ TON 650
2621 5' AGGREGATE BASE WALKWAY AQ TON 14
2680 TRAFFIC MARKING - DIRECTIONAL ARROWS AQ EA 13
2720 - A CMP CULVERT 18" AQ LF 40
2720 - B CMP CULVERT 24" AQ LF 40
2720 - C CMP CULVERT 36" AQ LF 20
2841 BARRIER ROCK AQ EA 1500
2842 - A FEE STATION SIGNAGE LSQ LS 1
2842 - B ROAD SIGNAGE AQ EA 2
2870 - A CAMPSITE - FURNISHING - TABLES - NEW AQ EA 13
2870 - B CAMPSITE - FURNISHING - TABLES - REUSED AQ EA 39
2870 - C CAMPSITE - FURNISHING - FIRERINGS - NEW AQ EA 48
2870 - D CAMPSITE - FURNISHING - GROUP FIRERINGS - NEW AQ EA 2
2870 - E CAMPSITE - FURNISHING - GRILLS - REUSED AQ EA 48
2870 - F CAMPSITE - FURNISHING - GROUP GRILLS - NEW AQ EA 2
2870 - G CAMPSITE - FURNISHING - FOOD STORAGE LOCKERS - REUSED AQ EA 50
2870 - H CAMPSITE - FURNISHING - FOOD STORAGE LOCKERS - NEW AQ EA 2
2870 - I CAMPSITE - FURNISHING - CAMP UNIT MARKER - NEW AQ EA 50
3310 REFUSE BIN PADS AQ EA 8
5500 FEE COLLECTION TUBE AQ EA 1
6609 WOOD STAIRS AQ EA 60
13010 PRECAST VAULT TOILET - DOUBLE UNIT AQ EA 4
13010 PRECAST VAULT TOILET - SINGLE UNIT AQ EA 4
15251 WATERLINE AND APPURTENANCES LSQ LS 1
15255 FAUCET UNIT WITH SUMP AQ EA 13
FLUSH
ALIGN
SCHEDULE OF ITEMS - OPTIONS
ITEM # DESCRIPTION METHODS OF
MEASUREMENT UNIT QUANTITY
2841 - A BARRIER ROCK AQ EA 100
2841 - B BARRIER ROCK AQ EA 100
2841 - C BARRIER ROCK AQ EA 100
2870 - A CAMPSITE - FURNISHING - TABLES - NEW AQ EA 13
2870 - B CAMPSITE - FURNISHING - TABLES - NEW AQ EA 13
2870 - C CAMPSITE - FURNISHING - TABLES - NEW AQ EA 13
File details come from the government source that posted it. Updated .