RECOVERY - FOREST-WIDE BRIDGE REHABILITATION AND RECONSTRUCTION FOR THE SEQUOIA NATIONAL FOREST
Solicitation number
AG-9702-S-10-0433
Issued by

About this file

Solicitation

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB APPROVAL NO. 2700-0042

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

RFP #AG-9702-S-10-0433

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

Jun 11, 2010

PAGE OF PAGES

1 58

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOUTHERN SIERRA PROVINCE

1600 TOLLHOUSE ROAD

CLOVIS, CA 93611

SOUTHERN SIERRA PROVINCE

1839 S. NEWCOMB STREET

PORTERVILLE, CA 93257

9. FOR INFORMATION

CALL:

A. NAME

NANCY RUGGERI

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 559-784-1500, Ext. 1240

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

SEQUOIA NATIONAL FOREST

FOREST WIDE BRIDGE REHAB PROJECT

Price Range:

Price range is between $500,000 and $1,000,000.

DUNS #________________________

TIN #__________________________

NOTE: ANY REFERENCE TO “BID” MEANS “OFFER”

11. The Contractor shall begin performance within 5 calendar days after issuance of the Notice to proceed and complete the work not later than 360 calendar days after issuance of the Notice to Proceed. This performance period is mandatory, negotiable.

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 4:30 local time July 15, 2010 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required, in the amount of 20% of the offered total price.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Computer Generated Prescribed by GSA FAR (48 CFR) 53.236-1(e)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract.

The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)

Solicitation #RFP #AG-9702-S-10-0433 Project: Sequoia National Forest ARRA Bridges

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES

**SCHEDULE OF ITEMS**

ARRA BRIDGES PROJECT

Hume Lake, Western Divide, Kern River Ranger Districts Sequoia National Forest Fresno, Tulare County

Pay Item

No. Item Description

Method of

Measure Est

Quan Pay Unit Unit Price Amount

Hume Lake Bridge 151(01) Mobilization LSQ 1 LS $________ $________

201(05B) Clearing and Grubbing, Disposal of Tops and Limbs j, Logs j, Stumps j LSQ 1 LS $________ $________

208(08) Structural Backfill LSQ 1 LS $________ $________ 251(04) Keyed Riprap, Class 4 CQ 32 CY $________ $________ 573(01) Minor Bridge Repair LSQ 1 LS $________ $________ 633(06) Object Marker, Type 3 AQ 4 EA $________ $________

SUB-TOTAL $_________

Lower Ten Mile Bridge

201(05A) Clearing and Grubbing, Disposal of Tops and Limbs f, Logs f, Stumps f LSQ 1 LS $________ $________

203(05) Removal of Structures and Obstructions LSQ 1 LS $________ $________

204(04) Unclassified Borrow, Compaction Method A, Finish Method A AQ 50 CY $________ $________

417(03) Minor Cold Mix Asphalt LSQ 1 LS $________ $________ 556(01) Steel Bridge Railing AQ 122.6 LF $________ $________ 563(01) Painting, Steel Structure (4500 SF) LSQ 1 LS $________ $________ 573(01) Minor Bridge Repair LSQ 1 LS $________ $________

617(01) Bridge Approach Rail System G4, Type II, Class B AQ 100 LF $________ $________

617(02) Terminal Section Type G4-CRT with Concrete Anchor AQ 4 EA $________ $________

617(06) Connection to Bridge Rail Structure AQ 4 EA $________ $________

633(08) Removing and Resetting Object Marker AQ 4 EA $________ $________

633(20)

Furnish and Install Project Information Signs, Type Approved FHWA ARRA, Supports Double 4" x 4" Posts with Anti Theft Hardware AQ 1 EA $________ $________

Method of

Measure Est

Quan

Boulder Creek Bridge

Clearing and Grubbing, Disposal of Tops and Limbs f, Logs f, Stumps f LSQ 1 LS $________ $________

251(04) Keyed Riprap, Class 4 CQ 10 CY $________ $________ 417(03) Minor Cold Mix Asphalt LSQ 1 LS $________ $________ 573(01) Minor Bridge Repair LSQ 1 LS $________ $________ 605(03) Geocomposite Underdrain System AQ 70 LF $________ $________

633(20)

Furnish and Install Project Information Signs, Type Approved FHWA ARRA, Supports Double 4" x 4" Posts with Anti Theft Hardware AQ 1 EA $________ $________

Woodward Creek Bridge

Clearing and Grubbing, Disposal of Tops and Limbs f, Logs f, Stumps f LSQ 1 LS $________ $________

563(01) Painting, Steel Structure LSQ 1 LS $________ $________ 573(01) Minor Bridge Repair LSQ 1 LS $________ $________ 633(06) Object Marker, Type 3 AQ 4 EA $________ $________

Millwood Bridge

201(05B) Clearing and Grubbing, Disposal of Tops and Limbs j, Logs j, Stumps j LSQ 1 LS $________ $________

203(05) Removal of Structures and Obstructions LSQ 1 LS $________ $________

251(04) Keyed Riprap, Class 4 CQ 108 CY $________ $________ 241(10) Hand-Placed Riprap CQ 10 CY $________ $________ 417(03) Minor Cold Mix Asphalt LSQ 1 LS $________ $________

556(01) Timber Bridge Railing with Wheelguards AQ 84.0 LF $________ $________

557(05) Treated Structural Timber, Glued Laminated AQ 4.61 MFBM $________ $________

633(06) Object Marker, Type 3 AQ 4 EA $________ $________

633(20)

Furnish and Install Project Information Signs, Type Approved FHWA ARRA, Supports Double 4" x 4" Posts with Anti Theft Hardware AQ 1 EA $________ $________

Method of

Measure Est

Quan

Bony Witt Bridge

Clearing and Grubbing, Disposal of Tops and Limbs f, Logs f, Stumps f LSQ 1 LS $________ $________

203(05) Removal of Structures and Obstructions LSQ 1 LS $________ $________

556(01) Timber Bridge Railing with Wheelguards AQ 36.0 LF $________ $________

557(05) Treated Structural Timber, Glued Laminated AQ 1.38 MFBM $________ $________

573(01) Minor Bridge Repair LSQ 1 LS $________ $________

Powderhorn Bridge

Clearing and Grubbing, Disposal of Tops and Limbs f, Logs f, Stumps f LSQ 1 LS $________ $________

203(05) Removal of Structures and Obstructions LSQ 1 LS $________ $________

251(04) Keyed Riprap, Class 4 CQ 20 CY $________ $________

556(01) Timber Bridge Railing with Wheelguards AQ 60.0 LF $________ $________

557(03) Treated Structural Timber and Lumber AQ 1.20 MFBM $________ $________

557(05) Treated Structural Timber, Glued Laminated AQ 2.76 MFBM $________ $________

573(01) Minor Bridge Repair LSQ 1 LS $________ $________ 633(06) Object Marker, Type 3 AQ 4 EA $________ $________

633(20)

Furnish and Install Project Information Signs, Type Approved FHWA ARRA, Supports Double 4" x 4" Posts with Anti Theft Hardware AQ 1 EA $________ $________

Upper Ten Mile Bridge

Clearing and Grubbing, Disposal of Tops and Limbs f, Logs f, Stumps f LSQ 1 LS $________ $________

204(60) Roadway Excavation, Compaction Method A, Finishing Method A LSQ 1 LS $________ $________

251(04) Keyed Riprap, Class 4 CQ 185 CY $________ $________ 417(03) Minor Cold Mix Asphalt LSQ 1 LS $________ $________

Method of

Measure Est

Quan Pay

Horse Corral Bridge

Clearing and Grubbing, Disposal of Tops and Limbs f, Logs f, Stumps f LSQ 1 LS $________ $________

204(60) Roadway Excavation, Compaction Method A, Finishing Method A LSQ 1 LS $________ $________

251(04) Keyed Riprap, Class 4 CQ 50 CY $________ $________ 417(03) Minor Cold Mix Asphalt LSQ 1 LS $________ $________ 573(01) Minor Bridge Repair LSQ 1 LS $________ $________

Upper White River Bridge

201(05B) Clearing and Grubbing, Disposal of Tops and Limbs j, Logs j, Stumps j LSQ 1 LS $________ $________

251(07) Mortared Riprap, Class 4 CQ 12 CY $________ $________ 556(02) Steel Bridge Railing LSQ 1 LS $________ $________

Holby Creek Bridge

Clearing and Grubbing, Disposal of Tops and Limbs f, Logs f, Stumps f LSQ 1 LS $________ $________

251(04) Keyed Riprap, Class 4 CQ 14 CY $________ $________ 251(07) Mortared Riprap, Class 4 CQ 13 CY $________ $________ 573(01) Minor Bridge Repair LSQ 1 LS $________ $________ 633(06) Object Marker, Type 3 AQ 4 EA $________ $________

Upper South Creek Bridge

Clearing and Grubbing, Disposal of Tops and Limbs f, Logs f, Stumps f LSQ 1 LS $________ $________

573(01) Minor Bridge Repair LSQ 1 LS $________ $________ 633(06) Object Marker, Type 3 AQ 1 EA $________ $________

Method of

Measure Est

Quan Pay

Bone Creek Bridge

Clearing and Grubbing, Disposal of Tops and Limbs f, Logs f, Stumps f LSQ 1 LS $________ $________

203(05) Removal of Structures and Obstructions LSQ 1 LS $________ $________

204(04) Unclassified Borrow, Compaction Method A, Finish Method A AQ 40 CY $________ $________

251(04) Keyed Riprap, Class 4 CQ 40 CY $________ $________ 556(01) Steel Bridge Railing AQ 87.0 LF $________ $________ 573(01) Minor Bridge Repair LSQ 1 LS $________ $________

617(01) Bridge Approach Rail System G4, Type II, Class B AQ 100 LF $________ $________

617(02) Terminal Section Type G4-CRT with Concrete Anchor AQ 4 EA $________ $________

617(06) Connection to Bridge Rail Structure AQ 4 EA $________ $________ 633(06) Object Marker, Type 3 AQ 4 EA $________ $________

633(20)

Furnish and Install Project Information Signs, Type Approved FHWA ARRA, Supports Double 4" x 4" Posts with Anti Theft Hardware AQ 1 EA $________ $________

Second Nobe Young Bridge

Clearing and Grubbing, Disposal of Tops and Limbs f, Logs f, Stumps f LSQ 1 LS $________ $________

251(04) Keyed Riprap, Class 4 CQ 40 CY $________ $________ 573(01) Minor Bridge Repair LSQ 1 LS $________ $________

Alder Creek Bridge

Clearing and Grubbing, Disposal of Tops and Limbs f, Logs f, Stumps f LSQ 1 LS $________ $________

203(05) Removal of Structures and Obstructions LSQ 1 LS $________ $________

251(07) Mortared Riprap, Class 4 CQ 20 CY $________ $________ 417(03) Minor Cold Mix Asphalt LSQ 1 LS $________ $________ 556(01) Steel Bridge Railing AQ 125.0 LF $________ $________ 573(01) Minor Bridge Repair LSQ 1 LS $________ $________

617(01) Bridge Approach Rail System G4, Type II, Class B AQ 100 LF $________ $________

Method of Est

Quan

Measure

617(02)

Terminal Section Type G4-CRT with Concrete Anchor AQ 4 EA $________ $________

617(06) Connection to Bridge Rail Structure AQ 4 EA $________ $________

633(20)

Furnish and Install Project Information Signs, Type Approved FHWA ARRA, Supports Double 4" x 4" Posts with Anti Theft Hardware AQ 1 EA $________ $________

Brush Creek Bridge

Clearing and Grubbing, Disposal of Tops and Limbs f, Logs f, Stumps f LSQ 1 LS $________ $________

203(05) Removal of Structures and Obstructions LSQ 1 LS $________ $________

251(07) Mortared Riprap, Class 4 CQ 15 CY $________ $________ 417(03) Minor Cold Mix Asphalt LSQ 1 LS $________ $________ 556(01) Steel Bridge Railing AQ 125.0 LF $________ $________

617(01) Bridge Approach Rail System G4, Type II, Class B AQ 100 LF $________ $________

617(02) Terminal Section Type G4-CRT with Concrete Anchor AQ 4 EA $________ $________

617(06) Connection to Bridge Rail Structure AQ 4 EA $________ $________ 633(06) Object Marker, Type 3 AQ 4 EA $________ $________

TOTAL $_________

SECTION C--DESCRIPTION/SPECIFICATIONS

C.1. DESCRIPTION OF WORK

Furnish all the materials not supplied by the government, all labor and equipment to accomplish the work under this contract. This project proposes is to rehabilitate and reconstruct selected bridges, also including cleaning of the structures and graffiti removal. The project will include 16 bridges in the Sequoia National Forest. Work includes but is not limited to the following major items:

o Clear and grub vegetation within 10 feet of designated bridges, with disposal of construction slash by scattering or removal as specified for each location; removal of marked hazard trees; removal of marked large woody debris in channels upstream of designated bridges.

o Unplug, clean, and recondition specified bridge drainage structures on bridge approaches (ditches, ditch relief culverts, and over the side drains), to reestablish effective free flowing drainage of the areas.

o Clean structure of debris and graffiti; clean bridge drains and expansion joints.

o Repair, tighten and/or replace in-kind damaged or missing bridge hardware.

o Roadway embankment construction/reconstruction for eroded approaches.

o Structural excavation, backfill and compaction to repair existing soil erosion under and along the abutments.

o Riprap armoring along abutments, wing walls and embankments as per plans. Salvage and reuse existing riprap when available; or gather, sort, and haul from designated borrow sites (government furnished).

o Painting steel structures per plans.

o Remove, replace and/or reset bridge railings to meet AASHTO or half AASHTO safety requirements as specified per plans.

o Replace deteriorated treated timber structure decks per plans.

o Repair concrete spalling on decks, abutments, and wing walls per plans as required.

o Minor Cold Asphalt repair.

The Contractor should refer to the SCHEDULE OF ITEMS and project plans and specifications when making estimates of quantities or work.

The Contractor is advised to submit technical proposals and pricing in accordance with Section M, Evaluation Factors for Award.

C.2. PROJECT LOCATION

Bridges are within the State of California and in Fresno and Tulare Counties.

The sixteen (16) project bridge sites are located throughout the Sequoia National Forest/Giant Sequoia National Monument on all three ranger districts. Seven (7) bridges are located on the Hume Lake Ranger District; and are generally accessed from State Route 180 out of Fresno, CA. Seven (7) bridges are located on the Western Divide Ranger District; and are generally accessed from County Road M50 between California Hot Springs and Johnsondale, CA. Two (2) bridges are located on the Kern River Ranger District, and are generally accessed from County Road M99 between Johnsondale and Kernville, CA. See vicinity maps in the drawings for more information.

C.3. CONTRACT TIME

Estimated start work date is August 1, 2010. Contract completion is scheduled for 360 calendar days.

Contract time includes delays for weather; locating and transporting supplies and materials; and final site cleanup.

C.4. PROJECT SITE CLEAN UP

Project site cleanup includes the removal and proper disposal of all construction trash, debris, and residue off of National Forest Land. All spills of petroleum products including leak spots from parked vehicles shall be removed and properly disposed according to all Local, State, and Federal rules, regulations, and laws governing such disposal. During the Work the Contractor is required to furnish dumpsters or other trash receptacles and to empty such containers either as they become full or weekly, whichever is more frequent. The Contractor shall not place materials of any kind into private or Government trash bins or dumpsters.

C.5. PRICE RANGE

The price range of this project is between $250,000 and $500,000.

C.6. SPECIAL CONDITIONS AFFECTING THE WORK

a. Physical Conditions. The indications of physical conditions on the drawings and in the specifications are the result of site investigations and surveys performed by the Government.

b. Weather. Low temperatures at the project site range from temperatures of less than 20 ºF in December and January to lows of 65 ºF in July and August. High temperatures range from 45 ºF in December and January to over 90 ºF in July and August. The annual precipitation at the project site is less than 24 inches per year including snow fall. Winter snow storms and freezing temperatures will occur during the winter months that result in a winter project shutdown. Icy conditions on local roads and highways can occur during the fall, winter and spring. Highway curves in shaded areas will remain covered with ice or frost for weeks.

c. Work Hours. Work hours are from 7:00 am to 5:00 pm Monday through Friday. Weekend equipment work is not allowed at any time during the Work. Dogs and pets are not allowed on the project sites at any time.

d. Safety, Emergency Communications and Evacuation. Contractor is responsible for the safety of the Contractor’s employees including Subcontractors employees, Government employees associated with the project, and any visitors to the site both Government and private.

The Contractor shall submit a project safety plan to the Contracting Officer for review prior to commencement of Work. The project safety plan shall comply with the appropriate California OSHA and Federal OSHA rules and regulations and must include a medical evacuation and emergency communications plan.

e. Highway Permits. Contractor is responsible for securing any overload or over width limit permits required for the transport of materials or equipment to the project sites. The Contractor is responsible for conducting a thorough reconnaissance of all routes leading to the sites.

f. Toilets. No toilet or shower facilities are available on site. Contractor shall provide toilet facilities for its employees.

g. Camping. Contractor may use a self-contained travel trailer or recreational vehicle to camp on the premises. All waste material must be transported off-site to a station equipped to handle such waste. This is subject to availability and must be coordinated through the Contracting Officer.

h. Security. Contractor is responsible for the Contractor’s equipment and materials supplied to the sites. All equipment not equipped with a key lock system shall be secured in such a manner as to make it inoperable to the average person at the end of each working day. All hand tools and other equipment shall be secured at the end of each working day. On Fridays all construction debris, trash, and refuse shall be properly stored in dumpsters or trash bins or removed from the site.

i. Burning Permits. Contractor is subject to all rules and regulations governing the on site burning of slash and other debris. Contractor shall obtain a burning permit from the jurisdiction having control over burning. The Contractor shall comply with Fire Plan for Construction and Service Contracts included in the Contract.

j. Protection of Resources. Contractor shall thoroughly clean all equipment prior to delivery to the project sites to remove weeds, mud, grease and oil buildup from the tires, wheels, tracks, engines and engine compartments, and other surfaces. Spills of petroleum products and other hazardous substances shall be reported, contained, and removed in accordance with all applicable rules, regulations and laws. Contractor shall submit a project spill response plan at the pre-work meeting for review by the Contracting Officer.

k. Limited Operating Periods. The table below summarizes the limitations on work periods, road closures, and traffic delays for each bridge. All bridges are subject to winter seasonal closure.

Bridge Road No. Work Period Closure Traffic Delay Hume Lake 13S09 Sep 8 – May

None 30 minutes max Lower Ten Mile 13S09 Sep 8 – May

None 30 minutes max Upper Ten Mile 13S09 Sep 8 – May

None 30 minutes max Woodward Creek

14S29 Year round None 30 minutes max

Boulder Creek 14S11 Year round None 30 minutes max

Horse Corral 14S11 Year round None 30 minutes max

Millwood 13S58 Sep 8 – May

21 days max 30 minutes max

Bony Witt 23S05C Year round 21 days max 30 minutes max

Upper White River

20S05 Year round None 30 minutes max

Holby Creek 21S06 Year round None 30 minutes max

Upper South Creek

23S16 Year round None 30 minutes max

Powderhorn 23S64 Year round 28 days max 30 minutes max

Bone Creek 22S82 Sep 8 – May

None 30 minutes max

Second Nobe Young

22S82 Year round None 30 minutes max

Alder Creek 22S21 Year round None 30 minutes max

Brush Creek 22S21 Year round None 30 minutes max

C.7. PRE-BID TOUR

The pre-bid tour will take two to days; the first day June 15, 2010 at 9:00 AM will meet at the Hume Lake Ranger District office on State Highway 180 (35860 East Kings Canyon Road) in Dunlap, CA;

then proceed to the seven bridge locations on the Hume Lake ranger district. The second day June 16, 2010 at 9:00 AM will meet at the Hot Springs (Uhl) Work Center on County Road M50 (43474 Parker Pass Drive) in California Hot Springs, CA; then proceed to the remaining nine bridge locations on the Western Divide and Kern River ranger districts. Contractors should notify the Contracting Officer of their intent to attend the pre-bid tour.

Offerors are highly encouraged to inspect the project work sites on their own if they are unable to attend the scheduled Pre-Bid Tour.

Please complete the following:

[ ] I have made a site visit.

Name of individual that visited the site and date visited

[ ] I have not made a site visit.

C.8. CONDITIONS AFFECTING THE AWARD OF CONTRACT

Contractors are directed to Section K, L and M of the contract. These sections have questions that must be answered fully and completely to be considered for award.

C.9. AGAR 452.211-72 Statement Of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

C.10. AGAR 452.211-73 Attachments To Statement Of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

C.11. Drawings and Specifications

a. Project Specifications and Drawings are attached as Attachment 1 and 2.

SECTION D--PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

SECTION E--INSPECTION AND ACCEPTANCE

E.1. FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov/far/

E.2. FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-1 Contractor Inspection Requirements (APR 1984) 52.246-12 Inspection of Construction (AUG 1996) http://www.acquisition.gov/far/�

SECTION F--DELIVERIES OR PERFORMANCE

F.1. FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov/far/

F.2. FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.242-14 Suspension of Work (APR 1984) 52.211-13 Time Extensions (SEPT 2000) 52.242-15 Stop Work Order (AUG 1989) 52.242-17 Government Delay of Work (APR 1984)

F.3. FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR

1984) The Contractor shall be required to (a) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use within 360 calendar days after issuance of the Notice to Proceed. The time stated for completion shall include final cleanup of the premises. The estimated start work date is August 1, 2010.

F.4. AGAR 452.236-75 MAXIMUM WORKWEEK – CONSTRUCTION SCHEDULE (NOV 1996)

Within 5 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:

(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and

(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work.

The maximum workweek that will be approved is Monday through Friday 7:00 am to 5:00 pm.

SECTION G--CONTRACT ADMINISTRATION DATA

G.1. GOVERNMENT-FURNISHED PROPERTY

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.

2268 SQUARE FEET GEOTEXTILE MATERIAL

300 LINEAR FEET RUNNING PLANKS

450 LINEAR FEET 12 GUAGE METAL BEAM GUARD RAIL (Note: This may be salvaged from one bridge and used on another.)

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1. FAR 52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. (a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys.

(b) Weather conditions: The areas are normally June through October, but is not guaranteed.

(c) Transportation facilities are by county, state, and forest roads (paved and unpaved).

H.2. UTILITY SERVICES

There are no utilities available.

H.3. THREATENED OR ENDANGERED SPECIES

Location of known threatened or endangered species protected under the Threatened or Endangered Species Act (1973), will be identified for the Contractor before work commences. Upon discovery by either party (Government or Contractor) of additional threatened or endangered species, activity in the area shall cease and the find shall promptly be reported to the other party. Newly discovered or listed threatened or endangered species identified on-the-ground during project operations may result in modification of the project or rescheduling of the operations so that assessment of the threatened or endangered species’ significance can be made and provision for their protection and conservation implemented.

H.4. AGAR 452.204-70 INQUIRIES (FEB 1988)

Inquiries and all correspondence concerning this solicitation should be submitted in writing to the Contracting Officer. Offerors should contact only the Contracting Officer issuing the solicitation about any aspect of this requirement prior to contract award.

H.5. SSP.1 PREWORK CONFERENCE

Prior to commencement of work, the Contracting Officer will arrange a meeting with the Contractor to discuss the contract terms and work performance requirements. At this meeting, the Contractor shall be required to furnish his/her tentative progress schedule in writing. The contractor's foreman is encouraged to attend this meeting.

H.6. SSP.2 SUBCONTRACTS

The Contractor shall request permission in writing from the Contracting Officer to subcontract any portion of the contract and furnish sufficient evidence that the subcontractor is experienced and equipped for such work. Written consent to subcontract any portion of the contract shall not be construed to relieve the Contractor of any responsibility under the contract.

H.7. SSP.3 LANDSCAPE PRESERVATION

(a) The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as required by the Contracting Officer.

(b) Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, lakes, reservoirs, and other surface waters. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged. Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.

(c) Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments, or into natural or manmade channels leading thereto. If the total oil or oil products storage exceeds 1,320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare and implement a Spill Prevention and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer. The Contractor under the direction of the Contracting Officer, or in the absence of said officer, acting independently, shall immediately take action to contain and clean up, without expense to the Government, all petroleum products spills on/or in the vicinity of the project which are caused by the Contractors employees directly or indirectly as a result of construction operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government for the containment and clean up of petroleum products spills caused by Contractors employees or resulting from construction operations. The Contractor shall immediately report all petroleum products spills to the Contracting Officer.

H.8. SSP.4 CONTRACTOR'S RESPONSIBILITY FOR CONTRACTOR CAUSED FIRE

The contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by the Contractor's employees, whether set directly or indirectly as a result of construction operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government resulting from fires set or caused by Contractor's employees or resulting from construction operations.

H.9. SSP.5 AVAILABILITY OF CONTRACTOR'S EMPLOYEES AND EQUIPMENT

When requested by the Contracting Officer, the Contractor shall allow the Forest Service to temporarily use employees and equipment for emergency work whether or not caused by the Contractor. Payment will be made at not less than the current area rate established by the Forest Service. Employees and equipment will be released when other labor and equipment adequate for the protection of the area is obtained.

H.10. SSP.7 SUPERVISION

The contractor shall directly superintend all work performed or assign an on-site representative who is fully competent in supervising work and who has authority to act for the Contractor. The Contractor and his representative(s) shall have both oral and written command of the English language.

H.11. SSP.5 WINTER SHUTDOWN

When winter weather sets in and the continuation of work is impractical, upon written request by the Contractor, the Contracting Officer may authorize a total suspension until such winter weather has passed and work can proceed. During the period of total suspension, the calendar days elapsed will not be charged against the contract time.

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1. FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.acquisition.gov/far/ www.usda.gov/procurement/policy/agar.html

I.2. FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.202-1 Definitions (JUL 2004) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant Against Contingent Fees (APR 1984) 52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006) 52.203-7 Anti-Kickback Procedures (JUL 1995) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity

(JAN 1997)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (JAN 1997) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (SEP 2007) 52.204-4 Printed or Copied Double- Sided on Recycled Paper (AUG 2000) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (SEP 2006) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.219-8 Utilization of Small Business Concern (MAY 2004) 52.219-9 Small Business Subcontracting Plan (APR 2008) (Applicable if > $1 Million)

Alternate II (Oct 2001) 52.219-14 Limitations on Subcontracting (DEC 1996) 52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards Act -- Overtime Compensation (JUL 2005) 52.222-6 Davis-Bacon Act (JUL 2005) 52.222-7 Withholding of Funds (FEB 1988) 52.222-8 Payrolls and Basic Records (FEB 1988) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988) 52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (FEB 1988) 52.222-21 Prohibition of Segregated Facilities (FEB 1999) 52.222-26 Equal Opportunity (MAR 2007) 52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999) 52.222-35 Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (SEP 2006) 52.222-36 Affirmative Action for Workers with Disabilities (JUN 1998) 52.222-37 Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (SEP 2006) 52.222-50 Combating Trafficking in Persons (SEP 2007) 52.223-5 Pollution Prevention and Right-to-Know Information (AUG 2003) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-14 Toxic Chemical Release Reporting (AUG 2003) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) http://www.usda.gov/procurement/policy/agar.html�

52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-1 Authorization and Consent (DEC 2007) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-5 Insurance – Work on a Government Installation (JAN 1997) 52.228-11 Pledges of Assets (SEP 2009) 52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995) 52.228-14 Irrevocable Letter of Credit (DEC 1999) 52.228-15 Performance and Payment Bonds – Construction (NOV 2006) 52.229-3 Federal, State, and Local Taxes (APR 2003) 52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002) 52.232-17 Interest (OCT 2008) 52.232-23 Assignment of Claims (JAN 1986) 52.232-27 Prompt Payment for Construction Contracts (OCT 2008) 52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003) 52.233-1 Disputes (JULY 2002) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

(APR 1984)

52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991), Alt 1 (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 Preconstruction Conference (FEB 1995) 52.242-13 Bankruptcy (JUL 1995) 52.243-5 Changes and Changed Conditions (APR 1984) 52.245-1 Government Property (JUN 2007) 52.246-21 Warranty of Construction (MAR 1994) 52.248-3 Value Engineering -- Construction (SEP 2006) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (MAY 2004)--Alternate I

(SEP 1996)

52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)

I.3 AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452-232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996) 452-236-71 Prohibition Against the Use of Lead-Paint (NOV 1996) 452-236-72 Use of Premises (NOV 1996) 452-236-73 Archeological or Historic Sites (FEB 1988) 452-236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452-236-76 Samples and Certificates (FEB 1988)

452-236-77 Emergency Response (NOV 1996)

I.4. FAR 52.203-15 WHISTLEBLOWER PROTECTIONS UNDER THE AMERICAN RECOVERY

AND REINVESTMENT ACT OF 2009 (MAR 2009)

(a) The Contractor shall post notice of employees rights and remedies for whistleblower protections provided under section 1553 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5).

(b) The Contractor shall include the substance of this clause including this paragraph (b) in all subcontracts.

I.5. FAR 52.204-7 CENTRAL CONTRACTOR REGISTRATION (APR 2008)

(a) Definitions. As used in this clause— “Central Contractor Registration (CCR) database” means the primary Government repository for Contractor information required for the conduct of business with the Government.

“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

“Data Universal Numbering System +4 (DUNS+4) number” means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.

“Registered in the CCR database” means that—

(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and

(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record “Active”. The Contractor will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.

(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS +4” followed by the DUNS or DUNS +4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.

(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number—

(i) Via the Internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office.

The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company Physical Street Address, City, State, and ZIP Code.

(iv) Company Mailing Address, City, State and ZIP Code (if separate from physical).

(v) Company Telephone Number.

http://www.arnet.gov/far/current/html/Subpart%2032_11.html#wp1043964� http://fedgov.dnb.com/webform�

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) The Contractor is responsible for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(g) (1) (i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to (A) change the name in the CCR database; (B) comply with the requirements of Subpart 42.12 of the FAR; and (C) agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.

(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.

(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the internet at http://www.ccr.gov or by calling 1-888-227-2423, or 269-961-5757.

I.6. FAR 52.204-11 AMERICAN RECOVERY AND REINVESTMENT ACT—REPORTING

REQUIREMENTS (MAR 2009)

(a) Definitions. As used in this clause— “Contract”, as defined in FAR 2.101, means a mutually binding legal relationship obligating the seller to furnish the supplies or services (including construction) and the buyer to pay for them. It includes all types of commitments that obligate the Government to an expenditure of appropriated funds and that, except as otherwise authorized, are in writing. In addition to bilateral instruments, contracts include (but are not limited to) awards and notices of awards; job orders or task letters issued under basic ordering http://www.arnet.gov/far/current/html/Subpart%2042_12.html#wp1084217� http://www.arnet.gov/far/current/html/Subpart%2042_12.html#wp1084217� http://www.arnet.gov/far/current/html/Subpart%2032_8.html#wp1029202� http://www.ccr.gov/� agreements; letter contracts; orders, such as purchase orders, under which the contract becomes effective by written acceptance or performance; and bilateral contract modifications. Contracts do not include grants and cooperative agreements covered by 31 U.S.C. 6301, et seq. For discussion of various types of contracts, see FAR Part 16.

“First-tier subcontract” means a subcontract awarded directly by a Federal Government prime contractor whose contract is funded by the Recovery Act.

“Jobs created” means an estimate of those new positions created and filled, or previously existing unfilled positions that are filled, as a result of funding by the American Recovery and Reinvestment Act of 2009 (Recovery Act). This definition covers only prime contractor positions established in the United States and outlying areas (see definition in FAR 2.101). The number shall be expressed as “full-time equivalent” (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full-time schedule, as defined by the contractor. For instance, two full-time employees and one part-time employee working half days would be reported as 2.5 FTE in each calendar quarter.

“Jobs retained” means an estimate of those previously existing filled positions that are retained as a result of funding by the American Recovery and Reinvestment Act of 2009 (Recovery Act). This definition covers only prime contractor positions established in the United States and outlying areas (see definition in FAR 2.101). The number shall be expressed as “full-time equivalent” (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full-time schedule, as defined by the contractor. For instance, two full-time employees and one part-time employee working half days would be reported as 2.5 FTE in each calendar quarter.

“Total compensation” means the cash and noncash dollar value earned by the executive during the contractor’s past fiscal year of the following (for more information see 17 CFR 229.402(c)(2)):

(1) Salary and bonus.

(2) Awards of stock, stock options, and stock appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Statement of Financial Accounting Standards No. 123 (Revised 2004) (FAS 123R), Shared Based Payments.

(3) Earnings for services under non-equity incentive plans. Does not include group life, health, hospitalization or medical reimbursement plans that do not discriminate in favor of executives, and are available generally to all salaried employees.

(4) Change in pension value.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .