Text version

PART I—THE SCHEDULE

Revised SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS SCHEDULE OF ITEMS

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 01S01Y

District: Groveland

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
204(13)A
Furrow Ditches, Type Lead Off Ditch
CQ
LF
505
$
$
204(20)A
Drainage Excavation, Type 3' Ditch
CQ
LF
235
$
$
204(20)F
Drainage Excavation, Type Waterbar
CQ
Each
2
$
$
204(20)G
Drainage Excavation, Type Driveable Waterbar
CQ
Each
14
$
$
204(20)K
Drainage Excavation, Type Rolling Dip
CQ
Each
9
$
$
301-01)
Aggregate Base, Grading B, Compaction Method B
CQ
Ton
69
$
$
303(22)
Reconditioning of Roadbed, Roller Compaction - Method B
CQ
Mile
0.55
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 01S01YB

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
204(13)A
Furrow Ditches, Type Lead Off Ditch
CQ
LF
355
$
$
204(20)G
Drainage Excavation, Type Driveable Waterbar
CQ
Each
14
$
$
204(20)K
Drainage Excavation, Type Rolling Dip
CQ
Each
2
$
$
204(52)
Excavation Placement Method 5 -Realignments
CQ
LS
1
$
$
303(22)
Reconditioning of Roadbed, Roller Compaction - Method B
CQ
Mile
0.51
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 01S11

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
202(51)
Removal of Individual Trees, (Medium), Disposal of Tops and Limbs F(1), Logs F(1)
CQ
Each
3
$
$
204(13)A
Furrow Ditches, Type Lead Off Ditch
CQ
LF
710
$
$
204(19)A
Remove Existing Berm
CQ
LF
175
$
$
204(20)A
Drainage Excavation, Type 3’ Ditch
CQ
LF
308
$
$
204(20)G
Drainage Excavation, Type Driveable Waterbar
CQ
Each
23
$
$
204(20)K
Drainage Excavation, Type Rolling Dip
CQ
Each
21
$
$
303(22)
Reconditioning of Roadbed, Roller Compaction - Method B
CQ
Mile
1.48
$
$
602(02)B
24-Inch Corrugated Metal Pipe, 0.064-Inch thk FE, Method B
CQ
LF
8
$
$
607(01)
Clean Plugged CMP, Reconstruct Inlet/Catch Basin
CQ
Each
1
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 01S013Y

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
204(20)A
Drainage Excavation, Type 3’ Ditch
CQ
LF
1,446
$
$
204(20)F
Drainage Excavation, Type Waterbar
CQ
Each
1
$
$
301(01)
Aggregate Base, Grading B, Compaction Method D
CQ
Ton
5
$
$
303(22)
Reconditioning of Roadbed, Roller Compaction - Method B
CQ
Mile
.25
$
$
607(01)
Clean Plugged CMP, Reconstruct Inlet/Catch Basins
CQ
Each
3
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 01S16Y

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
204(13)A
Furrow Ditches, Type Lead Off Ditch
CQ
LF
495
$
$
204(19)
Construct Berm
CQ
LF
62
$
$
204(19)A
Remove Existing Berm
CQ
LF
50
$
$
204(20)A
Drainage Excavation, Type 3’ Ditch
CQ
LF
210
$
$
204(20)G
Drainage Excavation, Type Driveable Waterbar
CQ
Each
27
$
$
204(20)K
Drainage Excavation, Type Rolling Dip
CQ
Each
11
$
$
251(02)
Placed Riprap, 4"to 5" Ditch Rock
CQ
Ton
13.2
$
$
301(01)
Aggregate Base, Grading B, Compaction Method D
CQ
Ton
161
$
$
303(22)
Reconditioning of Roadbed, Roller Compaction - Method B
CQ
Mile
1.88
$
$
602(02)C
24-Inch Corrugated Metal Pipe, 0.064-Inch thk FE, Method B.
CQ
LF
30
$
$
602(03)B
18-Inch Metal End Section
CQ
Each
3
$
$
602(03)C
24-Inch Metal End Section
CQ
Each
1
$
$
718(08)
Furnish Signpost (a)
CQ
Each
1
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 01S56Y

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
204(13)A
Furrow Ditches, Type Lead Off Ditch
CQ
LF
115
$
$
204(19)A
Remove Existing Berm
CQ
LF
212
$
$
204(20)A
Drainage Excavation, Type 3' Ditch
CQ
LF
2,247
$
$
204(20)G
Drainage Excavation, Type Driveable Waterbar
CQ
Each
7
$
$
204(20)K
Drainage Excavation, Type Rolling Dip
CQ
Each
1
$
$
251(02)
Placed riprap, 4” to 5” Ditch Rock
CQ
Ton
49.4
$
$
301(01)
Aggregate Base, Grading B, Compaction Method D
CQ
Ton
176
$
$
301(01)a
1-1/2” Rock Sub “B” Sub Base, w/ non woven geotextile
CQ
Ton
91
303(22)
Reconditioning of Roadbed, Roller Compaction - Method B
CQ
Mile
0.57
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 01S59

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
202(51)
Removal of Individual Trees, (Medium), Disposal of Tops and Limbs F(1), Logs F(1).
CQ
Each
1
$
$
204(13)A
Furrow Ditches, Type Lead Off Ditch
CQ
LF
395
$
$
204(20)A
Drainage Excavation, Type 3' Ditch
CQ
LF
455
$
$
204(20)G
Drainage Excavation, Type Driveable Waterbar
CQ
Each
18
$
$
204(20)K
Drainage Excavation, Type Rolling Dip
CQ
Each
11
$
$
204(20)L
Drainage Excavation, Type Rocked Rolling Dip
CQ
Each
7
$
$
251(02)
Placed Riprap, 4"to 5" Ditch Rock
CQ
Ton
54
$
$
301(01)
Aggregate Base, Grading B, Compaction Method D
CQ
Ton
33.3
$
$
303(22)
Reconditioning of Roadbed, Roller Compaction - Method B
CQ
Mile
0.89
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 01S61Y

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
204(02)
Roadway Excavation, Compaction Method B, Finishing Method A
CQ
CY
58
$
$
204(13)A
Furrow Ditches, Type Lead Off Ditch
CQ
LF
30
$
$
204(20)G
Drainage Excavation, Type Driveable Waterbar
CQ
Each
4
$
$
204(20)K
Drainage Excavation, Type Rolling Dip
CQ
Each
4
$
$
303(22)
Reconditioning of Roadbed, Roller Compaction - Method B
CQ
Mile
0.35
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 01S70

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
204(13)A
Furrow Ditches, Type Lead Off Ditch
CQ
LF
15
$
$
204(20)G
Drainage Excavation, Type Driveable Waterbar
CQ
Each
1
$
$
303(22)
Reconditioning of Roadbed, Roller Compaction - Method B
CQ
Mile
0.16
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 01S71

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
204(13)A
Furrow Ditches, Type Lead Off Ditch
CQ
LF
159
$
$
204(20)G
Drainage Excavation, Type Driveable Waterbar
CQ
Each
12
$
$
204(20)K
Drainage Excavation, Type Rolling Dip
CQ
Each
17
$
$
204(51)
Excavation Placement Method 5- Curve Widening
CQ
LS
2
$
$
251(02)
Placed Riprap, 4"to 5" Ditch Rock
CQ
Ton
5.4
$
$
251(02)a
Placed Class 1 Rock w/ nonwoven Geotextile
CQ
Ton
44
$
$
301(01)
Aggregate Base, Grading B, Compaction Method D
CQ
Ton
68
$
$
303(22)
Reconditioning of Roadbed, Roller Compaction - Method B
CQ
Mile
1.49
$
$

602(02)B

18-Inch Corrugated Metal Pipe, 0.064-Inch thk FE, Method B.
CQ
LF
4
$
$

602(02)C

24-Inch Corrugated Metal Pipe, 0.064-Inch thk FE, Method B.
CQ
LF
48
$
$
602(03)A
18-inch Metal End Section
CQ
Each
1
$
$
607(01)
Clean Plugged CMP, Reconstruct Inlet/Catch Basins.
CQ
Each
3
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 02S30

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
204(02)
Roadway Excavation
CQ
CY
4
$
$
204(20)A
Drainage Excavation, Type 3' Ditch
CQ
LF
150
$
$
204(20)F
Drainage Excavation, Type Waterbar
CQ
Each
2
$
$
301(01)
Aggregate Base, Grading B, Compaction Method D
CQ
Ton
82
$
$
303(23)
Minor Blading, Surface and Shoulder Maintenance, Culvert and Ditch Cleaning.
CQ
Mile
2.8
$
$
404(1)
Hot Bituminous Plant Mix - 1/2" Caltrans Spec.
CQ
Ton
175
$
$
602(02)C
24-Inch Corrugated Metal Pipe, 0.064-Inch thk FE, Method B.
CQ
LF
5
$
$
607(01)
Clean Plugged CMP, Reconstruct Inlet/Catch Basins.
CQ
Each
4
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 02S40

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
202(51)
Removal of Individual Trees, (Medium), Disposal of Tops and Limbs F(1), Logs F(1).
CQ
Each
2
$
$
204(13)A
Furrow Ditches, Type Lead Off Ditch
CQ
LF
75
$
$
204(19)A
Remove Existing Berm
CQ
LF
40
$
$
301(01)
Aggregate Base, Grading B, Compaction Method D
CQ
Ton
30.5
$
$
303(22)
Reconditioning of Roadbed, Roller Compaction - Method B
CQ
Mile
0.44
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 02S87

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
204(13)A
Furrow Ditches, Type Lead Off Ditch
CQ
LF
325
$
$
204(19)A
Remove Existing Berm
CQ
LF
1,137
$
$
204(20)A
Drainage Excavation, Type 3' Ditch
CQ
LF
155
$
$
204(20)G
Drainage Excavation, Type Driveable Waterbar
CQ
Each
3
$
$
204(20)K
Drainage Excavation, Type Rolling Dip
CQ
Each
6
$
$
204(20)L
Drainage Excavation, Type Rocked Rolling Dip
CQ
Each
1
$
$
204(51)
Excavation Placement Method 5- Curve Widening
CQ
LS
2
$
$
251(02)
Placed Riprap, 4"to 5" Ditch Rock
CQ
Ton
265
$
$
301(01)
Aggregate Base, Grading B, Compaction Method D
CQ
Ton
207.8
$
$
301(02)
Crushed Aggregate - 2"- Crushed Rock
CQ
Ton
3
$
$
303(22)
Reconditioning of Roadbed, Roller Compaction - Method B
CQ
Mile
0.52
$
$
602(03)C
24-Inch Metal End Section
CQ
Each
1
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: N/A

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
151(01)
Mobilization - Applies to Project
LSQ
LS
1
$
$
151(01)
Remobilization to begin work Sept 15th, 2010 to all of 01S71 and 02S87 (from Station 21+19 to 27+69 EOP)
LSQ
LS
1
$
$
Total all items
$

Contractor Name: _____________________________ DUNS #:____________________

Signature: ___________________________________ TIN #: ______________________

Ph: ________________________________________ CAGE CODE: _______________

Email:______________________________________

File details come from the government source that posted it. Updated .