Attachment 3 Revised Plans Drawings as of 6 May 2010.pdf

PDF 13 MB Posted

Attached to
RECOVERY: Timber Sale Roads (Soldier Creek) Stanislaus National Forest
Solicitation number
AG-9702-S-10-0354
Issued by

About this file

Attachment 3 revised Plans Drawings dated 6 May 2010

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

* " W E" , ..-A • S

N

W E

S

OREGON

FOREST SERVICE

STANISLAB~GI~A~IO~"lL FOREST

DRA~NGS FOR PROPOSED

TIMBER SALE ROADS (SOLDIER CREEK)

.eAl<EllSl'l£ll> lOS

STATE Of CALIfORNIA

INDEX IAAP N.T.S.

Tuolumne County, California From Sonora, California, travel approximatr.ly 5 rniles Southwest on State Highway 108 to State Highway 49 and turn South (left), then proceed South on State Highway 49 for approximately 2 112 miles to State Highway 120, then proceed East (left) on State Highway 120 fur approximately 23 miles

NO. IS71

RECONSmUCTION OF ROAD

NO.

RECONSmUCTION OF ROAD

NO.2S4O

RECONSffiUCTION OF ROAD

NO. 2SB7

ROAD

SECTION DETAILS

RECONsmuCTION OF DIP

INSTAltATION OF

METAL END SECTIONS

32 RECONSffiUCTION OF WA1£R BARS AND l£AO OFF DITCHES

33 RECONSffiUCTION OF IN1£RSEPllNG DIP

34 RECONSTRUCTION OF

DRIIlEABLE WA1£R BAR

35 RECONSmUCTION OF ROCK DIP RlPRAP DRAINAGE

36 RECONSTRUCTION OF

ClEAR

-sTANOARO SP£afJCA'fDfS Fat ~ (E ROADS All) BRlDOES ... ft:DSW. IIGHWAY PftO.EC'ls fP-03 u.s. CUS'JCtIARY !IW.L tXMRH.

WATER SOURCE OPTIONS: ttDr:aw:n~~~~~~~~~

1) Carlon day use site east of Evergreen Rd.

APPROVED BY:

2) Highway 120 crossing of the South Fork. and

3) Harden Flat Road crossing of Rush Creek.

Access to Rush Cr. mUll".

~~~~~f~~~_~~~~~~~16~J~~~~~;~~r.~~Z~~~:~~~~~~'~1:b:e on the east side of Rush Cr

Y, O1S70, 0IS71, 02830,

STANISLAUS NATIONAL fOREST INDEX MAP - IU.s.

02S40, and 02S87. Total road reconstruction mileage is approximately 12.01.

01S71 and 02S87 are affected by a Limited Operating Period (L.O.P.) with a start work date of September 15, 2010 for all of 01S71 and August 15, 2010 for 02S87 from station 21+19 to 27+69. All the other roads including 02S87 from station 0+00 to 21+19 of are not affected by the L.O.P.

E. SETNESS &M.SCHAFER

TITLE SHEET &

VICINITY MAP

AS SHOWN

STANISLAUS

TIMBER SALE ROADS

ER

File details come from the government source that posted it. Updated .