Solicitation AG-9702-S-10-0354

Timber Sale Roads(Soldier Creek)

Stanislaus National Forest

OMB APPROVAL NO. 2700-0042

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

AG-9702-S-10-0354

2. TYPE OF SOLICITATION

FORMCHECKBOX

SEALED BID (IFB)

FORMCHECKBOX

NEGOTIATED (RFP)

3. DATE ISSUED

15 Apr 10

PAGE OF PAGES

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

370277/ Timber Sale Roads (Soldier Creek), Stanislaus National Forest

6. PROJECT NO.

CIM #0305-03F

7. ISSUED BY

CODE

9702
8. ADDRESS OFFER TO

U.S. Forest Service

EROC-SW Contracting

1323 Club Dr.

Vallejo, CA 94592 See Section L – Instructions, Conditions and Notices to Offerors or Respondents for offer submittal requirements as well as the response due date

9. FOR INFORMATION

CALL:

A. NAME

Dindo L. Laxamana B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 707-562-9120/ email: dlaxamana@fs.fed.us

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

SPECIAL NOTICE

*RECOVERY* - This solicitation is funded in whole or part by funds from the American Recovery and Reinvestment Act (ARRA).

This procurement action in being advertised under FAR Part 19 as an Emerging Small Business Set-Aside.

Price Range The Government's estimate is: between $250,000 and $500,000.

11. The Contractor shall begin performance within 10 calendar days and complete it within 100 calendar days after receiving

FORMCHECKBOX

award, FORMCHECKBOX notice to proceed. This performance period is FORMCHECKBOX mandatory, FORMCHECKBOX negotiable. (See .)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

FORMCHECKBOX

YES

FORMCHECKBOX

NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A.

Sealed offers in original and _____ copies to perform the work required are due at the place specified in item 8 by ________(hour). Local time __________(date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B.

An offer guarantee

FORMCHECKBOX

is, FORMCHECKBOX is not required.

C.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D.

Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212

1442-101

STANDARD FORM 1442 (REV. 4-85)

Computer Generated

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include email address)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE

FACILITY CODE

17.

The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.
DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

FORMCHECKBOX

10 U.S.C. 2304(c)( )

FORMCHECKBOX

41 U.S.C. 253(c)( )

26. ADMINISTERED BY

CODE

27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

FORMCHECKBOX

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.

FORMCHECKBOX

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

Computer Generated

STANDARD FORM 1442 BACK (REV. 4-85)

Section B: Supplies or Services/Prices

Section C: Statement of Work Section D: Packaging and Marking Section E: Inspection and Acceptance Section F: Deliveries or Performance Section G: Contract Administration Data Section H: Special Contract Requirements Section I: Contract Clauses Section J: List of Documents, Exhibits and Other Attachments Section K: Representations, Certifications, and Other Statements of Bidders Section L: Instructions, Conditions, and Notices to Bidders Section M: Evaluation Factors for Award……………………

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS SCHEDULE OF ITEMS

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 01S01Y District: Groveland

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
204(13)A
Furrow Ditches, Type Lead Off Ditch
CQ
LF
610
$
$
204(20)A
Drainage Excavation, Type 3' Ditch
CQ
LF
235
$
$
204(20)F
Drainage Excavation, Type Waterbar
CQ
Each
2
$
$
204(20)G
Drainage Excavation, Type Driveable Waterbar
CQ
Each
17
$
$
204(20)K
Drainage Excavation, Type Rolling Dip
CQ
Each
9
$
$
303(22)
Reconditioning of Roadbed, Roller Compaction - Method B
CQ
Mile
0.66
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 01S01YB

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
204(13)A
Furrow Ditches, Type Lead Off Ditch
CQ
LF
355
$
$
204(20)G
Drainage Excavation, Type Driveable Waterbar
CQ
Each
14
$
$
204(20)K
Drainage Excavation, Type Rolling Dip
CQ
Each
2
$
$
303(22)
Reconditioning of Roadbed, Roller Compaction - Method B
CQ
Mile
0.51
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 01S11

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
202(51)
Removal of Individual Trees, (Medium), Disposal of Tops and Limbs F(1), Logs F(1)
CQ
Each
3
$
$
204(13)A
Furrow Ditches, Type Lead Off Ditch
CQ
LF
710
$
$
204(20)G
Drainage Excavation, Type Driveable Waterbar
CQ
Each
23
$
$
204(20)K
Drainage Excavation, Type Rolling Dip
CQ
Each
21
$
$
303(22)
24-Inch Corrugated Metal Pipe, 0.064-Inch thk FE, Method B
CQ
LF
8
$
$
602(02)B
Reconditioning of Roadbed, Roller Compaction - Method B
CQ
Mile
1.48
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 01S013Y

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
204(20)A
Drainage Excavation, Type 3’ Ditch
CQ
LF
1,446
$
$
301(01)
Aggregate Base, Grading B, Compaction Method D
CQ
Ton
89.5
$
$
303(22)
Reconditioning of Roadbed, Roller Compaction - Method B
CQ
Mile
.25
$
$
607(01)
Clean Plugged CMP, Reconstruct Inlet/Catch Basins
CQ
Each
31
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 01S16Y

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
204(13)A
Furrow Ditches, Type Lead Off Ditch
CQ
LF
495
$
$
204(19)
Construct Berm
CQ
LF
62
$
$
204(19)A
Remove Existing Berm
CQ
LF
50
$
$
204(20)A
Drainage Excavation, Type 3’ Ditch
CQ
LF
210
$
$
204(20)G
Drainage Excavation, Type Driveable Waterbar
CQ
Each
27
$
$
204(20)L
Drainage Excavation, Type Rocked Rolling Dip
CQ
Each
9
$
$
251(02)
Placed Riprap, 4"to 5" Ditch Rock
CQ
Ton
13.2
$
$
301(01)
Aggregate Base, Grading B, Compaction Method D
CQ
Ton
64.1
$
$
303(22)
Reconditioning of Roadbed, Roller Compaction - Method B
CQ
Mile
0.4
$
$
602(07)B
18-Inch Metal End Section
CQ
Each
6
$
$
602(02)C
24-Inch Corrugated Metal Pipe, 0.064-Inch thk FE, Method B.
CQ
LF
30
$
$
718(08)
Furnish Signpost (a)
CQ
Each
1
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 01S56Y

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
204(13)A
Furrow Ditches, Type Lead Off Ditch
CQ
LF
115
$
$
204(19)A
Remove Existing Berm
CQ
LF
212
$
$
204(20)A
Drainage Excavation, Type 3' Ditch
CQ
LF
2,247
$
$
204(20)G
Drainage Excavation, Type Driveable Waterbar
CQ
Each
6
$
$
204(20)K
Drainage Excavation, Type Rolling Dip
CQ
Each
1
$
$
301(01)
Aggrgate Base, Grading B, Compaction Method D
CQ
Ton
178
$
$
303(22)
Reconditioning of Roadbed, Roller Compaction - Method B
CQ
Mile
0.57
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 01S59

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
202(51)
Removal of Individual Trees, (Medium), Disposal of Tops and Limbs F(1), Logs F(1).
CQ
Each
1
$
$
204(13)A
Furrow Ditches, Type Lead Off Ditch
CQ
LF
395
$
$
204(20)A
Drainage Excavation, Type 3' Ditch
CQ
LF
455
$
$
204(20)G
Drainage Excavation, Type Driveable Waterbar
CQ
Each
24
$
$
204(20)K
Drainage Excavation, Type Rolling Dip
CQ
Each
5
$
$
204(20)L
Drainage Excavation, Type Rocked Rolling Dip
CQ
Each
5
$
$
251(02)
Placed Riprap, 4"to 5" Ditch Rock
CQ
Ton
13.6
$
$
301(01)
Aggrgate Base, Grading B, Compaction Method D
CQ
Ton
38.8
$
$
303(22)
Reconditioning of Roadbed, Roller Compaction - Method B
CQ
Mile
0.89
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 01S61Y

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
204(13)A
Furrow Ditches, Type Lead Off Ditch
CQ
LF
30
$
$
204(20)G
Drainage Excavation, Type Driveable Waterbar
CQ
Each
4
$
$
204(20)K
Drainage Excavation, Type Rolling Dip
CQ
Each
6
$
$
204(20)L
Drainage Excavation, Type Rocked Rolling Dip
CQ
Each
1
$
$
303(22)
Reconditioning of Roadbed, Roller Compaction - Method B
CQ
Mile
0.35
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 01S70

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
204(13)A
Furrow Ditches, Type Lead Off Ditch
CQ
LF
15
$
$
204(20)G
Drainage Excavation, Type Driveable Waterbar
CQ
Each
1
$
$
204(20)L
Drainage Excavation, Type Rocked Rolling Dip
CQ
Each
2
$
$
303(22)
Reconditioning of Roadbed, Roller Compaction - Method B
CQ
Mile
0.16
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 01S71

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
204(13)A
Furrow Ditches, Type Lead Off Ditch
CQ
LF
159
$
$
204(20)G
Drainage Excavation, Type Driveable Waterbar
CQ
Each
10
$
$
204(20)K
Drainage Excavation, Type Rolling Dip
CQ
Each
21
$
$
204(51)
Excavation Placement Method 5- Curve Widening
CQ
LS
1
$
$
251(02)
Placed Riprap, 4"to 5" Ditch Rock
CQ
Ton
4.1
$
$
301(01)
Aggrgate Base, Grading B, Compaction Method D
CQ
Ton
289.5
$
$
607(01)
Clean Plugged CMP, Reconstruct Inlet/Catch Basins.
CQ
Each
3
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 02S30

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
204(20)A
Drainage Excavation, Type 3' Ditch
CQ
LF
150
$
$
204(20)F
Drainage Excavation, Type Waterbar
CQ
Each
2
$
$
301(01)
Aggrgate Base, Grading B, Compaction Method D
CQ
Ton
10.7
$
$
303(23)
Minor Blading, Surface and Shoulder Maintenance,Culvert and Ditch Cleaning.
CQ
Mile
2.8
$
$
404(1)
Hot Bituminous Plant Mix - 1/2" Caltrans Spec.
CQ
Ton
175
$
$
602(02)C
24-Inch Corrugated Metal Pipe, 0.064-Inch thk FE, Method B.
CQ
LF
5
$
$
607(01)
Clean Plugged CMP, Reconstruct Inlet/Catch Basins.
CQ
Each
4
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 02S40

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
202(51)
Removal of Individual Trees, (Medium), Disposal of Tops and Limbs F(1), Logs F(1).
CQ
Each
2
$
$
204(13)A
Furrow Ditches, Type Lead Off Ditch
CQ
LF
75
$
$
204(19)A
Remove Existing Berm
CQ
LF
40
$
$
301(01)
Aggregate Base, Grading B, Compaction Method D
CQ
Ton
17.6
$
$
303(22)
Reconditioning of Roadbed, Roller Compaction - Method B
CQ
Mile
0.44
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: 02S87

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
201(05)
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER.
LSQ
LS
1
$
$
204(13)A
Furrow Ditches, Type Lead Off Ditch
CQ
LF
325
$
$
204(19)A
Remove Existing Berm
CQ
LF
1137
$
$
204(20)A
Drainage Excavation, Type 3' Ditch
CQ
LF
155
$
$
204(20)G
Drainage Excavation, Type Driveable Waterbar
CQ
Each
3
$
$
204(20)K
Drainage Excavation, Type Rolling Dip
CQ
Each
3
$
$
204(20)L
Drainage Excavation, Type Rocked Rolling Dip
CQ
Each
4
$
$
204(51)
Excavation Placement Method 5- Curve Widening
CQ
LS
1
$
$
251(02)
Placed Riprap, 4"to 5" Ditch Rock
CQ
Ton
293.8
$
$
301(01)
Aggregate Base, Grading B, Compaction Method D
CQ
Ton
207.8
$
$
301(02)
Crushed Aggregate - 2"- Crushed Rock
CQ
Ton
3
$
$
303(22)
Reconditioning of Roadbed, Roller Compaction - Method B
CQ
Mile
0.52
$
$
Subtotal
$

Project: Timber Sale Roads (Soldier Creek), Stanislaus National Forest

Road #: N/A

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
Unit
Qty
UNIT PRICE
TOTAL PRICE
151(01)
Mobilization - Applies to Project
LSQ
LS
1
$
$
151(01)
Remobilization to begin work Sept 15th, 2010 to all of 01S71 and 02S87 (from Station 21+19 to 27+69 EOP)
LSQ
LS
1
$
$
Total all items
$

Contractor Name: _____________________________ DUNS #:____________________

Signature: ___________________________________ TIN #: ______________________

Ph: ________________________________________ CAGE CODE: _______________

Email:______________________________________

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 Scope of Contract

The project involves: Reconstructing of Forest Roads 01S01Y, 01S01YB, 01S11, 01S13Y, 01S16Y, 01S56Y, 01S59, 01S61Y, 01S70, 01S71, 02S30, 02S40, and 02S87. The reconstruction includes reconditioning of roadbed, adding waterbars, aggregate base, hot bituminous plant mix, rolling dips, rocked dips, riprap, lead off ditches, curve widening, metal end sections, corrugated metal pipes, ditches and berms, removal of berms and ditches, removal of trees and stumps, cleaning and clearing of culverts, channel repair, ditch maintenance, and clearing and grubbing of those roads as shown on the plans. There is a Limited Operating Period affecting reconstruction on roads 01S71 and 02S87. See C.5 for dates.

See attachments listed on Section J for full specification, scope and description.

C.2 Project Location and Direction to Work areas Work areas are located in Tuolumne County, California.

From Sonora, California, travel approximately 5 miles Southwest on State Highway 108 to State Highway 49 and turn South (left), then proceed South on State Highway 49 for approximately 2 1/2 miles to State Highway 120, then proceed East (left) on State Highway 120 for approximately 23 miles or 1 mile past the South Fork of Tuolumne River to 01S13Y and turn left. Return to the intersection of HWY 120 and turn left 0.5 miles to Golden Arrow Rd. and turn right to Hardin Flat Rd. and turn right 0.25 miles to 01S61Y and turn right. Return to the intersection of Hardin Flat Rd. and turn left 0.75 mi to 01S70 and turn right 0.15 miles to 01S71. Return to the intersection of Hardin Flat Rd. and turn right 1.5 mi. to 02S30 and turn right. 01S70, 01S11, 02S87 and 02S40 can be reached by 02S30. Now go back to intersection of 02S30 and Hardin Flat Rd. and turn right 0.2 mi.to the intersection of Hardin Flat and Hwy. 120 and turn right 0.25 mi. to 01S16Y to 01S59. Return to Hwy. 120 and turn right 0.75 mi. to 01S01Y and 01S01YB.

See plans & drawings attachment on Section J.

C.3 Specifications Standard Specifications for Construction of Bridges on Federal Highway Projects, FP-03

Supplemental Specifications.

See attachments listed on Section J for full specifications, scope and description.

C.4 Project Site Cleanup Project site cleanup includes the removal and proper disposal of all construction trash, debris, and residue off of National Forest Land. All spills of petroleum products including leak spots from parked vehicles shall be removed and properly disposed according to all Local, State, and Federal rules, regulations, and laws governing such disposal. During the Work the Contractor is required to furnish dumpsters or other trash receptacles and to empty such containers either as they become full or weekly, whichever is more frequent. The Contractor shall not place materials of any kind into private or Government trash bins or dumpsters.

C.5 Start of Construction

Reconstruction on 01S01Y, 01S01YB, 01S11, 01S13Y, 01S16Y, 01S56Y, 01S59, 01S61Y, 01S70, 02S30, and 02S40 will start June 15, 2010 and the LOP restricts reconstruction on the last 800+/- feet of 02S87 to begin no earlier than 08/15/2010 and restricts reconstruction on 01S71 to begin no earlier than 09/15/2010. Refer to Supplemental Specifications for restrictions.

C.6 Contract Time

The contract time will be 90 days total work time. Contract time includes restriction for L.O.P areas, delays for weather; locating and transporting supplies and materials; and final site cleanup.

AGAR 452.211-72 Statement Of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

AGAR 452.211-73 Attachments To Statement Of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

SECTION D--PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

SECTION E--INSPECTION AND ACCEPTANCE

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-12 Inspection of Construction (AUG 1996)

Inspections

Government inspections are for the purpose of satisfying the Government that the supplies and/or services are acceptable and do not relieve the Contractor of the responsibility for maintaining quality control. The Contracting Officer’s Representative or designated inspector will conduct all inspections. The Contractor (or designated representative) is encouraged to be present to observe inspections.

SECTION F--DELIVERIES OR PERFORMANCE

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.242-14 Suspension of Work (APR 1984)

FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 calendar days after issuance of the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

Work Timing Delays due to normal adverse weather, weekends, and holidays have been included in the calculation of contract time.

Winter Shutdown

When winter weather sets in and the continuation of work is impractical, the Contracting Officer may authorize a total suspension until such time as work can proceed. During the period of total suspension, the calendar days elapsed will not be charged against the contract time.

SECTION G--CONTRACT ADMINISTRATION DATA

G.1

GOVERNMENT-FURNISHED PROPERTY

None G.2

DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE

The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award.

The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.

The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).

On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. If a disagreement exists as in regards to the contract, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

SPECIAL CONDITIONS AFFECTING THE WORK

H.1 Physical Conditions. The indications of physical conditions on the drawings and in the specifications are the result of site investigations and surveys performed by the Government.

H.2 Weather. Low temperatures at the project site range from temperatures of less than 20 ºF in December and January to lows of 65 ºF in July and August. High temperatures range from 45 ºF in December and January to over 90 ºF in July and August. The annual precipitation at the project site is less than 12 inches per year including snow fall. Winter snow storms and freezing temperatures will occur during the winter months that result in a winter project shutdown. Icy conditions on local roads and highways can occur during the fall, winter and spring. Highway curves in shaded areas will remain covered with ice or frost for weeks.

H.3 Work Hours. Work hours are from 7:00 am to 5:00 pm Monday through Friday. Weekend equipment work is not allowed at any time during the Work. Dogs and pets are not allowed on the project site at any time.

H.4 Safety, Emergency Communications and Evacuation. Contractor is responsible for the safety of the Contractor’s employees including Subcontractors employees, Government employees associated with the project, and any visitors to the site both Government and private. The Contractor shall submit a project safety plan to the Contracting Officer for review prior to commencement of Work. The project safety plan shall comply with the appropriate California OSHA and Federal OSHA rules and regulations and must include a medical evacuation and emergency communications plan.

H.5 Highway Permits. Contractor is responsible for securing any overload or over width limit permits required for the transport of materials or equipment to the project site. The Contractor is responsible for conducting a thorough reconnaissance of all routes leading to the site.

H.6 Toilets. No toilet or shower facilities are available on site. Contractor shall provide toilet facilities for its employees.

H.7 Camping. Contractor may use a self-contained travel trailer or recreational vehicle to camp on the premises. All waste material must be transported off-site to a station equipped to handle such waste. A full hookup trailer pad may be available at the Work Center for the Contractor’s use during the contract. This is subject to availability and must be coordinated through the Contracting Officer.

H.8 Security. Contractor is responsible for the Contractor’s equipment and materials supplied to the site. All equipment not equipped with a key lock system shall be secured in such a manner as to make it inoperable to the average person at the end of each working day. All hand tools and other equipment shall be secured at the end of each working day. On Fridays all construction debris, trash, and refuse shall be properly stored in dumpsters or trash bins or removed from the site.

H.9 Burning Permits. Contractor is subject to all rules and regulations governing the on site burning of slash and other debris. Contractor shall obtain a burning permit from the jurisdiction having control over burning. The Contractor shall comply with Fire Plan for Construction and Service Contracts included in the Contract.

H.10 Protection of Resources. Contractor shall thoroughly clean all equipment prior to delivery to the project site to remove weeds, mud, grease and oil buildup from the tires, wheels, tracks, engines and engine compartments, and other surfaces. Spills of petroleum products and other hazardous substances shall be reported, contained, and removed in accordance with all applicable rules, regulations and laws. Contractor shall submit a project spill response plan at the pre-work meeting for review by the Contracting Officer.

H.11 Equipment Cleaning. The contractor shall ensure that prior to moving onto, or to another part of the project area, that all off-road equipment which last operated in areas known by Forest Service to be infected with noxious weeds, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Contractor shall certify in writing that off-road equipment is free of noxious weeds prior to each start-up of operations and for subsequent moves of equipment to other project areas. Measures taken to ensure that off-road equipment is free of noxious weeds will be identified. “Off-road equipment” includes all equipment operating off of paved roadways. A Current list of noxious weeks of concern to Forest Service is available at the Forest Supervisor’s office. Contractor shall clean off-road equipment prior to moving between project areas with known infestations with noxious weeds and other project areas, if any, which are free of such weeds. Project Area maps show areas known by Forest Service that contain specific noxious weeds species of concern. Contractor shall employ whatever cleaning methods are necessary to ensure that off-road equipment is free of noxious weeds. Equipment shall be considered free of soil, seeds, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools is not required.

Contractor shall notify Forest Service at least 24 hours prior to beginning of work in area designated as a noxious week area, unless otherwise agreed. Notification shall include the location of the equipment’s most recent operations. If the prior location of the off-road equipment cannot be identified, forest service may assume that it was infested with noxious weed seeds. Upon request of Forest Service, Contractor must arrange for forest Service to inspect each piece of off-road equipment prior to it being placed into service. If Contractor desires to clean off-road equipment on National forest land, such as at the end of a project or prior to moving to a new unit that is free from noxious weeds, Contractor and Forest service shall agree on methods of cleaning, locations for the cleaning, and control of off-site impacts, if any. New infestations of noxious weeds, of concern to Forest Service and identified by either Contractor or Forest Service, within the project area or on the haul route, shall be promptly reported to the other party.

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.202-1 Definitions (JUL 2004)

52.203-3 Gratuities (APR 1984)

52.203-5 Covenant Against Contingent Fees (APR 1984)

52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006)

52.203-7 Anti-Kickback Procedures (JUL 1995)

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (JAN 1997)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (JAN 1997)

52.203-12 Limitation on Payments to Influence Certain Federal Transactions (SEP 2007)

52.204-4 Printed or Copied Double-Sided on Recycled Paper (AUG 2000)

52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (MAY 2008)

52.211-18 Variation in Estimated Quantity (APR 1984)

52.215-2 Audit and Records – Negotiation Alternate 1 (MAR 2009)

52.222-3 Convict Labor (JUN 2003)

52.222-4 Contract Work Hours and Safety Standards Act -- Overtime Compensation (JUL 2005)

52.222-6 Davis-Bacon Act (JUL 2005)

52.222-7 Withholding of Funds (FEB 1988)

52.222-8 Payrolls and Basic Records (FEB 1988)

52.222-9 Apprentices and Trainees (JUL 2005)

52.222-10 Compliance with Copeland Act Requirements (FEB 1988)

52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988)

52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988)

52.222-14 Disputes Concerning Labor Standards (FEB 1988)

52.222-15 Certification of Eligibility (FEB 1988)

52.222-21 Prohibition of Segregated Facilities (FEB 1999)

52.222-26 Equal Opportunity (MAR 2007)

52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999)

52.222-35 Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (SEP 2006)

52.222-36 Affirmative Action for Workers with Disabilities (JUN 1998)

52.222-37 Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (SEP 2006)

52.222-50 Combating Trafficking in Persons (SEP 2007)

52.223-6 Drug-Free Workplace (MAY 2001)

52.223-14 Toxic Chemical Release Reporting (AUG 2003)

52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007)

52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008)

52.227-1 Authorization and Consent (DEC 2007)

52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007)

52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007)

52.228-2 Additional Bond Security (OCT 1997)

52.228-11 Pledges of Assets (FEB 1992)

52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995)

52.228-14 Irrevocable Letter of Credit (DEC 1999)

52.228-15 Performance and Payment Bonds – Construction (NOV 2006)

52.229-3 Federal, State, and Local Taxes (APR 2003)

52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002)

52.232-17 Interest (OCT 2008)

52.232-23 Assignment of Claims (JAN 1986)

52.232-27 Prompt Payment for Construction Contracts (OCT 2008)

52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003)

52.233-1 Disputes (JULY 2002)

52.233-3 Protest After Award (AUG 1996)

52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)

52.236-2 Differing Site Conditions (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)

52.236-5 Material and Workmanship (APR 1984)

52.236-6 Superintendence by The Contractor (APR 1984)

52.236-7 Permits and Responsibilities (NOV 1991)

52.236-8 Other Contracts (APR 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984)

52.236-10 Operations and Storage Areas (APR 1984)

52.236-11 Use and Possession Prior to Completion (APR 1984)

52.236-12 Cleaning Up (APR 1984)

52.236-13 Accident Prevention (NOV 1991) 52.236-15 Schedules for Construction Contracts (APR 1984)

52.236-16 Quantity Surveys (APR 1984) 52.236-17 Layout of Work (APR 1984)

52.236-21 Specifications and Drawings for Construction (FEB 1997)

52.236-26 Preconstruction Conference (FEB 1995)

52.242-13 Bankruptcy (JUL 1995)

52.243-4 Changes (JUN 2007)

52.244-6 Subcontracts for Commercial Items (MAR 2009)

52.246-21 Warranty of Construction (MAR 1994) 52.248-3 Value Engineering – Construction (SEP 2006)

52.249-2 Termination for Convenience of the Government (Fixed-Price) (MAY 2004)--Alternate I (SEP 1996)

52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996)

452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996)

452.236-72 Use of Premises (NOV 1996)

452.236-73 Archeological or Historic Sites (FEB 1988)

452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996)

452.236-76 Samples and Certificates (FEB 1988)

452.236-77 Emergency Response (NOV 1996)

52.203-15 Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (Mar 2009)

(a) The Contractor shall post notice of employees rights and remedies for whistleblower protections provided under section 1553 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5).

(b) The Contractor shall include the substance of this clause including this paragraph (b) in all subcontracts.

52.204-7 Central Contractor Registration (APR 2008)

(a) Definitions. As used in this clause—

“Central Contractor Registration (CCR) database” means the primary Government repository for Contractor information required for the conduct of business with the Government.

“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number means the number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.

“Registered in the CCR database” means that—

(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and

(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record “Active”. The Contractor will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.

(b)

(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.

(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number—

(i) Via the internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business name.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company physical street address, city, state and Zip Code.

(iv) Company mailing address, city, state and Zip Code (if separate from physical).

(v) Company telephone number.

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) The Contractor is responsible for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(g)

(1)

(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:

(A) Change the name in the CCR database;

(B) Comply with the requirements of Subpart 42.12 of the FAR;

(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.

(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.

(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the Internet at http://www.ccr.gov or by calling 1-888-227-2423, or 269-961-5757.

52.204-11 – American Recovery and Reinvestment Act—Reporting Requirements (Mar 2009)

(a) Definitions. As used in this clause—

“Contract,” as defined in FAR 2.101, means a mutually binding legal relationship obligating the seller to furnish the supplies or services (including construction) and the buyer to pay for them. It includes all types of commitments that obligate the Government to an expenditure of appropriated funds and that, except as otherwise authorized, are in writing. In addition to bilateral instruments, contracts include (but are not limited to) awards and notices of awards; job orders or task letters issued under basic ordering agreements; letter contracts; orders, such as purchase orders, under which the contract becomes effective by written acceptance or performance; and bilateral contract modifications. Contracts do not include grants and cooperative agreements covered by 31 U.S.C. 6301, et seq. For discussion of various types of contracts, see FAR Part 16.

“First-tier subcontract” means a subcontract awarded directly by a Federal Government prime contractor whose contract is funded by the Recovery Act.

“Jobs created” means an estimate of those new positions created and filled, or previously existing unfilled positions that are filled, as a result of funding by the American Recovery and Reinvestment Act of 2009 (Recovery Act). This definition covers only prime contractor positions established in the United States and outlying areas (see definition in FAR 2.101). The number shall be expressed as ‘‘full-time equivalent’’ (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full-time schedule, as defined by the contractor. For instance, two full-time employees and one part-time employee working half days would be reported as 2.5 FTE in each calendar quarter.

“Jobs retained” means an estimate of those previously existing filled positions that are retained as a result of funding by the American Recovery and Reinvestment Act of 2009 (Recovery Act). This definition covers only prime contractor positions established in the United States and outlying areas (see definition in FAR 2.101). The number shall be expressed as ‘‘full-time equivalent’’ (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full-time schedule, as defined by the contractor. For instance, two full-time employees and one part-time employee working half days would be reported as 2.5 FTE in each calendar quarter.

“Total compensation” means the cash and noncash dollar value earned by the executive during the contractor’s past fiscal year of the following (for more information see 17 CFR 229.402(c)(2)):

(1) Salary and bonus.

(2) Awards of stock, stock options, and stock appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Statement of Financial Accounting Standards No. 123 (Revised 2004) (FAS 123R), Shared Based Payments.

(3) Earnings for services under non-equity incentive plans. Does not include group life, health, hospitalization or medical reimbursement plans that do not discriminate in favor of executives, and are available generally to all salaried employees.

(4) Change in pension value. This is the change in present value of defined benefit and actuarial pension plans.

(5) Above-market earnings on deferred compensation which is not tax-qualified.

(6) Other compensation. For example, severance, termination payments, value of life insurance paid on behalf of the employee, perquisites or property if the value for the executive exceeds $10,000.

(b) This contract requires the contractor to provide products and/or services that are funded under the American Recovery and Reinvestment Act of 2009 (Recovery Act). Section 1512(c) of the Recovery Act requires each contractor to report on its use of Recovery Act funds under this contract. These reports will be made available to the public.

(c) Reports from contractors for all work funded, in whole or in part, by the Recovery Act, and for which an invoice is submitted prior to June 30, 2009, are due no later than July 10, 2009. Thereafter, reports shall be submitted no later than the 10th day after the end of each calendar quarter.

(d) The Contractor shall report the following information, using the online reporting tool available at http://www.FederalReporting.gov .

(1) The Government contract and order number, as applicable.

(2) The amount of Recovery Act funds invoiced by the contractor for the reporting period. A cumulative amount from all the reports submitted for this action will be maintained by the government’s on-line reporting tool.

(3) A list of all significant services performed or supplies delivered, including construction, for which the contractor invoiced in this calendar quarter.

(4) Program or project title, if any.

(5) A description of the overall purpose and expected outcomes or results of the contract, including significant deliverables and, if appropriate, associated units of measure.

(6) An assessment of the contractor’s progress towards the completion of the overall purpose and expected outcomes or results of the contract (i.e., not started, less than 50 percent completed, completed 50 percent or more, or fully completed). This covers the contract (or portion thereof) funded by the Recovery Act.

(7) A narrative description of the employment impact of work funded by the Recovery Act. This narrative should be cumulative for each calendar quarter and only address the impact on the contractor’s workforce. At a minimum, the contractor shall provide—

(i) A brief description of the types of jobs created and jobs retained in the United States and outlying areas (see definition in FAR 2.101). This description may rely on job titles, broader labor categories, or the contractor’s existing practice for describing jobs as long as the terms used are widely understood and describe the general nature of the work; and

(ii) An estimate of the number of jobs created and jobs retained by the prime contractor, in the United States and outlying areas. A job cannot be reported as both created and retained.

(8) Names and total compensation of each of the five most highly compensated officers of the Contractor for the calendar year in which the contract is awarded if—

(i) In the Contractor’s preceding fiscal year, the Contractor received—

(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements; and

(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements; and

(ii) The public does not have access to information about the compensation of the senior executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986.

(9) For subcontracts valued at less than $25,000 or any subcontracts awarded to an individual, or subcontracts awarded to a subcontractor that in the previous tax year had gross income under $300,000, the Contractor shall only report the aggregate number of such first tier subcontracts awarded in the quarter and their aggregate total dollar amount.

(10) For any first-tier subcontract funded in whole or in part under the Recovery Act, that is over $25,000 and not subject to reporting under paragraph 9, the contractor shall require the subcontractor to provide the information described in (i), (ix), (x), and (xi) below to the contractor for the purposes of the quarterly report. The contractor shall advise the subcontractor that the information will be made available to the public as required by section 1512 of the Recovery Act. The contractor shall provide detailed information on these first-tier subcontracts as follows:

(i) Unique identifier (DUNS Number) for the subcontractor receiving the award and for the subcontractor’s parent company, if the subcontractor has a parent company.

(ii) Name of the subcontractor.

(iii) Amount of the subcontract award.

(iv) Date of the subcontract award.

(v) The applicable North American Industry Classification System (NAICS) code.

(vi) Funding agency.

(vii) A description of the products or services (including construction) being provided under the subcontract, including the overall purpose and expected outcomes or results of the subcontract.

(viii) Subcontract number (the contract number assigned by the prime contractor).

(ix) Subcontractor’s…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .