fig2.pdf

PDF 101 KB Posted

Attached to
IT Infrastructure Upgrade Cabling
Solicitation number
AG-9255-S-16-0003
Issued by

About this file

Additional Location Layout

View the file

Other files

File Type Posted
Question_asked_2.docx DOCX document
PBARC_Site_map.pdf PDF
PBARC_Fiber_Upgrade_and_Wireless_Project.docx DOCX document
CiscoPartsOnHand.pdf PDF
insectorydrawings.pdf PDF
TechOfficeand_ConfRoomFloorPlan.pdf PDF
Fig3AccessPointLocations.pdf PDF
HiloNetworkCurrent.pdf PDF
MainLabOverview.pdf PDF
Fig2FiberRunsandEnclosureLocations.pdf PDF
MainLabFloorPlan.pdf PDF
HiloFiberUpgradeWireless.pptx PPTX presentation
HHfloorplan.pdf PDF
Fig4CAT6Locations.pdf PDF
Hilo_proposed_network_drawing.pdf PDF
fig1.pdf PDF
SF18_Hilo.pdf PDF
WD2005-2153_12.29.2015.pdf PDF
AG-9255-S-16-0003.pdf PDF
ARS_Hilo_HI_Network_Infrastructure_Upgrade_032816.docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Insectory

Admin Trailer Ecology Trailer

Comm Room 1 Upstairs in the Mezzanine Room# 302

Comm Room 2 Room# 174

Pull box

Pull box

Cable tray in hallway ceiling

120 feet feet

PBARC Main Laboratory

Headhouse

Electrical Bldg.

Pacific Basin Agricultural Research Center 64 Nowelo Street, Hilo HI 96720

Figure 2: The Four Fiber Runs Wall Mount Enclosure

Comm1 to Comm2 (10G) Comm1 to Ecology (10G) Comm1 to Admin (10G) Comm1 to Insectory (1G) Existing fiber (2 pair) (1G)