Copy_of_North_Thompson_Creek_RWE_SOW_final.xlsx

XLSX spreadsheet 36 KB Posted

Attached to
AOP Training DVD Project
Solicitation number
AG-91S8-S-16-0001
Issued by

About this file

Attachment 3 North Thompson Creek RWE

View the file

Other files

File Type Posted
SF_30-2.pdf PDF
Questions_for_AG-91S8-S-16-0001_FS_reply.docx DOCX document
SF_30-1.pdf PDF
Solicitation_-_Do_Not_Reply_(4).pdf PDF
Copy_of_Hog_Creek_RWE_SOW_final.xlsx XLSX spreadsheet
Copy_of_Comprehensive_AOP_SOW_final.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

North Thompson Creek RWE Attachment #3SOW Changes/Corrections that need to be made.2014-2015
PhaseSlideCommentTasks to be doneAdditional CommentsLegend
11Title on slide misleadingChange the title of the slide to North Thompson Creek Stream Simulation Process.RM= Resources Material
1Text on slide 1 needs improvementMove the text from the slide 1 onto slide 2 and move the text from slide 2 onto slide 1.ER=Exercise Resources
2needs photgraphs showing road stream crossings on NTCMove photographs from slide 1 to slide 2 showing a stream crossing (photo # 1 and 2 with their appropriate text).GC=Grade Control
2Text on slide 2 needs improvementEnsure the text and photgraphs from slide 1 are moved on slide 2.XS=Cross Sections
3need to present the material consisten from Hogback Creek and NTCAdd the 2002 North Thompson Creek Aerial Photograph on the slide.GM=Geomorphic Map
3Slide needs more instructions on what technical lectures needed to be reviwed.Modify text on lecture to replace the statement of "or by watching a technical lecture" with "or by reviewing technical lecture slides 3-12."LP= Long Profile
3Text on slide below technical lecture tabDelete text belew technical lecture tab
3Aerial photgraph in RM but had not been presented to student/learner yet.Delete Aerial Photograph from RM
3RM needs work and add organization of materials presented in RMAdd folder (NTC Maps) and place the non-interactive maps under the tab and carry that forward to other slides.
4Needs to have a consistent appraoch between how material is presented in Hogback Creek and North Thompson CreekDelete technical lecture tab and any reference to watching technical lecture. Delete text under technical lecture tab.
5Slide 5 Phase 1 NTC needs to be consistent with Phase 1 slide 5 Hogback CreekDelete Technical lecture tab from slide 5, delete text under technical lecture tab on slide
5RM needs work and add organization of materials presented in RMAdd folder (NTC Maps) and place the non-interactive maps under the tab and carry that forward to other slides.
5RM needs quality controlAdd folder (NTC Tables and Videos) and videos under that tab and carry that forward to other slides
6Video does not have any information as to what is being presented or by whomAdd title to video; video title should include name of presenter/ job title and focus of video: Mark Weinhold, Forest Hydrologist, White River National Forest,Watershed Characteristics of North thompson Creek Watershed.
6text telling what technical lectures to watch but no technical lecture tabDelete text referring to what thechnical lecture to watch on the slide.
6RM needs work and add organization of materials presented in RMAdd folder (NTC Tables and Videos) and videos under that tab and carry that forward to other slides
8Need to have consistency between how material is presented in Hogback and North Thompsom RWE.Slide 8 should contain the "Initial Site recon" presentation (currently contained on Slide 9).
8Needs clarification on what techical lectures to review and have the correct maps and tables in RM.Modify slide 9 text "or by watching lecture with"by reviewing Technical Lecture Slide13-18".
8Text below technical lecture incorrect.Delete reference to what lectures to watch below technical lecture tab.
9Text inccorctSlide 9 should be the knowledge test. Swap slide 8 and 9. Slide 8 should contain the Initial Site recon and Slide 9 should contain the knowledge test.
10Add title to video.Title should be "results of Intial Recon North Thompson Creek" Mark Weinhold Forest Hydrologist.
10Exercise map incorrectly labeled on slideMap descriptive text on slide should be "Sketch Map of North Thompson Creek".
10RM needs work and quality controlCarry the changes from Slide 5 forward and palce the maps under the appropriate folder/tab and delete technical lecture from RM.
10Photo #5 shows an upstream view, but not the outlet plunge pool.Modify the description of an upstream view of a glide entering the top of the pool.
10Photo 6 text not correctModify text to say "View of effect of culvert outflow on North Thompson Creek"
10Photo #7 and 10-15 are incorrect.Modfy the text so that is consistent with the photographs.Contractor/PA Coordination
11Photo on slide is questionabale of its value, does not demonstrate the need to identify project design standardsReplace photograph with Sketch map photograph #5 with appropraie text
11RM needs work and quality controlCarry the changes from Slide 5 forward and palce the maps under the appropriate folder/tab and delete technical lecture from RM.
12Why do we have a rm tab on slide 12 when it is a knowledge testDelete RM from slide. It is not necessary to have the RM when the purpose of the slide is knowledge check.
12Slide contains design informationDelete reference to design criteria from slide
13RM needs workCarry the changes from Slide 5 forward and place the maps under the appropriate folder/tab and delete technical lecture from RM.
13Slide contains design informationDelete reference to design criteria from slide
13Text incomplete or needs some editingDelete the second paragraph and add the following text to Phase 1, Slide 13; "If the student is not confident that they have mastered all of the topics presented in Phase 1 (Intial Watershed and Reach Review), they should review technical lectures 3-18 or technical document chapter 4 before proceeding forward to Phase 2. if the student has mastered all the subject areas presented in Phase 1, they they should proceed forward to Phase2."
21Text on slide 1 nned to be modifiedAdd the following text as the first paragraph. "In Phase 2 the student will be exposed to Site Assesssment (Cross Sections, Grade Control and Longitiundal Profile), Analyzing and Interpretating Channel Planaform Patterns, Analyzing Physical characteristics of a Channel and Project Risk Assessment".
1Photgraph on slide needs descriptive textAdd descriptive text for photograph "downstream view of North Thompson Creek near culvert inlet and downtream of a long riffle".
1The RM does not provide a service to the learner on this slide.Remove RM tab from this slide.
2Slide needs more instructions on which technical lecture to review and RM that are available to the student.Modify slide 2 text by replacing the statement of watching a technical lecture with "by reviewing Technical Lecture Slides 3-7".
2RM needs work and quality controlRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 needs to be consistent with the RM content at the end of Phase 1.Contractor/PA Coordination
2Photgraph on slide needs descriptive text and a better picture other than to show a creek with evidence of sediment accumulation.Replace the exisitng photgraph with photgraph #5 with the following text: "View of channel conditions and bank erosion near an culveet inlet North Thompson Creek".
3Slide needs more instructions on which technical lecture to review.Modify the text to "by reviewing Technical Lecture Slide 13-18".
3RM needs work and quality controlRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 needs to be consistent with the RM content at the end of Phase 1.Contractor/PA Coordination
3Excersie map on slide needs better titleTitle of Exercise map should be Sketch Map-Geomorphic Contour Map North Thompson Creek
3Interaction (Site Sketch Map and Geomorphic Contour Map): The same photos are shown on the the GM and the SM. This is not necessary and provides no additional benefit to the student.Spatially connect the sketch map and the geomorphic map; turn off the photos icon on the GM but turn on all of the crosss sections on the GM for the channel conditions; the maps that should be active on the GM should be the ones associated with the cross sections.. When the photo icon is clicked on the location on the geomorphic map needs to be highlighted. When you click on the cross section on the geomorphic map the location needs to be highlighted on the sketch map. None of the photos on the excersise map have the correct title (North Thompson Creek Photo #) or any descriptive text. The photos need to have the correct title and the correct text. the same goes for the cross sections
4Technical lecture tab does not workFix it so the techncial lecture button/tab goes to "undefined"., it should go to technical lecture slide 23.
4Slide needs more instructions on which technical lecture to review.Modify slide 4 text "by reviewing Technical Lecture Slide 23-33".
4RM needs work and quality controlRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 needs to be consistent with the RM content at the end of Phase 1.Contractor/PA Coordination
4On the slide all the graphics are the same. The maps are not interactive but static maps. The maps in the exercise needs to be interactive so that the student can click on the survey point and the location on the geomorphic map is highlighted.Replace the map icons with one icon on the slide. The long pro-gemorphic map that comes up needs to be spatially connected have the photo icons on the geomorp map active and the photo icons with the corrects photos. The cross sections need to be active on both the geomorphic and long pro maps with their proper description.
4Map in the exercise is a pdf not an interactive map. The map needs to be interactive to help the student complete the exercise.Spatially connect the long profile and and interactive and the geomorphic map.When yo click on an icon or cross section it also needs to highlight on the long profile map, or what is the purpose on the comboniation map.Contractor/PA Coordination
5Needs clarification on what techical lectures to review and what to read in in technical document.Modify slide 5 text "by reviewing Technical Lecture Slide 34-44".
5Excerise map presented on slide needs a titleChange the title to Longituidal Profile-Geomorphic Map for North Thompson Creek-Grade Control
5RM needs work and quality controlRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 needs to be consistent with the RM content at the end of Phase 1.Contractor/PA Coordination
5The exercise map that opens up is a statsic map and not interactive map. The maps in the exercise needs to be interactive so that the student can click grade controls.Repalace the static map with an interactive long pro geomorphic map.
5There are no numbers next to the grade controls on the geomorphic map (no stability ratings to compare).Spatially connect the long profile and the geomorphic map; turn off the photos icon on the GM but turn and number the grade controls on the GM. When the grade control icon is clicked on the geomorph map, then the location on the long profile map is highlighted. The photgraph attached needs to be of the grade control with the proper descriptive text. No other photo icons need to be active on the the geomorphic map other than the grade control icons. Use photos from NTC Grade Conntrols photos.doc
5Stability table opens on top of map, preventing comparison of stability ratings on map with table.Add the ability to print the grade control stability table; add an exercise resource tab and have the stability table in the ER. Add a technical document button or tab in the lower right corner of the er map.
5This comment was orginally made for slide 4 but is more appropriate for slide 5. The print function on long profile and geomorphic map should print each on a separate large format (11 X 17) page in landscape orientation.The maps listed on the exercise should be spatially connected and interactive and not pdf maps. These maps and their print capability should be accomplished for the next excersie and loacted in the resources material tab (RM) or if necessary on slide 4 within the exercise resources (ER) tab.Contractor/PA Coordination
6Slide needs more instructions on which technical lecture to review.Modify slide 6 text by replacing statement of "or by watching a technical lecture" with "by reviewing Technical Lecture Slide 4-20".
6RM needs work and quality controlRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 needs to be consistent with the RM content at the end of Phase 1.Contractor/PA Coordination
6Slide map has no titleAdd a descriptive tile to the map icon on the slide "North Thompson Creek Cross Sections".
6when you click on the cross section on the geo morph map the location on the lp does not highlight, it works vice a versa.When you click on the cross section icon on the geo morph map the location should highlight on the LP map. Fix the connection to make the long pro map and the geomorph map spatially connected
6The exercise map that opens up is a statsic map and not interactive map. The maps in the exercise needs to be interactive so that the student can click on the cross sections on geo morphic map and see the location on the long profile map..Repalace the static map with an interactive long pro geomorphic map.make the cross sections active on the geo morphic map and highlight the locations on the long profile map
6The cross sections have the photographs but not any diagram showing the bankful.Add the diagrams to the cross section diagrams from NTC Cross Section (with bankful delineated).docContractor/PA Coordination
7Needs clarification on what techical lectures to review and what to read in in technical document.Modify text to "or by reviewing Technical Lecture slides 19-27.
7RM needs work and quality controlRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 needs to be consistent with the RM content at the end of Phase 1.Contractor/PA Coordination
7Slide map has no titleAdd a descriptive tile to the map icon on the slide "North Thompson Creek Cross Sections".
7The exercise map that opens up is a static map and not interactive map. The maps in the exercise needs to be interactive so that the student can click on the cross sections on geo morphic map and see the location on the long profile map..Repalace the static map with an interactive long pro geomorphic map.make the cross sections active on the geo morphic map and highlight the locations on the long profile map
8Slide needs more instructions on which technical lecture to review.Modify slide 8 text by replacing the statement of "or by watching a technical lecture" with "by reviewing Technical Lecture Slide 28-36".
8RM needs work and quality controlRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 needs to be consistent with the RM content at the end of Phase 1.Contractor/PA Coordination
8Slide map has no titleAdd a descriptive tile to the map icon on the slide "North Thompson Creek Sediment Sampling Locations".
8Interaction (Long Profile Map and Geomorphic Contour Map): The long pro/geomorphic map are not spatially connected. They are static map. When the students clicks on the cross section on the geomorphic map nothing happensReplace the static maps with patially connected the maps so that when the student clicks on the highlighted cross section on the LP map, the cross section is highlighted on the geomorphic map; delete the photos icons on the geomorphic map if they are not going to be active. Add the "North Thompson" to the title box. More explanation needs to be added to the cross section descritption
8Instructions are inadequate for the exercise map.Instructions for the exercise needs to be modified to tell the student that grade controls are not active for this exercise and that only XS 1 and XS3 are active for this exercise.
9Slide needs more instructions on which technical lecture to review.Modify slide 9 tex by replacing the text of "or watching a technical lecture" with "by reviewing Technical Lecture Slide 56-59".
9RM needs work and quality controlRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 needs to be consistent with the RM content at the end of Phase 1.Contractor/PA Coordination
9Slide map has no titleAdd a descriptive tile to the map icon on the slide "North Thompson Creek Sediment Sampling Locations".
9The exercise map that opens up is a static map and not interactive map. The maps in the exercise needs to be interactive so that the student can click on the cross sections on geo morphic map and see the location on the long profile map..Repalace the static map with an interactive long pro geomorphic map.make the cross sections active on the geo morphic map and highlight the locations on the long profile map
9The text for the cross sections highlighted has no descritpition of bank characteristics, which is the point of the presentationAdd description of bank characteristics and channel morphology. PA will provide these descriptions.
9Interaction (Bank Characteristics): The spatial relationship between survey points on the longitudinal profile and geomorphic-contour map is NOT correct for this interaction.Spatially link the the long pro map and the geomorp map. The maps in the exercise are static maps and need to be replaced with interactive maps. When you click on the geomorp map highlighted XS, the XS on the long pro map needs to be highlighted. The photos are connected to the geomorph map.
10Slide needs more instructions on which technical lecture to review.Modify slide 10 text "by reviewing Technical Lecture Slide 61-65".
10Photgraphs overlain over text on technical lecture 61Resize photograph size so as not to overlay or block text.
10RM needs work and quality controlRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 needs to be consistent with the RM content at the end of Phase 1.Contractor/PA Coordination
10Exercise map has no titleAdd a descriptive tile to the map icon on the slide "North Thompson Creek Geotechnical Technical Sampling Locations".
10Interaction (Bank Characteristics): The spatial relationship between survey points on the longitudinal profile and geomorphic-contour map is NOT correct for this interaction.Spatially link the the long pro map and the geomorp map. The maps in the exercise are static maps and need to be replaced with interactive maps. Place the photo icons on the geomorp map that is related to the subject material being presented.
10There are no icons on the geomorphic map to review the results of the preliminary geotechnical investigation.See comments above
10The instructions pop up on the exercise map states "Click on the icons on the geomorphic-contour map to review the results of the preliminary geotechnical investigation conducted at the North Thompson Creek road-stream crossing". Yet none of the cons on the geomorphic maps are active since the map is a pdf and not an interactive map.Activate the icons on the geo morph map after you spatially connect the exercise map.
11There is no good technical lecture for this slide.Modify slide 11 text deleting technical lecture button from slide and reference to watching a technical lecture.
11Exercise map has no titleAdd a descriptive tile to the map icon on the slide "North Thompson Creek Roadway and Travel Considerations".
11RM needs work and quality controlRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 needs to be consistent with the RM content at the end of Phase 1.Contractor/PA Coordination
11Excerise map on the slide map has no titleAdd a descriptive tile to the map icon on the slide "North Thompson Creek Road Travelway and Construction Considerations".
11Interaction (Road Travel-Way and Construction Considerations): The spatial relationship between survey points on the longitudinal profile and geomorphic-The maps in the excercise are static and not interactive maps. Replace the long pro and geo morph map with an interactive geomorphic map with cross section 4 and 5 active and the culvert photo ico active with the approppriate pictures. Since the topic is roadway consideration, only thing that needs to be active is what contributes to the presentation
11Click on the icons on the geomorphic-contour map to learn about road travel-way and construction considerations at the North Thompson Creek road-stream crossingThe instructions pop up on the exercise map states "Click on the icons on the geomorphic-contour map to review the results of the preliminary geotechnical investigation conducted at the North Thompson Creek road-stream crossing". Yet none of the cons on the geomorphic maps are active since the map is a pdf and not an interactive map.Activate the icons on the geo morph map realted to the stream crossing after you spatially connect the exercise map.
12Photgraphs on slide 12 needs a better descriptive text.Modify the descriptive text to include "Condition of North Thompson Creek in channel conditions showing channel bed accumalation of cobbles, boulders and large woody debris".
12In the technical lecture there is no real description of channel planform and currently goes to the riprap slideReference to technical lecture should be modified to review technical document "Chapter 5.2 Analyzing and Interpreting Site Data" and delete the technical lecture tab and reference to watching a technical lecture
12To be consistent with the Technical Document, consider using the term lateral adjustment potential in the text .Modify the txt on the slide of “channel planform” with “channel lateral adjustment potential”.
12RM needs work and quality controlRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 needs to be consistent with the RM content at the end of Phase 1.Contractor/PA Coordination
12Excerise map on the slide map has no titleAdd a descriptive tile to the map icon on the slide "North Thompson Channel Lateral Adjustment".
12Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active.delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example. However, none of the materials in the Resource Materials tab will display once the exercise is launched".
12When you come to step 1 and 2 of the excersie you can"t see where you have delineated the new channel. Step 3 you can not see the proper delineation of the channel.Fix step 1 and 2 so that you can see where the channel is delienated.
12The map contained in the Excersie resource is the geomorphic map, but is interactive. Thaa is the map that should be spatially connected for the exercise not the pdf map. The pdf maps should be in either the exercise resource or the the resources material.Modify the excersie compbo map of long profile-geomorphic map to make it spatially connected and interactive.Contractor/PA Coordination
12No icons on geomorphic map active for this exercise. The geomorphic map serves as the background for the exercise.XS 4 and XS 5 should be highlighted on geo morphic map
13Photgraph on slide needs descriptive textDescriptive text is as follows "View of North Thompson Creek riffle that is composed primarily of cobbles and gravels. Site is located near cross section 1 and grade control 2".
13Modify Chapter to read in technical document and provide more instructions on which technical lecture to review.Modify slide 13 text "by reading Technical Document Chapter 5.2 and "by reviewing Technical Lecture Slide 50-60". Right now the technical lecture goes to slide 45 not slide 50.
13RM needs work and quality controlRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 needs to be consistent with the RM content at the end of Phase 1.Contractor/PA Coordination
13No information on identifying the long profile assessment process in the resources materialAdd longituidal profile assessment profile.pptx to the rm
13Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active.delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example. However, none of the materials in the Resource Materials tab will display once the exercise is launched".
13Exercise is not working right. It woorks fine up to step 4. When you go to click on pool associated with segment H it does not work right.Install a fix to this problem. Install a button that will allow the reviewer to proceed forward from step to step. Unable to complete the review of the long pro exercise because I could not proceed from step 4 forward.
13Once you are operating in the excerise, if you zoom in to see it better, you are not able to zoom out. You have to exit to begin the exercise over again.Modify the exercise map to allow the student to zoom in and out on the LP map after you begin the exercise.
13Excersie resources needs aditional informationAdd the following document to the ER for phase 13 slide 2: Longitudial Profile Assessment.pptx
14Photgraph on slide needs descriptive textDescriptive text is as follows "View of cross sections of North Thompson Creek that shows the conditions including bedload and stability of the channel".
14There is no good technical lecture for this slide.Delete reference on slide to "watching a technical lecture" and delete technical lecture button on slide
14Modify Chapter to read in technical documentModify slide 14 text "by reading Technical Document Chapter 5.1.
14RM needs work and quality controlRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 needs to be consistent with the RM content at the end of Phase 1.Contractor/PA Coordination
14No information on identifying the long profile assessment process in the resources materialAdd longituidal profile assessment profile.pptx to the rm
14Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active.delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example. However, none of the materials in the Resource Materials tab will display once the exercise is launched".
14excersie step 1 photograph text is flawed; the diagram should not contain the channel floodplan diagram before the student completes the action of identify the floodplan height of the cross sectionModify the diagram to show the diagram after the student/learner complete the activity. Delete the diagram from the photgraph after the student complete step 1. The diagram tab/button should only show up when the student completes step 1 and step 2 for each cross section.Contractor/PA Coordination
14Step 1 delination bankful and step 2 delinae floodplain. The text changed from cross section description to grade control rather than cross section description. XS 1 is correct but the remaining cross sections are not rightrefer to how the photo changes from cross section 1 as the student completes the exercise. That is how it should change for the remaining of cross sections.
14Excersie resources is populated wit the results of the previous delination. This is not necessary. It maybe be better to just have one cross section results populated as an example to the student.Modify the ER to have only Cross section 1 example after the student completes step 1 and step 2.Contractor/PA Coordination
14Step 3 there are no instuctions on how to achieve these measurementsModify the insturctions to tell the student how to answer these questions.
14Unable to go backward in Q&A.Place the Q&A with the coreect answer in the ER after it is answered.
14ER has excessive material available to the studentModify the individual cross sections. Having the tables for cross section summary should provide the student with all the information they need to complete this exercise.
15Photgraphs do not have descriptive text.Descriptive text is as follows "View of North Thompson Creek near cross sections 1 and 2 showing the bedload and stability of the channel".
15Modify Chapter to read in technical document and provide more instructions on which technical lecture to review.Modify slide 15 text "by reading Technical Document Chapter 5.2.or "by reviewing Technical Lecture Slide 32-45".
15RM needs work and quality controlRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 needs to be consistent with the RM content at the end of Phase 1.Contractor/PA Coordination
15No information on identifying the long profile assessment process in the resources materialAdd longituidal profile assessment profile.pptx to the rm
15excesise Resources information is missingCross Section Summary Chart is missing
15Excessive files when you begin the excercise. Why does the cross sections photgraphs along with graphs come up when this exercise is about sediment. This excessive files, also a pebbel count chart comes up that does not help the student complete step 1 of the excercise.PA will work with the contractor on what is necessary to complete that exercise.
15Unable to move exercise resources (i.e., particle size distribution plot) out of the way to complete the exercise.Place a tab on the table that allows the student to minimize it
15The instructions are incomplete. It does not tell the student to compute the d95 or any other diameter from the table providedPA will work with the contractor on modifying the instructions for each step.
15It is not possible to go back on check on the answers from the Q/A part of the exercise.After the question is answered place the complete Q/A in the ER
15There is a superfluous comma in the Q&A, between sediment and sample sites.Delete the unecessary comma from the Q&A for sediment and sample sites
16Modify Chapter to read in technical document and provide more instructions on which technical lecture to review.Modify slide 13 text "by reading Technical Document Chapter 5.3.or "by reviewing Technical Lecture Slide 67-79".
16RM needs work and quality controlRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 needs to be consistent with the RM content at the end of Phase 1.Contractor/PA Coordination
16No information on identifying the long profile assessment process in the resources materialAdd longituidal profile assessment profile.pptx to the rm
16Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active.delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example. However, none of the materials in the Resource Materials tab will display once the exercise is launched".
16Excessive files when you begin the excercise. What value is the cross section summary when the topic of the exercise is risk assessmentPA will work with the contractor on what is necessary to complete that exercise.
excesise Resources information is missingCross Section Summary Chart is missing
16It is not possible to go back on check on the answers from the Q/A part of the exercise.After the question is answered place the complete Q/A in the ER
16The geomorphic is not interactive so it provide little or no value to the exercise.Replace the static geomorphic map with an interactive geomorphic map with the cross sections active along with the photos and descriptive text from NTC Cross section photos with bankfull deleinated.
17replace the send paragraph and add the following text to Phase 2, Slide 17 as the second paragraph; "If the student is not confident that they have mastered all of the topics presented in Phase 2 (Site Data collection, site Assessment, Longitundial Profile and Site Risk Assessment), they should review technical lectures 3-80 or technical document chapter 5 before proceeding forward to Phase 3. if the student has mastered all the subject areas presented in Phase 2, they they should proceed forward to Phase 3."
17Resources Material is not necessaryDelete resources material tab from this slide.
31Add the learning objectives for phase 3Add the followingstatement at the beginning og the second paragraph: "During Phase 3 the student will be presented with the design process of developing a aquatic organism passage process for North Thompson Creek". The student should understand that the design process is not linear.
1Video on Slide 1 is on the wrong slideMove video from slide 1 to slide 2
1Resources Material is not necessaryDelete resources material tab from this slide.
2Photograph on slide 2 needs a descriptive textAdd the following text to slide 2 for the photgraph: "Plunge pool created from water flow from culvert outlet on North Thompson Creek."
2Video needs a timer and title added so it is consistent with the way in which the information is presented in Hogback Creek RWEVideo needs a title based on content and a timer to show the student how long it is.
2Needs more instruction on the slide on what technical lectures to review. Currently technical lecture goes to slide 30. It should go to slide 11.Modify the statement "watch a technical lecture" with "review technical lecture slide 11-16". Change the assignment so it goes to slide 11 to begin.
2RM needs work and quality controlRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 needs to be consistent with the RM content at the end of Phase 1.Contractor/PA Coordination
2No information on identifying the long profile assessment process in the resources materialAdd longituidal profile assessment profile.pptx to the rm
2Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active.delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example. However, none of the materials in the Resource Materials tab will display once the exercise is launched".
2Excessive files when you begin the excercise. What value is the cross section summary when the topic of the exercise is risk assessmentDelete the Cross Section Photgraphs 1-9 from the Exercise Resources
2Structures are not added to the map by clicking or rotating. The base map is a static and not an interactive map.Step 1 structure 1, the image of the culvert alingnment needs to displayed on the background map this the same for Step 2, Structure 2. Change the static map to an interactive map. Fix step 1 and 2 so it visually dispalays where the crossing alignment should be displayed.
2The geomorphic is not interactive so it provide little or no value to the exercise.Replace the static geomorphic map with an interactive geomorphic map with the cross sections4 and 5 active along with the road stream crossing photo.
2Q&A – Diagram needs a north arrow and flow direction lines to answer the question about access.Place an arrow in the road stream crossing near the crossing indicating the direction of flow and a an arrow indicating north on the map.
3Needs more instruction on the slide on what technical lectures to review.Modify the statement "watch a technical lecture" with "review technical lecture slide 30-41".
3Maps presented on slide needs a descriptive textThe recommended text should be "North Thompson Creek Geomorphic Map and completed Longituidal Summary Profile"
3RM needs work and quality controlRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 needs to be consistent with the RM content at the end of Phase 1.Contractor/PA Coordination
3No information on identifying the long profile assessment process in the resources materialAdd longituidal profile assessment profile.pptx to the rm
3Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active.delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example. However, none of the materials in the Resource Materials tab will display once the exercise is launched".
3At the begginning of Step 1 Identify a second upstream control point the ER goes from 5 to 2, but the map that brings up is a static map. None of the icons are active and is of no value to the material being presnted.Change the map from a static to an interactive map with the crossections both upstream and downstream active (with their proper text) and the grade controls associated with the cross sections both upstream and downs stream of the road-stream crossing.
3Instruction for step 2 a needs to be modifiedPA will work with the contractor on what the instructions needs to be changed to to make the step activities clearer.
3Instructions at the end of the excersie is of no value as it is the same intructions that come up at the beginning of the exercise.delete the instructions tab at the end of the exercise.
3The geomorphic map in the ER is of not value to completion of the exercise.As previously stated replace the static map with an interactive map that has the cross sections and grade controls active that support the comletion of the exercise.
4The diagrams presented on slide 4 need a descriptive text.Add the following desprtive text to slide 4: "Cross section shape diagrams for North Thompson Creek".
4The technical lectures presented need to be consistent with what is presented in Hogback Creek RWE Phase 3, Slide 4Correct the technical lectures available to what is presented in HC RWE Phase 3, Slide 4
4Needs more instruction on the slide on what technical lectures to review.Modify the statement "watch a technical lecture" with "review technical lecture slide 16-19".
4RM needs work and quality controlRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 needs to be consistent with the RM content at the end of Phase 1.Contractor/PA Coordination
4No information on identifying the long profile assessment process in the resources materialAdd longituidal profile assessment profile.pptx to the rm
4Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active.delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example. However, none of the materials in the Resource Materials tab will display once the exercise is launched".
4The geomorphic map in the ER is of not value to completion of the exercise.As previously stated replace the static map with an interactive map that has the cross sections and grade controls active that support the comletion of the exercise.
5The diagrams presented on slide 5 need a descriptive text.Add the following desprtive text to slide 5: "sediment size graphs and diagrams".
5Needs more instruction on the slide on what technical lectures to review.Modify the statement "watch a technical lecture" with "review technical lecture slide 1-17".
5RM needs work and quality controlRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 needs to be consistent with the RM content at the end of Phase 1.Contractor/PA Coordination
5No information on identifying the long profile assessment process in the resources materialAdd longituidal profile assessment profile.pptx to the rm
5Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active.delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example".
5The geomorphic map in the ER is of not value to completion of the exercise.As previously stated replace the static map with an interactive map that has the cross sections and grade controls active that support the comletion of the exercise.
5Step 1 of the exercise does not provide sufficent guidance on how to calculate the answersDevelop better instructions based on the fuller thompson equations shown on the exercise slideContractor/PA Coordination
6Needs more instruction on the slide on what technical lectures to review.Modify the statement "watch a technical lecture" with "review technical lecture slide 66-80".
6Design criteria shown on slideDelete reference to design criteria from slide
6RM needs work and quality controlRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 needs to be consistent with the RM content at the end of Phase 1.Contractor/PA Coordination
7The diagrams presented on slide 7 need a descriptive text.Add the following desprtive text to slide 7: "North Thompson Creek Crossing Structures Design and Diagrams".
7Needs more instruction on the slide on what technical lectures to review.Modify the statement "watch a technical lecture" with "review technical lecture slide 19-31".
7Slide contains design informationDelete reference to design criteria from slide
7RM needs work and quality controlRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 needs to be consistent with the RM content at the end of Phase 1.Contractor/PA Coordination
7Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active.delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example".
8Knowledge check on large woody debris questions but no information in resources material.PA will work with the contractor on how to improve the resources material for phase 3 and to provide reports on role and riask of in channel debris cloggis culverts and preventing fish passage during storm flow events.Contractor/PA Coordination
9Modify text on slidereplace the second paragraph by adding the following text to Phase 3, Slide 9; "If the student is not confident that they have mastered all of the topics presented in Phase 2 (Stream Simulation Design, Manage Risk Factors at the crossing location and development of alternative structures), they should review technical lectures 9-42 or technical document Chapter 6 before proceeding forward to Phase 4. if the student has mastered all the subject areas presented in Phase 3, they they should proceed forward to Phase 4."
9Reference to RM needs to be deleted from slideDelete the second paragraph starting with "Please note…."
9RM tab not necessary for this slide.delete RM tab from slide and delte reference in text to resources material.
All slidesThe geomorphic maps located in the ER is not spatially connected nor is it interactive. It is a static map and of little value to the student in completion of the excercises.replace all of the static maps with interactive maps and make the icons active, based on the point of the exercise.
All slidesRM needs organization structure and consistency in how they are organized in the Hogback Creek RWEPA will work with the contractor on how to accomplish of having consistency with other RWE examples presented.
41Reference to RM needs to be deleted from slideDelete the second paragraph starting with "Please note…."
1Add learning objectives for Phase 3 to slide 1.Incorporate the following text on slide Phase 4, Slide 1 as the first paragraph: "During Phase 4 the student will be presented with the process of development of a final design and contract preparation for an AOP project. This will inlcude the following tasks that the student will be taught are as follows: (replace the statement "The next tasks are")
1Diagrams have no descriptive textModify text under diagrams to "Engineering Diagrams of AOP Structure".
1RM tab has no purpose on the first slideDelete the RM tab from the first slide
1Slide contains design informationDelete reference to design criteria from slide
1Slide 1 has an exercise tab that just takes back to the beginning of phase 3.Modify exercise tab from slide 1 to "Return to Phase 3".
2Photograph has no descriptive text"Example of AOP structure".
2Needs more instruction on the slide on what technical lectures to review.Modify the statement "watch a technical lecture" with "review technical lecture slide 3-11".
2RM tab has no purpose on the first slideDelete the RM tab from the first slide
2Slide contains design informationDelete reference to design criteria from slide
3Diagram on slide has no descriptive textModify text under diagrams to "AOP Crossing Structure Diagram".
3RM needs work and quality controlRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 needs to be consistent with the RM content at the end of Phase 1.Contractor/PA Coordination
3Slide contains design information even though structure and design has not been slected yet.Delete reference to design criteria from slide
3Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active.delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example".
3The exercise resources has excessive files at the beginning of the exerciseDelete the design summary table from the exercise resources at the beginning of the exercise.
3The geomorphic maps located in the ER is not interactive and it is of little value to the student in completion of the excercises.replace all of the static maps with interactive maps and make the icons active, based on the point of the exercise. The completed long profile summary map while it is interactive the photographs associated with the XS have no decritptive text. Add the appropriate descriptive text.
4need more information on what technical lecture to watch.Modify the statement "watch a technical lecture" with "review technical lecturem slides 3-24".
4RM needs work and quality controlRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 needs to be consistent with the RM content at the end of Phase 1.Contractor/PA Coordination
4Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active.delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example".
4The exercise resources has excessive files at the beginning of the exerciseDelete Design 1 and Design 2 Tables from ER
4The geomorphic maps located in the ER is not interactive and it is of little value to the student in completion of the excercises.replace all of the static maps with interactive maps and make the icons active, based on the point of the exercise.