Copy_of_Hog_Creek_RWE_SOW_final.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
AOP Training DVD Project Federal contract opportunity
Solicitation number
AG-91S8-S-16-0001
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Attachment 2 - Hogback Creek RWE

View the file

Other files for this federal contract opportunity

Other files attached to AOP Training DVD Project, newest first.
File Type Posted
Questions_for_AG-91S8-S-16-0001_FS_reply.docx DOCX document
SF_30-2.pdf PDF
SF_30-1.pdf PDF
Copy_of_Comprehensive_AOP_SOW_final.xlsx XLSX spreadsheet
Solicitation_-_Do_Not_Reply_(4).pdf PDF
Copy_of_North_Thompson_Creek_RWE_SOW_final.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

combined review BG MW

Hogback Creek RWE Attachment #2SOW Changes that need to be made.2014-2015
PhaseSlideCommentTasks to be doneAdditional commentsLegend
13Needs clarification on what techical lectures to review and what to read in in technical document. RM is OKModify text from "by reading ..to reading Technical Document Chapter 4.4 or by reviewing Technical Lecture Slides 3-12".RM= Resources Material
4RM needs some changesMap in RM needs to be renamed to " 2002 Aerial Photograph of Hogback Creek"ER=Exercise Resources
5RM needs some changesModify the RM to reflect chnages made in slide 4.GC=Grade Control
6Maps in RM need to be renamed to be consistent with name presented in previous slides and tables need to be added that were presented in Slide 5Modify the RM by completion of the following tasks: Carry the changes forward from RM in slide 5 and rename existing table to : "Summart Table of Hogback Creek Fish Distribution" and add "Summary Table of Lolo National Forest Culvert Barriers"XS=Cross Sections
7RM tab on slide 7 is not necessary as it is a knowledge test from what was presented in phase 1Delete RM tab from slide 12GM=Geomorphic Map
8Needs clarification on what techical lectures to review and have the correct maps and tables in RM.Modify slide 8 text "or by watching lecture with"by reviewing Technical Lecture Slide13-18".LP= Long Profile
8RM needs to be upgraded to present material to the student that has been presented in previous slidesMake sure the changes made to RM for slide 6 are incorporated into slide 8 RM and add "Topographic Map of Hogback Creek Watershed" and Mass Wasting Map of the Hogback Creek Watershed"; modifty the tables presented to include "Summarizing Hogback and Rock Creek Flood-Frequency Discharge Estimates"
9RM tab on slide 9 is not necessary as it is a knowledge test from what was presented in phase 1Delete RM tab from slide 12
10Exercise map incorrectly labeled on slideChange caption to Interactive Sketch Map Hogback Creek.
10Maps in RM need to be renamed to be consistent with name presented in previous slides and tables need to be added that were presented in Slide 5 and 6Modify the RM for slide to to ensure that the chnages that were made in slide 8 are carried into slide 10
10No photgraphs attached to cross sections highlighted only diagramsadd photographs from 3March2008.pdf to the cross sections of the interactive map
11RM needs to be modified to include material presented in previous slidesModify the RM for slide to to ensure that the chnages that were made in slide 10 are carried into slide 11
12RM tab on slide 12 is not necessary as it is a knowledge test from what was presented in phase 1Delete RM tab from slide 12
12RM tab on slide 12 is not necessary as it is a knowledge test from what was presented in phase 1Delete RM tab from slide 12
13Text incompleteDelete the second paragraph and add the following text to Phase 1, Slide 13; "If the student is not confident that they have mastered all of the topics presented in Phase 1 (Intial Watershed and Reach Review), they should review technical lectures 3-18 or technical document chapter 4 before proceeding forward to Phase 2. if the student has mastered all the subject areas presented in Phase 1, they they should proceed forward to Phase2."
21Text incompleteInsert the following text at the beginning of first paragraph: "In Phase 2 the student will be exposed to Site Assesssment (Cross Sections, Grade Control and Longitiundal Profile), Analyzing and Interpretating Channel Planaform Patterns, Analyzing Physical characteristics of a Channel and Project Risk Assessment". The first paragph on the slide will now become the second paragrph of the slide.
2Slide needs more instructions on which technical lecture to review.Modify slide 2 text "by reviewing Technical Lecture Slide 3-7".
RM is incompleteRM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 RM need to be carried forward from this point on forward.
2Interactive Sketch Map photgraphs are incomplete for the cros sections.Add photographs from 3March2008.pdf to the cross sections pop up. PA will work with the contractor which photgraphs to use.Contractor/PA Coordination
3Slide needs more instructions on which technical lecture to review.Modify the text to "by reviewing Technical Lecture Slide 13-18".
3when you click on the technicial lecture it goes to slide 16. Not correct.When you click on technical lecture it should goe to slide 13 not slide 16.
3RM is incomplete and includes maps that have not been introduced to the student yet or from previous slides for Phase 2. Make sure the resources presented for Phase 1 is consistent with Slide 11 Phase1.RM needs to be consistent for Phase 1 with the previous RM Phase 1. Remove the Geomorphic map from Interactive maps from Phase 2.
3Resource materials tabs - Phase 2 Interactive Maps and Diagrams - the link to the sketch map does not work. They give an error messageMap link in RM does not work. Fix the link
3Exercise Map has incorrect titleChange title on exercise map to "Hogback Creek Sketch and Geomorphic-Contour Map"
3Interaction (Site Sketch Map and Geomorphic Contour Map): The number of photos on each map do not match. The Geomorphic-Contour Map has more photo icons shown.The only photos that should be active on the geomorphic map should be associated with the highlighted cross sections. Turn off all the photos on the geomorphic map that are not linked to the highlighted cross sections. When the student clicks in the highlighted cross sections it should also identify the location on the interactive sketch map.
4Slide needs more instructions on which technical lecture to review.Modify slide 4 text "by reviewing Technical Lecture Slide 23-33".
RM not working right.Fix it so that the geomorphic map is an interactive that brings up the correct map. The photo incons on the geomorphic map should bring up the highlighted cross sections. The interactive map should have the photo icons active but not the selected cross sections.Contractor/PA Coordination
4Interactive maps in RM not working correctly. When I clicked on the interactive maps in RM for Phase 2, no map came up, instead undefined came up for both maps and the combined map presented in slide 4 is not included under interactive maps for Phase 2.Fix the connections so that the correct map comes up when it is clicked on in the RM and add the exercise map from slide 4 (combined long pro/gemorphic map) to rm interactive maps phase 2.
4Interaction (Longitudinal Profile/Geomorphic-Contour Map): The two maps are not spatially connected and excessive photo icons on the geomorphic map that do not add to the point of the exercise.The GC icons should not be highlighted or active for this exercise. When you click on the LP map the XS on the GM is highlighted. When you click on the XS on the GM nothing is spatially connected on the LP map. this needs to be fixed. Also the only photo icons that should be active should be related teaching student about long profile map. Turn off photo icons unecessary from map that includes photo icon 29, 6,7, 15,13, 1 and 31.
5Slide needs more instructions on which technical lecture to review.Modify slide 5 text "by reviewing Technical Lecture Slide 34-44".
5maps are not spatially connected. Grade controls need to be shown on the long profile when the grade control number is highlighetd on the geomorphic map. No way to identify the location on the long pro map.When a student clicks on the gc on the geomorph map the location needs to highlight on the long profile map. If you can not spatially connect the grade control on the long pro exercise map then what is the point of having the map as part iof tge excercise.
6Slide needs more instructions on which technical lecture to review.Modify slide 6 text "by reviewing Technical Lecture Slide 4-19". Delete statement below technical lecture button.
RM needs worksFix the connection so that the right interactive map comes upContractor/PA Coordination
6when you click on the cross section on the geo morph map the location on the lp does not highlight, it works vice a versa.When you click on the cross section icon on the geo morph map the location should highlight on the LP map. Fix the connection to make the long pro map and the geomorph map spatially connected
6The cross sections have the photographs but not any diagram showing the bankful.Add the diagrams to the cross section diagrams from 21Feb2008.pdfContractor/PA Coordination
7The RM is incompleteUnder the interactive maps add the combined long pro/geomorph maps presented in slides 3, 4, 5 and 6.Contractor/PA Coordination
7when you click on the cross section on the geo morph map the location on the lp does not highlight, it works vice a versa.When you click on the cross section icon on the geo morph map the location should highlight on the LP map. Fix the connection to make the long pro map and the geomorph map spatially connected
8Slide needs more instructions on which technical lecture to review.Modify slide 8 text "by reviewing Technical Lecture Slide 28-36".
8Slide contains text under technical lecture buttonDelete text under technical lecture button.
8RM incompleteFix the maps that are in add the combined long pro/geomorphic maps that were presented on slides 3-7.Contractor/PA Coordination
9Slide needs more instructions on which technical lecture to review.Modify slide 9 text "by reviewing Technical Lecture Slide 56-59".
9Slide contains text under technical lecture buttonDelete text under technical lecture button.
9RM incompleteUnder interactive maps add the combined long pro/geomorphic maps that were presented on slides 3-8Contractor/PA Coordination
9Interaction (Bank Characteristics): The spatial relationship between survey points on the longitudinal profile and geomorphic-contour map is NOT correct for this interaction.Spatially link the the long pro map and the geomorp map. When you click on the geomorp map highlighted XS, the XS on the long pro map needs to be highlighted. The photos are connected to the geomorph map.Contractor/PA Coordination
9Interaction (Bank Characteristics): Of the six cross sections (XS1, XS2, XS5, XS7, XS8, XS9) only XS1 is correct. XS1 has the cross section description and characterization of the channel banks.
The captions for XS2, XS5, XS7, XS8, and XS9 have descriptions of grade controls and do NOT have descriptions of channel bank characteristics.Modify descriptions to cross sections to describe bank characteristics not grade control or cross sections. Only Cross sections 1, 2, 5, 7, 8 and 9 should be active. Delete phot icons 6 and 15..Contractor/PA Coordination
9On the geomorphic-countour exercise map there are excessive photo icons that are not related to subject materialDelete photo icons 29, 6, 7, 13, 1, 2 and 31 from the geomorph map. Only photgraphs that should be active are the ones linked to the cross sections.
10Slide needs more instructions on which technical lecture to review.Modify slide 10 text "by reviewing Technical Lecture Slide 61-65".
10Photgraphs overlain over text on technical lecture 61Resize photograph size so as not to overlay or block text.Contractor/PA Coordination
10RM incompleteWithin Phase 2, under interactive maps add the maps that were presented on slides 2-9. remove the geomorphic map from the rm ans it does not provide any value to the learner.Contractor/PA Coordination
10Interactive maps in RM do not work. When you click on them they go to "undefined'Fix connection so that the correct map is brought up.Contractor/PA Coordination
10The highlighted cross sections for xs 7 and 8 do not have the right photographs or descriptive text.XS 7 and 8 have grade control description not XS description. Use description 3March2008.pdf delinated for banfull for XS 7 and 8. Also add the diagrams as well as legend for XS 7 and 8 from Hogback XS's bankful 21Feb2008.pdf.Contractor/PA Coordination
10Interaction (Geotechnical Locations): The spatial relationship between survey points on the longitudinal profile and geomorphic-contour map is NOT correct for this interaction.Spatially connect the Long Pro and Geomorphic so when you click on the XS on the Geomorphic Map the XS on the Long pro Map is also highlighted.
11There is no good technical lecture for this slide.Modify slide 11 text deleting technical lecture button from slide.
11Since there will be no technical lecture to watch the slide should not tell students to watch a technical lectureDelete text tell students to watch a technical lecture.
11RM incompleteWithin Phase 2, under interactive maps add the maps that were presented on slides 2-10. remove the geomorphic map from the rm ans it does not provide any value to the learner.
11The Eexcersise map contains excessive active icons that do not contribute to the excerise being presented. This includes grade control, no cross sections and channel photgraphs.These icons are active but do not contribute to the subject to be presentedThe only icons necessary to be highlighted are the XS 7 and 8; GC 15 and 16 and photgraph icons 9, 13,and 14. Turn off all other active icons.
11Excersie map instructions are confusing and misleading.Modify instructions to tell the students that the only icons active are in reference to the road travel way
12There is no good technical lecture for this slide.Modify the text on the slide to read Technical Document 5.2. Delete any reference to a technical lecture, none of the lectures adequately refrence Channel Planform Analysis.
12To be consistent with the Technical Document, consider using the term lateral adjustment potential in the text .Modify the txt on the slide of “channel planform” with “channel lateral adjustment potential”.
12Modify Chapter to read in technical documentReference to technical lecture should be modified to review technical document "Chapter 5.2 Analyzing and Interpreting Site Data".
12RM incompleteWithin Phase 2, under interactive maps add the maps that were presented on slides 2-11. remove the geomorphic map from the rm ans it does not provide any value to the learner.Contractor/PA Coordination
12Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active.delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example. However, none of the materials in the Resource Materials tab will display once the exercise is launched".
12As you conplete Step 1 and click on photo icon 11 there is no imageFix it so that photo icon has the right photograph.
12In excersise step two, the SME answer should not have lines wider than the plunge pool from the undersized culvert .Modify the width of the lines to be consistent with the channel width.
12In the exercise the base map or background map is the geomorphic/contour map. Photos on the geomorphic/contour map are missing or in incorrect places.There are inadequate icons active for the material being presented.Photo icon 11 and 13 missing photograph and text. No icon for photo 16. Activate icons for XS 7 and 8 with the appropriate photos and text and grade control (GC) 15 and 16
13Indequate text for material presented on slide 13Add descriptive text for photograph and long pro of Hogback Creek.
13Modify Chapter to read in technical document and provide more instructions on which technical lecture to review.Modify slide 13 text "by reading Technical Document Chapter 5.2 and "by reviewing Technical Lecture Slide 49-60".
13RM incompleteWithin Phase 2, under interactive maps add the maps that were presented on slides 2-12. remove the geomorphic map from the rm ans it does not provide any value to the learner.Contractor/PA Coordination
13Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active.delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example. However, none of the materials in the Resource Materials tab will display once the exercise is launched".
13Excersie resources needs aditional informationAdd the following document to the ER for phase 13 slide 2: Longitudial Profile Assessment.pptx
14There is no good technical lecture for this slide.Delete reference on slide to "watching a technical lecture" and delete technical lecture button on slide
14Modify Chapter to read in technical documentModify slide 14 text "by reading Technical Document Chapter 5.1.
14RM incompleteWithin Phase 2, under interactive maps add the maps that were presented on slides 2-13. remove the geomorphic map from the rm ans it does not provide any value to the learner.Contractor/PA Coordination
14Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active.delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example. However, none of the materials in the Resource Materials tab will display once the exercise is launched".
14excersie step 1 photograph text is flawed; the diagram should not contain the channel floodplan diagram before the student completes the action of identify the floodplan height of the cross sectionModify the diagram to show the diagram after the student/learner complete the activity. Delete the diagram from the photgraph after the student complete step 1. The diagram tab/button should only show up when the student completes step 1 and step 2 for each cross section.Contractor/PA Coordination
14Step 1 delination bankful and step 2 delinae floodplain. The text changed from cross section description to grade control rather than cross section description. XS 1 is correct but the remaining cross sections are not rightrefer to how the photo changes from cross section 1 as the student completes the exercise. That is how it should change for the remaining of cross sections.Contractor/PA Coordination
14Excersie resources is populated wit the results of the previous delination. This is not necessary. It maybe be better to just have one cross section results populated as an example to the student.Modify the ER to have only Cross section 1 example after the student completes step 1 and step 2.Contractor/PA Coordination
14Step 3 there are no instuctions on how to achieve these measurementsModify the insturctions to tell the student how to answer these questions.
14In the Excerise Resources geomorphic map does not have the correct descriptions for the XS's. it is not necessary to have both the geomorphic map and ong pro/geo morph map both in the ER.The XS button on the long pro/geomorph map has diagrams for step 1 and step 2 before the student has completed the steps.delete the Geomorphic map from the ER, the long pro/geomorph map should only have the daigram button availabale after the student/learner completes the cross section analysis in step 1 and step of the exercise.Contractor/PA Coordination
15None of the diagram icons on the slide work.Modify the slide to have only one icon on the slide and make the icon active.
15Modify Chapter to read in technical document and provide more instructions on which technical lecture to review.Modify slide 13 text "by reading Technical Document Chapter 5.2.or "by reviewing Technical Lecture Slide 32-45".
15RM incompleteWithin Phase 2, under interactive maps add the maps that were presented on slides 2-14. remove the geomorphic map from the rm ans it does not provide any value to the learner. Then make sure all the links work correctlyContractor/PA Coordination
15Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active.delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example. However, none of the materials in the Resource Materials tab will display once the exercise is launched".
15Excessive files in ERDelete Geomorphic map, keep combo planaform map. After you do a step in the exercise is populated with the map and table from previous exercise. This is not necessary. The only resources that are necessary are those to complete that excecise.Contractor/PA Coordination
15ER Step 1Cross section Summary Chart missing
15Exercise base map has too many icons active, confusing to the learner.Add the diagrams of bankfull and the cross sections description are for grade control and not cross sections from Hogback XS'sbankfull 21feb2008.pdf. No reason to have the photo icons active that are not related to cross sections or grade control.
16Modify Chapter to read in technical document and provide more instructions on which technical lecture to review.Modify slide 13 text "by reading Technical Document Chapter 5.3.or "by reviewing Technical Lecture Slide 67-79".
16RM incompleteWithin Phase 2, under interactive maps add the maps that were presented on slides 2-14. remove the geomorphic map from the rm ans it does not provide any value to the learner. Then make sure all the links work correctlyContractor/PA Coordination
16within the RM none of the interactive maps work correctly. there are two steps. First step is to make sure that the correct material is provided in the RM and the second step is to make sure the links work rightFix the link to make sure the interactive maps work correctly.
16Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active.delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example. However, none of the materials in the Resource Materials tab will display once the exercise is launched".
16ER missing informationCross section Summary Chart missing
16Cross section photographs for XS2-9 are description for grade control and cross sections with bankfull delineated; use Hogback XS's bankful 21Feb2008.pdfAdd the diagrams of bankfull and the cross sections description are for grade control and not cross sections from Hogback XS'sbankfull 21feb2008.pdf.
16geomorphic bas map has too many icon highlighted or active.The only icons necessary to be highlighted are the xs. All the other icons neeed to be turned over as well as grade controls.
Slide contains design informationDelete reference to design criteria from slide
RM incompleteWithin Phase 2, under interactive maps add the maps that were presented on slides 2-15. remove the geomorphic map from the rm ans it does not provide any value to the learner. Then make sure all the links work correctlyContractor/PA Coordination
17Modify slide at the end of phase 2Move "to start phase 3" as the tird paragraph above the tab and delete the RM tab from the slide.
31Add learning objectives for Phase 3 to slide 1.Move learning objectives from its current place on slide 3 (last paragraph) to the beginning of the second paragraph. And delete the first sentence of the second paragraph
2Needs more instruction on the slide on what technical lectures to review.Modify the statement "watch a technical lecture" with "review technical lecture slide 11-16".
2text under technical lecture tab is mislocatedDelete text under technical lecture button.
2Video has no tile or subject for the learnerTitle should be Fish Passage Structure Design
2Photgraphs and graphs serve no purpose on slide 2 other than to take up spacedelete these items from slide 2 and replace them with the video "Fish Passage Structure Design".
2RM incompleteMake sure that Phase 1 and 2 have the correct maps laoded and they are functional from the completion of those Phases and they are functional and the tabs work.Contractor/PA Coordination
3Needs more instruction on the slide on what technical lectures to review.Modify the statement "watch a technical lecture" with "review technical lecture slide 30-41".
3text under technical lecture tab is mislocatedDelete text under technical lecture button.
3RM needs work and quality controlThe contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3.Contractor/PA Coordination
3Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active.delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example".
4Needs more instruction on the slide on what technical lectures to review.Modify the statement "watch a technical lecture" with "review technical lecture slide 16-19".
4text under technical lecture tab is mislocatedDelete text under technical lecture button.
RM needs work and quality controlThe contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3.Contractor/PA Coordination
4Grade control descriptions on Geomorphic Map are incorrect; they need to be updated so that the description includes the physical characteristics of the grade control. Grade control features are not active on longitudinal profile; they need to be .Turn off or delete the other photo icons that are not associated with either cross sections or grade control.
4Cross section photographs and descriptions are incorrect as they do not delineate or discuss bankfull. XS diagrams delineate bankfull. Cross sections are not active on the longitudinal profile; they need to be .Spatially connect the two maps. When you click on the XS on the geomorphic map the XS on the LP map should be highlighted. Add descriptive text Hogback Creek Photographs (bankful delinations) 3 March 2008.pdf.
5Needs more instruction on the slide on what technical lectures to review.Modify the statement "watch a technical lecture" with "review technical lecture slide 20-29".
5text under technical lecture tab is mislocatedDelete text under technical lecture button.
5RM needs work and quality controlThe contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3.Contractor/PA Coordination
5Grade control descriptions on Geomorphic Map are incorrect; they need to be updated so that the description includes the physical characteristics of the grade control. Grade control features are not active on longitudinal profile; they need to be .Turn off or delete the other photo icons that are not associated with either cross sections or grade control.
5Cross section photographs and descriptions are incorrect as they do not delineate or discuss bankfull. XS diagrams delineate bankfull. Cross sections are not active on the longitudinal profile; they need to be .Spatially connect the two maps. When you click on the XS on the geomorphic map the XS on the LP map should be highlighted. Add descriptive text Hogback Creek Photographs (bankful delinations) 3 March 2008.pdf.
5Photographs and diagrams displayed on slide need descriptive text of what is being observed/presented in the diagram .Text needs to be changed from "Cross Section Maps" to Cross Section Diagrams"
5ER has excessive maps that do not contribute to completion of the exerciseGeomorphic map is not necessary to complete the exercise, delete the Geomorphic map from ER.
6Needs more instruction on the slide on what technical lectures to review.Modify the statement "watch a technical lecture" with "review technical lecture slide 66-80".
6text under technical lecture tab is mislocatedDelete text under technical lecture button.
6Replace photgraph on slideDelete photgraph and replace with photographs from IMG_2214 and 2232.jpg from Hogback Photos 17March2008.pdf. Add text "Photographs of Hogback Creek showing channel conditions".
6RM needs work and quality controlThe contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3.Contractor/PA Coordination
6Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active.delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example".
6Cross section photographs, descriptions, and diagrams needs to have bankfull flow delineated. See file “Hogback Creek XS Photos-Descriptions (bankfull delineated) (3March2008).doc .dd the descriptions and diagrams of bank full delineation by using Hogback Creek XS's descriptions 3march2008.pdf and turnoff the remaining photo icons not related to XS OR GC.Contractor/PA Coordination
8Change descriptive text for slideModify the Text to " Table and Charts for Culvert Dseign Hogback Creek"
8Needs more instruction on the slide on what technical lectures to review.Modify the statement "watch a technical lecture" with "review technical lecture slide 19-22".
8text under technical lecture tab is mislocatedDelete text under technical lecture button.
8RM needs work and quality controlThe contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3.Contractor/PA Coordination
9Modify slide at the end of phase 2Move "to start phase 4" as the third paragraph.
41Diagrams have no descriptive textModify text under diagrams to "Engineering Diagrams of AOP Structure".
2Photographs and diagrams displayed on slide need descriptive text of what is being observed/presented in the diagram .Change text from Culvert opening to "culvert inlet".
2Needs more instruction on the slide on what technical lectures to review.Modify the statement "watch a technical lecture" with "review technical lecture slide 3-11".
2RM needs work and quality controlThe contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3.Contractor/PA Coordination
3No good technical lecture for the material presented on this slideDelete technical lecture tab on this slide. Delete "or by watching technical lecture".
On the instructions for the exercise, the following statement appears in the instructions window "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" pull down menu in the main window of the Real World Example". yet there is no resources tab for this excercise.Delete the following statement from the exercise instructions" Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" pull down menu in the main window of the Real World Example."
4Needs more instruction on the slide on what technical lectures to review.Modify the statement "watch a technical lecture" with "review technical lecture slides 3-24".
text under technical lecture tab is mislocatedDelete text under technical lecture button.
RM needs work and quality controlThe contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3.Contractor/PA Coordination
4On the instructions for the exercise, the following statement appears in the instructions window "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" pull down menu in the main window of the Real World Example". yet there is no resources tab for this excercise.Delete the following statement from the exercise instructions" Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" pull down menu in the main window of the Real World Example."
4Exercise resources: After each excerise there are excessive files generated for that exceriseThe files in the ER are confusing and do not add to lesson or material being presentedContractor/PA Coordination
4Excerise it is not clear how to proceed throught the individual steps of the exerciseInstructions are unclear on how to proceed on this exercise.Contractor/PA Coordination
5Needs more instruction on the slide on what technical lectures to review.Modify the statement "watch a technical lecture" with "review technical lecture slides 9-16".
5text under technical lecture tab is mislocatedDelete text under technical lecture button.
5Photographs and diagrams displayed on slide need descriptive text of what is being observed/presented in the diagram .Change text to read "Culvert outlets Hogback Creek".
5RM needs workThe contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3.Contractor/PA Coordination
5Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active.delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example".
5Excessive files/tables in the ER that do not contribute to completing the exercise.PA will work with the contractor on what files/tables should be available to the student/learner in ER.Contractor/PA Coordination
6Needs more instruction on the slide on what technical lectures to review.Modify the statement "watch a technical lecture" with "review technical lecture slides 41-44".
6text under technical lecture tab is mislocatedDelete text under technical lecture button.
6RM needs workThe contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3.Contractor/PA Coordination
7Photograph does not add any substance to this slideDelete current photgraph and text from slide and look for an additional photograph as shown on technical lecture slide 8 on slideContractor/PA Coordination
7There is no good technical lecture for this slideDelete reference to technical lecture and what technical lectures to review from this slide.
7RM needs workThe contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3.Contractor/PA Coordination
7Excessive files/tables in the ER that do not contribute to completing the exercise.PA will work with the contractor on what files/tables should be available to the student/learner in ER.
8Needs more instruction on the slide on what technical lectures to review.Modify text with the following statement "or by reviewing technical lecture slide 53-56
8Replace photgraph on slideDelete photgraph and replace with photographs from IMG_0949 and 0950.jpg from Hogback Photos 17March2008.pdf. Add text "Photographs of Hogback Creek upstream and downstream of road crossing".
9Needs more instruction on the slide on what technical lectures to review.Add text "or by reviewing technical lecture slide 9".
10Photographs and diagrams displayed on slide need descriptive text of what is being observed/presented in the diagram .Change descriptive text to "Hogback Creek road-stream Crossing Construction"
11Photographs and diagrams displayed on slide need descriptive text of what is being observed/presented in the diagram .Change descriptive text to "Hogback Creek road-stream Crossing Construction"
11Excersise Instructions includes the following statement: Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" pull down menu in the main window of the Real World Example.
Delete the following statement from the exercise instuctions: Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" pull down menu in the main window of the Real World Example.
12RM needs workThe contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3.Contractor/PA Coordination
13Exercise resources: After each excerise there are excessive files generated for that exceriseThe files in the ER are confusing and do not add to lesson or material being presentedContractor/PA Coordination
13Photographs and diagrams displayed on slide need descriptive text of what is being observed/presented in the diagram .Change descriptive text to "Hogback Creek road-stream Crossing Construction"
14RM needs workThe contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3.Contractor/PA Coordination
14Video on Slide 14 needs to have a titleVideo title should be "Hogback Creek AOP Selection Rationale"
15Videos on Slide 15 needs to have a titlesVideo title should be "Fish Passage Design Review" and replace second video with Traci Sytle video on Hogback Creek Road Design Review".
15RM needs workThe contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3.Contractor/PA Coordination
16Text needs modificationsdelete the second paragraph that starts with "Please note" and move the paragraph that starts with "If the student" to replace it.
16No need for RM on slideDelete the RM tab from slide 16.
51Text needs modificationsMove the sentence starting with "During Phase 5" to the beginning of the paragraph.
3video on slide rather dark and difficult to watchPA will work with the contractor to see if they can improve the quality of the video and add a title to the video (Hogback Creek AOP Construction Project)
3Slide does not have reference to technical lecture and technical document.Modify text on slide by modifying text to include "review techncial document Chapter 8.25 and 8.26.1 or by reviewing technical lecture slide 49-56".
3text under technical lecture tab is mislocatedDelete text under technical lecture button.
4modify text on slidemove the last sentence starting with "Click on the videos" to the start of the fourth paragraph.
4Slide does not have reference to technical lecture and technical document.Modify text on slide to say "review techncial document Chapter 8.25 and 8.26 and review technical lecture slide 49-56".
4Add title to videos on slideFirst video title "Dewatering Plan" and second video tile should be Erosion Control Plan".
4Slide does not have reference to technical lecture and technical document.Modify tex on slide to "to review techncial document Chapter 8.1 and 8.2 or by reviewing technical lecture slides 2-11.
4text under technical lecture tab is mislocatedDelete text under technical lecture button.
5Photograph does not contribute to slidedelete photgraph from slide
5text needs to be modifiedreplace the second paragraph with the last paragraph.
61Slide contains design informationDelete reference to design criteria from slide
2Photographs and diagrams displayed on slide need descriptive text of what is being observed/presented in the diagram .Change descriptive text to "Hogback Creek Construction Dewatering Operation"
text on slide needs to be modifiedDelete the second paragraph that starts with "Please note" and move the paragraph that starts with "If the student" to replace it.
3Slide contains design informationDelete reference to design criteria from slide
4Photgraph is questionable that it adds anything to the presentationdelete photograph and add photgraphs from phase 5 slide 4 and 5 with the text associated.
Modify the text on the slideModify the statement on the slide to the following: "For more information on post construction structure maintenance please review technical document Chapter 8.1-8.3 or review technical lectures slide 1-23."
text under technical lecture tab is mislocatedDelete text under technical lecture button.
Slide contains design information but does not contribute anything to the prsentationDelete reference to design criteria from slide
There are only two RWE (Hogback Creek and North Thompson Creek)delete the last sentence of the text

Sheet1

File details come from the government source that posted it. Updated .