Copy_of_Hog_Creek_RWE_SOW_final.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- AOP Training DVD Project Federal contract opportunity
- Solicitation number
- AG-91S8-S-16-0001
About this file
Attachment 2 - Hogback Creek RWE
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_for_AG-91S8-S-16-0001_FS_reply.docx | DOCX document | |
| SF_30-2.pdf | ||
| SF_30-1.pdf | ||
| Copy_of_Comprehensive_AOP_SOW_final.xlsx | XLSX spreadsheet | |
| Solicitation_-_Do_Not_Reply_(4).pdf | ||
| Copy_of_North_Thompson_Creek_RWE_SOW_final.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
combined review BG MW
| Hogback Creek RWE Attachment #2 | SOW Changes that need to be made. | 2014-2015 | |||
| Phase | Slide | Comment | Tasks to be done | Additional comments | Legend |
| 1 | 3 | Needs clarification on what techical lectures to review and what to read in in technical document. RM is OK | Modify text from "by reading ..to reading Technical Document Chapter 4.4 or by reviewing Technical Lecture Slides 3-12". | RM= Resources Material | |
| 4 | RM needs some changes | Map in RM needs to be renamed to " 2002 Aerial Photograph of Hogback Creek" | ER=Exercise Resources | ||
| 5 | RM needs some changes | Modify the RM to reflect chnages made in slide 4. | GC=Grade Control | ||
| 6 | Maps in RM need to be renamed to be consistent with name presented in previous slides and tables need to be added that were presented in Slide 5 | Modify the RM by completion of the following tasks: Carry the changes forward from RM in slide 5 and rename existing table to : "Summart Table of Hogback Creek Fish Distribution" and add "Summary Table of Lolo National Forest Culvert Barriers" | XS=Cross Sections | ||
| 7 | RM tab on slide 7 is not necessary as it is a knowledge test from what was presented in phase 1 | Delete RM tab from slide 12 | GM=Geomorphic Map | ||
| 8 | Needs clarification on what techical lectures to review and have the correct maps and tables in RM. | Modify slide 8 text "or by watching lecture with"by reviewing Technical Lecture Slide13-18". | LP= Long Profile | ||
| 8 | RM needs to be upgraded to present material to the student that has been presented in previous slides | Make sure the changes made to RM for slide 6 are incorporated into slide 8 RM and add "Topographic Map of Hogback Creek Watershed" and Mass Wasting Map of the Hogback Creek Watershed"; modifty the tables presented to include "Summarizing Hogback and Rock Creek Flood-Frequency Discharge Estimates" | |||
| 9 | RM tab on slide 9 is not necessary as it is a knowledge test from what was presented in phase 1 | Delete RM tab from slide 12 | |||
| 10 | Exercise map incorrectly labeled on slide | Change caption to Interactive Sketch Map Hogback Creek. | |||
| 10 | Maps in RM need to be renamed to be consistent with name presented in previous slides and tables need to be added that were presented in Slide 5 and 6 | Modify the RM for slide to to ensure that the chnages that were made in slide 8 are carried into slide 10 | |||
| 10 | No photgraphs attached to cross sections highlighted only diagrams | add photographs from 3March2008.pdf to the cross sections of the interactive map | |||
| 11 | RM needs to be modified to include material presented in previous slides | Modify the RM for slide to to ensure that the chnages that were made in slide 10 are carried into slide 11 | |||
| 12 | RM tab on slide 12 is not necessary as it is a knowledge test from what was presented in phase 1 | Delete RM tab from slide 12 | |||
| 12 | RM tab on slide 12 is not necessary as it is a knowledge test from what was presented in phase 1 | Delete RM tab from slide 12 | |||
| 13 | Text incomplete | Delete the second paragraph and add the following text to Phase 1, Slide 13; "If the student is not confident that they have mastered all of the topics presented in Phase 1 (Intial Watershed and Reach Review), they should review technical lectures 3-18 or technical document chapter 4 before proceeding forward to Phase 2. if the student has mastered all the subject areas presented in Phase 1, they they should proceed forward to Phase2." | |||
| 2 | 1 | Text incomplete | Insert the following text at the beginning of first paragraph: "In Phase 2 the student will be exposed to Site Assesssment (Cross Sections, Grade Control and Longitiundal Profile), Analyzing and Interpretating Channel Planaform Patterns, Analyzing Physical characteristics of a Channel and Project Risk Assessment". The first paragph on the slide will now become the second paragrph of the slide. | ||
| 2 | Slide needs more instructions on which technical lecture to review. | Modify slide 2 text "by reviewing Technical Lecture Slide 3-7". | |||
| RM is incomplete | RM for Phase 1 needs to be complete from the completion of Slide 11 Phase 1. All subsequent slides in Phase 2 RM need to be carried forward from this point on forward. | ||||
| 2 | Interactive Sketch Map photgraphs are incomplete for the cros sections. | Add photographs from 3March2008.pdf to the cross sections pop up. PA will work with the contractor which photgraphs to use. | Contractor/PA Coordination | ||
| 3 | Slide needs more instructions on which technical lecture to review. | Modify the text to "by reviewing Technical Lecture Slide 13-18". | |||
| 3 | when you click on the technicial lecture it goes to slide 16. Not correct. | When you click on technical lecture it should goe to slide 13 not slide 16. | |||
| 3 | RM is incomplete and includes maps that have not been introduced to the student yet or from previous slides for Phase 2. Make sure the resources presented for Phase 1 is consistent with Slide 11 Phase1. | RM needs to be consistent for Phase 1 with the previous RM Phase 1. Remove the Geomorphic map from Interactive maps from Phase 2. | |||
| 3 | Resource materials tabs - Phase 2 Interactive Maps and Diagrams - the link to the sketch map does not work. They give an error message | Map link in RM does not work. Fix the link | |||
| 3 | Exercise Map has incorrect title | Change title on exercise map to "Hogback Creek Sketch and Geomorphic-Contour Map" | |||
| 3 | Interaction (Site Sketch Map and Geomorphic Contour Map): The number of photos on each map do not match. The Geomorphic-Contour Map has more photo icons shown. | The only photos that should be active on the geomorphic map should be associated with the highlighted cross sections. Turn off all the photos on the geomorphic map that are not linked to the highlighted cross sections. When the student clicks in the highlighted cross sections it should also identify the location on the interactive sketch map. | |||
| 4 | Slide needs more instructions on which technical lecture to review. | Modify slide 4 text "by reviewing Technical Lecture Slide 23-33". | |||
| RM not working right. | Fix it so that the geomorphic map is an interactive that brings up the correct map. The photo incons on the geomorphic map should bring up the highlighted cross sections. The interactive map should have the photo icons active but not the selected cross sections. | Contractor/PA Coordination | |||
| 4 | Interactive maps in RM not working correctly. When I clicked on the interactive maps in RM for Phase 2, no map came up, instead undefined came up for both maps and the combined map presented in slide 4 is not included under interactive maps for Phase 2. | Fix the connections so that the correct map comes up when it is clicked on in the RM and add the exercise map from slide 4 (combined long pro/gemorphic map) to rm interactive maps phase 2. | |||
| 4 | Interaction (Longitudinal Profile/Geomorphic-Contour Map): The two maps are not spatially connected and excessive photo icons on the geomorphic map that do not add to the point of the exercise. | The GC icons should not be highlighted or active for this exercise. When you click on the LP map the XS on the GM is highlighted. When you click on the XS on the GM nothing is spatially connected on the LP map. this needs to be fixed. Also the only photo icons that should be active should be related teaching student about long profile map. Turn off photo icons unecessary from map that includes photo icon 29, 6,7, 15,13, 1 and 31. | |||
| 5 | Slide needs more instructions on which technical lecture to review. | Modify slide 5 text "by reviewing Technical Lecture Slide 34-44". | |||
| 5 | maps are not spatially connected. Grade controls need to be shown on the long profile when the grade control number is highlighetd on the geomorphic map. No way to identify the location on the long pro map. | When a student clicks on the gc on the geomorph map the location needs to highlight on the long profile map. If you can not spatially connect the grade control on the long pro exercise map then what is the point of having the map as part iof tge excercise. | |||
| 6 | Slide needs more instructions on which technical lecture to review. | Modify slide 6 text "by reviewing Technical Lecture Slide 4-19". Delete statement below technical lecture button. | |||
| RM needs works | Fix the connection so that the right interactive map comes up | Contractor/PA Coordination | |||
| 6 | when you click on the cross section on the geo morph map the location on the lp does not highlight, it works vice a versa. | When you click on the cross section icon on the geo morph map the location should highlight on the LP map. Fix the connection to make the long pro map and the geomorph map spatially connected | |||
| 6 | The cross sections have the photographs but not any diagram showing the bankful. | Add the diagrams to the cross section diagrams from 21Feb2008.pdf | Contractor/PA Coordination | ||
| 7 | The RM is incomplete | Under the interactive maps add the combined long pro/geomorph maps presented in slides 3, 4, 5 and 6. | Contractor/PA Coordination | ||
| 7 | when you click on the cross section on the geo morph map the location on the lp does not highlight, it works vice a versa. | When you click on the cross section icon on the geo morph map the location should highlight on the LP map. Fix the connection to make the long pro map and the geomorph map spatially connected | |||
| 8 | Slide needs more instructions on which technical lecture to review. | Modify slide 8 text "by reviewing Technical Lecture Slide 28-36". | |||
| 8 | Slide contains text under technical lecture button | Delete text under technical lecture button. | |||
| 8 | RM incomplete | Fix the maps that are in add the combined long pro/geomorphic maps that were presented on slides 3-7. | Contractor/PA Coordination | ||
| 9 | Slide needs more instructions on which technical lecture to review. | Modify slide 9 text "by reviewing Technical Lecture Slide 56-59". | |||
| 9 | Slide contains text under technical lecture button | Delete text under technical lecture button. |
| 9 | RM incomplete | Under interactive maps add the combined long pro/geomorphic maps that were presented on slides 3-8 | Contractor/PA Coordination | ||
| 9 | Interaction (Bank Characteristics): The spatial relationship between survey points on the longitudinal profile and geomorphic-contour map is NOT correct for this interaction. | Spatially link the the long pro map and the geomorp map. When you click on the geomorp map highlighted XS, the XS on the long pro map needs to be highlighted. The photos are connected to the geomorph map. | Contractor/PA Coordination | ||
| 9 | Interaction (Bank Characteristics): Of the six cross sections (XS1, XS2, XS5, XS7, XS8, XS9) only XS1 is correct. XS1 has the cross section description and characterization of the channel banks. | ||||
| The captions for XS2, XS5, XS7, XS8, and XS9 have descriptions of grade controls and do NOT have descriptions of channel bank characteristics. | Modify descriptions to cross sections to describe bank characteristics not grade control or cross sections. Only Cross sections 1, 2, 5, 7, 8 and 9 should be active. Delete phot icons 6 and 15.. | Contractor/PA Coordination | |||
| 9 | On the geomorphic-countour exercise map there are excessive photo icons that are not related to subject material | Delete photo icons 29, 6, 7, 13, 1, 2 and 31 from the geomorph map. Only photgraphs that should be active are the ones linked to the cross sections. | |||
| 10 | Slide needs more instructions on which technical lecture to review. | Modify slide 10 text "by reviewing Technical Lecture Slide 61-65". | |||
| 10 | Photgraphs overlain over text on technical lecture 61 | Resize photograph size so as not to overlay or block text. | Contractor/PA Coordination | ||
| 10 | RM incomplete | Within Phase 2, under interactive maps add the maps that were presented on slides 2-9. remove the geomorphic map from the rm ans it does not provide any value to the learner. | Contractor/PA Coordination | ||
| 10 | Interactive maps in RM do not work. When you click on them they go to "undefined' | Fix connection so that the correct map is brought up. | Contractor/PA Coordination | ||
| 10 | The highlighted cross sections for xs 7 and 8 do not have the right photographs or descriptive text. | XS 7 and 8 have grade control description not XS description. Use description 3March2008.pdf delinated for banfull for XS 7 and 8. Also add the diagrams as well as legend for XS 7 and 8 from Hogback XS's bankful 21Feb2008.pdf. | Contractor/PA Coordination | ||
| 10 | Interaction (Geotechnical Locations): The spatial relationship between survey points on the longitudinal profile and geomorphic-contour map is NOT correct for this interaction. | Spatially connect the Long Pro and Geomorphic so when you click on the XS on the Geomorphic Map the XS on the Long pro Map is also highlighted. | |||
| 11 | There is no good technical lecture for this slide. | Modify slide 11 text deleting technical lecture button from slide. | |||
| 11 | Since there will be no technical lecture to watch the slide should not tell students to watch a technical lecture | Delete text tell students to watch a technical lecture. | |||
| 11 | RM incomplete | Within Phase 2, under interactive maps add the maps that were presented on slides 2-10. remove the geomorphic map from the rm ans it does not provide any value to the learner. | |||
| 11 | The Eexcersise map contains excessive active icons that do not contribute to the excerise being presented. This includes grade control, no cross sections and channel photgraphs.These icons are active but do not contribute to the subject to be presented | The only icons necessary to be highlighted are the XS 7 and 8; GC 15 and 16 and photgraph icons 9, 13,and 14. Turn off all other active icons. | |||
| 11 | Excersie map instructions are confusing and misleading. | Modify instructions to tell the students that the only icons active are in reference to the road travel way | |||
| 12 | There is no good technical lecture for this slide. | Modify the text on the slide to read Technical Document 5.2. Delete any reference to a technical lecture, none of the lectures adequately refrence Channel Planform Analysis. | |||
| 12 | To be consistent with the Technical Document, consider using the term lateral adjustment potential in the text . | Modify the txt on the slide of “channel planform” with “channel lateral adjustment potential”. | |||
| 12 | Modify Chapter to read in technical document | Reference to technical lecture should be modified to review technical document "Chapter 5.2 Analyzing and Interpreting Site Data". | |||
| 12 | RM incomplete | Within Phase 2, under interactive maps add the maps that were presented on slides 2-11. remove the geomorphic map from the rm ans it does not provide any value to the learner. | Contractor/PA Coordination | ||
| 12 | Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active. | delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example. However, none of the materials in the Resource Materials tab will display once the exercise is launched". | |||
| 12 | As you conplete Step 1 and click on photo icon 11 there is no image | Fix it so that photo icon has the right photograph. | |||
| 12 | In excersise step two, the SME answer should not have lines wider than the plunge pool from the undersized culvert . | Modify the width of the lines to be consistent with the channel width. | |||
| 12 | In the exercise the base map or background map is the geomorphic/contour map. Photos on the geomorphic/contour map are missing or in incorrect places.There are inadequate icons active for the material being presented. | Photo icon 11 and 13 missing photograph and text. No icon for photo 16. Activate icons for XS 7 and 8 with the appropriate photos and text and grade control (GC) 15 and 16 | |||
| 13 | Indequate text for material presented on slide 13 | Add descriptive text for photograph and long pro of Hogback Creek. | |||
| 13 | Modify Chapter to read in technical document and provide more instructions on which technical lecture to review. | Modify slide 13 text "by reading Technical Document Chapter 5.2 and "by reviewing Technical Lecture Slide 49-60". | |||
| 13 | RM incomplete | Within Phase 2, under interactive maps add the maps that were presented on slides 2-12. remove the geomorphic map from the rm ans it does not provide any value to the learner. | Contractor/PA Coordination | ||
| 13 | Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active. | delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example. However, none of the materials in the Resource Materials tab will display once the exercise is launched". | |||
| 13 | Excersie resources needs aditional information | Add the following document to the ER for phase 13 slide 2: Longitudial Profile Assessment.pptx | |||
| 14 | There is no good technical lecture for this slide. | Delete reference on slide to "watching a technical lecture" and delete technical lecture button on slide | |||
| 14 | Modify Chapter to read in technical document | Modify slide 14 text "by reading Technical Document Chapter 5.1. | |||
| 14 | RM incomplete | Within Phase 2, under interactive maps add the maps that were presented on slides 2-13. remove the geomorphic map from the rm ans it does not provide any value to the learner. | Contractor/PA Coordination | ||
| 14 | Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active. | delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example. However, none of the materials in the Resource Materials tab will display once the exercise is launched". | |||
| 14 | excersie step 1 photograph text is flawed; the diagram should not contain the channel floodplan diagram before the student completes the action of identify the floodplan height of the cross section | Modify the diagram to show the diagram after the student/learner complete the activity. Delete the diagram from the photgraph after the student complete step 1. The diagram tab/button should only show up when the student completes step 1 and step 2 for each cross section. | Contractor/PA Coordination | ||
| 14 | Step 1 delination bankful and step 2 delinae floodplain. The text changed from cross section description to grade control rather than cross section description. XS 1 is correct but the remaining cross sections are not right | refer to how the photo changes from cross section 1 as the student completes the exercise. That is how it should change for the remaining of cross sections. | Contractor/PA Coordination | ||
| 14 | Excersie resources is populated wit the results of the previous delination. This is not necessary. It maybe be better to just have one cross section results populated as an example to the student. | Modify the ER to have only Cross section 1 example after the student completes step 1 and step 2. | Contractor/PA Coordination | ||
| 14 | Step 3 there are no instuctions on how to achieve these measurements | Modify the insturctions to tell the student how to answer these questions. | |||
| 14 | In the Excerise Resources geomorphic map does not have the correct descriptions for the XS's. it is not necessary to have both the geomorphic map and ong pro/geo morph map both in the ER.The XS button on the long pro/geomorph map has diagrams for step 1 and step 2 before the student has completed the steps. | delete the Geomorphic map from the ER, the long pro/geomorph map should only have the daigram button availabale after the student/learner completes the cross section analysis in step 1 and step of the exercise. | Contractor/PA Coordination | ||
| 15 | None of the diagram icons on the slide work. | Modify the slide to have only one icon on the slide and make the icon active. | |||
| 15 | Modify Chapter to read in technical document and provide more instructions on which technical lecture to review. | Modify slide 13 text "by reading Technical Document Chapter 5.2.or "by reviewing Technical Lecture Slide 32-45". | |||
| 15 | RM incomplete | Within Phase 2, under interactive maps add the maps that were presented on slides 2-14. remove the geomorphic map from the rm ans it does not provide any value to the learner. Then make sure all the links work correctly | Contractor/PA Coordination | ||
| 15 | Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active. | delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example. However, none of the materials in the Resource Materials tab will display once the exercise is launched". | |||
| 15 | Excessive files in ER | Delete Geomorphic map, keep combo planaform map. After you do a step in the exercise is populated with the map and table from previous exercise. This is not necessary. The only resources that are necessary are those to complete that excecise. | Contractor/PA Coordination | ||
| 15 | ER Step 1 | Cross section Summary Chart missing | |||
| 15 | Exercise base map has too many icons active, confusing to the learner. | Add the diagrams of bankfull and the cross sections description are for grade control and not cross sections from Hogback XS'sbankfull 21feb2008.pdf. No reason to have the photo icons active that are not related to cross sections or grade control. | |||
| 16 | Modify Chapter to read in technical document and provide more instructions on which technical lecture to review. | Modify slide 13 text "by reading Technical Document Chapter 5.3.or "by reviewing Technical Lecture Slide 67-79". | |||
| 16 | RM incomplete | Within Phase 2, under interactive maps add the maps that were presented on slides 2-14. remove the geomorphic map from the rm ans it does not provide any value to the learner. Then make sure all the links work correctly | Contractor/PA Coordination | ||
| 16 | within the RM none of the interactive maps work correctly. there are two steps. First step is to make sure that the correct material is provided in the RM and the second step is to make sure the links work right | Fix the link to make sure the interactive maps work correctly. | |||
| 16 | Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active. | delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example. However, none of the materials in the Resource Materials tab will display once the exercise is launched". | |||
| 16 | ER missing information | Cross section Summary Chart missing | |||
| 16 | Cross section photographs for XS2-9 are description for grade control and cross sections with bankfull delineated; use Hogback XS's bankful 21Feb2008.pdf | Add the diagrams of bankfull and the cross sections description are for grade control and not cross sections from Hogback XS'sbankfull 21feb2008.pdf. | |||
| 16 | geomorphic bas map has too many icon highlighted or active. | The only icons necessary to be highlighted are the xs. All the other icons neeed to be turned over as well as grade controls. | |||
| Slide contains design information | Delete reference to design criteria from slide | ||||
| RM incomplete | Within Phase 2, under interactive maps add the maps that were presented on slides 2-15. remove the geomorphic map from the rm ans it does not provide any value to the learner. Then make sure all the links work correctly | Contractor/PA Coordination | |||
| 17 | Modify slide at the end of phase 2 | Move "to start phase 3" as the tird paragraph above the tab and delete the RM tab from the slide. | |||
| 3 | 1 | Add learning objectives for Phase 3 to slide 1. | Move learning objectives from its current place on slide 3 (last paragraph) to the beginning of the second paragraph. And delete the first sentence of the second paragraph | ||
| 2 | Needs more instruction on the slide on what technical lectures to review. | Modify the statement "watch a technical lecture" with "review technical lecture slide 11-16". | |||
| 2 | text under technical lecture tab is mislocated | Delete text under technical lecture button. | |||
| 2 | Video has no tile or subject for the learner | Title should be Fish Passage Structure Design | |||
| 2 | Photgraphs and graphs serve no purpose on slide 2 other than to take up space | delete these items from slide 2 and replace them with the video "Fish Passage Structure Design". | |||
| 2 | RM incomplete | Make sure that Phase 1 and 2 have the correct maps laoded and they are functional from the completion of those Phases and they are functional and the tabs work. | Contractor/PA Coordination | ||
| 3 | Needs more instruction on the slide on what technical lectures to review. | Modify the statement "watch a technical lecture" with "review technical lecture slide 30-41". | |||
| 3 | text under technical lecture tab is mislocated | Delete text under technical lecture button. | |||
| 3 | RM needs work and quality control | The contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3. | Contractor/PA Coordination | ||
| 3 | Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active. | delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example". | |||
| 4 | Needs more instruction on the slide on what technical lectures to review. | Modify the statement "watch a technical lecture" with "review technical lecture slide 16-19". | |||
| 4 | text under technical lecture tab is mislocated | Delete text under technical lecture button. | |||
| RM needs work and quality control | The contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3. | Contractor/PA Coordination | |||
| 4 | Grade control descriptions on Geomorphic Map are incorrect; they need to be updated so that the description includes the physical characteristics of the grade control. Grade control features are not active on longitudinal profile; they need to be . | Turn off or delete the other photo icons that are not associated with either cross sections or grade control. | |||
| 4 | Cross section photographs and descriptions are incorrect as they do not delineate or discuss bankfull. XS diagrams delineate bankfull. Cross sections are not active on the longitudinal profile; they need to be . | Spatially connect the two maps. When you click on the XS on the geomorphic map the XS on the LP map should be highlighted. Add descriptive text Hogback Creek Photographs (bankful delinations) 3 March 2008.pdf. | |||
| 5 | Needs more instruction on the slide on what technical lectures to review. | Modify the statement "watch a technical lecture" with "review technical lecture slide 20-29". | |||
| 5 | text under technical lecture tab is mislocated | Delete text under technical lecture button. | |||
| 5 | RM needs work and quality control | The contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3. | Contractor/PA Coordination | ||
| 5 | Grade control descriptions on Geomorphic Map are incorrect; they need to be updated so that the description includes the physical characteristics of the grade control. Grade control features are not active on longitudinal profile; they need to be . | Turn off or delete the other photo icons that are not associated with either cross sections or grade control. | |||
| 5 | Cross section photographs and descriptions are incorrect as they do not delineate or discuss bankfull. XS diagrams delineate bankfull. Cross sections are not active on the longitudinal profile; they need to be . | Spatially connect the two maps. When you click on the XS on the geomorphic map the XS on the LP map should be highlighted. Add descriptive text Hogback Creek Photographs (bankful delinations) 3 March 2008.pdf. | |||
| 5 | Photographs and diagrams displayed on slide need descriptive text of what is being observed/presented in the diagram . | Text needs to be changed from "Cross Section Maps" to Cross Section Diagrams" | |||
| 5 | ER has excessive maps that do not contribute to completion of the exercise | Geomorphic map is not necessary to complete the exercise, delete the Geomorphic map from ER. | |||
| 6 | Needs more instruction on the slide on what technical lectures to review. | Modify the statement "watch a technical lecture" with "review technical lecture slide 66-80". | |||
| 6 | text under technical lecture tab is mislocated | Delete text under technical lecture button. | |||
| 6 | Replace photgraph on slide | Delete photgraph and replace with photographs from IMG_2214 and 2232.jpg from Hogback Photos 17March2008.pdf. Add text "Photographs of Hogback Creek showing channel conditions". | |||
| 6 | RM needs work and quality control | The contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3. | Contractor/PA Coordination | ||
| 6 | Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active. | delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example". | |||
| 6 | Cross section photographs, descriptions, and diagrams needs to have bankfull flow delineated. See file “Hogback Creek XS Photos-Descriptions (bankfull delineated) (3March2008).doc . | dd the descriptions and diagrams of bank full delineation by using Hogback Creek XS's descriptions 3march2008.pdf and turnoff the remaining photo icons not related to XS OR GC. | Contractor/PA Coordination | ||
| 8 | Change descriptive text for slide | Modify the Text to " Table and Charts for Culvert Dseign Hogback Creek" | |||
| 8 | Needs more instruction on the slide on what technical lectures to review. | Modify the statement "watch a technical lecture" with "review technical lecture slide 19-22". | |||
| 8 | text under technical lecture tab is mislocated | Delete text under technical lecture button. | |||
| 8 | RM needs work and quality control | The contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3. | Contractor/PA Coordination | ||
| 9 | Modify slide at the end of phase 2 | Move "to start phase 4" as the third paragraph. | |||
| 4 | 1 | Diagrams have no descriptive text | Modify text under diagrams to "Engineering Diagrams of AOP Structure". | ||
| 2 | Photographs and diagrams displayed on slide need descriptive text of what is being observed/presented in the diagram . | Change text from Culvert opening to "culvert inlet". | |||
| 2 | Needs more instruction on the slide on what technical lectures to review. | Modify the statement "watch a technical lecture" with "review technical lecture slide 3-11". | |||
| 2 | RM needs work and quality control | The contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3. | Contractor/PA Coordination | ||
| 3 | No good technical lecture for the material presented on this slide | Delete technical lecture tab on this slide. Delete "or by watching technical lecture". | |||
| On the instructions for the exercise, the following statement appears in the instructions window "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" pull down menu in the main window of the Real World Example". yet there is no resources tab for this excercise. | Delete the following statement from the exercise instructions" Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" pull down menu in the main window of the Real World Example." | ||||
| 4 | Needs more instruction on the slide on what technical lectures to review. | Modify the statement "watch a technical lecture" with "review technical lecture slides 3-24". | |||
| text under technical lecture tab is mislocated | Delete text under technical lecture button. | ||||
| RM needs work and quality control | The contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3. | Contractor/PA Coordination | |||
| 4 | On the instructions for the exercise, the following statement appears in the instructions window "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" pull down menu in the main window of the Real World Example". yet there is no resources tab for this excercise. | Delete the following statement from the exercise instructions" Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" pull down menu in the main window of the Real World Example." | |||
| 4 | Exercise resources: After each excerise there are excessive files generated for that excerise | The files in the ER are confusing and do not add to lesson or material being presented | Contractor/PA Coordination | ||
| 4 | Excerise it is not clear how to proceed throught the individual steps of the exercise | Instructions are unclear on how to proceed on this exercise. | Contractor/PA Coordination | ||
| 5 | Needs more instruction on the slide on what technical lectures to review. | Modify the statement "watch a technical lecture" with "review technical lecture slides 9-16". | |||
| 5 | text under technical lecture tab is mislocated | Delete text under technical lecture button. | |||
| 5 | Photographs and diagrams displayed on slide need descriptive text of what is being observed/presented in the diagram . | Change text to read "Culvert outlets Hogback Creek". | |||
| 5 | RM needs work | The contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3. | Contractor/PA Coordination | ||
| 5 | Faulty information on excersie pop up window for the excerise. The the student will not be able to utlize RM interactive maps while the excercise is open and active. | delete the following statement from the instruction pop up window: "Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" tab in the main window of the Real World Example". | |||
| 5 | Excessive files/tables in the ER that do not contribute to completing the exercise. | PA will work with the contractor on what files/tables should be available to the student/learner in ER. | Contractor/PA Coordination | ||
| 6 | Needs more instruction on the slide on what technical lectures to review. | Modify the statement "watch a technical lecture" with "review technical lecture slides 41-44". | |||
| 6 | text under technical lecture tab is mislocated | Delete text under technical lecture button. | |||
| 6 | RM needs work | The contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3. | Contractor/PA Coordination | ||
| 7 | Photograph does not add any substance to this slide | Delete current photgraph and text from slide and look for an additional photograph as shown on technical lecture slide 8 on slide | Contractor/PA Coordination | ||
| 7 | There is no good technical lecture for this slide | Delete reference to technical lecture and what technical lectures to review from this slide. | |||
| 7 | RM needs work | The contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3. | Contractor/PA Coordination | ||
| 7 | Excessive files/tables in the ER that do not contribute to completing the exercise. | PA will work with the contractor on what files/tables should be available to the student/learner in ER. | |||
| 8 | Needs more instruction on the slide on what technical lectures to review. | Modify text with the following statement "or by reviewing technical lecture slide 53-56 | |||
| 8 | Replace photgraph on slide | Delete photgraph and replace with photographs from IMG_0949 and 0950.jpg from Hogback Photos 17March2008.pdf. Add text "Photographs of Hogback Creek upstream and downstream of road crossing". | |||
| 9 | Needs more instruction on the slide on what technical lectures to review. | Add text "or by reviewing technical lecture slide 9". | |||
| 10 | Photographs and diagrams displayed on slide need descriptive text of what is being observed/presented in the diagram . | Change descriptive text to "Hogback Creek road-stream Crossing Construction" | |||
| 11 | Photographs and diagrams displayed on slide need descriptive text of what is being observed/presented in the diagram . | Change descriptive text to "Hogback Creek road-stream Crossing Construction" | |||
| 11 | Excersise Instructions includes the following statement: Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" pull down menu in the main window of the Real World Example. | ||||
| Delete the following statement from the exercise instuctions: Other site information obtained from previous exercises and presentations can be obtained from the "Resource Materials" pull down menu in the main window of the Real World Example. | |||||
| 12 | RM needs work | The contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3. | Contractor/PA Coordination | ||
| 13 | Exercise resources: After each excerise there are excessive files generated for that excerise | The files in the ER are confusing and do not add to lesson or material being presented | Contractor/PA Coordination | ||
| 13 | Photographs and diagrams displayed on slide need descriptive text of what is being observed/presented in the diagram . | Change descriptive text to "Hogback Creek road-stream Crossing Construction" | |||
| 14 | RM needs work | The contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3. | Contractor/PA Coordination | ||
| 14 | Video on Slide 14 needs to have a title | Video title should be "Hogback Creek AOP Selection Rationale" | |||
| 15 | Videos on Slide 15 needs to have a titles | Video title should be "Fish Passage Design Review" and replace second video with Traci Sytle video on Hogback Creek Road Design Review". | |||
| 15 | RM needs work | The contents of the RM needs to be redone to make sure that the correct material is placed in the RM and that which is there works correctly. Phase 3 should have the material/maps that were presented in the previous slides presented under Phase 3. | Contractor/PA Coordination | ||
| 16 | Text needs modifications | delete the second paragraph that starts with "Please note" and move the paragraph that starts with "If the student" to replace it. | |||
| 16 | No need for RM on slide | Delete the RM tab from slide 16. | |||
| 5 | 1 | Text needs modifications | Move the sentence starting with "During Phase 5" to the beginning of the paragraph. | ||
| 3 | video on slide rather dark and difficult to watch | PA will work with the contractor to see if they can improve the quality of the video and add a title to the video (Hogback Creek AOP Construction Project) | |||
| 3 | Slide does not have reference to technical lecture and technical document. | Modify text on slide by modifying text to include "review techncial document Chapter 8.25 and 8.26.1 or by reviewing technical lecture slide 49-56". | |||
| 3 | text under technical lecture tab is mislocated | Delete text under technical lecture button. | |||
| 4 | modify text on slide | move the last sentence starting with "Click on the videos" to the start of the fourth paragraph. | |||
| 4 | Slide does not have reference to technical lecture and technical document. | Modify text on slide to say "review techncial document Chapter 8.25 and 8.26 and review technical lecture slide 49-56". | |||
| 4 | Add title to videos on slide | First video title "Dewatering Plan" and second video tile should be Erosion Control Plan". | |||
| 4 | Slide does not have reference to technical lecture and technical document. | Modify tex on slide to "to review techncial document Chapter 8.1 and 8.2 or by reviewing technical lecture slides 2-11. | |||
| 4 | text under technical lecture tab is mislocated | Delete text under technical lecture button. | |||
| 5 | Photograph does not contribute to slide | delete photgraph from slide | |||
| 5 | text needs to be modified | replace the second paragraph with the last paragraph. | |||
| 6 | 1 | Slide contains design information | Delete reference to design criteria from slide | ||
| 2 | Photographs and diagrams displayed on slide need descriptive text of what is being observed/presented in the diagram . | Change descriptive text to "Hogback Creek Construction Dewatering Operation" | |||
| text on slide needs to be modified | Delete the second paragraph that starts with "Please note" and move the paragraph that starts with "If the student" to replace it. | ||||
| 3 | Slide contains design information | Delete reference to design criteria from slide | |||
| 4 | Photgraph is questionable that it adds anything to the presentation | delete photograph and add photgraphs from phase 5 slide 4 and 5 with the text associated. | |||
| Modify the text on the slide | Modify the statement on the slide to the following: "For more information on post construction structure maintenance please review technical document Chapter 8.1-8.3 or review technical lectures slide 1-23." | ||||
| text under technical lecture tab is mislocated | Delete text under technical lecture button. | ||||
| Slide contains design information but does not contribute anything to the prsentation | Delete reference to design criteria from slide | ||||
| There are only two RWE (Hogback Creek and North Thompson Creek) | delete the last sentence of the text |