About this file

Diagrams

View the file

Other files for this federal contract opportunity

Other files attached to Fence Installation at the Central Plains Experimental Range, newest first.
File Type Posted
SITE_VISIT_QUESTIONS.pdf PDF
SOLICITATION__AG-8KAP-S-15-0001.pdf PDF
Categories_of_Bio-Based_Products.pdf PDF
STATEMENT_OF_WORK.pdf PDF
DAVIS_BACON_WAGE_DETERMINATION.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 1 Section 6 Section 5

N

Section 1

H H PP Tie

1 mile

From West:

H = Construct 2‐post H brace in corner P = Set 10’ post at ¼ mile H = Construct 2 post H brace at ½ mile P = Set 10’ post at ¼ mile Tie = Tie off to existing H brace

N

Section 6

HHPH

1 mile

From West:

H = Construct 2 post H brace off corner 3H = Construct 3 post H brace to avoid eroded road bank 3H = Construct 3 post H brace to bring fence back next to road P = Set 10’ post at ¼ mile H = Construct 2 post H brace at ½ mile H = Construct 2 post H brace with gate at corner of private landPr iv at e

N

3H

3H ga te

Section 5

HHP3H

1 mile

From West (fence 1 along road):

H = Construct 2 post H brace to hang gate H = Construct 2 post H brace at cattle guard

(see next page) 3H = Construct 3 post corner brace P = Set 10’ post at ¼ mile H = Construct 2 post H brace at ½ mile P = Set 10’ post at ¾ mile H = Construct 2 post H brace at corner

From North (fence 2 split section):

H = Construct 2 post H brace at cattle guard P = Set 10’ post at ¼ mile H = Construct 2 post H brace at ½ mile P = Set 10’ post at ¾ mile H = Construct 2 post H brace with gate 16’ from existing metal corral corner

P

H gate cattle guard

H

H

H

P

P

N

H gate

Enlargement of NW corner – Section 5

Pr iv at e

H

3H

Ca tt le g ua rd

Hgate

File details come from the government source that posted it. Updated .