About this file

Diagrams

View the file

Other files

File Type Posted
SITE_VISIT_QUESTIONS.pdf PDF
Categories_of_Bio-Based_Products.pdf PDF
STATEMENT_OF_WORK.pdf PDF
DAVIS_BACON_WAGE_DETERMINATION.pdf PDF
SOLICITATION__AG-8KAP-S-15-0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 1 Section 6 Section 5

N

Section 1

H H PP Tie

1 mile

From West:

H = Construct 2‐post H brace in corner P = Set 10’ post at ¼ mile H = Construct 2 post H brace at ½ mile P = Set 10’ post at ¼ mile Tie = Tie off to existing H brace

N

Section 6

HHPH

1 mile

From West:

H = Construct 2 post H brace off corner 3H = Construct 3 post H brace to avoid eroded road bank 3H = Construct 3 post H brace to bring fence back next to road P = Set 10’ post at ¼ mile H = Construct 2 post H brace at ½ mile H = Construct 2 post H brace with gate at corner of private landPr iv at e

N

3H

3H ga te

Section 5

HHP3H

1 mile

From West (fence 1 along road):

H = Construct 2 post H brace to hang gate H = Construct 2 post H brace at cattle guard

(see next page) 3H = Construct 3 post corner brace P = Set 10’ post at ¼ mile H = Construct 2 post H brace at ½ mile P = Set 10’ post at ¾ mile H = Construct 2 post H brace at corner

From North (fence 2 split section):

H = Construct 2 post H brace at cattle guard P = Set 10’ post at ¼ mile H = Construct 2 post H brace at ½ mile P = Set 10’ post at ¾ mile H = Construct 2 post H brace with gate 16’ from existing metal corral corner

P

H gate cattle guard

H

H

H

P

P

N

H gate

Enlargement of NW corner – Section 5

Pr iv at e

H

3H

Ca tt le g ua rd

Hgate

File details come from the government source that posted it. Updated .