SF-30 Amendment of Solicitation_Mod4.doc
DOC document 64 KB Posted
- Attached to
- Posey Lake Phase II Federal contract opportunity
- Solicitation number
- AG-84N8-S-10-0110
About this file
SF30_Amendment4_Site Visit Notes
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF-30 Amendment of Solicitation_Mod3.doc | DOC document | |
| SF-30 Amendment of Solicitation_Mod2.doc | DOC document | |
| 3_Specifications and Sections_Posey Lake Phase II.doc | DOC document | |
| 2_RFQ AG84N8S100110 Posey Lake Phase II_0407.doc | DOC document | |
| 1_Cover Page.doc.shs | — | |
| 5_Experience Questionnaire.doc.shs | — | |
| 6_WD UT79.docx | DOCX document | |
| 4_Project Location Map.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1. CONTRACT ID CODE |
| PAGE OF PAGES |
| 1 |
| 3 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| 4 |
| 08/18/2010 |
| 6. ISSUED BY |
| CODE |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
USDA- Forest Service R4 - Utah Acquisition Support Center 2222 West 2300 South Salt Lake City, UT 84119-2020
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) |
| (X) |
| 9A. AMENDMENT OF SOLICITATION NO. |
| X |
| AG-84N8-S-10-110 |
9B. DATED (SEE ITEM 11)
08/10/2010
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (X) |
| A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN |
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
| X |
| D. OTHER (Specify type of modification and authority) |
Upload Site Visit notes from August 16, 2010
E. IMPORTANT: X Contractor _ is not, is required to sign this document and return __copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
This amendment is to incorporate the Site Visit notes from August 16, 2010 Solcitation response date is NOT extended and all other terms and conditions are to remain the same.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
Elouise Fowler, Contracting Officer
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
| /s/ Elouise Fowler |
| 08/18/2010 |
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
| 30-105 |
| STANDARD FORM 30 (REV. 10-83) |
Prescribed by GSA
FAR (48 CFR) 53.243
PRE-BID TRIP MEETING NOTES
POSEY LAKE PHASE II
RFQ# AG-84N8-S-10-0110
CONTRACTOR ATTENDEES:
Kevin New
Ron New & Sons Construction
Tony Jackson
Jackson Excavation
Ryan Rees
Harward & Rees
Newell Harward
Harward & Rees
Dan Flake
DDF Construction
GOVERNMENT ATTENDEES:
Paul Dastrup FS Contracting Officers Representative (COR)
Phone # 435-676-9352 or 435-676-3025 cell
The pre-bid meeting was held on August 16, 2010 at 10:00 a.m. We met at the project site. The pre-bid meeting notes are part of an amendment to the above referenced solicitation.
We walked through the entire project and looked at each site. The corners for all spurs and family units are marked on the ground.
The following is a list of questions and answers:
1. Question. What is the quantity of gravel needed for the project. Answer. The schedule of items has 100 cubic yards as a pay item 129204-1 under the base bid and 10 cubic yards as a pay item under option 5. This gravel is for surfacing the spurs. In addition gravel will be needed for the family units and for the trails. These are paid for under items 129400-1 Family Units, 129410-1 Group Site, and 321204-2 4’ wide aggregate trail.
2. Question. Where is the gravel source. Answer. The designated gravel source is the Stump Springs pit. Specific directions to the pit is in 321204 Section 2.3A. The contractor may also elect to purchase gravel from a private source. If the Stump Springs material is used, the Government will assume the responsibility of the quality requirements for gradation and PI. If a commercial source is used, the gravel will need to meet the requirements of Grading G. The grading is shown incorrectly as Grading C in the Schedule of Items.
3. Question. Does the Forest Service have a proctor on the gravel. Answer. After checking the files, the Forest Service does not have a proctor. Contractor will need to perform the tests specified in Table 14100-1.
4. Comment. We hope to be able to award as many options as possible based on bid pricing and available funding. Bidders need to bid for base and all options.
5. Comment. There are already 2 amendments out on this project. The due date has been change to September 7, 2010 @ 4:30 pm. Make sure you acknowledge all amendments.
6. Comment. Due to the late start date this fall it is expected that construction will go into next field season. The campground will be shut down from this fall after award, but will be open during construction next field season.
7. Comment. During the walkthrough the group looked at the valve and drain near spur 17. It is located below the road on a steep sidehill. It appears as though the drain could be located closer to the road, but the exact location of the waterline is not known. Bid this valve and drain at the location shown on the drawings. If during construction it is determined that the drain can be moved closer to the road we will issue a contract modification at that time.