3_Specifications and Sections_Posey Lake Phase II.doc

DOC document 499 KB Posted

Attached to
Posey Lake Phase II Federal contract opportunity
Solicitation number
AG-84N8-S-10-0110
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

3_AG84N8S100110 Gen Specs and Sections_Posey Lake Phase II

View the file

Other files for this federal contract opportunity

Other files attached to Posey Lake Phase II, newest first.
File Type Posted
SF-30 Amendment of Solicitation_Mod4.doc DOC document
SF-30 Amendment of Solicitation_Mod3.doc DOC document
SF-30 Amendment of Solicitation_Mod2.doc DOC document
2_RFQ AG84N8S100110 Posey Lake Phase II_0407.doc DOC document
1_Cover Page.doc.shs —
5_Experience Questionnaire.doc.shs —
6_WD UT79.docx DOCX document
4_Project Location Map.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section C - Description/Specifications/Statement of Work

GENERAL SPECIFICATIONS

Posey Lake Campground Rehabilitation

1.1 Scope of Contract

This project will reconstruct a portion of the Posey Lake Campground to make six sites accessible. Work for the project will include:

Base Bid:

1. Site demolition, grading and rehabilitation of Camp Sites 9 - 14 including removal and disposal of old site furniture, construction of new aggregate surfaced pads, furnishing & installing tables, fire rings, pedestal grills and food storage boxes. Spurs shall be widened, extended and sloped as needed to meet ADA requirements.

2. Rehabilitation of spurs 9-13. Spurs shall be widened, extended and sloped as needed to meet ADA requirements.

3. Construction of an accessible trail from spurs to unit pads at sites 12, 13, and 14.

4. Remove and replace hydrants and drains near sites 15, 18, and 22. Includes removal and disposal of existing hydrants, valves, and drains and installation of new hydrants, valves, and drains.

5. Constructing rock retaining walls at spur 13 and group site pad.

Option(s):

1. Remove and replace hydrant and drain behind the restroom near the boat dock. Includes removal and disposal of existing hydrant, concrete, drain, valve, and abandoned waterline and installing new hydrant, valve, drain, and waterline.

2. Remove and replace hydrant and drain near site #7. Includes removal and disposal of existing hydrant and installing new hydrant, valve, drain, and waterline.

3. Remove and replace hydrant near the group site #14. Includes removal and disposal of existing hydrant and install new hydrant, combination air valve, valve, drain and waterline.

4. Rehab site #8. Includes removal and disposal of existing site furniture and constructing a new single family unit, including new aggregate surfaced pad, furnishing and installing tables, fire rings, pedestal grills and food storage boxes. Does not require reconstructing the spur.

5. Rehab site #15. Includes removal and disposal of existing site furniture, and timbers and constructing a new single family unit, including new aggregate surfaced pad, furnishing and installing tables, fire rings, pedestal grills and food storage boxes. Does not require reconstructing the spur, but does require shaping and sloping edge of spur where timbers are removed, and placing aggregate surfacing over the disturbed area.

1.2 Project Location

Posey Lake Campground is located on the Escalante Ranger District of the Dixie National Forest in Garfield County, Utah approximately 19 miles northwest of Escalante, Utah via Forest Roads 153 & 154. From Escalante, Utah travel north on Forest Road 30153 for approximately 12 miles, turn left onto Forest Road 30154 and follow this road for approximately 2 miles to Posey Lake Campground.

The campground sits at an elevation of approximately 8800 feet.

1.3 Site Information and Limitations

The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:

1. Construction sites will be closed to the public during construction but open to authorized government employees. The Contractor will be responsible for signing, limiting public access and safety of public and/or government employees in the area.

2. Water for compaction and dust abatement can be obtained from Posey Lake. Water from the campground water hydrant may be used if the system is not closed down for the season.

3. Aggregate can be used from an existing pile on National Forest Lands. The location is the Stump Springs Gravel pit which is approximately 35 miles by road southwest of the project. Contractor may also elect to obtain surfacing material commercially.

1.4 Traffic Control and Construction Signing

No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic has been submitted by the contractor and approved by the Contracting Officer. Construction signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). All traffic control signs will be placed in areas adequate for a truck pulling a fifth wheel trailer to be turned around. Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items.

1.5 Work Camps, Staging and Storage Areas

1. Areas of staging operations and storage of materials shall be approved by the CO. The Contractor must request in writing for approval from the CO to stage trailers (work or housing) on site.

2. Overnight camping will be allowed. Coordination shall be made with the CO and District Ranger.

1.6 Inspection of Worksite

1.

The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work, and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.

1.7 Start Date

Work is anticipated to begin in late summer or early fall of 2010. A specific start date will be negotiated between the contractor and the CO. Work cannot start until after labor day weekend 2010.

1.8 Contract Time

1. Base: 60 Calendar Days

2. Option1: 3 Calendar Days

3. Option 2: 4 Calendar Days

4. Option 3: 3 Calendar Days

5. Option 4: 6 Calendar Days

6. Option 5: 8 Calendar Days 1.9 Specifications & Drawings Include listing of Special Project Specifications or CSI Specifications.

Specification #
Specification Title
02206
Riprap/Rock Wall
02380
Earthwork Geotextiles
011250
Measurement & Payment
011900
Mobilization
013300
Submittals
014100
Quality Control
024100
Waste Material Disposal
024102
Removal & Disposal of Existing Structures
033010
Cast in Place Concrete (Limited Applications)
033020
Concrete from packaged dry mix for minor structures
129400
Family Units
129410
Group Area
133402
Utility Boxes
221100
Water Distribution Systems
221102
Curb Valves & Boxes

221103

221105
Water Hydrants
311000
Clearing & Grubbing
312000
Earthwork
312010
Select Borrow
312100
Project Site Preparation Grading
312225
Excavation & Embankment
321204
Crushed Aggregate Base or Surface Course

Include the following drawings:

Sheet 1 – Cover Sheet

Sheet 2 – Vicinity Map & Project Description

Sheet 3 – Campground Site Plan

Sheet 4 – Plan View Details 1

Sheet 5 – Plan View Details 2

Sheet 6 – Spur Details

Sheet 7 – Rock Wall, Trail, and Ditch Details

Sheet 8 – Family Unit Details

Sheet 9 – Group Pad Details Sheet 10 –Fire Ring and Pedestal Grill Details

Sheet 11 – Table and Curb Stop Details

Sheet 12 – Valves, Valve Box, Trench, and Daylight Drain Details

Sheet 13 – Hydrant Details

Sheet 14 – Combination Air Valve and Valve Box AGAR 452.211-72 Statement of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

End of Section C

July 2010

USDA FOREST SERVICE, R-4

POSEY LAKE CAMPGROUND REHABILITATION

SECTION 02206 – RIPRAP/ROCK WALL

PART 1 - GENERAL

1.1 SUMMARY

A. This item shall consist of furnishing and constructing a dry stack rock retaining wall on designated cut and fill slopes, in accordance with these specifications, and in conformity with the drawings and to the lines and grades established.

1.2 MEASUREMENT AND PAYMENT

1. The quantity of dry stack rock wall to be measured shall be the number of square feet of wall face, measured in place, completed and accepted. The limiting dimensions shall not exceed those shown on the drawings or otherwise established.

a. The area, determined as provided above, shall be paid for at the contract unit price per square foot of "Rock Retaining Wall." This price and payment shall constitute full compensation for furnishing, hauling, placing, preparing base, cleanup, and for all labor, material, equipment, tools, and incidentals necessary to complete the item. Geotextile fabric material placed beneath the riprap when shown on the drawings, shall be considered incidental and will not paid for separately.

PART 2 - PRODUCTS

2.1 STONES - The stones used for this work shall be durable, angular, field, or quarry stones which are sound, hard, and free from laminations, fractures, or other structural defects. They shall be of such quality that they will not disintegrate on exposure to water or weathering.

A. Stones used shall be such that at least 60 percent of the individual stones shall have a volume of 8 cubic feet or more. Not more than 10 percent of the stone shall have a perimeter of less than 24 inches when measured on the smallest section.

B. Gradation Requirements for Riprap

Class
Percent of Rock

by Mass Mass

(kg) Approximate Cubic Dimension(2)(3) inches

4
20
550 to 770
18 to 20
30
220 to 550
14 to 18
40
22 to 220
6 to 14
10(1)
0 to 22
0 to 6

(1) Furnish spalls and rock fragments graded to provide a stable dense mass.

(2) The volume of a rock with these cubic dimensions has a mass approximately equal to the specified rock mass.

(3) Furnish rock with breadth and thickness at least one-third its length.

2.2 SOURCE - Riprap may be obtained from government owned pit, as shown on the drawings. Suitable rock generated in the construction of the spurs and family units may be used for constructing rock walls.

2.3 GEOTEXTILE FABRIC – See Section 2380.

PART 3 - EXECUTION

3.1 FOUNDATION - The slope or area upon which the riprap is to be placed shall be shaped to the required lines and grades. The surface shall be roughened to provide a surface to which the base stones will key and be firmly bedded. Foundation trenches shall be excavated at the toe of the slope or area to receive the base stones and provide a secure footing. These trenches shall be of sufficient width and extend a minimum of 6 inches below existing ground or the bed of the stream or wash. Slopes and trenches shall be approved before the placing of riprap is begun.

3.2 PLACING RIPRAP

A. Geotextile fabric shall be placed on the prepared slope, parallel with the centerline of the spur and campsite with edges overlapping, prior to the placement of the riprap stone. See Section 02380 for additional requirements. The stones shall be placed on the approved slope and in the trench to form the cross section desired. They shall be manipulated sufficiently to secure a roughly regular surface and mass stability. All stones shall be firmly keyed or bedded. Insofar as possible, the larger stones shall be placed at the bottom.

B. The voids between the larger stones shall be filled with smaller stones. This shall be done in such a manner that they do not prevent the interlocking of the larger stones. The finished surfaces which will remain exposed, shall present a broken joint surface on which voids are reasonably well filled.

C. When the rock retaining wall is completed, the area shall be cleaned up by removing all debris and material not used. Material excavated from foundation trenches, etc., shall be satisfactorily disposed of.

END OF SECTION – 02206

May 2005

USDA FOREST SERVICE, R-4

POSEY LAKE CAMPGROUND REHABILITATION

SECTION 02380 - EARTHWORK GEOTEXTILES

PART 4 - GENERAL

4.1 SUMMARY

A. The work under this section consists of furnishing and placing a geotextile as a permeable separator, stabilizer, or for subsurface drainage and permanent erosion control measures.

B. General

1. The work under this section consists of furnishing and placing a geotextile as a permeable separator, stabilizer, or for subsurface drainage and permanent erosion control measures.

2. Elevate and protect rolls with a waterproof cover if stored outdoors. When using a geotextile for a permanent installation, limit the geotextile exposure to ultraviolet radiation to less than 10 days.

4.2 Reference Specifications- The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

ASTM D 3786

Burst Strength

ASTM D 4355

Ultraviolet Stability

ASTM D 4362

Sewn Seam Strength

ASTM D 4491

Permittivity

ASTM D 4533

Tear Strength

ASTM D 4632

Grab Strength

ASTM D 4751

Apparent Opening Size

ASTM D 4833

Puncture Strength

4.3 Method of Measurement: No separate payment will be made for the work included under this section; rather payment shall be considered to be included in construction of Rock Retaining Wall.

4.4 Related Sections: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

Section 02206 Heavy Loose Rock Riprap

PART 5 - PRODUCTS

5.1 Geotextile: Use long-chain, synthetic polymers, composed at least 95 percent by mass of polyolefins or polyesters, to manufacture geotextile or the threads used to sew geotextile. Form the geotextile, including selvedges, into a stable network such that the filaments or yarns retain their dimensional stability relative to each other. Suitable nonwoven polypropylene geotextiles include Mirafi 180N, manufactured by TC Mirafi, 365 South Holland Drive, Pendergrass, GA 30567, (706) 693-2226, www.tcmirafi.com or an approved equal.

A. Physical Requirements:

Mechanical Properties
Test Method

ASTM

Units
Minimum

Average Roll Value

Grab strength
D 4632
N (lbs)
912(205)
Grab Tensile Elongation
D 4632
%
50
Trapezoid Tear strength
D 4533
N (lbs)
356(80)
CBR Puncture strength
D 6241
N (lbs)
2225 (500)
Apparent Opening Size (AOS)1
D 4751
mm

(US Sieve)

0.18 (80)

Permittivity
D 4491
sec-1
1.1
Flow Rate
D 4491
l/min/m2

(gal/min/ft2)

(95)

UV Resistance (at 500 hours)
D 4355
% strength retained
70

1 ASTM D 4751: AOS is a Maximum Opening Diameter Value

Physical Properties
Test Method

ASTM

Units
Typical Value
Weight
D 5261
g/m2 (oz/yd2)
271 (8.0)
Thickness
D 5199
mm (mils)
1.8 (72)

B. All property values, with the exception of apparent opening size (AOS), in these specifications represent minimum average roll values in the weakest principal direction (i.e., average test results of any roll in a lot sampled for conformance or quality assurance testing shall meet or exceed the specified values). Values for AOS represent maximum average roll values.

PART 6 - EXECUTION

6.1 INSTALLATION

A. Where placing a geotextile on native ground, cut the trees and shrubs flush with the ground surface. Do not remove the topsoil and vegetation mat. Remove all sharp objects and large rocks. Fill depressions or holes with suitable material to provide a firm foundation.

B. Place and anchor the geotextile on an approved smooth-graded surface.

C. The geosynthetic reinforcement shall be placed directly on the prepared subgrade. Place the geotextile smooth and free of tension, stress, or wrinkles. Fold or cut the geotextile to conform to curves. Overlap the geotextile a minimum of 12 inches at the ends and sides of adjoining sheets or sew the geotextile joints according to the manufacturer's recommendations. Overlap the uphill or upstream sheet over the downhill or downstream sheet. Offset end joints of adjacent sheets a minimum of 4.5 feet. Pins may be used to hold the geotextile sheets in place. Space pins along the overlaps at approximately 1-meter centers

D. Place riprap on the geotextile starting at the toe of the slope and proceed upward. Place riprap onto the geotextile from a height of less than 12 inches. Place slope protection rock onto the geotextile from a height less than 3 feet.

6.2 Samples: The Contractor shall submit samples of geotextile for approval by the Contracting Officer.

END OF SECTION 02380

July 2010

USDA FOREST SERVICE, R-4

POSEY LAKE CAMPGROUND REHABILITATION

SECTION 011250 - MEASUREMENT AND PAYMENT

PART 7 - GENERAL

7.1 SUMMARY

A. Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work, labor, materials, equipment, and incidentals necessary to successfully complete the project will be considered as included in the payment for items shown. This section defines the method of measurements and basis of payment for work items listed in the Schedule of Items.

B. When more than one class, size, type, thickness, etc. is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the pay items.

7.2 DETERMINATION OF QUANTITIES

A. The following measurements and calculations shall be used to determine contract quantities for payment.

1. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.

2. For excavation or embankment volumes, the average end area method shall be used to compute volumes. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three-dimensional methods.

3. For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.

4. For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, piping, utilities, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed.

5. For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.

6. For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.

B. Earthwork Tolerances - Adjustments of horizontal or vertical alignment, within the tolerances specified in this contract, or shifts of balance points up to 100 feet shall be made by the contractor as necessary to produce the designed sections and to balance earthwork. Such adjustments shall not be considered as "Changes."

7.3 UNITS OF MEASUREMENT

A. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:

1. Acre: Make longitudinal and transverse measurements for area computations horizontally.

2. 50lb Bag: Measurement will be for the actual number of 50lb bags of standard bentonite grout.

3. 94lb Bag: Measurement will be for the actual number of 94lb bags of standard cement or grout.

4. Cubic Yard (CY): A measurement computed by one of the following methods:

a. Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.

b. Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.

c. Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.

5. Each (EA): One complete unit, which may consist of one or more parts.

6. Gallons (GAL): The quantity shall be measured by any of the following methods:

a. Measured volume in container.

b. Metered volume by approved metering system.

c. Commercially package volume.

7. Hour (HR): Measurement will be for the actual number of hours (or fraction thereof) ordered by the Contracting Officer and performed by the contractor.

8. Linear Foot (LF): Measurement of work along its length from point-to-point; parallel to the base or foundation. Do not measure overlaps.

9. Lump Sum (LS): One complete unit.

10. Mile: Measured horizontally along the centerline of each roadway, approach, or ramp.

11. Pound (LB): For sacked or packaged material, measurement will be the net weight as packed by the manufacturer.

12. Square Foot (SF): Measured on a plane parallel to the surface being measured.

13. Square Yard (SY): Measured on a plane parallel to the surface being measured.

14. Ton: Measured as a short ton consisting of 2,000 pounds.

7.4 METHOD OF MEASUREMENT

A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:

1. ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work.

2. DESIGNED QUANTITIES (DQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units shown in the Schedule of Items may be authorized under any of the following conditions:

a. As a result of changes in the work authorized by the CO.

b. As a result of the CO determining that errors exist in the original design that causes a pay item quantity to change by 15 percent or more.

c. As a result of the Contractor submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

3. LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.

4. STAKED QUANTITIES (SQ) - These quantities are determined from staked measurements prior to construction.

5. VEHICLE QUANTITIES (VQ) - These quantities are measured or weighed in hauling vehicles.

PART 8 - PRODUCTS (NOT APPLICABLE)

PART 9 - EXECUTION (NOT APPLICABLE)

END OF SECTION 011250

MAY 2006

USDA FOREST SERVICE, R-4

POSEY LAKE CAMPGROUND REHABILITATION

SECTION 011900 - MOBILIZATION

PART 10 - GENERAL

10.1 SUMMARY

A. This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.

10.2 MEASUREMENT AND PAYMENT

A. The measurement shall be lump sum for mobilization. Payment shall be as follows:

1. Bond premiums will be reimbursed after receipt of the evidence of payment.

2. 50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.

3. Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.

4. Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.

5. Progress payments for mobilization and preparatory work shall be subject to retainage.

PART 11 - PRODUCTS (NOT USED)

PART 12 - EXECUTION (NOT USED)

END OF SECTION 011900

July 2005

USDA FOREST SERVICE, R-4

POSEY LAKE CAMPGROUND REHABILITATION

SECTION 013300 - SUBMITTAL PROCEDURES

PART 13 - GENERAL

13.1 SUMMARY

A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. See Table 013300-1 for a summary of required submittals.

B. See other specification section within this package for additional requirements on submittal.

13.2 SUBMITTAL PROCEDURES

A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

a. The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

B. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.

1. Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.

2. If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Allow 14 days for processing each re-submittal.

4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.

C. Identification: Place a permanent label or title block on each submittal for identification.

1. Indicate name of firm or entity that prepared each submittal on label or title block.

2. Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.

3. Include the following information on label for processing and recording action taken:

a. Project name.

b. Date.

c. Name and address of Contractor.

d. Name of manufacturer.

e. Unique identifier, including revision number.

f. Number and title of appropriate Specification Section.

g. Drawing number and detail references, as appropriate.

h. If more than one item is shown on submittal sheet, identify item.

D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.

E. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.

F. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.

13.3 MEASUREMENT AND PAYMENT

A. No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.

PART 14 - PRODUCTS

14.1 ACTION SUBMITTALS – (Submittals requiring CO approval)

A. General: Prepare and submit Action Submittals required by individual Specification Sections.

1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's written recommendations.

b. Manufacturer's product specifications.

c. Manufacturer's installation instructions.

d. Manufacturer's catalog cuts.

e. Wiring diagrams showing factory-installed wiring.

f. Compliance with recognized trade association standards.

g. Compliance with recognized testing agency standards.

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.

1. Preparation: Include the following information, as applicable:

a. Dimensions.

b. Identification of products.

c. Fabrication and installation drawings.

d. Roughing-in and setting diagrams.

e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.

f. Notation of dimensions established by field measurement.

2. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.

D. Contractor's Construction Schedule: The contractor shall submit a Construction Schedule, for approval by CO, in accordance with the contract provisions within 5 day of commencement of work.

E. Samples: Prepare physical units of materials or products, including the following:

1. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.

14.2 INFORMATIONAL SUBMITTALS – (Submittals NOT requiring CO approval)

A. General: Prepare and submit Informational Submittals required by other Specification Sections.

1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will not return copies.

2. Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

3. Test and Inspection Reports: Comply with requirements in Section 014100 "Quality Control."

B. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.

C. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.

D. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment.

E. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.

PART 15 - EXECUTION

15.1 GENERAL

A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.

B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

C. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.

D. Submittals not required by the Contract Documents will not be reviewed and may be discarded.

E. Substitutions – Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 30 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution.

F. Requests for substitutions will only be considered if contractor submits the following:

1. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution. Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.

2. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.

3. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.

4. The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.

EDIT table below for each project. COORDINATE table references with edited specification sections.

15.2 SUBMITTAL SCHEDULE – Submittals shall be made as required by and called for in the drawings and specifications. The following table is a summary of the required submittals for the project - the table is to assist the Contractor and may not be all inclusive – additional submittals may be required by specific specifications:

TABLE 013000-1

Spec. Section
Section Title
Subsection
Required Submittal
014100
Quality Control
1.3 A
Contractor quality control plan
014100
Quality Control
1.3 B
Permits, Licenses, and Certificates
014100
Quality Control
1.3 C
Test and inspection reports
014100
Quality Control
1.3 D
As-Built drawings
033010
Cast – in – Place Concrete
1.3 B
Product Data
033010
Cast – in – Place Concrete
1.3 C
Design Mixtures
033000
Cast – in – Place Concrete
3.9
Field Quality Control Tests
221100
Water Distribution Systems
1.3 A1
Pipe & fittings
221100
Water Distribution Systems
1.3 A2
Drain & vent screens
221100
Water Distribution Systems
1.3 B
Plan for disposal of testing water
221105
Water Hydrants
1.3 A
Manufacturer’s Literature & Maintenance Data
221105
Water Hydrants
1.3 B
Certification that washed rock meets gradation requirements
312000
Earthwork
1.3 A
Approval source of aggregates & backfill materials & certified sieve analysis.
312000
Earthwork
1.3 B
Product Data – Drainage Fabric
312225
Excavation & Embankment
1.3 A
Density Test results
312225
Excavation & Embankment
1.3 B
Testing Frequency
321204
Crushed Aggregate Base or Surface Course
1.2 A
Aggregate Source, Gradation, & Material Properties
321204
Crushed Aggregate Base or Surface Course
1.2 B
Compaction density test results & proctor

END OF SECTION 013300

July 2010

USDA FOREST SERVICE, R-4

POSEY LAKE CAMPGROUND REHABILITATION

SECTION 014100 – QUALITY CONTROL

PART 16 - GENERAL

16.1 This work shall consist of providing quality control in conformance with the inspection, testing, and product certification requirements of this contract to ensure compliance with the drawings and specifications. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of the contract.

16.2 QUALITY CONTROL

A. The Contractor shall provide and maintain a quality control system that will ensure all services, supplies, and construction work required under this contract conforms to the contract requirements. The Contractor shall perform, or cause to be performed, the sampling, inspection, and testing required to substantiate that all services, supplies, and construction conform to the contract requirements.

B. Special Tests and Inspections: Contractor will engage a testing agency to conduct required special tests and inspections. The Contractor shall authorize the testing agency to perform the required testing and inspections on the work completed. The authority shall include:

1. Testing agency will interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from the Contract Documents.

2. Testing agency will re-test and re-inspect corrected work.

C. Retesting/Reinspecting: Contractor shall provide quality-control services for retesting and reinspection for replaced construction work or for work that failed to comply with the requirements under the contract.

16.3 SUBMITTALS

A. Contractor Quality Control Plan

B. Permits, Licenses, and Certificates

C. Test and Inspection Reports

D. As-Built Drawings

16.4 MEASUREMENT AND PAYMENT

A. No separate payment will be made for the work included under this section; rather payment shall be considered to be included in the items of work listed in the Schedule of Items.

PART 17 - PRODUCTS (Not Applicable)

PART 18 - EXECUTION

18.1 QUALITY CONTROL SYSTEM

A. General: Perform required testing, inspections, sampling, and similar services per direction specified in the contract drawings and specifications and in accordance with established industry standards.

18.2 CONTRACTOR QUALITY CONTROL PLAN

A. At the time of the preconstruction conference, the Contractor shall submit for approval a written Contractor Quality Control Plan.

1. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days.

2. The Government reserves the right to require changes in the plan during the contract period as necessary.

3. No change in the approved plan may be made without written concurrence by the Contracting Officer.

4. At a minimum, the plan shall include the following:

a. A list of personnel responsible for quality control and assigned duties. Include each person's qualifications.

b. A copy of a letter of direction to the Contractor's Quality Control Supervisor outlining assigned duties.

c. Names, qualifications, and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.

d. Methods of performing, documenting, and enforcing quality control of all work.

e. Methods of monitoring and controlling environmental pollution and contamination as required by all applicable regulations and laws.

18.3 TEST AND INSPECTION REPORTS

A. Submit three copies of complete test results no later than three calendar days after the test was performed.

B. Submit failing test results and proposed remedial actions within four hours of noted deficiency.

C. Testing and Inspection Reports shall include the following:

1. Date of issue.

2. Project title and number.

3. Name, address, and telephone number of testing agency.

4. Dates and locations of samples, tests, or inspections.

5. Names of individuals performing tests and inspections.

6. Reference Specification Section(s).

7. Complete test or inspection data.

8. Test and inspection results and an interpretation of test results.

9. Ambient conditions at time sample was taken, tested, or inspected.

10. Comments or professional opinion on whether tested or inspected work complies with the Contract Document requirements.

11. Name and signature of laboratory inspector.

12. Recommendations on retesting and reinspecting.

18.4 PERMITS, LICENSES, AND CERTIFICATES

A. For Contracting Officer’s records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations relevant to the on performance of the work.

18.5 AS-BUILT DRAWINGS

A. The Contractor shall maintain a set of the contract drawings depicting as-built conditions. These drawings shall be maintained in a current condition and shall be available for review. All variations from the original contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as-built drawings shall be submitted to the Contracting Officer.

18.6 SAMPLING, TESTING, AND CERTIFICATION REQUIREMENTS

A. Sampling, testing, and Certification requirements and frequency for specific items shall be as specified in the drawings and specification. The following table is a summary of the required sampling, testing, and certification for the project - the table is to assist the Contractor, but may not be all inclusive – additional submittals may be required by specific specification section:

TABLE 014100-1

Item
Subsection
Certification or Test Required
Frequency
033010
2.8
Concrete Mixing
Each Truck
033010
3.9
Concrete – three cylinders, slump, air, temperature
1 composite < 9cy and 1 composite for each additional 25cy
221100
3.2L
HDPE Pipe - Bent Strap Test
Once Daily
221100
3.5A
Hydrostatic Testing of Water System
See Spec.
221100
3.6B
Pressure and Leakage Test – Water Line
See Spec.
221100
3.6A
Bacteriological Examination
After disinfection, before use
312000
3.12C
Compaction Test – at Pipe Zone
One test – at each road crossing
312000
3.12D
Compaction Test – above Pipe Zone
One test every other lift – at each road crossing
312000
3.12I
Tracer Wire Conductivity Test
Until Passing
312225
3.9B
Moisture-Density Relationship
One Test for Each Soil Type Encountered
312225
3.9B
Compaction – Spur, Family Unit, and Group Site Embankment (method 4)
One test every 750 sq. yd. of embankment per lift
312225
3.9B
Compaction – Subgrade
One test every 1000 sq. yd. of subgrade
321204
3.4
Compaction Tests – Aggregate
One test for every 150 sq. yd. of aggregate

END OF SECTION 014100

APRIL 2009

USDA FOREST SERVICE, R-4

POSEY LAKE CAMPGROUND REHABILITATION

SECTION 024100 - WASTE MATERIAL DISPOSAL

PART 19 - GENERAL

19.1 SUMMARY

A. This Section includes the loading, handling, hauling, and placing of excess excavation material, unsuitable excavation material, clearing and grubbing debris, and construction debris.

19.2 MEASUREMENT AND PAYMENT

A. There will be no separate measurement or payment for work in this Section. Waste material disposal is considered incidental to other items of work shown in the Schedule of Items.

PART 20 - PRODUCTS – NOT APPLICABLE

PART 21 - EXECUTION

21.1 Waste material to be removed:

A. All excavated material not used in the construction of embankments or backfilling of trenches, or other excess material resulting from the excavation and embankment operation shall be hauled to a disposal area.

21.2 Disposal Site:

A. All waste material shall be removed from the project site and legally disposed off of Government property in an approved landfill.

1. The contractor is responsible for all costs and permits associated with landfill disposal.

2. The Government is not responsible for waste material upon its departure from the project site.

END OF SECTION 024100

March 2006

USDA FOREST SERVICE, R-4

POSEY LAKE CAMPGROUND REHABILITATION

SECTION 024102 - REMOVAL AND DISPOSAL OF STRUCTURES AND OBSTRUCTIONS

PART 22 - GENERAL

22.1 SUMMARY

A. Work includes the removal and disposal of existing structures, obstructions, constructed features and elements. Items to remain will be designated by the Contracting Officer prior to demolition work.

1. Base Bid

a. Three water hydrants, valves, drains and appurtenances.

b. Existing site furniture at sites #9, #10, #11, #12, #13 & #14.

2. Option 1

a. Water hydrant, valve, & drain.

3. Option 2

a. Water hydrant, valve, & drain.

4. Option 3

a. Water hydrant, valve, & drain.

5. Option 4

a. Existing site furniture at site 7.

6. Option 5

a. Existing site furniture at site 15.

1.2 RELATED SECTIONS

A.

Section 24100 “Waste Material Disposal.”

1.3 MATERIALS OWNERSHIP

A. Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain Government property, demolished materials shall become Contractor’s property and shall be removed from Project site.

a. The pedestal grill shall be salvaged. Transport and store at the Forest Service administrative site in Escalante, Utah.

b. All table tops and table seats shall be salvaged. Transport and store at the Forest Service administrative site in Escalante, Utah.

1.4 PROJECT CONDITIONS

A. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.

1.5 MEASUREMENT AND PAYMENT

A.

Measurement and Payment shall be as listed below.

1. Base Bid – This work shall be paid lump sum for work associated with removal, disposal, and salvage of all existing structures, obstructions, and constructed features.

2. Option 1 – This work is considered incidental to Option 1 pay items and will not be paid for separately.

3. Option 2 - This work is considered incidental to Option 2 pay items and will not be paid for separately.

4. Option 3 – This work is considered incidental to Option 3 pay items and will not be paid for separately.

5. Option 4 – This work shall be paid lump sum for work associated with removal, disposal, and salvage of all existing structures, obstructions, and constructed features in site 7.

6. Option 5 – This work shall be paid lump sum for work associated with removal, disposal, and salvage of all existing structures, obstructions, and constructed features in site 15.

PART 23 - PRODUCTS – not applicable

PART 24 - EXECUTION

24.1 GENERAL

A. Topsoil stripping and storage, if required, shall comply with the applicable specification.

B. The Contractor may use any means he may elect to remove the structure or items shown on the drawings to be removed, as long as he provides for the safety of the public and preservation of the surrounding site and structures.

1. All of a substructure shall be demolished to a depth of 1 foot below the present ground level.

All wood, concrete, and metal materials to be removed shall be broken into sufficiently small pieces to enable handling and disposal. All other structures shall be backfilled and the surrounding ground restored to as near normal conditions as practicable in accordance with these specifications.

C. Backfill for removed items may be excess material from other excavation or borrow from an approved source.

1. Backfill shall be brought up in 12-inch compacted layers.

2. Compaction shall be by mechanical tampers, with at least three passes over the entire surface.

3. Maximum size of rock in backfill shall be 8 inches.

4. Backfill shall be compacted and rounded 6 inches above the natural ground.

5. When topsoil replacement is required, backfill and compaction shall be as specified above, except the backfill shall terminate 6 inches below the natural ground. Placement of topsoil, when required, shall comply with the applicable specification.

D. Excessive settlement or other evidence of improper backfill shall be corrected by reopening the excavation to the depth required for proper refilling and compaction.

24.2 DISPOSAL

A. Disposal of debris shall comply with Section 024100 “Waste Material Disposal.”

END OF SECTION 024102

July 2010

USDA FOREST SERVICE, R-4

POSEY LAKE CAMPGROUND REHABILITATION

SECTION 033010 - CAST-IN-PLACE CONCRETE (LIMITED APPLICATIONS)

PART 25 - GENERAL

25.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

25.2 SUMMARY

A. This Section specifies cast-in-place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes, for noncritical applications of concrete and for projects using small quantities of concrete.

B. Related Sections include the following:

List below only products and construction that the reader might expect to find in this Section but are specified elsewhere.

1. Section 312000 “Earthwork” for drainage fill under slabs-on-grade.

25.3 SUBMITTALS

Submittal checklist in ACI 301, Sections 1 through 5, includes 68 items. Many deal with Contractor-requested options; others would not apply to less-complex projects.

A. General: In addition to the following, comply with submittal requirements in ACI 301.

B. Product Data: For each type of product indicated.

C. Design Mixtures: For each concrete mixture.

25.4 QUALITY ASSURANCE

A. Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and equipment.

B. Source Limitations: Obtain each type of cement of the same brand from the same manufacturer's plant, obtain aggregate from one source, and obtain admixtures through one source from a single manufacturer.

Always retain paragraph below because this Section is based on ACI 301.

C. Comply with ACI 301, "Specification for Structural Concrete," including the following sections, unless modified by requirements in the Contract Documents:

Usually retain five subparagraphs below. See Evaluations for ACI 301 organization. Four other Sections of ACI 301, "Architectural Concrete," "Mass Concrete," "Prestressed Concrete," and "Shrinkage-Compensating Concrete," could be added but usually fall outside the scope of this Section.

1. "General Requirements."

2. "Formwork and Formwork Accessories."

3. "Reinforcement and Reinforcement Supports."

4. "Concrete Mixtures."

5. "Handling, Placing, and Constructing."

Delete subparagraph below if no structural lightweight concrete is required.

6. "Lightweight Concrete."

D. Comply with ACI 117, "Specifications for Tolerances for Concrete Construction and Materials."

25.5 MEASUREMENT AND PAYMENT

A. There will be no separate measurement or payment for work in this section. Payment will be included at the contract unit price as shown on the Schedule of Items for other items of work.

PART 26 - PRODUCTS

26.1 FORMWORK

A. Furnish formwork and formwork accessories according to ACI 301.

26.2 STEEL REINFORCEMENT

Select requirements from this Article or revise to suit Project.

A. Reinforcing Bars: ASTM A 615/A 615M, Grade 60 (Grade 420), deformed.

B. Plain-Steel Wire: ASTM A 82, as drawn.

C. Plain-Steel Welded Wire Reinforcement: ASTM A 185, fabricated from as-drawn steel wire into flat sheets.

D. Deformed-Steel Welded Wire Reinforcement: ASTM A 497, flat sheet.

26.3 CONCRETE MATERIALS

A. Cementitious Material: Use the following cementitious materials, of the same type, brand, and source throughout Project:

Select portland cement type from options in subparagraph below.

1. Portland Cement: ASTM C 150, Type II.

B. Lightweight Aggregate: ASTM C 330, 1-inch (25-mm) nominal maximum aggregate size.

C. Water: ASTM C 94/C 94M; potable.

Retain paragraph below if using synthetic-fiber reinforcement. Revise fiber type if adding polyester or nylon fibers. Monofilament fibers help reduce plastic shrinkage cracking.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .