Amendment B - Wage Determination.docx
DOCX document 21 KB Posted
- Solicitation number
- AG-84N8-S-10-0094
About this file
Attachment B - Wage Determination (3 pages)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Construction RFQ.doc | DOC document | |
| Amendment A - Project Specifications.docx | DOCX document | |
| Cover Sheet.doc | DOC document | |
| Attachment C - Location Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dixie National Forest Terry Shoal Creek Fence Construction
RFQ #AG-84N8-S-10-0094
Amendment B – Wage Determination Page 1 of 3
General Decision Number: UT100066 07/09/2010 UT66 Superseded General Decision Number: UT20080066 State: Utah Construction Type: Heavy County: Washington County in Utah.
Including Natural Gas Pipeline Construction Modification Number Publication Date 0 03/12/2010 1 07/09/2010
* ENGI0003-021 07/01/2010
Rates Fringes OPERATOR: Power Equipment
| (2a)Blade/Grader............ | $ 25.45 13.26 | |
| (3) Front End Loader (Over 5 cu. yds.)................. | $ 24.93 13.26 |
(4) Asphalt Paver, Front End Loader (2 to 5 cu.
yds.), Oil Distributor, Scraper..................... $ 23.93 13.26
(5) Asphalt Roller, Bobcat/Skid loader, Front
| End Loader (Under 2 cu. yds.)....................... | $ 22.93 13.26 | |||
| (6) Screed.................. | $ 21.97 13.26 | |||
| (7) Roller(Dirt and Grade Compaction)................. | $ 21.06 13.26 |
* ENGI0003-055 02/02/2010
Natural Gas Pipeline Construction Only Rates Fringes OPERATOR: Power Equipment Backhoe/Excavator/Trackhoe, Blade/Grader, Boom, Bulldozer................... $ 35.10 12.49
* ENGI0003-065 07/01/2010
Excluding Natural Gas Pipeline Construction Rates Fringes OPERATOR: Power Equipment
| (2a) Blade Grader........... | $ 25.45 13.26 |
| (3) Backhoe/Excavator...... | $ 24.93 13.26 |
| (4) Bulldozer.............. | $ 23.93 13.26 |
IRON0027-002 07/01/2009
| Rates Fringes | ||
| IRONWORKER (Ornamental, Reinforcing, Structural)......... | $ 26.61 11.60 |
LABO0295-016 07/01/2008
Rates Fringes
LABORER
(1)Flagger.................. $ 19.69 5.40 (3)Mason Tender (Cement/Concrete), Chain
| Saw, Hand Held Saw, Jackhammer, Vibrator........ | $ 19.95 5.40 | ||
| (5)Hand Held Drill.......... | $ 20.75 5.40 |
LABO0295-017 07/01/2008
Natural Gas Pipeline Construction Only Rates Fringes
LABORER
| (3)Chain Saw and Nail Gun... | $ 19.95 5.40 |
| (5)Power Drill.............. | $ 20.75 5.40 |
SUUT2008-043 08/19/2008
| Rates Fringes | |
| CARPENTER, Including Form Work... | $ 12.52 0.27 |
| CEMENT MASON/CONCRETE FINISHER... | $ 16.42 2.85 |
| ELECTRICIAN...................... | $ 23.74 7.64 |
| LABORER: Common or General...... | $ 9.00 0.00 |
| LABORER: Landscape.............. | $ 7.25 0.00 |
| LABORER: Pipelayer.............. | $ 14.00 0.00 |
| OPERATOR: Crane................. | $ 28.97 9.40 |
OPERATOR: Trackhoe (Excluding Natural Gas Pipeline Construction)...........$ 19.98 0.00
TEAM0222-016 07/01/2008
| Rates Fringes | |||
| TRUCK DRIVER (Articulated)....... | $ 20.73 8.43 | ||
| TRUCK DRIVER (Concrete Pumping)......................... | $ 18.39 8.43 |
TRUCK DRIVER (Dump Truck, Bottom-end or side)
| Less than 8 cu. yds......... | $ 18.16 8.43 | |
| 8 cu. yds. to less than 14 cu. yds..................... | $ 18.31 8.43 | |
| 14 cu. yds. to less than 35 cu. yds.................. | $ 18.46 8.43 |
Dixie National Forest Terry Shoal Creek Fence Construction
RFQ #AG-84N8-S-10-0094
Amendment B – Wage Determination Page 2 of 3
| 35 cu. yds. to less than 55 cu. yds.................. | $ 18.66 8.43 |
| 55 cu. yds. to less than 75 cu. yds.................. | $ 18.86 8.43 |
| 75 cu. yds. to less than 95 cu. yds.................. | $ 19.06 8.43 |
| 95 cu. yds. to less than 105 cu. yds................. | $ 19.26 8.43 |
| 105 cu. yds. to less than 130 cu. yds................. | $ 19.38 8.43 |
TRUCK DRIVER (Flat Rack, Bulk Cement, Semi-Trailers,
| Mud/Banding and Paint) Less than 10 tons........... | $ 18.06 8.43 | |||
| 10 tons to less than 15 tons........................ | $ 18.21 8.43 | |||
| 15 tons to less than 20 tons........................ | $ 18.31 8.43 | |||
| 20 tons and over............ | $ 18.46 8.43 | |||
| Pickup Truck................ | $ 17.99 8.43 | |||
| TRUCK DRIVER (Lowboy)............ | $ 21.238 8.43 | |||
| TRUCK DRIVER (Oil Spreader)...... | $ 18.86 8.43 | |||
| TRUCK DRIVER (Tiremen and Greaser)......................... | $ 18.56 8.43 |
TRUCK DRIVER (Transit Mix)
| 0 cu. yds. to 8 cu. yds..... | $ 18.39 8.43 | ||
| Over 8 cu. yds. to 14 cu. yds......................... | $ 18.49 8.43 | ||
| TRUCK DRIVER (Water, Fuel & Oil Tank) less than 1,200 gal......... | $ 18.04 8.43 | ||
| 1,200 gal. to less than 2,500 gal................... | $ 18.16 8.43 | ||
| 2,500 gal. to less than 4,000 gal................... | $ 18.31 8.43 | ||
| 4,000 gal. to less than 6,000 gal................... | $ 18.61 8.43 | ||
| 6,000 gal. to less than 10,000 gal.................. | $ 18.86 8.43 | ||
| 10,000 gal. to less than 15,000 gal.................. | $ 19.11 8.43 | ||
| 15,000 gal. to less than 20,000 gal.................. | $ 18.36 8.43 | ||
| 20,000 gal. to less than 25,000 gal.................. | $ 19.71 8.43 | ||
| 25,000 gal. and over........ | $ 19.86 8.43 |
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in he matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, Project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
Dixie National Forest Terry Shoal Creek Fence Construction
RFQ #AG-84N8-S-10-0094
Amendment B – Wage Determination Page 3 of 3
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION