Solicitation.doc
DOC document 302 KB Posted
- Solicitation number
- AG-82X9-S-11-0153
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 02 Revised Schedule of Items.docx | DOCX document | |
| Amend 02.doc | DOC document | |
| Attach J.4 Current Wage Decision CO20100013 as of Aug 12 2011.docx | DOCX document | |
| Amend 01.doc | DOC document | |
| GENERAL DECISION C020100013.Delta County.docx | DOCX document | |
| ColumbineSpecs part 1.pdf | ||
| ColumbineSpecs part 2.pdf | ||
| ColumbineDwgs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
AG-82X9-S-11-0153
2. TYPE OF SOLICITATION
FORMCHECKBOX
SEALED BID (IFB)
FORMCHECKBOX
NEGOTIATED (RFP)
3. DATE ISSUED
08/01/2011
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
526157
6. PROJECT NO.
7. ISSUED BY
CODE
| 82X9 |
| 8. ADDRESS OFFER TO |
USDA Forest Service – Rocky Mountain Region 740 Simms St Golden, CO 80401-4720 USDA Forest Service - Southern Tier Contracting 2840 Kachina Drive
Pueblo, CO 81008
Attention: Ida Marino
9. FOR INFORMATION
CALL:
A. NAME
Ida Marino B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 719-553-1530 or irmarino@fs.fed.us
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
SOLICITATION NO: AG-82X9-S-11-0153
Project Title: Columbine Campground and OHV Facilities Set Aside: Total Small Business Project Location: GMUG National Forest, Uncompahgre, Delta County, Colorado Pre-Bid Meeting/Site Visit: YES. See FAR 52.236-27, Section L, Page 34 Price Range: The Government’s estimate is between $250,000 - $500,000 The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual’s income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, DC 20250-9410, or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer.
11. The Contractor shall begin performance within 10 calendar days and complete it within 120 calendar days after receiving
FORMCHECKBOX
award, FORMCHECKBOX notice to proceed. This performance period is FORMCHECKBOX mandatory, FORMCHECKBOX negotiable. (See 52.211-10.)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
FORMCHECKBOX
YES
FORMCHECKBOX
NO (AS REQUIRED BY FAR 52.228-15)
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A.
Sealed offers in original and 0 copy to perform the work required are due at the place specified in Item 8 by 4:30pm (hour) local time September 01, 2011. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B.
An offer guarantee
FORMCHECKBOX
is, FORMCHECKBOX is not required. (AS REQUIRED BY FAR 52.228.1) C.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D.
Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212
1442-101
STANDARD FORM 1442 (REV. 4-85)
Computer Generated
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
| DUNS NO: ____________________ TIN: ______________ |
| 16. REMITTANCE ADDRESS (Include only if different than Item 14) |
17.
The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
| AMENDMENT NO. |
| DATE |
| 20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) |
| 20B. SIGNATURE |
20C. OFFER DATE
AWARD (To be completed by Government)21. ITEMS ACCEPTED:
| 22. AMOUNT |
| 23. ACCOUNTING AND APPROPRIATION DATA |
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
FORMCHECKBOX
10 U.S.C. 2304(c)( )
FORMCHECKBOX
41 U.S.C. 253(c)( )
26. ADMINISTERED BY
CODE
| 27. PAYMENT WILL BE MADE BY |
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
FORMCHECKBOX
28.NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
FORMCHECKBOX
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
| 30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) |
| 31A. NAME OF CONTRACTING OFFICER (Type or print) |
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
Table of Contents Part I – The Schedule
Page Number
SECTION A – SOLICITATION/CONTRACT FORM
1-2
TABLE OF CONTENTS
SECTION B – SUPPLIES OR SERVICES AND PRICES 4-5
SECTION C – DESCRIPTION/SPECIFICATIONS
SECTION D – PACKAGING AND MARKING
SECTION E – INSPECTION AND ACCEPTANCE
SECTION F – DELIVERIES OR PERFORMANCE
SECTION G – CONTRACT ADMINISTRATION
SECTION H – SPECIAL CONTRACT REQUIREMENTS
SECTION I – CONTRACT CLAUSES
SECTION J – LIST OF DOCUMENTS, EXHIBITS, AND ATTACHMENTS
SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF BIDDERS
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS
SECTION M – EVALUATION FACTORS FOR AWARD
SECTION B—Schedule of Items - Page 1 of 2 Columbine Campground and OHV Facilities – GMUG NF
| ITEM NO. |
| DESCRIPTION |
| METHOD OF MEASURE |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| EXTENDED PRICE |
| 1 |
| MOBILIZATION |
| LSQ |
| 1 |
| LS |
| $ |
| $ |
| 2 |
| QUALITY CONTROL |
| LSQ |
| 1 |
| LS |
| $ |
| $ |
| 3 |
| CONSTRUCTION SURVEYING & STAKING |
| LSQ |
| 1 |
| LS |
| $ |
| $ |
| 4 |
| CONSTRUCTION SIGNING, BARRICADES AND FENCING |
| LSQ |
| 1 |
| LS |
| $ |
| $ |
| 5 |
| EROSION AND SEDIMENTATION CONTROL |
| LSQ |
| 1 |
| LS |
| $ |
| $ |
| 6 |
| AS-BUILT DRAWINGS |
| LSQ |
| 1 |
| LS |
| $ |
| $ |
| 7 |
| 2-UNIT WOOD FRAME VAULT TOILET, REMOVAL AND HAUL TO DUMP |
| AQ |
| 2 |
| EA |
| $ |
| $ |
| 8 |
| OBLITERATION OF ABANDONED ROADWAYS, SPURS AND USE AREAS |
| AQ |
| 1588 |
| SY |
| $ |
| $ |
| 9 |
| EXCAVATION AND EMBANKMENT - ROADS, PULL-OUTS |
| DQ |
| 2696 |
| CY |
| $ |
| $ |
| 10 |
| EXCAVATION AND EMBANKMENT - HOST UNIT SPUR AND USE PAD |
| DQ |
| 10 |
| CY |
| $ |
| $ |
| 11 |
| LOAD, HAUL AND PLACE: CDOT (Class 6) ROADBASE |
| DQ |
| 3350 |
| CY |
| $ |
| $ |
| 12 |
| CRUSHER FINES @ 4" DEPTH WITH SOIL SOLIDIFIER |
| DQ |
| 180 |
| TONS |
| $ |
| $ |
| 13 |
| FIRE RING INSTALLATION - ACCESSIBLE WITH CONCRETE FOOTING |
| AQ |
| 16 |
| EA |
| $ |
| $ |
| 14 |
| GROUP FIRE RING INSTALLATION - ACCESSIBLE WITH CONCRETE FOOTING |
| AQ |
| 7 |
| EA |
| $ |
| $ |
| 15 |
| UNIT MARKER/NUMBER POSTS AND INSTALLATION |
| AQ |
| 23 |
| EA |
| $ |
| $ |
| 16 |
| CONCRETE TABLE, 4000 PSI, ACCESSIBLE, 8 FT. LONG with INSTALLATION |
| AQ |
| 1 |
| EA |
| $ |
| $ |
| 17 |
| USE PAD TIMBER BORDER 22' X 20' |
| AQ |
| 82 |
| LF |
| $ |
| $ |
| 18 |
| TRAFFIC SIGN POST AND INSTALLATION |
| AQ |
| 15 |
| EA |
| $ |
| $ |
ITEM
NO.
Schedule of Items continued—
DESCRIPTION
METHOD OF MEASURE
ESTIMATED QUANTITY
UNIT
UNIT PRICE
EXTENDED PRICE
| 19 |
| SITE SIGN POST AND INSTALLATION |
| AQ |
| 10 |
| EA |
| $ |
| $ |
| 20 |
| BARRIER ROCKS, 24-36" DIAMETER |
| DQ |
| 25 |
| EA |
| $ |
| $ |
| 21 |
| SEEDING |
| AQ |
| 1 |
| ACRE |
| $ |
| $ |
| 22 |
| CONCRETE TOILET ENTRY APRON, 5 'X 20' FIBER REINFORCED, 6" THICK |
| AQ |
| 2 |
| EA |
| $ |
| $ |
| 23 |
| TUBULAR STEEL TRIPLE PANEL INFORMATION KIOSK INSTALLATION |
| AQ |
| 2 |
| EA |
| $ |
| $ |
| 24 |
| HOST SITE WATER AND WASTE WATER SYS. |
| AQ |
| 1 |
| LS |
| $ |
| $ |
| 25 |
| STEEL FENCE |
| AQ |
| 291 |
| LF |
| $ |
| $ |
| 26 |
| RUBBER CURB WHEELSTOP |
| AQ |
| 56 |
| EA |
| $ |
| $ |
| TOTAL BASE BID |
| $________________ |
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Mobilization.
Payment will be made on actual work performed unless otherwise noted.
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
AGAR 452.211-72 Statement of Work/Specifications (FEB 1988)
Contractor shall furnish the necessary personnel, materials, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Referenced in Section J.
AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract. This includes Standard Specifications and Supplemental specifications applicable to this project.
C.1 Scope of Contract
Columbine Campground and OHV Facilities on the GMUG, Uncompahgre National Forest (Delta, County) Colorado Work consists of, but not limited to, laying out a minimal campground including some road construction/reconstruction with drainage and culverts, installation of government-furnished property and materials as identified in C.3. The project also includes demolition of two vault toilets at Columbine and Iron Spring Campground and installation of government furnished toilets and vault.
C.2 Location of Work Project is located approximately 32 road miles southwest of Delta, Colorado and is approximately ¼ mile from the intersection with the Delta-Nucia Road (Forest Road 503) and the Divide Road (Forest Road 402). Project is on the west side of the Divide Road.
C.3 Government Furnished Property The following government-furnished property and materials, addressed in the specifications, will be made available to the Contractor at the project site.
-Crushed Aggregate
-Imported Borrow
-Fire Rings
-Group Fire Ring
-2-unit Concrete SST Toilets & Vault
-Concrete Toilet Entry
-Tubular Steel Triple Panel Information Kiosk
SECTION D--PACKAGING AND MARKING
(There are no clauses for this Section)
SECTION E--INSPECTION AND ACCEPTANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(s): www.acquisition.gov/far/ 52.246-12 Inspection of Construction (AUG 1996)
52.246.13 Inspection-Dismantling, Demolition, or Removal of Improvements (Aug 1996)
SECTION F--DELIVERIES OR PERFORMANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(s): www.acquisition.gov/far/ 52.242-14 Suspension of Work (APR 1984)
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 calendar days. The time state for completion shall include final cleanup of the premises.
452.236-75 Maximum Workweek – Construction Schedule (NOV 1996) Within fifteen (15) calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:
(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and
(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work.
The maximum workweek that will be approved is Forty (40) hours.
Submittals, Schedules, and Reports Pursuant to contract requirements the following submittals are required prior to issuance of the Notice to Proceed unless the contracting officer determines otherwise:
Item Description
Copies Required
1 Proposed Schedule of Work
2 List of proposed sub-contractors and their intended work
3 Designation of Contractor’s Personnel describing responsibilities
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 INVOICES SHALL BE SUBMITTED TO:
TOINETTE ARANDA, CONTRACTING OFFICER
PHONE: 719-553-1431
FAX: 719-553-1435
EMAIL: toinetteparanda@fs.fed.us
2840 Kachina Drive
Pueblo, Colorado 81008
IN ACCORDANCE TO THE TERMS AND CONDITIONS OF THIS CONTRACT.
G.2 PAYMENT WILL BE MADE BY:
USDA Rural Development
Centralized Servicing Center
4300 Goodfellow Blvd (FC-233)
Bldg 105E
St. Louis, MO 63120-1703
PHONE: 314-457-4525
G.3 FOREST SERVICE REPRESENTATIVES:
Toinette P. Aranda will serve as the Contracting Officer on this contract. She will have full warrant authority over all contract issues. She can be reached at 719-553-1431 or tparanda@fs.fed.us A Contracting Officer Representative (COR) will be appointed for this contract upon award. His/her delegated authority and responsibilities will be defined on a delegation letter issued after contract award. This delegation will also contain his contact information.
G.4 Pre Work Conference
G.4.1 452-215-73 Post award Conference. (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled within fifteen (15) calendar days after the date of contract award. The conference will be held at location to be determined.
SECTION H--SPECIAL CONTRACT REQUIREMENTS
452.237-74 Key Personnel. (FEB 1988)
(a) The Contractor shall assign to this contract the following key personnel: Project Manager
(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
452.236-77 (NOV 1996) Emergency Response
(a) Contractor’s Responsibility for Fire Fighting. (1) The Contractor, under the provisions of FAR Clause 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities and Improvements, shall immediately extinguish all fires on the work site other than those fires in use as part of the work. (2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor’s agents or employees.
(b) Contractor’s Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires signed on or in the vicinity of the work site.
(c) Contractor’s Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the Contractor shall allow the Forest Service to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to firefighting). An equitable adjustment for the temporary use of employees and equipment will be made under the Changes Clause, FAR 52.243-4.
4G52.222-704 Personal Protective Equipment (Feb 2007)
1. The contractor will train in the safe operation and use of equipment to all workers using such equipment.
2. Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards or processes encountered in a manner capable of causing injury or impairment in the function of any part of the body.
3. Defective or damaged personal protective equipment shall not be used.
4. The contractor shall provide, at no cost to the employee, to each employee who operates a chain saw, chain saw chaps and assure the chaps are worn during saw operations. These chaps must be approved by Underwriters Laboratory or meet Forest Service specification 6170-47. The chaps shall cover the full length of the thigh to the top of the boot on each leg.
5. The contractor shall assure that each employee wears foot protection that provides adequate traction and ankle support. Employees operating chain saws shall wear foot protection that is constructed with cut-resistant material which will protect the employee against contact with a running chain saw.
6. The contractor shall provide, at no cost to the employee, and assure that each employee who works in an area where there is potential for head injury from falling objects or flying objects wears a hard hat that meets the minimum requirements of American National Standards Institute (ANSI) standard Z89.1-1997.
7. The contractor shall provide, at no cost to the employee, eye protection where there is potential for eye injury due to flying objects. This eye protection must meet the minimum requirements of ANSI standard Z87.1-2003.
8. The contractor shall provide, at no cost to the employee, hearing protection where there is a potential for hearing loss due to high intensity noise e.g., chain saw operation.
4G52.222-705 Camping Provisions for Labor Intensive Contracts (Feb 2007) The following provisions apply to all camping on National Forest lands during performance of this contract:
1. These provisions are in addition to those contained in, or provided for, in the clause titled “Use of Premises”, in this contract.
2. Every structure used as shelter shall provide protection from the elements. Where heat adequate for weather conditions is not provided, other arrangements should be made to protect workers from the cold. Firewood may be cut only after obtaining a District Firewood Permit.
3. The campsite will not encroach beyond the boundaries designated by the Forest Service. The campsite shall be located so as to minimize impacts on streams, lakes, and other bodies of water. No camping shall be permitted within developed recreation sites or along primary recreation roads.
4. The campsite shall have a clean appearance at all times.
5. Upon abandonment of any campsite, or termination, revocation, or cancellation of camping privileges, the contractor shall remove, within 10 calendar days, all structures and improvements except those owned by the United States, and shall restore the site, unless otherwise agreed upon in writing or in the camping permit. If the contractor fails to remove all structures or improvements within the 10 calendar days, they shall become the property of the United States, but that will not relieve the contractor of liability for the cost of their removal and restoration of the site.
6. Unless otherwise designated by the Contracting Officer, the use of this area is not exclusive, and may be granted to other permittees, contractors, or recreating public. Disorderly conduct is not permitted.
7. Damaging or removing any natural feature or other property of the Forest Service is prohibited.
8. Servicing of equipment in the campsite is not permitted, unless the campsite is within the project area.
9. Sanitary facilities shall be provided for storing food. Ice chests or coolers, with ice supply made from potable water and replenished as necessary, shall be provided and sufficient for the storage of perishable food items.
10. An adequate and convenient potable water supply shall be provided in each camp for drinking and cooking purposes.
11. Toilet facilities adequate for the capacity of the camp shall be provided and supplied with adequate toilet paper. Such facilities shall be serviced and maintained in a sanitary condition.
12. Garbage shall be collected, stored, and disposed of in such a manner as to prevent scattering by the wind, minimize attraction of flies, and discourage access by rodents.
13. Basic first aid supplies shall be maintained, available and under the charge of a person trained to administer first aid. The supplies shall include:
a. Gauze pads (at least 4x4 inches)
b. Two large gauze pads (at least 8x10 inches)
c. Box adhesive bandages (band-aids)
d. One package of gauze roller bandage at least 2 inches wide
e. Two triangular bandages
f. Scissors
g. At least one blanket
h. Tweezers
i. Adhesive tape
j. Latex gloves
k. Resuscitation device such as resuscitation bag, airway, or pocket mask
14. Any washing of laundry shall be done in such a way as to provide for washing and rinsing without polluting lakes, streams, or other flowing water.
15. Waste water must be disposed of away from living and eating areas and in a fashion that minimizes pollution to lakes, streams, and other flowing water.
16. The contractor shall take all reasonable precautions to prevent and suppress forest fires. No material shall be disposed of by burning in open fires during the closed season established by law or regulation without the written permission from the Forest Service.
17. The contractor shall comply with the following fire regulations during fire season:
a. A shovel, axe or pulaski, 10 quart pail which is full of water for immediate use and a fire extinguisher with an Underwriters Laboratory (UL) rating of at least 1:A 10:BC is required during the fire season.
b. All fire rings or outside fireplaces will be approved by the Forest Service representative. The area will be cleared down to mineral soil for a distance of 1 foot outside of the ring or fireplace and it will not have any overhanging material. Fire rings will be dismantled and material disposed prior to leaving the site.
c. All generators and other internal combustion engines will be equipped with USFS approved spark arrestors and/or factory designed muffler and exhaust system in good working order. They will be located in a cleared area with the same requirements as in (b).
d. All fuel will be stored in UL approved flammable storage containers and be located at least 50 feet from any open flame or other source of ignition.
18. Any violation of these conditions constitutes a breach of contract, and may result in revocation of camping approval.
19. The Forest Service reserves the right to terminate a camping permit at any time.
4G52.222-701 Employment of Eligible Workers (DEC 1999)
Section 274A of the Immigration and Nationality Act (8 USC 1324a) makes it unlawful for an employer to hire undocumented workers. The Immigration and Naturalization Service (INS) has established the Form I-9, Employment Eligibility Verification Form, as the document to be used for employment eligibility verification (see 8 CFR 274a).
The Contractor is required to (1) have all employees complete and sign the I-9 Form to certify that they are eligible for employment; (2) examine documents presented by the employee and ensure the documents appear to be genuine and related to the individual; (3) record information about the documents on the form, and complete the certification portion of the form; (4) retain the form for three years, or one year past the end of employment of the individual, whichever is longer.
It is illegal to discriminate against any individual (other than a citizen of another country who is not authorized to work in the United States) in hiring, discharging, or recruiting because of that individual's national origin or citizenship status.
Compliance with Section 274A of the Immigration and Nationality Act (8 U.S.C. 1324a) is a material condition of the contract. If the Contractor employs unauthorized workers during contract performance in violation of Section 274A, the Government may terminate the contract, in addition to other remedies or penalties prescribed by law.
For further information on the requirements of the Act, Contractors should contact the Employer and Labor Relations Officer of their local INS office.
H.1 Field Sanitation In accordance with US Department of Labor Fact Sheet No. ESA 97-28 “Field Sanitation Standards” (Ref. 29CFR 1928.110), employers must provide:
· Potable drinking water, suitably cool and in sufficient amounts, dispensed in single-use cups or by fountains, located so as to be readily accessible to employees.
· Facilities maintained in accordance with public health sanitation practices include upkeep of water quality through daily change or more often if necessary.
· Notification to each employee of the location of the water and allowance of reasonable opportunities during the workday to use them. The employer also must inform the employee of the relevant health hazards in the field and the practices necessary to minimize them.
Employees cannot be made to bear the costs incurred by the employer for providing required facilities.
H.2 Prework Conference Prior to commencement of work the Contractor shall attend a meeting to discuss the contract terms, work performance requirements and safety. Also at this meeting such items as work progress schedule, quality control, camping/worksite plan, and fire preventions plans shall be finalized in writing.
H.3 Safety Plan
When required by FAR 52.236-13 Accident Prevention Alt I, the Contractor shall prepare a Safety plan which addresses the specific hazards of the work site, and shall include working in areas of dead trees and falling debris. The Contractor shall identify the specific conditions that s/he considers is a hazard. The Safety Plan shall also address the personal protective equipment and mitigating measures the Contractor will do to increase safety on the worksite.
H.4 AGAR Advisory Number (No.) 88c – Contractor Performance Information and Contractor Performance system (CPS) Evaluations
The awarded Contractor shall be required to register in the civilian Contractor Performance System maintained by the National Institutes of health at http://cps.od.nih.gov/Contractor_Info7.html H.5 Noxious Weeds Prevention and Requirements All contractors and subcontractors performing work on National Forest System lands are required to use equipment and vehicles free of noxious weed seeds and/or propagating parts capable of producing a new noxious weed plant. This applies to ALL vehicles whether owned, leased or borrowed. This shall be accomplished by washing with a pressurized hose all equipment and vehicles used for construction, maintenance and support work prior to entering the National Forest according to Special Project Specification 171 Weed and Disease prevention
H.6 Signs and Traffic Control Requirements
In the performance of travel way maintenance, signs shall be located no more than one mile before and after the area of operation. Signs shall be posted only during the construction period. Traffic warning signs shall be provided by the contractor. Cost is incidental and is included in the Pay Items corresponding to the road maintenance work. Signs must conform to the Manual of Uniform Traffic Control Devices (MUTCD). No hand made signs will be allowed. No work shall be allowed to commence until construction signs have been approved by the CO.
H. 7. Fire Control
H.7.1. Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations.
H.7.2. Other Fires. For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor or his employees, the Contractor when requested by the Contracting Officer shall place his employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned.
H.7.3. Any employees and equipment furnished will be relieved from fire fighting as soon as the Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area.
H.7.4. An equitable adjustment in contract time may be made for this period.
H.7.5. Fire Protection Requirements - Fire Plan. At all times during closed fire season period, as specified by State law, the Contractor shall comply with each of the following provisions to the extent applicable to his operation under the contract.
H.7.5.1. Fire Tools. The Contractor will provide for each employee in the contract area at least one approved handtool of a type appropriate in the contract area, such as shovel, pulaski, or ax. Tools required and furnished under H.2.5.2. and H.2.5.4. below shall count toward fulfillment of the above requirement. Where additional tools, beyond those required below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service.
H.7.5.2. Fire Extinguishers and Tools on Mobile or Stationary Equipment. Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows:
a. One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with 4 BC or higher rating.
b. One - shovel, round point #0 lady or equal.
c. One - ax, 2 pounds or over, 26-inch minimum length, or one pulaski.
d. One - water container (at least 1-gallon capacity), not required with stationary equipment.
H.7.5.3. Spark Arresters. Each internal combustion engine shall be provided with a spark arrester or spark arresting device approved by the Forest Service. Exceptions where the Forest Service may approve mufflers or other equipment in lieu of spark arresters qualified and rated under Forest Service Standard 5100-1a are: (a) small multiposition engines, such as chainsaws, shall meet Society of Automotive Engineers J335b standards; (b) passenger-carrying vehicles and light trucks may have baffle-type mufflers with tail pipe; (c) heavy-duty trucks may have a vertical stack exhaust system and muffler, provided the exhaust stack extends above the cab of the vehicle. An exhaust-driven turbocharger is considered to be a satisfactory spark arrester. Internal combustion engine exhaust systems, arresters, and other devices must be properly installed and maintained.
H.7.5.4. Power saws. For each power saw used in connection with this contract, the following will be provided:
a. One - shovel, round point #0 lady or equal. Shovel must be immediately available for use.
b. One - Fire extinguisher, containing not less than 8 ounces of extinguisher fluid, or a dry chemical powder-type of not less than 1-pound capacity. The extinguisher must be immediately accessible to the saw operator at all times.
H.7.5.4.1. Any fueling or refueling of a powersaw or auger shall only be done in an area which has first been cleared or is free of all material capable of carrying fire; powersaw or auger shall be moved at least 10 feet from place of fueling before starting.
H.7.5.5. Blasting. Fuse or prima cord shall not be used unless authorized in writing by the COR with special precautions stated.
H.7.5.6. Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.
H.7.5.7. Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site where all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist.
H.7.5.8. Debris Burning and Warming Fires. Burning permits will be required for all debris burning fires. Lunch and warming fires may be allowed in fireproofed areas during periods of low fire danger if and as specified in the fire plan. Such fires must not be left burning unattended.
H.7.5.9. Precautions for Stoves. Stovepipes on all temporary buildings, trailers, and tents using wood burning stoves, will be equipped with roof jacks and serviceable spark arresters of mesh with openings no larger than 5/8 inch.
All stovepipes, inside and out, will not be closer than 2 feet from any wood or other flammable material or 1 foot if the combustible material is protected by a metal or asbestos shield.
H.7.5.10. Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with handpump attached, shall be immediately available for use in the event of a fire start.
H.7.5.11. Fire Plan. Prior to initiating work on the contract area, during the closed fire season period, a fire prevention and suppression plan will usually be prepared. The Contractor and the Forest Service will jointly prepare this plan. Such plan shall include a detailed list of men and equipment at the Contractor's disposal for implementing the plan. The fire plan shall also specify additional measures and/or special requirements, such as Hoot Owl restrictions, necessary during periods of critical fire weather conditions.
H.7.5.11.1. When Hoot Owl restrictions are invoked, the Forest Service may curtail or shut down all or portions of a Contractor's operations. The following requirements may be imposed:
a. All high fire risk operations could be terminated at 1300 local time.
b. All burning could be stopped, including debris burning fires.
c. Patrolman may be required for a period of 2 hours after high fire risk operations and 1 hour after end of work shift. The Contractor shall provide the patrolman unless the contract is for equipment rental, in which case the Government will provide the patrolman.
H.7.5.12. Pump and Trailer. Not required.
H.7.5.13. Burning. Before starting any open burning, the Contractor shall comply with the following:
a. Submit a burning plan, subject to approval by the Contracting Officer, designed to minimize the impact on air quality and to lessen any fire damage.
b. Obtain a burning permit from the District Ranger.
c. Use weather forecasts as far as possible in scheduling burning for more favorable dispersal of smoke.
d. Fuel shall be reasonably free of dirt and piled to facilitate rapid and complete combustion. Piles shall be tended during burning operations to maintain combustion and to eliminate unnecessary smudges. Piles shall be patrolled during off-work hours to avoid wildfires.
e. Unless fire season controls dictate otherwise, burning shall be scheduled, as far as practicable, for the most favorable conditions during the burning period.
f. Under certain atmospheric conditions, smoke accumulations may become excessive and, in these cases, the Regional Forester may, at his discretion, prohibit all open burning for definite periods within specific areas of the National Forest.
SECTION I—Contract Clauses FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.202-1 Definitions (JUL 2004) 52.203-3 Gratuities (APR 1984)
52.203-5 Covenant against Contingent Fees (APR 1984)
52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006)
52.203-7 Anti-Kickback Procedures (Oct 2010)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (JAN 1997)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (JAN 1997)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions (Oct 2010)
52.204-4 Printed or Copied Double- Sided on Postconsumer Fiber Content Paper (May 2011) 52.204-7 Central Contractor Registration (Apr 2008)
52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Dec 2010) 52.211-18 Variation in Estimated Quantity (APR 1984)
52.215-2 Audit and Records -- Negotiation (Oct 2010) 52.219-6 Notice of Total Small Business Set-Aside (Jun 2003)
52.219-8 Utilization of Small Business Concerns (Jan 2011) 52.219-9 Small Business Subcontracting Plan (Jan 2011) 52.219-14 Limitations on Subcontracting (DEC 1996) 52.219-16 Liquidated Damages – Subcontracting Plan (Jan 1999)
52.222-3 Convict Labor (JUN 2003)
52.222-4 Contract Work Hours and Safety Standards Act-Overtime Compensation (Jul 2005) 52.222-6 Davis-Bacon Act (JUL 2005) 52.222-7 Withholding of Funds (FEB 1988)
52.222-8 Payrolls and Basic Records (JUN 2010)
52.222-9 Apprentices and Trainees (JUL 2005)
52.222-10 Compliance with Copeland Act Requirements (FEB 1988)
52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988)
52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988)
52.222-14 Disputes Concerning Labor Standards (FEB 1988)
52.222-15 Certification of Eligibility (FEB 1988)
52.222-21 Prohibition of Segregated Facilities (FEB 1999)
52.222-26 Equal Opportunity (Mar 2007)
52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999)
52.222-35 Equal Opportunity for Veterans (Sep 2010)
52.222-36 Affirmative Action for Workers with Disabilities (Oct 2010) 52.222-37 Employment Reports on Veterans (Sep 2010) 52.22-50 Combating Trafficking in Persons (Feb 2009)
52.223-5 Pollution Prevention and Right-to-Know Information (May 2011) 52.223-6 Drug-Free Workplace (MAY 2001)
52.223-14 Reserved.
52.225-13 Restrictions on Certain Foreign Purchases (Jun 2008)
52.227-1 Authorization and Consent. (Dec 2007)
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement. (Dec 2007)
52.227-4 Patent Indemnity—Construction Contracts. (Dec 2007)
52.228-2 Additional Bond Security (OCT 1997)
52.228-5 Insurance - Work on a Government Installation (Jan 1997)
52.228-14 Irrevocable Letter of Credit (Dec 1999) 52.229-3 Federal, State, and Local Taxes (APR 2003)
52.232-5 Payments under Fixed-Price Construction Contracts (SEP 2002)
52.232-17 Interest (Oct 2010)
52.232-23 Assignment of Claims (JAN 1986)
52.232-27 Prompt Payment for Construction Contracts (Oct 2008)
52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003)
52.233-1 Disputes (JULY 2002) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claims (Oct 2004)
52.236-2 Differing Site Conditions (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)
52.236-5 Material and Workmanship (APR 1984)
52.236-6 Superintendence by the Contractor (APR 1984)
52.236-7 Permits and Responsibilities (NOV 1991)
52.236-8 Other Contracts (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984)
52.236-10 Operations and Storage Areas (APR 1984)
52.236-11 Use and Possession Prior to Completion (APR 1984)
52.236-12 Cleaning Up (APR 1984)
52.236-13 Accident Prevention (NOV 1991) 52.236-15 Schedules for Construction Contracts (Apr 1984)
52.236-16 Quantity Surveys (APR 1984)
52.236-17 Layout of Work (APR 1984)
52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 Preconstruction Conference (FEB 1995)
52.242-13 Bankruptcy (JUL 1995)
52.243-4 Changes (Jun 2007) 52.245-1 Government Property (AUG 2010) 52.246-21 Warranty of Construction (MAR 1994) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (May 2004) 52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)
452.232-70 Reimbursement for Bond Premiums - Fixed-Price Construction Contracts. (NOV 1996) 452.236-72 Use of Premises (NOV 1996)
452.236-73 Archeological or Historic Sites (FEB 1988)
452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996)
452.236-76 Samples and Certificates (FEB 1988)
52.222-5 Davis –Bacon Act—Secondary Site of the Work (Jul 2005) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Davis-Bacon Act, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror’s request for a wage determination for a secondary site of the work.
FAR 52.225-9 Buy American Act-Construction Materials (Sep 2010)
(a) Definitions. As used in this clause—
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is –
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace, and
(2) Does not include bulk cargo, as defined in section 3of the of the Shipping Act of 1984 (46 U.S.C. App.1702), such as agricultural products and petroleum products.
"Component" means an article, material, or supply incorporated directly into a construction material.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
"Cost of components" means—
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
"Domestic construction material" means—
(1) An un-manufactured construction material mined or produced in the United States; or
(2) A construction material manufactured in the United States, if the cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which non availability determinations have been made are treated as domestic.
"Foreign construction material" means a construction material other than a domestic construction material.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.(1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. In accordance with 41.U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
“NONE”
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(a) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act or Balance of Payments Program. .
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction Material Description Unit of Measure Quantity Price (Dollars) *
Item 1:
Foreign construction material
Domestic construction material ____________________________
Item 2:
Foreign construction material _____________________________
Domestic construction material ____________________________
List name, address, telephone number, and contact for suppliers surveyed. Attach copy of resonse; if oral, attach summary.
Include other applicable supporting information
*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).
[List…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .