Amend 02.doc

DOC document 90 KB Posted

Attached to
Columbine Campground and OHV Facilities - GMUG NF, Colorado
Solicitation number
AG-82X9-S-11-0153
Issued by

About this file

Amend 02 3 pages

View the file

Other files

File Type Posted
Amend 02 Revised Schedule of Items.docx DOCX document
Attach J.4 Current Wage Decision CO20100013 as of Aug 12 2011.docx DOCX document
Amend 01.doc DOC document
GENERAL DECISION C020100013.Delta County.docx DOCX document
ColumbineSpecs part 1.pdf PDF
ColumbineSpecs part 2.pdf PDF
ColumbineDwgs.pdf PDF
Solicitation.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE
PAGE OF PAGES
1
3
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
Amendment TWO
08/17/2011
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE

USDA Forest Service

Southern Tier Contracting 2840 Kachina Dr Pueblo, Colorado 81008

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code)
(X)
9A. AMENDMENT OF SOLICITATION NO.

FORMCHECKBOX

AG-82X9-S-11-0153

9B. DATED (SEE ITEM 11)

08/01/2011

FORMCHECKBOX

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FORMCHECKBOX

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of

Offers , is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning ONE copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

FORMCHECKBOX

FORMCHECKBOX

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

FORMCHECKBOX

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

FORMCHECKBOX

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Project: Columbine Camgpround and OHV Facilities - Grand Mesa, Uncompahgre, Gunnison NF.

Purpose of this amendment is to make changes from Government-furnished property to Contractor-furnished property and other changes as shown on attached pages.

Proposal due date of September 01, 2011 remains unchanged.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Ida Marino Contract Specialist

15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED
/s/ Ida Marino
08/17/2011

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105
STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 02, Solicitation AG-82X9-S-11-0153, Columbine Campground and OHV Facilities

Changes as a result of this amendment –

Contractor shall furnish site furnishings instead of the Government furnishing these items.

Refer to Section B – Schedule of Items. Refer to Items 13, 14, 23 - CHANGE the description of these items to read:

13
Fire Ring, Furnish and Installation - Accessble with concrete footing
AQ
16
EA
$________
$_________
14
Group Fire Ring – Furnish and installation – Accessible with concrete footings
AQ
7
EA
$________
$_________
23
Tubular Steel Triple Panel Information Kiosk – furnish and installation
AQ
2
EA
$________
$_________

Replace original schedule of items with enclosed schedule of items to reflect these changes – 2 pages -------------------------------------------------------------------------------------------------------------------Refer to Section C.3, Government Furnished Property (page 6) –

Delete the following items –

-Fire Rings

-Group Fire Rings

-Tubular Steel Triple Panel Information Kiosk

These items are hereby deleted under government-furnished property.

Refer to Specificatons and change as follows –

Section 129300 Miscellaneous Site Furnishings

Part 2 – Products

2.2 Fire Rings and Riser Box – CONTRACTOR FURNISHED

2.3 Triple Panel Kiosks w/Glasroc Ballistic sign panels, Brochure Box and Assembly Fixture – CONTRACTOR FURNISHED

Drawings, Sheet 27 of 35, Concrete Picnic Table & Fire Ring Details, Columbine Campground; delete all references to Government-Furnished

Sheet 28 of 35, 3 - Panel Information Kiosk Installation Details, Columbine Campground; delete all references to Government-Furnished

Amendment 02, Solicitation AG-82X9-S-11-0153, Columbine Campground and OHV Facilities

Section 024116 STRUCTURE DEMOLITION

PART 3 – Execution

3.1 Removal

A. DELETE THE LAST SENTENCE WHICH STATES: The Government will be responsible for pumping out the vaults before construction demolition begins.

ADD: The contractor shall be responsible for pumping out the vaults before construction demolition begins.

NO OTHER CHANGES OCCUR AS A RESULT OF THIS AMENDMENT