PierInstallationInstructions.pdf
PDF 10 MB Posted
- Attached to
- RECOVERY: ACCESSIBLE FISHING PIER INSTALLATION & TRAIL CONSTRUCTION Rio Grande National Forrest
- Solicitation number
- AG-82B1-S-10-0318
About this file
Pier manufacture installation instructions
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table of Contents
General lnformationand lnstallationOverview EZDockSpecifications l Model/Serial Number 2 SitePreparation 3 DockSectionOrientationCouplerand lnstallation 4 SelectingYourAnchoring 5 PipeAnchoring
PilingAnchoring DeadweightAnchoring StiffArmAnchoring
5 Gangways FloatHingeKit AbutmentHingeKit TransitionPlate GangwayRollerKit&Roller AluminumGangway PolyethyleneGangway GangplankMountingKit PolyethylenePlank
6 Accessories CornerGusset UtilityChannel CornerStorageBox LargeStorage Box Swimladder FloatStepladder Bench 8" Nylon TieUp Cleat
12" Galvanized TieUp Cleat
Bumper DockEdging SecurityCurbing Handrails
7 Warranty/CustomerService 8 MaintainingyourEZDock
Aear EZ Dock Owner, The EZ Dock team thanks you for your purchase. We know that you had other choices of docks, and we ap-preciate your decision to purchase EZ Dock.
You will flnd it easy to maintain your EZ Dock products and to add accessories and other components to your dock in the fulure. EZ Dock is the most durable dock on the market, and your friends and family will enjoy your dock for many years t0 come.
Sefare you install your new EZ-Dock, please take a moment to register your dock warranty, You can register online at wyrw.ez*dock.com or by using the warranty registration card provided by your distributor/dealer. By registering your product, you will activate your product warranty and thereby protect your purchase against covered product defects. Please feel free to give your EZ Dock customer servioe department a call with any issues that you may have with your EZ Dock. You can reach our customer service department by dialing:
UStuCanada: 1 -888-654-91 68 lnt'l: 1-417-235-223 Europe: +32 (0) 4 240 0353
For more information call 1-800-654-8168 or go to www.ez-dock.com.
GENERAL INFORMATION AND INSTALLATION OVERVIEW
GENERAL INFORMATION
The EZ Dock system is a uniquely simple, low-maintenance design that's versatile, safe, and durable.
EZ Dock's patented one-piece, self-floating design is fast and easy to install. Sections come in sev-eral sizes with evenly spaced coupler, hardware, and anchor pockets.
Once assembled, this system is designed to minimize the amount of flex occurring from stress and loads on the system. The rubber connections will stretch to help the system, and its attachments, absorb shock and extreme pr€ssures. Properly installed and maintained, this system will lasl for years of enjoyable use"
IMpORTANT! Assembly, lnstallation, Maintenance and Safety:
You should read these instructions thoroughly, before assembling and installing your EZ Dock.
Please adhere to all recommendations and cautionary suggestions appearing in this manual and al-ways follow the instruotions precisely. Please save these instructions and refer to them as needed for future reference.
A$SEMBLY OVERVIEW
become familiar with the installation instructions before beginning r Although most assembly instructions depict a 40" wide dock section, the same assembly meth-ods are used for the 60" and 80" wide docks.
r The layout should be planned before beginning to assemble the dock.
r Make sure the correct tools are available.
. The system may be assembled on the ground, on open water, or on a sufficiently thick ice sheet.
To make assembly easier, attach pairs of the dock sections together, before placing in the water.
Recommendations:
Attach as much hardware to dock sections as possible, before placing the sections in the water.
Whenever possible, connections should be made at the shoreline, and the dock should be pushed out into the water.
Tools and Requirements:
As with most assembly and installation projects, some tools are required to assemble and install your EZ Dock. You may not need every tool listed below for your particular installation, but the following tools are generally helpful in the installation process (for professional installation, call your local EZ Dock dealer):
. EZ Dock in-water installation tool (900010) c 112" drive ratchet . Socket set (especially 112",9116", 518",11116',15116", sq. HD or 19 mm-12 pt) r Open-end, boxed-end wrench set (above mentioned sizes) . Screwdrivers (Phillips and standard) . Pliers . Adjustable wrenches . Hammer . Level . Pipe Wrench (if using augers) . Pry-bar (small and large) . Rope (at least 3/S" braided nylon) r Power drill & bits . Power or Hand Saw r Utility knife r One bar of ordinary hand soap
EZ Dock Specifications
204010 {B} 4Q" X 10' Dock Section Length: 10' {3.1 m ) Width: 40" ('1 m) Height: 15" (38 cm) Weight 190 lbs. {86.2 kg) Floatation Capacity: 2000 lbs. (907.2 kg)
206010 {c} 60'n X 10' Dock Section Length: 10' (3.'1 m ) Width: 60" {1.5 m) Height: 15" (38 crn) Weight: 285lbs. (129.3 kg) Floatation Capacity: 3000lbs. {1360.8 kg)
208010 {D} 80" X 10' Dock Section Length: '10' (3.1 m ) Width: 80" (2 m) Height: 15" {38 cm) Weight: 375 lbs. {175 kg) Floatation Capacity: 4000|bs. (1814.4 kg)
204060 {A} 40" X 60" Dock tection Length:60" ('1.4m) Width:40" {1m) Height 15" (38 cm) Weight: 100lbs. (45.a kg) Flotation Capacity: 1,000 lbs, ( 453.6 kg)
260120 tE) Half Hex Dock Section Length: 10'{3"1 m) Width:60" {1.5m) Height: 15" (38 cm) Weight: 210 lbs. (95.3 kg) Flotation Capacity: (2,000 lbs. (907.2k9)
380s01 (F) Corner Gusset Length: 46-518" {1.17 m} Width: 33-112" {.84 m) Heighl: 6" ('15 cm) Weight: 40lbs. (18 kg) Flotation Capacity: N/A
Because of the rotational molding process, weights and dimensions may vary.
ModellSerial Number You should register your EZ Dock product to ensure proper warranty coverage. The location of the serial number may be difficult or impossible to see once installed, so we suggest that you create a record of your serial numbers and corresponding dock sections to insure proper identi-fication when flling a warranty claim, The serial numbers can be found on the verlical side wall on the logo end of the dock sections. See photo below.
Site Preparation
Each EZ Dock installation is site specific and needs to be configured specifically for the end user's intended application. Sorne factors to take into consideration when determining the components nec-essary for a proper installation include; intended usage, water conditions, soil and bed conditions, and climatic conditions. Listed below are simple rules to follow.
Be certain that your installation configuration is designed to accommodate the daily intended use of your EZ Dock. Please take into account the following:
. Commercialapplicationneeds
. Public access requirements (ADA, CORP, or other) r Private docking needs . Scale of operation and use (size of boats, number of PWCs, number of people, etc.)
. Other special considerations affecting your daily use
Be aware of the unique characteristics of the specific body of water and consider how such conditions will affect the installation. Take into account:
. Overall area of the body of water r Water depth (at the shore and at the furthest point of the dock from shore) r Normal and greatest wave action r Waterlevelfluctuation . Fresh, brackish, or salt-water . Normal and extraordinary ice ihickness and movement . Lake bed and soil conditions (sand, rock, mud, etc.)
. Determine whether your installation will be attended to and inspected on a regular basis.
. Become acquainted with the normal movement associated with floating structures.
. Determine whether you are capable of performing your own installation or wheiher it is best to hire a professional.
$ites with severe wave conditions need to arrange docks so pylons are parallel to wave action and vent holes are facing inside to minimize excess water collecting in docks.
For more information call 1-800-654-8168 or go to www.ez-dock,com.
EZ Dock $pecifications
204010 {B} 40'X 10' Dock Section Length: 10' {3.1 m ) Width: 40" {1 rn) Height: 15" {38 cm) Weight: 190 lbs. {86.2 kg) Floatation Capacity: 2000 lbs, (907.2 kg)
206010 {c} 60" X 10' Dock Section Length: 10' {3.1 m ) Width: 60" (1.5 m) Height: 15" {38 cm) Weight: 285 lbs. {129.3 kg) Floatation Capacity: 3000|bs. {1360.8 kg)
208010 (B) 80" X 10' Dock Section Length: '10' (3.1 m ) Width: 80" {2 rn) Height: 15" (38 cm) Weight: 375lbs. (175 kg) Floatation Capacity: 4000 lbs. {181a.4 kg)
204060 {A} 40" X 60'n Dock Section Length:60" {1.4m) Width:40" ('tm) Heighi 15" {38 cm) Weight: 100lbs. (45.4 kg) Flotation Capacity: '1,000 lbs. ( 453.6 kg)
260120 {E} Half Hex Dock Section Length: 10'{3.1 m) Width: 60" (1.5m) Height: 15'{38 cm) Weight: 210lbs. (95.3 kg) Flotation Capacity: {2,000 lbs. (907.2k9)
300501 {F} Corner Gusset Length: 46-518" {1.17 m) Width: 33-112" (.84 m) Height: 6" (15 cm) Weight:40lbs. (18 kg) Flotation Capacity: N/A
Because of the rotational molding process, weights and dimensions may vary.
Coupler Installation (301100)
Helpful Hint: To make assemtrly and disassembling easier, rub a bar of hand soap on the coupler rods to lubricate them.
lnsert the composite coupler bolt into coupler. Align the mark on the head of the bolt so the splines line up into the notched pockets in the coupler.
Using a hammer, seat the bolt into the coupler.
lnstall coupler with seated bolt on the in-water installation tool.
4. Align dock sections so coupler pockets are adjacent to each other, and using the in-water in-stallation tool, insert the coupler and bolt assembly into the bottom pocket with the bolt pointing upward.
5. Pull up on the in-water installation toolto seat the bottom coupler. {NOTE: The dock sections must be setting level on the water and at the same elevation for the coupler to properly seat into the bottom pocket. Sometimes it is helpful to ballast the opposing ends of dock sections to keep the adjoining ends from dipping. This can be done by having someone stand on the opposite ends of each dock section, or by standing on an elevated beam or board (as shown) placed perpendicular to the dock section to span the seam being connected. When coupling seams together, it is recommended to start at the center of the seam and work to the edges.
DO NOT OVER TIGHTEN THE NUT!
Torque to 15 ft lbs.
A11 empty or un-used coupler pockets should be filled with an EZDockpocket filler (201030); see page 38.
2.
3.
"11 ii iJ ili 4j
Indicator Hole
Drowning Hazard $wimming under andlor attempting to breathe in cavities under EZ Dock docks and ports while performing in-water installation of docks, ports and couplers can result in accidental drowning and death.
Do not attempt in-water installation without EZ Dock in-water coupler installation tools.
ln-Water Coupler lnstallation Tool (9000010)
1. Align and abut the adjoining ends of the dock seetions .
2. lnsert the bottom coupler and bolt assembly into installation tool and firmly pull up to seat coupler.
3. Hold the top handle and lower the tool with coupler into the water untilthe rod is completely below the bottom surface of the dock section. (lf the rod hits the dock section the couplet may fall off the tool).
,---.)"ll tl r1
I ,1, t'1 il ryd lndicator Xole
4. While maintaining the proper depth, slide the tool between the dock sections until you reach the pocket to be connected.
5. Lift the tool upward while aligning the rod to come up between the opening through the pockets. The tool has a 112" hole on the long flat part of the handle that may be seen above the deck area and will indicate that the bottom coupler is properly in position. lnsert a rod or screwdriver into this hole to hold the tool and coupler in place while connecting top coupler.
6. Place top coupler into position, thread on coupler nut, and draw the connections together tig htly.
7. To release the installation tool, remove pin from hole and push down tool, sliding it between the docks and begin your next coupler installation.
For help contact your dealer or distributor at 800-654-8'168.
Anchoring
Once you have selected your site and assembled the dock , the next step is to select the anchoring method best suited for your location. Since no two installations are ever exactly the same, each and every EZ Dock installation must be designed and configured for your specific application. Your local dealer can help you select the anchoring system that is right for your location. EZ Dock offers a wide variety of anchoring components which are simple to install and safe to use. Constructed of either poly-ethylene or steel {both of which are long lasting, durable materials that can range from light to heavy duty) lhey both provide a wide range of reliable options to construct a dock for nearly any use and wa-terscape.
$electing your Anchoring Method
EZ Dock provides a wide range of anchoring components to accommodate most water conditions and bottoms (deep, shallow, rough, or sandy). EZ Dock anchoring methods are sirnple to install and safe to use. Our anchoring products are made from long-lasting, durable materials that can accommodate from standard to heavy-duty demands.
r Pipe anchoring is typically used in most private and some light duty commercial applications.
r The deadweight method of anchoring is used with deeper water or rocky bottoms.
r Piling anchoring is very sirnilar to pipe anchoring in that the pilings are used to prevent the lateral movement of the dock. This method of anchoring is used in heavy duty commercial applications.
. Stiff-arm anchoring is a method of supporting the dock system by attachment to the shore or some other type ol rigid structure by poles or arms.
Pipe Anchoring
Pipe anchoring is our most popular type of anchoring using a small diameter pipe to provide the hori-zontal support necessary to keep the docks in place. The use of pipe will allow the docks to move up and down wilh most water fluctuations, and with little maintenance . lt includes a heavy-duty and a standard-duty pipe bracket that is typically used in most private and some light duty commercial instal-lations, The size and nurnber of pipe needed will be determined by conditions encountered.
Pipe is normally embedded or screwed into the bed of the body of water a distance of three to eight feet (roughly 114 to 113 the total length of the pipe). Wave action should not exceed three feet, and water depths should not exceed 12 feet for ihe 2-1 12" bracket or 1 B feet for the 3" bracket.
. Pipes can be used lo secure an EZ Port. When pipes are used they must be sufficiently embedded or screwed into the lake, river or ocean bed to a depth of at least three feet. The EZ Port will not hold the pipe upright, the pipe should remain vertical and hold the EZ Port in place.
. lt is recommended to use pipe augers, except in rocky or shale bottoms, to make installation easier.
Augers allow the pipe to be turned into the lake, river or ocean bed like a cork screw using a pipe wrench or by drilling the hole for the pipe and using a T-handle.
. Pipe diameter: Pipe brackets are available for two pipe sizes 2-112" and 3-112". A 2" bracket is de-signed to use pipe that measures 2-112" in outside diameter and a 3" bracket is designed to use pipe that measures 3-1/2". The installation process is the same for either pipe size.
r In salt water or brackish water conditions it is recommended that the steel pipe be sleeved with PVC pipe. The steel pipe will need to fit inside lhe 2-112" ar 3-112" pipe. This will help prevent abrasion and wear on the pipe bracket, prevent rust, and improve appearance.
Determine the length and size of pipe needed and bracket locations.
-'1
Pipe Brackets
EZ Dock pipe brackets are available in a standard-duty or heavy-duty models. Each type of bracket is capable of using 2-112" or 3-112" pipe depending on your needs.
Standard-Duty Pipe Bracket (130250 or 1 30350)
The standard-duty bracket is designed for residential use or to anchor EZ Port PWC lifts. For installation wave action should not exceed '1.5 to 2 feet and water depths should not exceed B feet for 2" pipe or 12 feet for 3" pipe. The standard-duty bracket is simple to install, connecting to a single set of pockets that may be placed anywhere around the perimeter of the dock.
It is always best to locate at least one bracket near the shore end of the dock. The other brackets may be placed along the sides or at the ends of the dock.
Heavy-Duty Pipe Bracket Q1A25A or 2'10350)
The heavy-duty pipe bracket is designed for residential and light commercial applications which must allow docks to ad-just to changing water levels. Wave action should not exceed
2.5 to 3 feet. Water depths should not exceed 12 feelfor 2" pipe or 1B feet for 3" pipe. lt is always best to locate at least one bracket near the shore end of the dock. The remaining brackets may be placed along the sides or at the end of the dock. You never want 1o span a seam restricting the move-ment of the dock creating more stress on the couplers. Two sets of pockets are required to connect the bracket to the dock.
Pipe Auger (100255 or 100355)
The auger is attached to the bottom of the pipe to allow easier installation of pipe anchoring in lake, river, or ocean bottoms. The auger works well in sandy or muddy bottoms.
Anchoring Pipe Specifications
For part numbers ending with ...025, component will be 2.5'OD 10 gauge, galvanized pipe.
For part numbers ending with ...035, component will be 3.5' OD B gauge, galvanized pipe.
2.
3.
4.
5.
Standard-Duty Pipe Bracket lnstallation Tools Required:
Ratchet 5/16" socket 5/16" wrench
1" Slide the polyethylene bracket halves over the top of the pipe as shown. The two halves of the bracket are identical" Align the pipe next to the dock where it is to be attached. The pipe should be placed so that it is centered with a pockel.
lnstall the bottom half of the bracket by inserting the molded on coupler into the bottom pocket of the dock or lift" Attach the top half of the bracket by inserting the molded on coupler into the top pocket of the dock or lift.
Secure the two halves together using the supplied 5/16" bolts and nuts.
Heavy-Duty Pipe
Tools Required:
Ratchet 5/16" Socket Hammer
Bracket lnstallation
Slide the insert over the top of the pipe to be installed.
Align the pipe next to the dock where it will be attached.
It should be placed so that the sleeve is centered between two pockets. Auger or drive lhe pipe into the bottom until it will stand by itself, but still can easily be adjusled for proper positioning.
Slide the sleeve inserts up the pipe far enough so that the main frame can be brought around the pipe and into posi-tion against the dock.
Attach the polyethylene main frame to the dock using a standard coupler set. Refer to coupler installation inslruc-tions.
$lide the insert sleeve down the pipe and into the polyethyl-ene main frame, adjusting pipe location if necessary" Se-cure the insert sleeve with the two 5/16" ( 80514SS).
6. Finish driving or screwing the pipe into the bottom so that it is solidly in place, lhe minimum depth of the pipe is three feet.
1.
2.
3.
5.
Lr
NUtT 5/16-1! r{ I 11,,l IRU::: Hn l8-8 :!
HTAVY IU]Y FiP[ l]RA[TfI
: 1/:', 1t. !!tYtIr-rYt[N[ 1N![Rr
3 r,,l :}riluttlt [/[v$fi[t P]Ff m
Anchoring Pipe and Auger lnstallation
Tools Required:
r Drill r Drill Bit r Ratchet , 314" or 19 mm socket t 3t4" or 19 mm wrench . Pipe Wrench (optional)
1. Determine the length and size of pipe needed.
2. lnsert auger butt into the end of the pipe and drill a 318" hole through the pipe and auger at the same time.
3. lnsert bolt lhat is provided through the hole and tighten with the lock nut that is provided.
NOTES
l/\ ::"
(T': l-l-':-'..4,.!_) oi i!l U)./'4{.-'' V r1'
TEM QTY. PART NO DESCRIPTION
1 1 1 00355 KITAUOER FOR 3 1I2 PIPE
2 2 T HANDLE
J 2 3'SCHEDULE 40 GALVANIZED PIPE
GANGWAYS
Access is an important feature of your dock system. EZ Dock has several different options available to meel your access requirements, whether it be residential, commercial, or special needs. Gangways are hinged to adjust with changing water levets EZ Dock gangways are designed to attain to a seawall or concrete abutment using an abutment hinge assembly or a float hinge assembly to allow your dock to sit on the shore with rollers to move in and out'
Aluminum Gangway {300310, 300314, 300320, 300325, 300330' 500510, 500514, 500520, 500525, & 5905301
The aluminum gangway has welded construction with slip-resistanl walkway, side curb and rail. Lengths of the gangways are from 10' to 30' and widths of 3' and 5'. As the weight of a gangway can cause the first dock section to list, it is important to select the right gangway for lhe applicalion, length and width re-quirements with the dock configuralion.
Polyethylene Gangway Section (400406)
The polyethylene gangway sectlon is 48 inches wide to also rneet special needs requirements in 6 foot lenglh. You are able to attach three of the polyethylene gangway sections together with compo-nents designed specifically for the polyethylene gangway' allowing you to have an 18' gangway. Handrails are also available for added safety. Kits contain all of the necessary hardware to assemble to your gangway.
Wooden Gangplank Mounting Kit t100240, 100340' & 100600)
The wooden gangplank mounting kit includes galvanized steel hinge bracket, and the attaching hardware. Lengths of the gangplank vary with the kit you select. selection of the proper width is important, as lhe weight of a gangplank that is too wide can cause the first dock section to liit, When using the 100240, your gangplank may be 12' long- With a 100340, your gangplank rnay be 8' long. With a 100600' your gang-plank may be 6' long. lt is availablein24",34", and 60" widths.
Lengths are based on the gangplank being attached to a system con-taining at least three dock sections. Lumber is not included. Optional shore-end hinge brackets and roller kits are available.
Polyethylene Plank Mounting Kit 1200200)
The polyethylene plank mounting kil is a hinged polyethyl-ene panel used to creale a smooth transitisn between shore grade and deck surface.
GANGWAY ACCESORIES
Float Hinge Assembly (10065055 or 100850SS, 400480ss)
The float hinge assembly is designed to attach your gangway to the dock. Each type of gang-way has a float hinge assembly. For the 3 foot aluminum gangway you will use the 10065055" For the 5 foot you will use the 100850SS. And the polyethylene gangway uses the 400460 for attaching to a 60" dock, or the 400480 for al-taching to an 80" dock. This same bracket is also used on the wooden gangplank kits:
10A24A,100340, and the 100600. lnstallation is the same procedure for each gangway.
Shore Abutment Hinge Assembly (50501SS or
The shore abutment hinge assembly attaches to the shoreline bulkhead with lag bolts when attach-ing to wood, or concrete anchors when attaching to concrete.
400460, 400460ss, 400480, or
50502SS, or 4004503S)
Transition Plate {300301, 400401, or 500501}
The hinged aluminum plate with skid-resistant surface offers a safe and sturdy transition be-tween shore grade and gangway.
Roller Kit & Roller {300300 w1105030, 300400 w/105035, or 300350 w/105040}
EZ Dock offers an optional roller kit and roller to add to our aluminum or polyethylene gangway. The roller kit and roller protects the end of gangway by adjusting to changing water levels. Part numbers for the roller kits are 300300 for the 3'gangway, 300400 for the 5'gang-way and 300350 for the 4' polyethylene gangway. Part numbers for the rollers are 105030 for the 3' gangway, 105035 for the 5' gangway and 105040 for the 4' poty-ethylene gangway.
1.
2.
3.
4.
Aluminum Gangway lnstallation
Tools Required:
Attach the hingeto-{loat braeket to the dock section as illustrated on page 27.
lnsert railing legs into corresponding holes in side rail of gangway. Make certain lhe legs bottom-out in the holes.
Drill 3l16" holes through the railing legs using the guide holes.
Attach with 3/16" stainless steel pop rivets.
Polyethylene Gangway Con nection Plate & Truss Support lnstallation
Tools Required:
Drill 3/8" X T" drill bit #2 Phillips Screw Driver 9/16" Open End Wrench or Socket
Lay out the gangway sections with the walking surface down.
Bolt the connection plates to the underside of gangway section. Use only the outer two mounting sur-faces, leaving the center one empty"
1.
2.
., 9', .,\ | | A \,,,A i: / 5/16',-18 X 3/4',SS TRU!SNfAn s40410li I ctrrtnic inll rLnrt 4i0406 PUtYtNYtINr IANIVAY SIl- | llN r- '4D r Nn II-\LPID-'|-\"flTLr- itL- MA-TIr;]IAt
3. Place aluminum trusses in truss cradles. Trusses must be 5-il?, from the outer end of the gangway.
4. Once everything is in place, drill 3/B" holes down through the trusses using the holes in the gangway section as pilot holes.
5. lnsert the 3/8'X 6" $$ carriage bolts in all of the holes and secure with washer and nut.
I
Roller Kit lnstallation
Tools Required:
Ratchet 5/B" Socket
Polyethylene Gangway Roller lnstallation
1. Align and Eecure one SS mounting bracket 1o the bot-tom side of lhe gangway using 5/16-18 X314" Phillips Truss Head bolts and 3/8" lD 316 SS wagher supplied in the small parts bag.
2. Align and insert the PVC roller assembly on the previ- l.
ously assembled bracket.
Hold in place and insert the other bracket in the oppo-site end bearing, align to the mounting holes on gang-way section.
Mount and iully thread all bolts till tight.
Aluminum Gangway Roller lnstallation
1. Determine the location that will allow the gangplank to roll and pivot without scraping on the dock surface.
2. The roller should be cut to length that will position brackets 2" from outside edge oi gangway.
3. Insert bracket (S30350SS) on flat area on outer edge of underneath side of the gangway.
4. When attaching brackets to the aluminum gangway use the 4 self tapping stainless steel serews on each side.
Self-tapping screws are ineluded in roller kit.
ii8's\ illx fJL.ll
]i8, TtAT VASI.]tR
{!!gi_[q' itM1! qm,*'A",i ilm, -'
.1)
J, 4.
:i6 ss rrAr vAsNrR
, l/4" PHlrilPs IRUSS llI stRlPllUN
F- .,,:,=-At_lL, Transition Plate lnstallation
Hammer
1. Align the sleeves of the hinge with the transition plate and slide the hinge pin through allthe sleeveg.
2. $ecure the hinge pin with the hinge pin clip.
3 8001 1 CtlP I.]ITCi] PIN
7 r 0047ss l-1NIi RIi]
I s50501 60' TRAN:jTi[N PLATT lTfl,{ (]TY PABT Nn. DiS(]RIPT lIN
RIL L NF- MA_tF:FiIA1, Bill of Materialfor 500501
Float Hinge Assembly lnstallation
Tools Required:
Ratchet 518" Socket Hammer lnsert the hardware connectors (S21 1040$$) in the top pockets of the dock.
Loosely attach hardware and over dock" $ecure using 5i8-11 self locking nuts (8050SS). Care should be taken to not over tighten the nuts.
Align the sleeves of the hinge{o-plank bracket (on gangway), and hinge-to-float bracket (on dock) and slide the hinge rod (10258SS) through allthe sleeves.
Secure rod with hinge pin (80011).
il b
Bill of Materialfor 300301 t, (l)
'a rI\ttl
1.
2.
J.
4.
36'TRANSITlI]N PIATI:
ilTY, PART NII, 1]I SCRIPT]NN
10 4 80580 5/8-11 LITCK NUI
1? 80012 rLAi VASHTR
I 8l al2Yl 1/a-13 x 2-tl4'iltr
E i
801l9YZ 1/E' NTX NUT
80011 I']IlCH CL]P P]N
5 sl0e44ss HIN(jI RI.]I
4 4 se1r40ss |-IARDVART CONNTClIR
? st0a43 6AN6 PTANK SlifiNtR
? s10e42 H]NGT 1[ ILANK IRACKII s10?416V 24' NIN[t TL] ItIIAI BRACKII lTtf4 OTY PART NN, lt,rscRIPTltN
R r nr MA*i-TRIAL
Shore Abutment Hinge Assembly lnstallation
Hammer
Attach brackel to shoreline bulkhead Align lhe sleeves of the hinge with the gangway sleeves.
Slide the hinge rod (10258SS) through allsleeves.
L 1 0a58SS t.t1Nt,I R[11
I l 80011 L1P hIITN PJN
I at HINIL ATTACHI4INi
IT[[1 0lY P ART Nt"l It )CRIPIIUN e t_ l_t F tl^
Bill of Materialfor 50501S$
Wooden Gangplank or Polyethylene Plank
Tools Required:
Ratchet 5/8" Socket Hammer
Cut allthe planks to equal lengths.
Lay the planks side by side as they will be when assembled.
Place the hingeto-plank bracket, shore* end stiff-ener, and middle stiffener on the planks and mark the holes for bolt locations.
Drill 112" holes through the planks at each of the locations marked in $tep 3.
Attach the stitfeners at the shore end and at the mid-point as shown using the carriage bolts, washers, and nuts provided.
Attach the hingeto-float bracket to the dock sec-tion by fully threading the 5/8" lock nuts onto the hardware connectors. Care should be taken to not over-tighten the nuts.
Align the sleeves of the hinge-to-plank Bracket on the gangplank and the hinge-to-float bracket on the dock side then slide the hinge pin through allthe steeves.
$ecure the hinge pin with the hinge pin ctip.
Bill of Materialfor 50502SS
Mounting Kit lnstallation
1.
2.
3.
.--t"@ tr.
ia\{.-,-i \ \N_--- . /)n \:\: -
.l/./-'* *\-r)' .',// \ -'\:.
1.
2.
3.
4.
5.
o ,b r'
.Lpl
6.
7.
IL]P HJiCH PIN
60'NINIt ArlAtr]N1tM
PARt Nil, tISIR1fr11tN
ILL- NF' FlATTR t'srr rfil( NL,] ftAf VA:tli,R
1/l-1.1 )( l-1i4'
HITTN II]P FJN
I.]ilRIVARI CI.]NNtIT!R
64\[ Pt|'!,']( :fltfw
HINII TI TIANK IPACKII
2,1' HlN6t TU f:rnAl tRAC([T
LL NT !,1A
St2raYZ irilttr
File details come from the government source that posted it. Updated .