Rocky Mountain Region

RIO GRANDE NATIONAL FOREST

Forest Service

U.S. Department of Agriculture

HANDICAP ACCESSIBLE FISHING PIER

INSTALLATION & TRAIL CONSTRUCTION

N

E

S

W

COLORADO STATE LOCATION MAP

NOT TO SCALE

LEGEND

RIO GRANDE NATIONAL FOREST

Craig

Gunnison

Grand Junction

Montrose

Durango

Colorado

Springs

Pueblo

Burlington

Walsenburg

Salida

Alamosa

COLORADO

I-70

I-70

I-25

I-25

Saguache

I-25

Monte Vista

DENVER

ROCKY MOUNTAIN REGION

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

RE

E P A

R TM N OFT AG

D

ICU LT

U R E

NONE

Sheet Title

RIO GRANDE NATIONAL FOREST

Project Name

Forest

Scale

TITLE SHEET

of

Sheet 1

Forest Engineer

Signature Title Date

The design and review of this project has been accomplished by qualified personnel and the design is consistent with current policy and direction.

Designed by:

The design objectives have been accomplished, the project will serve intended uses, all appropriate NEPA requirements have been met, and the design is consistent with approved resource planning documents and is in the program

District Ranger

Signature Title Date of work.

Forest Supervisor

Signature Title Date

Approved by:

FISHING PIER INSTALLATION &

TRAIL CONSTRUCTION

Vicinity Map 3

Vicinity Map 2

INDEX TO SHEETS

Vicinity Map 4

Vicinity Map 1

Title Sheet

M.Figgs

M.Figgs

Reviewed

Checked

Design

Drawn

A.Burbank

A.Burbank

Revisions:

Date

Date

Date

Initials

Initials

Initials

No.

No.

No.

Vicinity Map 5 6

7Trail Cross-Sections

Cross-Section Detail 8

Fishery Biologist

Signature Title Date

Raised Cross-Section

Divide District Ranger

Signature Title Date

Conejos Peak

Civil Engineer

Signature Title Date

Landing Detail

Parking Detail

ROCKY MOUNTAIN REGION

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

RE

E P A

R TM N OFT AG

D

ICU LT

U R E

NONE

Sheet Title

RIO GRANDE NATIONAL FOREST

Project Name

M.Figgs

M.Figgs

Reviewed

Checked

Design

Drawn Forest

Scale

VICINITY MAP 1

of

Sheet 2

FISHING PIER INSTALLATION &

TRAIL CONSTRUCTION

Wolf Creek Pass

A.Burbank

A.Burbank

Revisions:

Date

Date

Date

Initials

Initials

Initials

No.

No.

No.

Shaw ReservoirBig Meadows Reservoir

US Highway 160

FSR 410

To South Fork

(10 miles)

FOREST SERVICE

RE

E P A

R TM N OFT AG

D

ICU LT

U R E

NONE

Sheet Title

RIO GRANDE NATIONAL FOREST

Project Name

Reviewed

Checked

Design

Drawn Forest

Scale

VICINITY MAP 2

of

Sheet 3

FISHING PIER INSTALLATION &

TRAIL CONSTRUCTION

M.Figgs

M.Figgs

A.Burbank

A.Burbank

Revisions:

Date

Date

Date

Initials

Initials

Initials

No.

No.

No.

Alberta Park Reservoir

US

Highway

Wolf Creek Pass

Wolf Creek Ski Area FSR 391

To South Fork

(16 miles)

FOREST SERVICE

RE

E P A

R TM N OFT AG

D

ICU LT

U R E

NONE

Sheet Title

RIO GRANDE NATIONAL FOREST

Project Name

M.Figgs

M.Figgs

Reviewed

Checked

Design

Drawn Forest

Scale

VICINITY MAP 3

of

Sheet 4

TRAIL CONSTRUCTION

FISHING PIER INSTALLATION &

A.Burbank

A.Burbank

Revisions:

Date

Date

Date

Initials

Initials

Initials

No.

No.

No.

Road Canyon Reservoir

To

Creede

(20mi.)

CO State Highway 149FSR 520

FOREST SERVICE

RE

E P A

R TM N OFT AG

D

ICU LT

U R E

NONE

Sheet Title

FISHING PIER INSTALLATION &

RIO GRANDE NATIONAL FOREST

TRAIL CONSTRUCTION

Project Name

M.Figgs

M.Figgs

Reviewed

Checked

Design

Drawn Forest

Scale

VICINITY MAP 4

of

Sheet 5 A.Burbank

A.Burbank

Revisions:

Date

Date

Date

Initials

Initials

Initials

No.

No.

No.

Love Lake

To Creede

(6 mi.)

FSR 523

CO State Highway 149

FOREST SERVICE

RE

E P A

R TM N OFT AG

D

ICU LT

U R E

NONE

Sheet Title

FISHING PIER INSTALLATION &

RIO GRANDE NATIONAL FOREST

TRAIL CONSTRUCTION

Project Name

M.Figgs

M.Figgs

Reviewed

Checked

Design

Drawn Forest

Scale

VICINITY MAP 5

of

Sheet 6 A.Burbank

A.Burbank

Revisions:

Date

Date

Date

Initials

Initials

Initials

No.

No.

No.

Mix Lake Platoro

FSR 250

(Conejos Canyon

Road)

CO State Highway 17

US

Highway

Antonito

La Jara

Spectacle Lake

FOREST SERVICE

RE

E P A

R TM N OFT AG

D

ICU LT

U R E

NONE

Sheet Title

FISHING PIER INSTALLATION &

RIO GRANDE NATIONAL FOREST

TRAIL CONSTRUCTION

Project Name

M.Figgs

M.Figgs

Reviewed

Checked

Design

Drawn Forest

Scale

TRAIL CROSS-SECTIONS

of

Sheet 7 A.Burbank

A.Burbank

Revisions:

Date

Date

Date

Initials

Initials

Initials

No.

No.

No.

Notes

1. Construct all trails to meet American Disabillity Act (ADA) and Forest Service Trail Accessibility Guidelines (FSTAG) requirements, as per specs.

2. Trail width shall be 48".

3. Trail surface shall be

8" minus crushed gravel, compacted with a mechanical tamper, to a minimum depth of 6".

4. Certify that all materials and equipment brought on site are weed free, as per specs.

TYPICAL TRAIL CROSS-SECTIONS

0to 30

Sideslope

CL

5'-0

Trailbed

TYPICAL SECTION 1

0to 30

Sideslope

CL

5'-0

Trailbed

TYPICAL SECTION 2

Length of Typical Sections

Location Typ. Sec. 1 Typ. Sec. 2

Alberta Park Reservoir 50 ft 0 ft

Big Meadows Reservoir

40 ft 0 ft

Mix Lake 150 ft 0 ft

Road Canyon Reservoir

10 ft 50 ft

Shaw Reservoir 80 ft 0 ft

Spectacle Lake 120 ft 0 ft

FOREST SERVICE

RE

E P A

R TM N OFT AG

D

ICU LT

U R E

NTS

Sheet Title

RIO GRANDE NATIONAL FOREST

Project Name

M.Figgs

M.Figgs

Reviewed

Checked

Design

Drawn Forest

Scale

CROSS-SECTION DETAIL

of

Sheet 8

FISHING PIER INSTALLATION &

TRAIL CONSTRUCTION

A.Burbank

A.Burbank

Revisions:

Date

Date

Date

Initials

Initials

Initials

No.

No.

No.

CROSS-SECTION DETAIL - PROFILE VIEW

Existing grade

Excavate existing grade 6 in and place gravel

6 in compacted gravel surfacing

11'-9

48 in

Notes

1. Trail surface shall be

8" minus crushed gravel, compacted with a mechanical tamper, to a minimum depth of 6", as per specs.

2. Trail shall be constructed with a maximum grade of 5for any distance, or 8.33for up to 50', as per specs.

3. Construct 5' x 5' gravel landing using the same methods as for the trail construction at the beginning and end of each trail. All trails longer than 80' will require an additional landing at the midpoint of the trail.

4. Trail and landing shall have edging of 4"x12" pressure treated Douglas Fir board, buried in place to provide an edge protection height of 3" above trail surface, as per specs.

5. Place and compact topsoil on sides of timber edging to a minimum slope of 6:1. Place another 1" of loose topsoil, then seed, as per specs.

6. Remove all debris and rock 2" and larger prior to laying gravel.

7. Obtain gravel, topsoil, and seed from a Forest Service approved source, as per specs.

Compact trail bed with mechanical tamper prior to placing gravel

Bury 4"x12" pressure treated timber so that top of timber is 3 in above compacted trail surface

4" 3 in

2'-4

18 in

2'-0"

18 in

Build up existing grade to attain maximum slope of

6:1, compact, then place another 1 in of loose topsoil to seed

FOREST SERVICE

RE

E P A

R TM N OFT AG

D

ICU LT

U R E

NTS

Sheet Title

RIO GRANDE NATIONAL FOREST

Project Name

M.Figgs

M.Figgs

Reviewed

Checked

Design

Drawn Forest

Scale

RAISED CROSS-SECTION

of

Sheet 9

FISHING PIER INSTALLATION &

TRAIL CONSTRUCTION

A.Burbank

A.Burbank

Revisions:

Date

Date

Date

Initials

Initials

Initials

No.

No.

No.

RAISED CROSS-SECTION DETAIL - PROFILE VIEW

Existing grade

Build up existing grade to attain maximum slope requirements, compact, then place another 1 in of loose topsoil to seed

6 in compacted gravel surfacing

11'-9

48 in

Notes

1. If required running slope cannot be attained, raise existing grade to attain maximum slopes.

2. Compact fill to 85maximum density with a mechanical tamper before laying gravel.

3. Trail surface shall be

8" minus crushed gravel, compacted with a mechanical tamper, to a minimum depth of 6", as per specs.

4. Construct 5' x 5' gravel landing using the same methods as for the trail construction at the beginning and end of each trail. All trails longer than 80' will require an additional landing at the midpoint of the trail.

5. Trail and landing shall have edging of 4"x12" pressure treated Douglas Fir board, buried in place to provide an edge protection height of 3" above trail surface, as per specs.

6. Trail shall be constructed with a maximum grade of 5for any distance, or 8.33for up to 50', as per specs.

7. Apply seed mixture to any areas built up with fill, as per specs.

8. Obtain gravel, topsoil, and seed from a Forest Service approved source.

Place seed mixture on 1 in of topsoil on top of compacted fill

Maximum slope of

6:1 to existing grade

Compact trail bed with mechanical tamper prior to placing gravel

FillFill

Bury 4"x12" pressure treated timber so that top of timber is 3 in above compacted trail surface

4" 3 in

FOREST SERVICE

RE

E P A

R TM N OFT AG

D

ICU LT

U R E

NTS

Sheet Title

FISHING PIER INSTALLATION &

RIO GRANDE NATIONAL FOREST

TRAIL CONSTRUCTION

Project Name

M.Figgs

M.Figgs

Reviewed

Checked

Design

Drawn Forest

Scale

LANDING DETAIL

of

Sheet 10 A.Burbank

A.Burbank

Revisions:

Date

Date

Date

Initials

Initials

Initials

No.

No.

No.

TRAIL LANDING DETAIL - PLAN VIEW

Notes

1. Compact landing bed to 85maximum density with a mechanical tamper prior to laying gravel, as per specs.

2. Landing surface shall be

8" minus crushed gravel, compacted with a mechanical tamper, to a minimum depth of 6", as per specs.

3. Construct 5' x 5' gravel landing, using the same methods as for the trail construction, at the beginning and end of each trail. All trails longer than 80' will require an additional landing at the midpoint of the trail.

4. Trail and landing shall have edging of 4"x12" pressure treated Douglas Fir board, buried in place to provide an edge protection height of 3" above trail surface, as per specs.

5. Edging on ingress and egress sides of landing shall have a 4"x12" pressure treated Douglas Fir board, buried in place so that the top of the board is flush with the compacted landing surface.

6. Refer to trail cross-section details for detail of landing cross-section (dimensions will follow landing requirements).

7. Apply seed mixture to any areas built up with fill, as per specs.

5'-10

5'-10

4'-8

" 48 in60 in

60 in

Landing comprised of 6 in compacted gravel surfacing

Trail

Compact landing bed with mechanical tamper prior to placing gravel

Bury 4"x12" pressure treated timber so that top of timber is 3 in above compacted trail and landing surface

Timber on ingress and egress sides of landing shall be buried so that top of timber is flush with compacted landing surface

Secure corner edging together using

2" minimum dia. lag bolts

1'-6

3 in

3 in

8 in

TIMBER EDGING

CONNECTION DETAIL (TYP)

2" minimum dia.

lag bolts

Pre-drill holes

FOREST SERVICE

RE

E P A

R TM N OFT AG

D

ICU LT

U R E

NTS

Sheet Title

FISHING PIER INSTALLATION &

RIO GRANDE NATIONAL FOREST

TRAIL CONSTRUCTION

Project Name

M.Figgs

M.Figgs

Reviewed

Checked

Design

Drawn Forest

Scale

PARKING DETAILS

of

Sheet 11 A.Burbank

A.Burbank

Revisions:

Date

Date

Date

Initials

Initials

Initials

No.

No.

No.

3"

MIN.

2'-0" Min.

18"

5'-0"

PARKING SURFACE

FINISH GRADE

1'-6"

6"

8" TYP2" CLR. MIN. TYPICAL

6'-0"

CONCRETE

2 EACH #3 REBAR

5/8" D. ANCHOR HOLES WITH #5

REBAR ANCHORING RODS.

3"

9"

2" 3"

#3 REBAR

SECTION

CONCRETE WHEEL STOP

Notes

1. Concrete wheel stops locations to be staked by Government prior to placement and installed according to specs.

2. All curbs to be painted blue in accordance with the Manual on Uniform Traffic Control Devices (MUTCD), 2009 edition, and American Disability Act (ADA) guidelines, as per specs.

3. Exact signage to be used is found in the Sign Schedule of Section 02722 - Traffic Control Signs of the specs.

3. All signs for this project shall be installed accoriding to dimensions shown, as per specs.

4. All signs shall be installed on single posts and be centered.

5. All sign locations will be staked by Government prior to installation.

PARKING DETAILS

PARKING SIGNS

Fishing_Pier_Trails_Dwgs
Pg1
Pg2
Pg3
Pg4
Pg5
Pg6
Pg7
Pg8
Pg9
Pg10
Pg11
pg1
Pg1
pg10
Pg10
pg11
Pg11
pg2
Pg2
pg3
Pg3
pg4
Pg4
pg5
Pg5
pg6
Pg6
pg9
Pg9

File details come from the government source that posted it. Updated .