AG-82B1-S-10-0206 Special Project Specifications.pdf

PDF 107 KB Posted

Attached to
Road 202 Resurfacing Federal contract opportunity
Solicitation number
AG-82B1-S-10-0206
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Intermountain

About this file

AG-82B1-S-10-0206--Attachment 1-Special Project Specifications Road 202 Resurfacing

View the file

Other files for this federal contract opportunity

Other files attached to Road 202 Resurfacing, newest first.
File Type Posted
Ltr of Intent to Award.Road 202 Resurfacing.pdf PDF
Amendment 000001--AG-82B1-S-10-0206.pdf PDF
AG-82B1-S-10-0206--Experience Questionnaire.pdf PDF
AG-82B1-S-10-0206--General Wage Decision Number ID13.docx DOCX document
AG-82B1-S-10-0206--202 drawings.pdf PDF
AG-82B1-S-10-0206 Solicitation.rtf RTF text file
AG-82B1-S-10-0206--SF-1442.pdf PDF
AG-82B1-S-10-0206--304--Aggregate base spec.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIAL PROJECT SPECIFICATION

Road 202 Resurfacing

ARRA FOREST WIDE BMPS

Section 101 - Abbreviations

101.02 Delete in its entirety and substitute the following:

Pay Items & Pay Units "& .......................................... And AC .......................................... Acre AL. ......................................... Aluminum ASP ........................................ Asphalt AVAIL ................................... Available BARR ..................................... Barrier BKN ....................................... Broken BST ........................................ Bituminous Surface Treatment CATTLEGD ........................... Cattle guard CLEAR (CLG) ....................... Clearing CLEAR/GRUB ....................... Clearing & Grubbing CMP ....................................... Corrugated Metal Pipe COMP .................................... Compaction CONC ..................................... Concrete CONST ................................... Construction (Construct) CTD ........................................ Coated (Coating) CUSH ..................................... Cushion CY (CU YD) .......................... Cubic Yard CY MI (CYM) ........................ Cubic Yard Mile DIA......................................... Diameter DL .......................................... Double Lane DWGS .................................... Drawings EA .......................................... Each EMB ....................................... Embankment EXC ........................................ Excavation F&I ......................................... Furnish & Install FDN ........................................ Foundation FT ........................................... Foot (Feet) FUNC ..................................... Function GAL ....................................... Gallon GR. ......................................... Grade GRUB ..................................... Grubbing HDPE ..................................... High Density Polyethylene HOR ....................................... Horizontal HR .......................................... Hour HT .......................................... Height I .............................................. Install IN ........................................... Inches INCL ...................................... Including (Includes) IND ........................................ Individual JCT ......................................... Junction L ............................................. Logs LBS ........................................ Pounds LDG ....................................... Loading LF (LIN FT............................. Linear (lineal) Foot LS ........................................... Lump Sum LT ........................................... Left MAT'L .................................... Material

M ............................................ Metal MAX ....................................... Maximum MBF ........................................ One Thousand Feet Board Measure MGALS .................................. One Thousand Gallons MHD ....................................... Method MI ........................................... Mile MIN ........................................ Minimum MISC ...................................... Miscellaneous MP .......................................... Mile Post MSF ....................................... One Thousand Square Feet OTBC ..................................... Open Top Box Culvert P M ......................................... Placement Method PVC ........................................ Polyvinyl chloride RD .......................................... Road RECOND ................................ Reconditioning RECONST .............................. Reconstruction (Reconstruct) REFL ...................................... Reflectorized RT ........................................... Right STMP (STP) ........................... Stump(s) SB ........................................... Self Balance SEC ......................................... Section SF............................................ Square Foot (Feet) SL ........................................... Single Lane SLD ....................................... Solid ST ........................................... Slash Treatment STA ....................................... Station (100 Feet) STA YD .................................. Station Yard STL ........................................ Steel STR (STRUC) ........................ Structural SY (SQ YD) ............................ Square Yard SZ ........................................... Size T&L ........................................ Tops & Limbs TBR ........................................ Timber TH ........................................... Thickness TM .......................................... Ton Mile TO ........................................... Turnout TOL ........................................ Turnout Left TOR ........................................ Turnout right TRS ......................................... Trees UOT ........................................ Utilization of timber VERT ...................................... Vertical W ............................................ Width W/ ........................................... With W/O ....................................... Without X-SEC..................................... Cross Section YD .......................................... Yard

SPS 101 –1 (1/28/10)

Section 102 - Definitions

Add the following:

"Noxious Weeds or Weeds. Any exotic plant species established or that may be introduced in the State which may render land unfit for agriculture, forestry, livestock, wildlife, or other beneficial uses and which is designated by the State's Department of Agriculture, or by the

County's weed management district, or by other appropriate agencies having jurisdiction, or as listed on the current "All States Noxious Weed List".

Shop Drawings. Incidental design sheets and/or drawings, which the Contractor is required to submit to the Contracting Officer. Shop drawings shall conform to the contract requirements, but they are not part of the contract drawings. They may be drawings, diagrams, schedules, performance charts, brochures, and similar data prepared by the Contractor, subcontractor, manufacturer, suppliers, or distributors that illustrate how specific portions of the work are to be fabricated or installed.

Weed Management District. A weed management district is any area of land identified for one of the following: a project or job site, a County, two or more Counties, or a National Forest.

SPS 102 - 1 (1/28/10)

Section 103 – Intent of Contract

Replace the second sentence with the following:

“Unless otherwise provided, the contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies, and shall perform all work as indicated in the drawings and specifications, and in accordance with provisions of the contract.”

SPS 103 - 1 (1/28/10)

Section 104 – Maintenance for Traffic

104.01

Roads to be Delete the first two paragraphs and replace with the following:

Constructed

"All roads shall be closed during project work in accordance with the table below.

The following is added to this subsection:

“The Contractor shall be responsible for the safe passage of traffic through the construction site during construction and outside work hours.”

Delete the last two paragraphs of this subsection and add the following:

“Forest Road No. 202 (Wolf Lodge) shall remain open to public traffic during construction work as shown in the following table under this contract. The duration and periods of traffic delays is

45 min stipulated in the following table.

Time Periods Maximum Delays___No. Closures_ Duration

Monday – Friday (7:00 a.m. – 5:00 p.m.) ----------- 45 N/A N/A

Monday – Friday (5:00 p.m. – 7:00 a.m.) ----------- Open to Traffic None N/A

Weekends – (Sat. & Sun) and Holidays --------------Open to Traffic None N/A

“Forest Road No. 202 (Wolf Lodge) may be closed to public traffic when Pay Item 306(04) construction work is being done as shown in the following table under this contract.

Time Periods Maximum Delays___No. Closures_ Duration

Monday – Friday (7:00 a.m. – 5:00 p.m.) ----------- N/A Closed Length 10 days

Monday – Friday (5:00 p.m. – 7:00 a.m.) ----------- Open to Traffic None N/A

Weekends – (Sat. & Sun) and Holidays --------------Open to Traffic None N/A

The Contractor shall provide the Contracting Officer at least 14 days advance written notice prior to any traffic delay periods, to allow public notice of the traffic interruptions by the Forest

Service. The contractor shall be responsible for providing, maintaining and removal of all signs required for the traffic delay periods.

Other delay periods may be authorized by the Contracting Officer in writing upon receipt of a written request from the Contractor. The Contractor shall submit a written request outlining the additional traffic delays required at least 14 days prior to starting construction operation that necessitates the traffic delays. The contractor must open the road as rapidly as possible to allow passage of emergency vehicles.”

Prior to the Contractor shutting down any operations, the Contractor shall take such precautions as may be necessary to prevent damage to the project, such as approaches, crossings or intersections; and shall make provisions for normal drainage and minimization of erosion.

SPS 104 - 1 (1/28/10)

CONSTRUCTION SIGNING

The contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient signs, and other traffic control devices in accordance with the latest edition of the Manual on Uniform Traffic Control Devices

(MUTCD). The contractor shall take necessary precautions for the protection of the work and safety of the public. Access roads closed to traffic for safety and to protect the work shall be protected by effective barricades and signs."

PAYMENT

104.03 Add the following:

Basis

"Payment for construction signing and traffic control under this section shall be considered subsidiary to Pay Item 601 Mobilization, and no separate payment will be made."

SPS 104 - 2 (1/28/10)

Section 106 - Measurement & Payment

106.03

Units of Under "(a) Cubic Yard," add the following:

Measurement

"(4) Material, Compacted in Place. The measurement computed using measurements of material in the compacted state on the project. Statistically random measurements of length, depth, and width for computation of quantities shall be made when Actual Quantities are shown in the SCHEDULE OF ITEMS."

“(j) Lump Sum. The quantities that denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job”

106.04

Methods of Add the following:

Measurement

"The Variation of Quantity Clause does not apply to items paid for on a Designed

Quantity (DQ) or Lump Sum Quantity (LSQ) basis."

SPS 106 - 1 (1/28/10)

Section 202 - Removal of Structures and Obstructions

CONSTRUCTION

202.03 Add to this section:

Removal of

Bridges, "Upon removal all metal culverts and treated wood from log culverts

Culverts, & (including geotextile fabric) shall become the property of the contractor

Other Structures and shall be removed from National Forest System lands and disposed of in accordance with Federal, State and local laws.

Non-treated woody debris from the removal of log culverts and open top culverts shall be treated as clearing debris and disposed of as SHOWN ON

THE DRAWINGS.”

202.04 Delete in entirety.

Removal of Pipe, Other than

Culverts

SPS 202 - 1 (1/28/10)

Section 204 - Soil Erosion & Water Pollution Control

DESCRIPTION

204.01 Delete the entire subsection and substitute the following:

Work

"This work consists of special temporary and/or permanent construction measures as SHOWN ON THE DRAWINGS and/or listed in this specification to control soil erosion and water pollution. Such measures may include (but are not limited

to) filter windrows, slash blankets, brush barriers, drainage devices, earth berms, earthen water bars, sediment basins, aggregate base/surfacing, rock ditches, riprap, seeding, mulching, and/or straw bales.

This work shall also include special construction methods SHOWN ON THE

DRAWINGS to control erosion at control areas."

MATERIALS

204.02 Delete the 2nd paragraph and substitute the following:

Requirements

"All other materials shall meet commercial grade standards and shall be approved before being incorporated into the project."

204.03 Delete the 2nd paragraph and substitute the following:

Performance

"Erosion control measures shall be incorporated into the project no later than the dates specified in Table 204.1. Variations in this schedule must be approved in writing by the Engineer."

Add the following after the 3rd paragraph:

"The following construction requirements shall apply:

a.- Earthwork. Clearing and grubbing, excavation, borrow and embankment operations shall be scheduled and performed so that grading operations and permanent erosion control measures can follow without interference or be constructed within the time periods listed in Table 204.1.

b.- Stream Courses. Temporary culvert installations will not be permitted in live streams unless approved individually in writing by the

Engineer. If such approval is granted, temporary culverts shall be offset a sufficient distance so that installation of the permanent culvert can be completed without removal of the temporary culvert. Temporary culverts shall not be removed until flowing water is completely confined to the permanent culvert.

SPS 204 - 1 (1/28/10)

ARRA FOREST WIDE BMPS

Diversion of live streams to allow work in the streambed shall be performed in such a manner as necessary to prevent erosion. Dikes of sufficient height to divert the flow without being overtopped shall be constructed in the stream above the drainage structure. Water shall be conveyed around the work area by a non-eroding conduit. Watertight pipes, tubing, or lined trenches may be used. Trench or pipe outlet areas shall be protected with plastic or other material approved by the Engineer to insure that diverted water does not cause erosion as it returns to the stream.

Equipment shall not operate in the stream unless authorized by the Engineer.

This does not include a onetime crossing of the stream to begin installation.

After installation of the permanent drainage structure is completed, all dikes, temporary culverts, basins, and trenches shall be removed and the area restored to near natural condition.

c.- Wet Conditions. The contractor shall conduct operations so as to minimize erosion and not develop conditions that will cause erosion.

Work may continue during wet conditions as long as erosion and rutting is controlled.

d.- End of Construction Season and prior to Move-out. Any rutted areas and other damaged areas shall be smoothed, sloped and graded to drain. All temporary stream course diversion conduits and temporary culverts shall be removed and the stream returned to its natural channel. All erosion control measures required under this specification shall be functional and approved by the Engineer. The seeding method prescribed in

Section 625 shall be used on all areas where work has been completed.

MEASUREMENT

204.04 Add the following to the first paragraph:

Method

"Items not shown in the SCHEDULE OF ITEMS will not be measured."

204.05 Add the following:

"Other erosion control work required under this specification and not shown in the SCHEDULE OF ITEMS is considered incidental to pay items in the Section listed in Table 204.1."

SPS 204 - 2 (1/28/10)

TABLE 204.1

SECTION DURATION DESCRIPTION OF WORK TIMING OF CONSTRUCTION

Permanent Culvert Catch Basins and Ditch Transitions Concurrently with culvert installation.

203 Permanent Inslope/Outslope as shown on drawings.

Continuously as road is roughed to grade.

Incidental to 203 or 625

Special Construction Methods. Specific locations and requirements shown on the drawings, and/or described in the Special Project Specifications.

As described on the drawings and/or in the Special Project Specifications.

203 Permanent Drainage Dip Locations shown on the drawings.

Prior to the end of the construction season for all areas roughed to grade.

203 Temporary

Uncompleted Roads. The total length of all roads with uncompleted excavation and embankment, including pioneer roads, shall not exceed 500 lineal feet after Octorber 15.

See description of work.

Permanent

Aggregate Base/Surfacing The total length of all areas of disturbed earth (including pioneer roads and completed subgrades) on which gravel has not been placed shall not exceed 500 lineal feet after September 15.

This requirement may be waived by the Engineer based on a review of the Contractor's operations, methods, and progress in controlling erosion and keeping erosion control features current as described in this specification. Such waiver, if given, shall be in writing.

See description of work.

Permanent

Seeding

As specified in Section 625

Temporary

Road Closure Devices

Immediately before Section 306(04) is started, at the station designated for the device.

SPS 204 - 3 (1/28/10)

Section 206A - Excavation for Culverts & Minor Structures

206A.08 Add the following:

Methods

"(c) For gabion structures, measurement will be to the lines and grades as SHOWN ON

THE DRAWINGS."

"(d) Excavation for pipe culverts with diameter of 36 inches or smaller and for pipe arches 42 inches by 29 inches or smaller and drop inlets shall not be measured."

206A.09 After the first sentence, add:

"Payment for excavation for pipe culverts with diameter of 36 inches or smaller and for pipe arches 42 inches by 29 inches or smaller and drop inlets shall be included as a subsidiary item to Section 603 and Section 604. No separate payment shall be made under this Section or under Section 603, 603A, 603B, or 604."

F04-SPS 206A-1 (1/28/10)

Section 207 – Developing Water Supply & Watering

Description

207.01 Work.

“Contractor shall develop, haul and apply water during processing and compaction of the crushed material produced by the mobile crushing operation.

The optimum moisture content required for processing and compaction of the material for this project will vary depending on the material gradation produced but is anticipated to be within the range of 8-12%. Contractor is encouraged to plan operations to utilize natural moisture as much as possible to minimize the amount of water to be hauled and applied.”

Construction

207.03 Development of Supply & Access.

Delete this paragraph and add the following:

“All activities which may cause siltation or damming of a stream shall be approved in writing by the Contracting Officer in advance of the work.

Contractor will be permitted to utilize a developed water site the beginning of the project, located on Marie Creek. The spur road to the right at the BOP leads to the source. Alternative source(s) must be requested in writing for Contracting Officer approval.”

Measurement

207.05

Payment

207.06 Basis.

Delete the first paragraph and substitute with the following:

“Payment for Developing Water Supply & Watering shall be included as a subsidiary item to

Section 306(04). No separate payment shall be made under Section 207.”

SPS 207–1 (01/28/10)

Section 304 - Aggregate Base or Surface Course

Materials

304.03 Add the following:

Gradation

“In lieu of the gradation requirement of Subsection 703.06, similar gradations from

Commercial Sources that meet Idaho Department of Transportation, Shoshone County or

Kootenai County specifications may be substituted with written approval from the

Contracting Officer.

SPS 304–1 (01/28/10)

Section 306 – Reconditioning of Existing Road

Delete this section in its entirety and add the following:

Description

306.01 Work.

This work consists of manufacturing cushion material on native surface roads with mobile rock processing equipment. The work includes reducing bedrock and oversized rock to a specified size; watering, mixing, compacting, blading and shaping the manufactured cushion material into a smooth, non-segregated road surface as required by the design template.

The work shall consist of cleaning ditches and reconditioning of the traveled way and shoulders of the existing road. Treating the road surface with “road crushing” equipment. The existing road surface shall be ripped and windrowed for road crushing operation by obtaining material from the roadbed and ditches to produce a crushed surfacing for the width of the existing road traveled way, turnouts and shoulders. The post treatment work following use of “road processing” equipment requires the following types of equipment to accomplish the end product:

dozer w/rippers, road grader, mobile road crushing equipment (FAHR Roadcrusher, Forester C-

2000 or equivalent), vibratory steel wheel roller and water truck.

Material shall be obtained from the roadbed and ditches to produce a crushed surfacing for the width of the existing traveled way, turnouts and shoulders. Crushed material shall be uniformly processed, shaped and compacted to provide proper inslope or outslope for road surface drainage.

Construction

306.02 Performance

Clear the work area of vegetation and obstructions prior to excavation of subgrade material.

Scatter shall be done in accordance to 201.05 Method (4).

The traveled way, shoulder and turnouts shall be ripped to a depth necessary to produce a 6-inch minimum depth crushed surface layer at locations SPECIFIED IN THE CONTRACT and

DESIGNATED ON THE GROUND.

The contractor shall clean ditches as shown in the work list and prepare the road surface by ripping and windrowing for road crushing operation by obtaining enough material that is 2 inches or larger from the roadbed and ditch lines to produce a layer of uncompacted crushed material to a minimum depth of 6 inches for the full width of the existing traveled way, shoulders and turnouts.

Mix the aggregate and adjust the moisture content to obtain a uniform mixture near the optimum moisture content. Spread and shape the mixture to obtain a uniform layer to the required cross section. No oversized rock will be allowed within the specified depth of material.

SPS 306–1 (01/28/10)

ARRA FOREST WIDE BMPS

Oversized material may be sidecast outside the traveled way. No material shall be sidecast within 50’ of a live stream.

In limited situations, when shown on the plans, or when approved in writing by the CO, cover segments of roadway with imported material obtained from sources approved by the CO.

Materials to be crushed shall be obtained excavation ditches, roadside berms or from approved sources within the project area. The resulting crushed material will be visually inspected for meeting size requirements free of deleterious and non-mineral materials.

Ensure that the finished traveled way has a uniform grade and smooth surface free of hollows, depressions, and segregation. Do not leave berms or ridges along either shoulder of the roadbed, unless directed by the CO.

306.03 Gradation

The mobile road crusher shall process the windrowed material, up to 16 inch diameter, and reduce the size of the windrowed material to a 2 inch minus gradation.

Oversized material that cannot be accommodated in the mobile crusher shall be removed at the source and shall be disposed of by sidecasting at locations approved by the Contracting Officer.

No material shall be sidecast at locations that will result in material entering a stream channel or result in a safety issue with roadways below work area.

306.04 Thickness and Width Requirements

Crushed material shall be processed on the roadbed to the specified thickness (6-inch uncompacted depth) for the full width of the traveled way and shoulders. Crushed material shall be shaped with a 2% inslope (ditched sections) or 2% outslope (nonditched sections) for proper drainage. Crushed material shall be uniformly moistened or dried to the optimum moisture content for maximum density and compacted to full width by a vibratory steel wheeled roller as specified. Crushed material shall be surface bladed using a motor grader during the compaction operation to remove irregularities and produce a smooth running surface.

306.05 Compaction

Compaction equipment shall be operated over the full width of the traveled way and shoulders until visible deformation of the layer ceases. The vibratory steel-wheel roller shall have a minimum weight of 6 tons. The compactor shall be equipped with amplitude frequency control and specifically designed to compact the material on which it is used. At least three complete passes shall be made.

SPS 306–2 (01/28/10)

Measurement

306.06 Method

The method of measurement, as described in Section 106, will be DESIGNATED in the

SCHEDULE OF ITEMS.

306.07 Basis.

The accepted quantities will be paid for at the contract unit price for each pay item shown in the

SCHEDULE OF ITEMS.

Payment will be made under:

Pay Item Pay Unit

306(04) Reconditioning of Roadbed …………………………….…………………… Mile

(mobile rock processing equipment)

SPS 306–3 (01/28/10)

Section 306 –2 Reconditioning of Existing Road

304.01 Add the following:

This Work shall consist of cleaning culverts, including inlets and outlets, removing slide material, reshaping catch basins, installing ditch dams as needed.

304.02

PERFORMANCE

Culvert inlets and outlets shall have material removed from the inside of the pipe for a distance of five feet. Catch basins shall be cleared of material, slash and shaped to drain as shown on the plans.

306.07 Basis.

306(05) Culvert Cleaning …………………………………………………………….. Each

SPS 306–1 (01/28/10)

Section 601 - Mobilization

601.01 Add the following to this section:

"Preparatory work shall include cleaning of all equipment before entering National

Forest System Lands. The contractor is required to clean all construction equipment prior to entering National Forest System Lands. This cleaning shall remove all dirt, plant parts, and material that may carry noxious weed seeds into the area. Only construction equipment inspected by the Contracting Officer will be allowed to operate within

National Forest System Lands. All subsequent move-ins of equipment shall be treated the same as the initial move-in. Truck beds and dump boxes hauling to the project site must also be cleaned prior to entering the work area.

Prior to initial move-in, the Contractor shall make all construction equipment available for inspection by the Contracting Officer at an agreed upon location. The Contractor shall provide the Contracting Officer at least 24 hours advance notification when equipment is ready for inspection.”

SPS 601-1 (1/28/10)

Section 603 - Metal Pipe

603.02 Delete the second sentence, last paragraph, and add:

"Pipe should not be ordered until culvert locations are DESIGNATED ON

THE GROUND and the correct lengths are determined and approved by the

Contracting Officer."

603.06

Joining Pipes Replace the last sentence of the first paragraph with the following:

"Dimpled bands shall not be used unless approved by the Contracting Officer in writing."

603.08

Backfilling At the end of the second paragraph, after "Method A or B," add:

"or C"

After Method B, add:

"Method C - Compaction shall be obtained by a minimum of two passes with a mechanical tamper, approved by the Contracting Officer, for each 6-inch layer

(loose thickness) of backfill unless otherwise SHOWN ON THE DRAWINGS."

SPS 603-1 (1/28/10)

Section 619 - Riprap

RIPRAP

CLASS

STONE

WEIGHT

IN LBS

% SMALLER

THAN THE

GIVEN

1. 2. & 3.

EQUIVALENT

CUBIC SIZE

INCHES

BETWEEN

EQUIVALENT

CUBIC SIZE

MM

REMARKS

<---weight Size------------------------------------------------------>

I

<10

<10

1.Size developed from weight using specific gravity of 2.71 and unit weight of 169 #/cubic ft.

and then rounded to nearest inch.

619.02

Hand-placed, Machine-placed, and Dumped Riprap

Delete the Durability Absorption Ration Chart and formula and the second paragraph.

619.19

Geotextile

In the second paragraph, delete the third sentence.

In the last paragraph, delete the last sentence and add:

"Riprap placed on the gravel cushion or geotextile shall not be dropped or rolled a distance farther than 3 feet."

619.21

"The cost of excavation and embankment required for placement of riprap is incidental to this pay item and no separate payment will be made."

SPS 619-1 (1/28/10)

Section 625 - Seeding & Mulching

625.01 Delete in entirety and substitute the following:

“This work shall consist of preparing seedbeds and furnishing and placing required seed. Straw and grass hay bale sediment basins are used for mulch upon completion of stream channel restoration.”

625.03 Add the following:

Seeding

Seasons “Time of application shall be as specified below:

During the Months marked with an 'X' below:

JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC

x x x x x

Should climatic conditions permit, application may be performed outside the months marked above upon written approval by the Contracting Officer.”

625.05 The following is added:

Application

Methods for Seed, “The kinds of seed to be furnished and the amounts to be applied in terms of

Fertilizer, pure live seed (PLS) shall be as follows.

& Limestone

Standard Dry Site Mix

SPECIES PLS LBS/AC

Slender wheatgrass "Pryor" or "Revenue" (Elymus trachycaulu,s subspecies trachycaulus)

6.0

Sheep fescue "Durar" (Festuca ovina) 5.0

Streambank wheatgrass "Sodar" (Elymus lanceolatus, subspecies psammophilus)

3.0

Annual rye (Lolium multiflorum) 2.0

Canby bluegrass "Canbar" (Poa canbyi) 4.0

TOTAL 20.0

SPS 625 - 1 (1/28/10)

Acceptable substitutes:

Big bluegrass "Sherman" (Poa ampla) @ 4 PLS LBS/AC for Canby bluegrass.

Pounds of seed to be furnished per acre shall be obtained by dividing the pounds of pure live seed required per acre by the product of the percent purity and percent germination.

Pounds of seed per acre to be furnished shall be obtained by dividing the pounds of pure live seed (PLS) per acre required by the product of the percent purity times the germination rate:

PLS LBS/acre = pounds commercial seed per acre purity x germination

Example: 5 PLS LBS/acre_____ = 6.54 pounds of commercial seed per acre

0.9 x 0.85 (where purity = 90% and germination = 85%)

Apply seed by the Dry Method.”

SPS 625 - 2 (1/28/10)

Section 633 - Signs

633-Signs Delete in its entirety and substitute the following:

633.01

This work shall consist of installing only or furnishing and installing markers, delineators, signs, sign supports, panels, and posts or removing and disposing of existing signs, posts and hardware.

633.02

Traffic Control

Sign Details

Traffic control sign details not SHOWN ON THE DRAWINGS shall meet the requirements of the Manual on Uniform Traffic Control Devices (MUTCD).

633.03

Materials shall meet the requirements of the following subsections in 85 SPS 718:

Sign Panels .............................................................................. 718.01

Posts ........................................................................................ 718.02

Fittings ..................................................................................... 718.03

Reflective Sheeting. .................................................…........... 718.04

Paint......................................................................................... 718.05

Silk-Screen Inks...................................................................... 718.06

Edge Film................................................................................ 718.07

Letters, Numerals, Arrows, Symbols, Borders ...........…....... 718.08

Delineators ............................................................................. 718.09

The contractor will furnish to the Engineer certification that all materials comply with the specified requirements.

All concrete shall meet the requirements of Section 602, Method B or C as SHOWN

IN THE DRAWINGS.

Reinforcing steel as SHOWN IN THE DRAWINGS shall meet the requirements of

Subsection 709.01.

R01-85 SPS 633 - 1 (7/92)

633.04

Fabrication of

Sign Panels

Fabrication of all parts shall be accomplished in a uniform manner. All panel fabrication, including cutting, punching, and drilling of holes, shall be completed prior to final surface preparation and application of the sheeting except where required for the fabrication of diecut or sawed letters on processed and mounted signs. Workmanship shall be high quality with no visible defects in the finished product.

(1) Sign Panel Preparation. Sign panels shall be cut from the specified substrate material that is flat, free of warp, or any defects which interrupt smooth continuity of the panel surface. All panels shall be prepared precisely as described in writing by the substrate and sheeting manufacturers.

Sign panels less than 4 feet by 8 feet shall be cut from a single sheet of substrate material without joints.

Sign panels larger than 4 feet by 8 feet shall be fabricated in sections using three-quarter inch thick HDO substrate material. Individual panel sections shall be prepared to be joined using doweled butt joints. Dowels shall be

3/8-inch threaded bolt stock 4 1/2 inches in length placed 2 inches from each side and every 12 to 15 inches along the joint. Actual joining of the individual panels will occur during sign installation.

Dimensions for panels will be SHOWN ON THE DRAWINGS, with a tolerance of + 1/4 inch.

(2) Beveling. All edges of sign panels shall be slightly rounded or beveled to eliminate edge sharpness.

(3) Drilling. Holes shall be drilled at the locations and to the sizes as

SHOWN ON THE DRAWINGS. All holes shall be deburred. Field drilling of holes in any part of the Structural assembly will not be permitted without the approval of the Engineer.

(4) Surface and Edge Finishing. All core-gap holes on HDO plywood signs shall be filled with an exterior wood dough, sanded with a medium grit

(50-60) sandpaper to produce a smooth surface, and the edges shall receive one coat of paint prior to application of background sheeting.

(5) Sheeting, Legend, Border, and Symbol Application. All sheeting, legend, borders, and symbols shall be applied precisely as prescribed in writing by the sheeting manufacturer. Either "Pressure Sensitive" or "Heat

Activated" material may be used as SHOWN IN THE DRAWINGS.

R01-85 SPS 633 - 2 (7/92)

ARRA FOREST WIDE BMPS

The entire face of the sign panel shall be covered with one unspliced sheet if the panel is less that 48 inches in either dimension. Only horizontal splicing shall be used on each section. Materials shall be color matched and splice shall not coincide with any legend. The top piece shall overlap the bottom piece by ½-inch minimum.

All letters, layout, and spacing requirements shall conform to the

"Standard Alphabets for Highway Signs," FHWA, current edition, and AS

SHOWN ON THE DRAWINGS. The following tolerances shall apply:

(a) Letters, numerals, and symbols shall be horizontally aligned to a tolerance of + 1/8 inch.

(b) Letters, numerals, and symbols shall be vertically aligned to a tolerance of + 1/16 inch.

(c) Spacing between lines shall not exceed a tolerance of + 1/8 inch.

(5) Silk-Screening. All silk-screening operations shall be accomplished precisely as prescribed in writing by the manufacturers of the ink and the sheeting. Messages and borders of a color darker than the background shall be applied by direct screen process. Messages and borders of a color lighter than sign background shall be produced by the reverse screen process. The screening shall be done in a manner which results in uniform colors and tone, with sharply defined edges of legend and border and without blemishes on the sign background.

Silk-screened inks shall be color matched to eliminate any visual difference between silk-screened material and applied material of the same color on the same sign.

(6) Durability Treatment. All signs, other than those manufactured from 100 percent heat activated material shall receive a durability treatment. After all legends, borders, and symbols have been applied, the sign panel shall receive one cycle through the heat vacuum applicator at a temperature of approximately 190 degrees F. This special durability treatment is not required for those signs manufactured from 100 percent heat activated materials.

(7) Trimming and Edge Finishing. After all sheeting, legends, borders, and symbols have been applied to the substrate, all excess material shall be trimmed flush with the edge of the sign panel. Sheeting may overlap

HDO plywood substrate sign edges by one-eigth inch. The edges of HDO substrate panels shall be finished with a second coat of paint applied in accordance with the recommendation of the paint manufacturer.

(8) Edge Film. When SHOWN ON THE DRAWINGS, edge tape shall be applied over the entire top edge of the panel precisely in accordance with tape manufacturer's written instructions.

R01-85 SPS 633 - 3 (7/92)

(9) Maker's Mark. A decal showing the contractor's identification or trademark and the date of manufacture shall be installed on the back upper left-hand corner of each sign.

633.05

Delineator Posts and Housing

Delineator posts shall be driven at locations and to the depth SHOWN ON THE

DRAWINGS. The delineator shall be attached to the post in accordance with the manufacturer's direction.

633.06

Sign Erection

Sign supports shall be erected plumb and in accordance with the details SHOWN ON

THE DRAWINGS. Lengths of supports shall be as SHOWN ON THE DRAWINGS or SCHEDULE OF ITEMS.

The sign panels shall be securely fastened to the posts as SHOWN ON THE

DRAWINGS. To reduce specular glare, the sign panel face shall be erected in accordance with MUTCD, Section 2A-26.

633.07

Sign Removal

Sign assemblies to be removed shall be SHOWN IN THE DRAWINGS. Signs to be replaced shall be removed no longer than 24 hours prior to the installation of replacement signs. All sign material removed shall become the property of the contractor. Posts shall be removed to a minimum of 3 inches below natural ground line. Post holes remaining shall be backfilled with suitable material and compacted.

633.08

The method of measurement, as described in Section 106, will be DESIGNATED in the SCHEDULE OF ITEMS.

Quantities of sign face area will be computed using the sign dimensions SHOWN ON

THE DRAWINGS.

No deduction in sign face area will be made for rounded corners. The area for irregularly shaped signs, such as "Stop" signs, will be computed by multiplying the extreme width by the extreme height of the sign face.

For sign removal, an assembly of posts and signs shall be considered as only one sign when these materials are integrally connected and standing at one location.

R01-85 SPS 633 - 4 (7/92)

633.09

Work required under this specification and not shown in the SCHEDULE OF

ITEMS is considered incidental to pay items 601(01).

SPS 633-5 (1/28/10)

Section 713 - Roadside Improvement Materials

713.04 Replace the first paragraph with the following paragraph:

Seed

“The kinds of grass, legumes and cover crop seed furnished shall be those stipulated in the SPECIAL PROJECT SPECIFICATIONS. All seed shall meet the requirements of

Federal Specification-JJJ-S-181, which shall be amended as follows:

All seed purchased shall be certified to be free of noxious weed seeds from weeds listed on the current "All States Noxious Weeds List".

Replace the second paragraph with the following paragraph:

“Seed shall be furnished separately or in mixture in standard containers with (1) seed name; (2) lot number; (3) net weight; (4) percentages of purity and of germination (in case of legumes, percentage of germination to include hard seed); and (5) percentage of maximum weed seed content clearly marked for each kind of seed. The contractor shall furnish the Contracting Officer duplicate signed copies of a statement certifying that each lot of seed has been tested by a certified seed analyst. This statement shall include (1) name and address of laboratory, (2) date of test, (3) lot number for each kind of seed, and

(4) results of tests as to name, percentages of purity and of germination, and percentage of weed content for each kind of seed furnished, and, in case of a mixture, the proportions of each kind of seed. Laboratory testing for noxious weeds shall be conducted prior to seed mixing. Only after a finding and documentation in writing of no weeds on the current "All States Noxious Weeds List" will the seed be accepted and used. Legume seed shall be inoculated with approved cultures in accordance with the instructions of the manufacturer. Seed analysis labels attached to the bags shall be provided to the

Contracting Officer.”

R01-85 SPS 713 - 1 (4/96)

Section 718 - Sign Materials

718.01

Sign

Panels

Sign panels shall be cut from the specified substrate material shown in the

SCHEDULE OF ITEMS that is flat and free of warp or any defects which interrupt smooth continuity of the panel surface. The face side shall be reflectorized.

(a) High Density Overlay (HDO) Plywood. Both sides of the high density overlay

(HDO) plywood shall be Douglas-fir, exterior type, Product Standard PS-1

(current edition), with a B grade or better veneer on both faces. Surfacing overlay material shall be high density 90-90 resin-impregnated fiber, permanently fused under heat and pressure to the base panel. The material must be suitable for sign manufacturing and must be compatible with reflective sheeting adhesive. No marks, blemishes, or damage of any kind will be allowed. Overlay color shall be cocoa brown. Each panel shall be edge-branded HDO B-B G1 EXT APA PS 1. The Contractor shall supply the

Engineer with APA certification that the plywood meets all the above requirements.

Minimum 1/2-inch plywood shall be used for signs less than 24 inches in longest dimension. Five-eighths-inch material shall be used for all other signs cut from a single sheet. Three-quarter-inch plywood shall be used for all signs requiring joining.

(b) Aluminum. The aluminum substrate shall be alloy 5052-H38 or 6061-T6 from flat sheet stock conforming to the requirements of ASTM B 209.

Unless otherwise SHOWN ON THE DRAWINGS, the minimum panel thickness shall be 0.080 inches for all signs 30 inches or less in any dimension.

Sign panels larger than 30 inches in any dimension shall be a minimum thickness of 0.125 inches.

(c) Fiberglass Reinforced Plastic. Fiberglass reinforced plastic shall comply with the recommendations of the Fiber Glass Reinforced Panel Council publication

"Recommended Traffic Control Sign Panel Specifications." Unless SHOWN

ON THE DRAWINGS, the color of the material shall be brown, matching

Federal Standard 595a, Color No. 20059.

Reinforced fiberglass panels for signs up to and including 36 inches in any dimension shall be 0.135 inches thick. Reinforced fiberglass shall not be used for signs larger than 36 inches in the unsupported dimension unless otherwise

SPECIFIED AND/OR SHOWN ON THE DRAWINGS.

R01-85 SPS 718 - 1 (7/92)

ARRA FOREST WIDE BMPS

718.02

Posts

Posts shall be wood, aluminum, steel, or other material as specified.

(a) Wood Posts. Wood posts shall meet the grading, species, and dimensional requirements SHOWN ON THE DRAWINGS and meet the treatment requirements of Subsection 716.03.

(b) Steel Posts. Steel posts shall meet the requirements of ASTM A 499, galvanized in accordance with AASHTO M 111.

Minimum weight per foot will be as SHOWN ON THE DRAWINGS.

The posts shall have 7/16-inch holes drilled or punched along the centerline of the web before galvanizing. The punching or drilling should begin 1 inch from the top of the post, at 2-inch centers for the upper 5 feet of the post.

(c) Aluminum Posts. Aluminum posts shall be standard shapes as SHOWN ON

THE DRAWINGS and shall be aluminum alloy 6061-T6 or 6351-T5, meeting the requirements of ASTM B 221.

718.03

Fittings

Lag screws, washers, clip angles, wood screws, shear plates, U-bolts, clamps, bolts, nuts, and other fasteners shall be galvanized steel, cadmium-plated steel, aluminum alloy, or as SHOWN ON THE DRAWINGS.

Galvanizing of steel hardware shall be in accordance with AASHTO M 232. High-strength steel bolts, nuts, and washers shall meet the requirements of ASTM A 325, except as SHOWN ON THE DRAWINGS.

718.04

Reflecting

Sheeting

All reflective materials (sheeting, legend, borders, and symbols) shall conform with the "Standard Specifications for Construction of Roads and Bridges on Federal

Highway Projects," FP, current edition. Sheeting shall be either heat activated or

Class 1 pressure sensitive engineer grade or as SHOWN ON THE DRAWINGS.

Colors shall be as specified in the MUTCD and SHOWN ON THE DRAWINGS.

No more than 12 months shall elapse from the date of manufacture to the date of application.

718.05

Paint

Paint shall be ready-mixed, exterior type, polysilicone, alkyd resin base enamel, conforming to Federal Specification TT-E-1593B. Color to match the color of the

HDO substrate.

R01-85 SPS 718 - 2 (7/92)

ARRA FOREST WIDE BMPS

718.06

Silk Screen

Inks

Inks shall be compatible with the sheeting. Compatibility shall be determined by the manufacturer(s) of the ink and the sheeting. Color shall be as specified in the

MUTCD and as SHOWN ON THE DRAWINGS.

718.07

Edge Film

Edge film shall be a pressure-sensitive, premium-quality, clear, ultraviolet-resistant, 3-inch-wide vinyl film.

718.08

Legend, Border

Symbols

The legends, borders, symbols, and other features of the sign message shall conform to the "Standard Alphabets for Highway Signs," FHWA, current edition, and as

SHOWN ON THE DRAWINGS.

718.09

Delineators

The materials to be used for the delineator assembly shall be Type 1 or 2, as SHOWN

ON THE DRAWINGS. The reflectors shall be amber or crystal and ready for mounting. Supporting posts shall be steel, aluminum, wood, or other material as

SHOWN ON THE DRAWINGS.

R01-85 SPS 718 - 3 (7/92)