AG-82B1-S-10-0206--General Wage Decision Number ID13.docx

DOCX document 18 KB Posted

Attached to
Road 202 Resurfacing Federal contract opportunity
Solicitation number
AG-82B1-S-10-0206
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Intermountain

About this file

AG-82B1-S-10-0206--General Wage Decision Number ID13

View the file

Other files for this federal contract opportunity

Other files attached to Road 202 Resurfacing, newest first.
File Type Posted
Ltr of Intent to Award.Road 202 Resurfacing.pdf PDF
Amendment 000001--AG-82B1-S-10-0206.pdf PDF
AG-82B1-S-10-0206--SF-1442.pdf PDF
AG-82B1-S-10-0206 Special Project Specifications.pdf PDF
AG-82B1-S-10-0206--Experience Questionnaire.pdf PDF
AG-82B1-S-10-0206--202 drawings.pdf PDF
AG-82B1-S-10-0206 Solicitation.rtf RTF text file
AG-82B1-S-10-0206--304--Aggregate base spec.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: ID080013 01/15/2010 ID13

Superseded General Decision Number: ID20070020

State: Idaho

Construction Type: Highway

Counties: Bannock, Franklin and Power Counties in Idaho.

Modification Number Publication Date 0 02/08/2008 1 06/06/2008 2 02/20/2009 3 06/05/2009 4 01/15/2010

* CARP0808-005 01/01/2010

Bannock, Franklin and Power Counties

Rates Fringes

Carpenter.......................$ 26.57 8.10

ZONE PAY:

ZONE 1 0-30 MILES: FREE

ZONE 2 MORE THAN 30-60 MILES: $2.00/PER HOUR

ZONE 3 MORE THAN 60 MILES: $3.00/PER HOUR

If a project is located in more than one zone the lower zone rate shall apply

ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST

OFFICES:

BOISE: 304 N. 8TH STREET

TWIN FALLS: 253 2ND AVE. WEST

POCATELLO: CLARK STREET

IDAHO FALLS: 875 NORTH CAPITAL AVE.

IRON0732-006 06/01/2009

Bannock, Franklin and Power Counties

Rates Fringes

Ironworkers:

(Rebar/Reinforcing)..............$ 24.74 13.86

PAIN0764-002 06/01/2006

Bannock, Franklin and Power Counties

Rates Fringes

Painter: (Traffic Control Striper).........................$ 20.60 4.67

SUID2006-001 05/24/2006

Rates Fringes

Electrician......................$ 23.26 10.50

LABORER: Fence Erector..........$ 20.09 8.76

LABORER: Grade Checker..........$ 19.38 6.45

LABORER: Guard Rail Installer (Excludes the installation of post, but includes the bolting of rail to post).........................$ 20.09 8.76

Laborer: Asphalt Raker...........$ 19.38 7.65

Laborers: (Common)...............$ 19.18 7.65

Laborers: (Jackhammer)...........$ 19.18 7.65

POWER EQUIPMENT OPERATOR:

(Asphalt Paver (self Propelled))......................$ 22.47 7.22

POWER EQUIPMENT OPERATOR:

(Asphalt Roller).................$ 22.30 7.22

POWER EQUIPMENT OPERATOR:

(Backhoe-Over 3/4 CY)............$ 22.05 7.47

POWER EQUIPMENT OPERATOR:

(Backhoe-Under 3/4 CY)...........$ 22.84 7.22

POWER EQUIPMENT OPERATOR:

(Broom)..........................$ 22.80 7.47

POWER EQUIPMENT OPERATOR:

(Bulldozer (When Remote Grade Control Device is Used)).........$ 22.84 7.22

POWER EQUIPMENT OPERATOR:

(Concrete Road Paver)............$ 21.67 7.22

POWER EQUIPMENT OPERATOR:

(Dragline (Under 3/4 CY))........$ 22.84 7.22

POWER EQUIPMENT OPERATOR:

(Forklift (Under 20 FT)).........$ 23.32 8.31

POWER EQUIPMENT OPERATOR:

(Grade Roller (Including Sheepsfoot)).....................$ 22.30 7.22

POWER EQUIPMENT OPERATOR:

(Guardrail Equipment Operator (Includes Punch, Auger and Combination))....................$ 23.80 10.59

POWER EQUIPMENT OPERATOR:

(Loader, Front End & Overhead (Over 4 CY and Including 7

CY)).............................$ 22.13 7.22

POWER EQUIPMENT OPERATOR:

(Loader, Front End & Overhead (Over 7 CY)).....................$ 22.59 7.47

POWER EQUIPMENT OPERATOR:

(Loader, Front End & Overhead (Up to and including 4 CY))......$ 21.33 7.22

POWER EQUIPMENT OPERATOR:

(Screed Operator)................$ 22.30 7.22

POWER EQUIPMENT OPERATOR:

(Service Oiler)..................$ 22.30 7.22

POWER EQUIPMENT OPERATOR:

(Tractor, Rubber Tired Using Backhoe).........................$ 22.30 7.22

Truck drivers: (Flat Bed, Low Boy, Truck-Hauling Equipment Trailer (40,000 GVW to

106,000 GVW))....................$ 20.06 9.70

Truck drivers: (Tank Truck including Water, Fuel, Oil Distributor, Dry Cement (40,000 GVW to 106,000 GVW)).....$ 19.80 9.10

Truck drivers: (Trucks, 106,000 GVW or Above)............$ 19.80 9.10

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .