Attachment B -Drawings.pdf
PDF 2 MB Posted
- Solicitation number
- AG-82B1-S-10-0162
About this file
Attachment B - Drawings
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IT
EM
IT
E
M
IT
E M
IT
E
M
IT
EM
IT
E M
IT
EM
IT
EM
IT
EM
IT
EM
IT
E
M
IT
EM
W O
R K
D
ES
C R
IP
T
IO
N
A cre R em S ed O
D C
B (18
X
8"
6"
C lass III
Flapper
C enturytel telephone and L incoln electric buried U tilities located under road & along road R
/W for first 3.5 M iles P rior to any excavation C ontractor shall call U
-D
IG
(755-8344 O
R 1-800-551-8344) & request utilities be located T he contract is responsible for any required repairs.
0.000 B
egin P roject @ the Jct w / F arm to M ark et road.
B egin R econditioning (B lade, Shape &
P ull the D itches)
R eestablish 4%
C row n & Super elevations w
/75' runoffs
P lace 8345 C
Y A ggregate Surfacing w / G
ov. prem ixed B entonite
A pply aggregate surfacing stablizer Solid C aC l2 94%
P ure Salt
A pply A ggregate Surfacing 4" deep 24ft surface 5.12m i.
0.010 F
ix exist 18” C M
P
- C lean & Straighten Inlet and O utlet
0.070 F
ix exist 18” C M
P
- Straighten &
C lean Inlet and O utlet
0.180 F
ix exist 18” C M
P
- E xtend O utlet 2ft
P lace 1cy R iprap on O utlet
0.280 E
xist 18” C M
P
- C lean Inlet and O utlet (N o Fix needed)
0.450 L
incoln E lectric B ox on left
0.840 E
xist 18” C M
P
- C lean Inlet and O utlet
0.880 E
xist 18” C M
P
- C lean Inlet and O utlet
0.980 E
xist 18” C M
P
- C lean Inlet and O utlet
1.030 T
elephone B ox on R ight
M
IL
E P
O S
T
8345 cubic yards Crushed Aggregate
121 Tons
(3" of stabilizer) 2% CaCl2 @ 94% Salt(47.2 tons/mile)(6.7 lbs/SY,3"depth)
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
W O
R K
D
ES
C R
IP
T
IO
N
62505 20202
20420 20420
20420 30801
31106 60250
60250 60250
25101 66050
R em S ed O
D C
B (18X
18"
36" C lass III Flapper
1.290 E
xist 18” C M
P
- C lean Inlet and O utlet
1.350 F
ix exist 18” C M
P
- Straighten &
C lean Inlet and O utlet
1.440 E
xist 18” C M
P
- C lean Inlet and O utlet
1.460 E
xisting guardrail on left begins
1.550 E
xisting guardrail on left ends
1.580 E
xist 18” C M
P
- C lean O utlet
1.650 E
xisting guardrail on left begins
1.670 E
xist 18” C M
P
P T
I C arsonite Stake C all before digging
1.680 B
egin R etaining W all on R ight
1.740 H
and place 1 cubic yard of C lass I riprap
R iprap shall be placed to arm or the scoured area behind the guardrail and above the dow nhill retaining w all.
1.770 E
xisting R etaining W all on R ight ends
1.800 B
egin R etaining W all on R ight
1.890 E
xisting R etaining W all on R ight ends
1.910 E
xisting guardrail on left ends
1.960 E
xist 18” C M
P
- C lean O utlet
2.110 Junction right FS road #2920
M
IL
E P O
S T
8345 cubic yards Crushed Aggregate
121 Tons
(3" of stabilizer) 2% CaCl2 @ 94% Salt(47.2 tons/mile)(6.7 lbs/SY,3"d
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
W O
R K
D
ES
C R
IP
T
IO
N
62505 20202
20420 20420
20420 30801
31106 60250
60250 60250
R em S ed O
D C
B (18X
18"
36" C lass III Flapper
2.220 E
xist 18” C M
P
2.340 E
xist 18” C M
P
2.540 E
xist 18” C M
P
2.680 F
S property boundry E nd 2% Solid C aC l2 @
94% Salt Stabilizer Spreading
2.810 E
xist 18” C M
P
3.340 E
xist 18” C M
P
3.550 F
ix exist 18” C M
P
- E xtend Inlet 2ft
P lace 1cy R iprap on inlet
3.920 E
xist 18” C M
P
4.060 E
xist 18” C M
P
4.280 E
xist 18” C M
P
4.470 E
xist 18” C M
P
4.900 F
ix exist 18” C M
P
- Straighten &
C lean Inlet and O utlet
5.080 M
ountain M edow s R oad F
S #542 (1st Junction)
5.120 M
ountain M edow s R oad F
S #542 (2nd Junction) E nd A gg Surfacing w
/ bentonite 4" deep 24ft surface 5.12m i.
A pply A gg Surfacing 4" deep 20ft surface 5.445 m
i. 7455 C
Y
6.107 T
rail H ead P ark ing on R ight
6.176 T
rail H ead on L eft-T r # 801
6.331 E
xist 18” C M
P
M
IL
E P O
S T
8345 cubic yards Crushed Aggregate
121 T-2% CaCl2 @ 94% 47.2 tons/mile-6.7 lbs/SY
7455 CY Crushed Aggregate
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
W O
R K
D
ES
C R
IP
T
IO
N
62505 20202
20420 20420
20420 30801
31106 60250
60250 60250
R em S ed O
D C
B (18X
18"
36" C lass III Flapper
6.455 E
xist T urnout O n R ight
6.501 E
xist 18” C M
P
6.552 E
xist T urnout O n R ight
6.611 E
xist T urnout O n R ight
6.660 E
xist 18” C M
P -C lean Inlet and O utlet
6.816 B
eing G uardrail on R ight
6.866 E
nd G uardrail O n R ight
6.930 E
xist T urnout O n R ight
7.098 E
xist 18" C M
P -Straighten Inlet
A dd 2ft extention to outlet and P lace 2cy riprap
7.316 E
xist T urnout O n R ight
7.533 E
xist 18" C M
P -C lean O utlet
7.635 E
xist T urnout O n R ight
7.657 R
em ove and R eplace 18" C M
P w ith 18" X 60' C
M P
P lace 1cy R iprap at Inlet and 1cy R iprap at O utlet
7.850 E
xist T urnout O n R ight
7.960 R
em ove and R eplace 18" C M
P w ith 18" X 40' C
M P
P lace 1cy R iprap at Inlet and 1cy R iprap at O utlet
C onstruct 10ft of outlet ditch
8.010 E
xist T urnout O n R ight
8.095 E
xist 18” C M
P
8.223 E
xist 18” C M
P 7455 cubic yards Crushed Aggregate
M
IL
E P O
S T
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
W O
R K
D
ES
C R
IP
T
IO
N
62505 20202
20420 20420
20420 30801
31106 60250
60250 60250
R em S ed O
D C
B (18X
18"
36" C lass III Flapper
8.235 E
xist T urnout O n R ight
8.483 T
rail H ead O n L eft-T
R # 800
8.495 E
xist 18” C M
P
8.507 E
xist T urnout O n R ight
8.607 E
xist 18” C M
P
8.796 P
it Site on L eft
8.869 E
xist T urnout O n R ight
8.956 E
xist 18" C M
P -C lean Inlet and O utlet
8.927 R
oad 2895 R ight-T ally L ak e C am pground
8.956 E
xist 18” C M
P
9.033 R
oad 913-W O n L eft
9.163 Install F
lapper 22ft long-D rain R ight
C onstruct 5ft outlet ditch and L ine ditch w ith 5 cy R iprap
9.203 E
xist 18"C M
P -C lean Inlet and O utlet
A dd 4ft E xtention to outlet
R econstruct O utlet ditch for 20ft L ine ditch w ith 5cy riprap
9.362 R
oad 9613 O n L eft
C lean Inlet and O utlet of 18"C M
P under 9613
P lace 1cy R iprap at Inlet and 1cy R iprap at O utlet
7455 cubic yards Crushed Aggregate
M
IL
E P O
S T
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
W O
R K
D
ES
C R
IP
T
IO
N
62505 20202
20420 20420
20420 30801
31106 60250
60250 60250
R em S ed O
D C
B (18X
18"
36" C lass III Flapper
9.493 Install 18" x 38' C
M P
-Sk ew
C onstruct C atch B asin and D itch B lock
P lace 1cy R iprap at Inlet and 1cy R iprap at O utlet
9.625 E
xist 18" C M
P -A dd 4ft to Inlet and O utlet
R econstruct C atch B asin
P lace 1cy R iprap at Inlet and 1cy R iprap at O utlet
9.844 B
egin B ridge
9.852 E
nd B ridge
9.872 C
onstruct Sedim ent B asin In R ight and L eft D itch line
9.885 R
oad O n R ight-Short R oad
Straighten Inlet on 18" C M
P under Short R oad
9.982 R
em ove E xist 28" x 20" A C
M P
-O n Sm all Stream
R eplace w ith 36" x 42' C M
P -sk ew
P lace 1cy R iprap at Inlet and 1cy R iprap at O utlet
10.033 Install 18" x 36' C
M P
In E xist D rain Sag
C onstruct C atch B asin
P lace 1cy R iprap at Inlet and 1cy R iprap at O utlet B eing P ulling D itch on right
10.193 E
xist C rest-R oad P rism
N arrow s L arge cutslope B egin B uilding up O utside Shoulder 6" depth tapering to 1" on inside shoulder to inslope road surface
10.260 A
pply P neum atic/H ydrulic Seed &
M ulch to B are Slope 0.25
100' tall x 200' w ide, 70% incline
E xist D rain Sag E nd P ulling D itch
10.333 E
nd B uilding up O utside Shoulder 6" depth tapering to 1" on inside shoulder to inslope road surface
7455 cubic yards Crushed Aggregate
M
IL
E P O
S T
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
W O
R K
D
ES
C R
IP
T
IO
N
20202 20420
20420 30801
31106 60250
60250 60250
R em S ed O
D C
B (18X
18"
36" C lass III Flapper
10.565 E
xist 57" x 38" C M
P A
-Johnson C reek
E nd A ggregate Surfacing 4" deep 20ft surface 5.445m i.
A pply A gg Surfacing 4" deep 18ft surface 1.69 m
i. 2100 C
Y
10.585 Install 22' F
lapper-D rain L eft
C onstruct Sedim ent B asin O n left
10.647 E
xist T urnout O n L eft
10.659 R
oad 5393 O n R ight
R em ove and R eplace E xist 18" under 5393 w ith 18" X 42' C
M P
10.751 E
xist T urnout O n L eft
10.809 Install 22' F
lapper-D rain L eft P lace 1cy R iprap at outlet
10.829 Install 18" x 48' C
M P
-Sk ew
75-C onstruct C atch B asin
P lace 1cy R iprap at Inlet and 1cy O utlet
10.839 R
oad 9895 O n R ight
10.923 E
xist 18"C M
P -C lean Inlet and O utlet
Straighten O utlet and A dd 4ft E xtention
10.932 E
xist T urnout O n L eft
11.019 B
egin P ulling D itch on R ight
11.039 E
nd P ulling D itch on R ight
11.060 E
xist T urnout O n R ight
11.144 E
xist T urnout O n L eft
11.178 E
xist 18" C M
P
2100 cubic yards Crushed Aggregate
M
IL
E P O
S T
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
W O
R K
D
ES
C R
IP
T
IO
N
62505 20202
20420 20420
20420 30801
31106 60250
60250 60250
R em S ed O
D C
B (18X
18"
36" C lass III Flapper
11.264 B
egin B ridge
11.273 E
nd B ridge
11.381 E
xist T urnout O n R ight
11.479 E
xist 18"C M
P -C lean Inlet and O utlet
11.510 E
xist T urnout O n R ight
11.585 E
xist T urnout O n R ight
11.618 E
xist 18"C M
P -C lean Inlet and O utlet
11.650 E
xist F lapper-C lean
11.712 E
xist T urnout O n R ight
11.771 E
xist 18"C M
P -C lean Inlet and O utlet
11.808 E
xist T urnout O n R ight
11.830 E
xist F lapper-C lean
11.878 E
xist 18"C M
P -C lean Inlet and O utlet
11.950 E
xist F lapper-C lean
11.961 E
xist 18"C M
P -C lean Inlet and O utlet
12.014 E
xist T urnout O n R ight
12.035 E
xist 18"C M
P -C lean Inlet and O utlet
12.238 L
arge P ark ing area on R ight
12.258 Jnct w
ith Star M eadow s
E nd A ggregate Surfacing 4" deep 18ft surface 1.69m
i. 2100 C
Y
E nd G ravel L aydow n
R O
A D
913 W O
R K
IT
E
M T
O T
A L
S 0.25
17900 121.0
2100 cubic yards Crushed Aggregate
M
IL
E P O
S
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
W O
R K
D
ES
C R
IP
T
IO
N
20420 20420
20420 30318
30801 31106
31107 15703 sag C
B D
II
slash
T ype 1
C enturytel telephone and E lectric buried U tilities located under road & along road R
/W for m ost all of the project.
P rior to any excavation C ontractor shall call U -D
IG
(755-8344 O
R 1-800-551-8344) request utilities be located
T he contract is responsible for any required repairs.
0.000 B
egin P roject at the junction of C ounty road # 424 (F arm to M ark
et) B egin R econditioning shape 4% crow n Item
30318, B egin G ravel Stabilization 3"(R oller C om pacted) 14ft spread 1.23 m
i. length
Item 31106 Spread 34 tons 94% pure C loride 3" deep (6.7 lbs/SY
)(27.5 tons/m i)
Item 31107 Spread 32 tons B entonite C lay 3" deep (6.3 lbs/SY
) (25.7 tons/m i)
0.050 E
xist 18” C M
P
- C lean Inlet and O utlet, Install slash filters &
1 cy R iprap
C onstruct C atchbasin & D itch block item
20420
0.153 E
xist L ead off D itch L eft (no w ork)
0.181 E
xist L ead off D itch R ight (no w ork)
0.232 E
xist 18” C M
P
- F ix Inlet and C lean O utlet, Install slash filters & 1 cy R iprap
C onstruct C atchbasin & D itch block item
20420
0.267 E
xist 18” C M
P
- C lean Inlet and O utlet, Install slash filters &
1 cy R iprap
C onstruct C atchbasin & D itch block item
20420
0.861 E
xist 18” C M
P
- C lean Inlet and O utlet, Install slash filters &
1 cy R iprap
C onstruct C atchbasin & D itch block item
20420
0.879 C
onstruct D rain D ip & shape to 4%
O utslope Install slash filters &
1 cy R iprap
0.906 E
xisiting Sag- R econstruct to 4%
O utslope Install slash filters &
1 cy R iprap
1.111 Junction L
eft - #300 B ootjack R
D
1.230 Junction F
S road #351B B ootjack L ak e road
E N
D P roject F S road 351
E N
D R econditioning (B lade, &
Shape)
E nd C row ning, E nd G ravel Stablilization
R O
A D
351 W O
R K
IT
E
M T
O T
A L
S
1.23
M
IL
E P O
S T
1.23 miles Reconditioning
Item 31106 Spread 34 tons Calcium Chloride Flake @ 94% pure Solid Salt (6.7 lbs/SY)
Item 31107 Spread 32 tons Bentonite Clay
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
IT
EM
W O
R K
D
ES
C R
IP
T
IO
N
20420 20420
30318 30801
31106 31107
15703 sag
D
II
slash T ype 1
C enturytel telephone and E lectric buried U tilities located under road & along road R
/W for m ost all of the project.
P rior to any excavation C ontractor shall call U -D
IG
(755-8344 O
R 1-800-551-8344) & request utilities be located he contract is responsible for any required repairs.
0.000 B
egin P roject at the junction w
/ C liff C
r. R oad F
S #351 B egin R econditioning shape Item
30318
0.060 E
xisiting Sag- R econstruct to 4%
O utslope Install slash filters &
1 cy R iprap
0.240 B
egin G ravel Stabilization 3"(R oller C om pacted) 18ft spread 0.15 m
i. length
Item 31107 5 tons B entonite C lay (33.3 tons/m ile)(6.3 lbs/SY
Item 31107 5 tons C alcium C hloride (35.4 tons/m ile)(6.7 lbs/SY
0.280 Install R
ubber B elt W ater diverter - 45 degree sk ew
20 feet long
0.320 Install C
M P
A 42"x 29"x 28', Install slash filters &
5 cy riprap
Spread 28 C ubic Y ards (2 bellies or 3 E nd dum
ps) com m ercial sourced crushed agg.
0.360 C
onstruct D rain D ip & shape to 4%
O utslope Install slash filters &
2 cy R iprap
Spread 28 C ubic Y ards (2 bellies or 3 E nd dum
ps) com m ercial sourced crushed agg.
0.390 E
nd G ravel Stabilization 3"(R oller C om pacted) 18ft spread 0.15 m
i. length
0.596 E
nter P rivate land *N
O W
O R
K O
N R
O A
D
* N
O R
E C
O N
D
IT
IO
N
IN
G
N
O P
A R
K
IN
G E
Q U
IP
M
E N
T
* A
C C
E
SS G
R A
N T
E D
T O
C R
O
SS L
A N
D O
N L
Y
0.901 Junction F
S road #50819 - B egin R econditioning blade & shape Item
30318
1.011 C
onstruct D rain D ip & shape to 4%
O utslope Install slash filters &
1 cy R iprap
1.079 Junction F
S road #351B B ootjack L ak e road
1.110 C
onstruct D rain D ip & shape to 4%
O utslope Install slash filters &
1 cy R iprap
1.170 E
N D
P roject F
S road 351B
E N
D R econditioning (B lade, &
Shape)
R O
A D
351B W
O R
K
IT
E M
T O
T A
L S
0.87
5.00
Item 31107 5 tons Bentonite Clay (33.3 tons/mile)(6.3 lbs/SY)
0.87 miles Reconditioning
0.87 miles Reconditioning
M
IL
E P O
S T
Item 31106 5 tons Calcium Chloride (35.4 tons/mile)(6.6.7 lbs/SY)
| Pages_Drawing_Upsize Cover Sheet (1) |
| Pages_Drawing_Upsize Schedule (1) |
| Pages_Drawing_Upsize RL1 (1) |
| Pages_Drawing_Upsize RL2 (1) |
| Pages_Drawing_Upsize RL3 (1) |
| Pages_Drawing_Upsize RL4 (1) |
| Pages_Drawing_Upsize RL5 (1) |
| Pages_Drawing_Upsize RL6 (1) |
| Pages_Drawing_Upsize RL7 (1) |