ATTACHMENT A: SPECIFIC WORK ITEMS FOR EACH BUILDING
ANT FLAT OFFICE Building # 2825
1. Mobilize Item 1.1
2. Remove existing shingle roofing from office and porches. Item 1.1
3. Remove felt paper if present. Item 1.1
4. Inspect roof for damage or rot. It is anticipated that all of the sheathing on this structure is in good condition. Item 1.1
5. Remove and replace areas agreed to by the CO. Item 1.2
6. Place ice and water shield underlayment over the entire roof. Item 1.1
7. Place shingles, flashings, and ridges. Ridges are shingle. Item 1.1
8. Clean up site. Item 1.1
FAIRVIEW OFFICE Building # 2824
1. Mobilize. Item 2.1
2. Office: Remove existing metal roofing. Remove felt paper if present. Metal roofing is designated for salvage. Stockpile at location designated by the CO on site. Item 2.1
3. Porch: Remove existing shakes and felt paper from porch roof. Item 2.1
4. Inspect roof for damage or rot. It is anticipated that most of the sheathing on this structure is in good condition. Item 2.1
5. Office: Remove existing sheathing being careful not to damage. Item 2.3
6. Office: Install rafters from wall to ridge adjacent and fastened to existing rafters. Estimated rafter is 2x4x13 feet. Match size of existing framing member. Place with crown up. Remove only enough insulation to allow placement of new rafter. Fasten new rafter to existing with 10d galvanized nails spaced 12 on center, 3/4 inch from edge and staggered. Actual end treatment will be determined after the roof is opened. Item 2.3
7. Replace sheathing removed in number 6 above. Item 2.3
Note: Office: Solid sheath to a minimum 6 feet from eave. Place 2 courses of ice and water shield from rake to rake. Above this point to preserve the appearance of skip sheathing, place 2” to 2 1/2”board between 1x10 sheathing. 2” to 2 ½” boards to run wall to wall and 1x10 to run rake to rake. Place ice and water shield on remainder of roof from wall to wall, above the second course do not place ice and water shield on the gable overhang.
8. Replace areas agreed to by the CO. Match existing sheathing, appears to be 1x10 on the office and 1x12 on the porch. Item 2.2
Office: Agreed areas replaced and additional area needed to produce required spacing will be compensated under schedule item 2.2.
Porch: Contractor’s option to remove shingle and felt paper nails from existing sheathing without damaging sheathing or replace sheathing with same size, quality, and species. Only areas replaced due to rot will be compensated under pay item 2.2.
9. Place ice and water shield underlayment over the entire roof. Item 2.1
10. Place shingles, flashings, and ridges. Ridges are board. Item 2.1
11. Clean up site. Item 2.1
FAIRVIEW STORAGE SHED Building # 2627
1. Mobilize. Item 3.1
2. Remove existing shingle roofing. Remove felt paper if present. Item 3.1
3. Inspect roof for damage or rot. It is anticipated that all of the sheathing on this structure is bad.
Item 3.1
4. Remove and replace areas agreed to by the CO. Solid sheath roof. Use 1x8 No. 1 Doug Fir/Larch for replacement sheathing. Item 3.2
5. Place ice and water shield underlayment over entire roof. Item 3.1
6. Replace broken fascia. Estimated to be 1x6 Cedar. Item 3.1
7. Place shingles, flashings, and ridges. Ridges are board. Item 3.1
8. Clean up site. Item 3.1
MEADOW PEAK LOOKOUT Building # 4202
1. Mobilize. Item 4.1
2. Remove lightning protection air terminal and conductors as needed to complete the work.
Item 4.1
3. Remove existing metal roofing. Remove felt paper if present. Item 4.1
4. Remove existing chimney without damaging. Stockpile for removal by Forest Service. Item 4.1
5. Inspect roof for damage or rot. It is anticipated that all of the sheathing on this structure is in good condition. Item 4.1
6. Remove and replace areas agreed to by the CO. Match existing sheathing, appears to be 1x8 tongue and groove. Item 4.2
7. Install sheathing where chimney removed. Cut existing sheathing to provide one half the width of the existing rafter for support. Remove boards full width, do not rip. Item 4.2
8. Place ice and water shield underlayment over entire roof. Item 4.1
9. Place shingles, flashings, and ridges. Ridges are shingle. Item 4.1
10. Reinstall lightning protection air terminal and conductors. Fasten conductors at midpoint of ridgeline and to facsia. Fasteners to be compatible with conductor metal. Item 4.1
11. Clean up site. Item 4.1
SEX PEAK LOOKOUT Building # 4013
1. Mobilize. Item 5.1
2. Remove lightning protection air terminal and conductors as needed to complete the work.
Item 5.1
3. Remove existing shingle roofing and flashing. Remove felt paper if present. Item 5.1
4. Remove existing chimney without damaging. Stockpile for removal by Forest Service. Item 5.1
5. Inspect roof for damage or rot. It is anticipated that all of the sheathing on this structure is in good condition. Item 5.1
6. Remove and replace areas agreed to by the CO. Match existing sheathing, appears to be 1x8 tongue and groove. Item 5.2
7. Install Government furnished chimney. Item 5.1
In the event the opening for the chimney needs to be smaller. Fill in by the following. Cut existing sheathing to provide one half the width of the existing rafter for support. Remove boards full width, do not rip. Item 5.2
8. Place ice and water shield underlayment over entire roof. Item 5.1
9. Place shingles, flashings, and ridges. Ridges are shingle. Item 5.1
10. Reinstall lightning protection air terminal and conductors. Fasten conductors at maximum 3 foot interval. Fasteners to be compatible with conductor metal. Item 5.1
11. Clean up site. Item 5.1
File details come from the government source that posted it. Updated .