Description_Statement.docx
DOCX document 18 KB Posted
- Solicitation number
- AG-82B1-S-10-0122
About this file
Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Award intent.pdf | ||
| SF 30 AMEND 1.PDF | ||
| SPECS.pdf | ||
| SF18.PDF | ||
| AG-82B1-S-10-0122.pdf | ||
| PLANS.pdf | ||
| Wage Determination.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lake Creek Trail Bridge Rehabilitation Page C1 Section C
SECTION C – DESCRIPTION/SPECIFICATION/WORK STATEMENT
C.1 SCOPE OF WORK
Furnish all material, equipment, transportation, labor and supervision necessary to rehabilitate the Lake Creek Trail Bridge. The Lake Creek Trail Bridge crosses Lake Creek at Milepost 6.0 on Forest Trail 523. This project will replace the deck, running planks, curbs; paint the steel super structure, and install approach rails. Work for these projects shall include the following:
1. Removal, transportation from site, and disposal off Government lands of all replaced material shown in the PLANS and stated in the SPECIFICATIONS.
2. Replace deck, curbs and running planks.
3. Paint the steel superstructure.
4. Perform minor trail work leading to and away from the bridge.
5. Install approach railing.
C.2 LOCATION OF WORK
Lake Creek Trail Bridge:
The existing trail bridge is located on a National Forest Service Trail (NFST) 523, which accesses the San Juan National Forest.
The Lake Creek Trail Bridge No. 523-6.0 located on the Columbine Ranger District of the San Juan National Forest in Section 4, T37N, R5W, N.M.P.M., approximately15 miles northeast of Bayfield, Colorado via National Forest Service Road (NFSR) 602.
File details come from the government source that posted it. Updated .