Attachment to A-004 detailing additions to Section C-1

View the file

Other files

File Type Posted
AG-82B1-S-10-0112.pdf PDF
Amendment 005 S-10-0112.pdf PDF
Amendment 004 S-10-0112.pdf PDF
Page 2 continuation of Amendment No 003 S-10-0112.docx DOCX document
Amendment 003 S-10-0112.pdf PDF
South Zone Bridge Upgrade 14 to 26.pdf PDF
A-2- S-10-0112.pdf PDF
FP-03 SUPPLEMENTAL SPECS.doc DOC document
A-1-10-0112.txt.pdf PDF
S-10-0112 B-M.doc DOC document
S-10-0112 map and drawings South Zone Bridge Upgrade 1 to 13.pdf PDF
db Idaho wage rates.txt TXT text file
S-10-0112 CliffCrBridge map and drawings-Final.pdf PDF
S-10-0112 Cover Pages.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION C - DESCRIPTION AND SPECIFICATIONS

C- 1 - PROJECT DESCRIPTION AND LOCATION

(f) - Start Work. It is estimated that the notice to proceed under this contract will be issued in early February of 2010 to facilitate the contract submittal process and contractor’s ordering of prestressed concrete beams, precast concrete bridge components and treated timber bridge materials. On site work is anticipated for July 15, 2010 through October 1, 2011 (See mandatory Period of Performance for Cliff Creek Bridge No. 326-3.2 Replacement, Little NF Clearwater Bridge No 301-32.0 Repairs and St. Joe River Bridge No. 715-0.0 Repairs below).

(g) - Period of Performance. See Part 1, Section F, Clause 53.211-10. All work under this contract has a completion date of October 1, 2011 with a mandatory construction period for specific phases of the project as follows:

· Cliff Creek Bridge Replacement – Due to this section of Road No. 326 being the concessionaire bus route for the Route of the Hiawatha Trail facility, this portion of the project must be completed between September 20, 2010 and October 15, 2010. See Section 156 of Supplemental Specification for the 12 day Road Closure Period allowed for the Cliff Creek Bridge replacement.

· Treated Timber Bridge Repairs – Due to the time it takes to secure the treated timber bridge components, number of bridge repair sites and fish window restrictions, this portion of the project will be completed by October 1, 2011. Repair of the following two treated timber bridges must be completed during the 2011 construction season. Refer to Subsection (h) - Restrictions below for in-stream work restrictions.

· Little North Fork Clearwater River Bridge Road No. 301-32.0

· St. Joe River Bridge No. 715-0.0

(h) - Restrictions.

Color Key for In-stream Work Dates:

July 15 – Sept. 1

July 15 – Aug. 5

July 15 – Oct. 31

Cliff Creek Bridge Replacement & Avery/Red Ives Treated Timber Bridge Repairs

Construction Site
In-stream Work Period
Stream
Fish Bearing
Brief Description of Major In-Stream Work
Cliff Creek Bridge No. 326-3.2 Replacement
July 15 – Oct. 31

Mandatory 2010 Construction

Cliff Creek
Y
Existing bridge removal. riprap keyway excavation and riprap section construction
Frazier Creek Bridge No. 326-2.1
July 15 – Oct. 31
Frazier Creek
Y
None
Manhattan Creek Bridge No. 326-7.0
July 15 – Oct. 31
Manhattan Creek
Y
Wingwall and abutment post replacements and reinforcements
Ward Creek Bridge No. 326-9.0
July 15 – Oct. 31
Ward Creek
Y
Wingwall post relacement
Adair Creek Bridge No. 1268-4.8
July 15 – Sept. 1
Adair Creek
Y
None
Little NF Clearwater River Bridge No. 301-32.0
July 15 – Aug. 5

Mandatory 2011 Construction

Little NF Clearwater River
Y
Mid-span pier abutment post and backing plank repairs, reinforce existing abutment posts and replace wingwall posts
Gold Creek Bridge No. 1222-0.0
July 15 – Sept. 1
Gold Creek
Y
None
Red Ives Creek Bridge No. 218-9.9
July 15 – Sept. 1
Red Ives Creek
Y
None
Red Ives Creek Bridge No. 320-0.1
July 15 – Sept. 1
Red Ives Creek
Y
Abutment settlement mitigation work (jacking & grouting) and keyed riprap
St Joe River Bridge No. 715-0.0
July 15 – Aug. 5

Mandatory 2011 Construction

St. Joe River
Y
Gabion basket installation for abutment scour protection, replace abutment and wingwall posts and place riprap
Heller Sherlock Creek Bridge No. 320-15.5
July 15 – Sept. 1
Heller Sherlock Creek
Y
Gabion basket installation for abutment scour protection and replace abutment and wingwall posts.
Medicine Creek Bridge No. 320-19.7
July 15 – Sept. 1
Medicine Creek
Y
Reinforce existing abutment posts