SZ Timber Bridge Repairs Section C S-10-0112.docx
DOCX document 21 KB Posted
- Solicitation number
- AG-82B1-S-10-0112
About this file
Attachment to A-004 detailing additions to Section C-1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-82B1-S-10-0112.pdf | ||
| Amendment 005 S-10-0112.pdf | ||
| Amendment 004 S-10-0112.pdf | ||
| Page 2 continuation of Amendment No 003 S-10-0112.docx | DOCX document | |
| Amendment 003 S-10-0112.pdf | ||
| South Zone Bridge Upgrade 14 to 26.pdf | ||
| A-2- S-10-0112.pdf | ||
| FP-03 SUPPLEMENTAL SPECS.doc | DOC document | |
| A-1-10-0112.txt.pdf | ||
| S-10-0112 B-M.doc | DOC document | |
| S-10-0112 map and drawings South Zone Bridge Upgrade 1 to 13.pdf | ||
| db Idaho wage rates.txt | TXT text file | |
| S-10-0112 CliffCrBridge map and drawings-Final.pdf | ||
| S-10-0112 Cover Pages.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION C - DESCRIPTION AND SPECIFICATIONS
C- 1 - PROJECT DESCRIPTION AND LOCATION
(f) - Start Work. It is estimated that the notice to proceed under this contract will be issued in early February of 2010 to facilitate the contract submittal process and contractor’s ordering of prestressed concrete beams, precast concrete bridge components and treated timber bridge materials. On site work is anticipated for July 15, 2010 through October 1, 2011 (See mandatory Period of Performance for Cliff Creek Bridge No. 326-3.2 Replacement, Little NF Clearwater Bridge No 301-32.0 Repairs and St. Joe River Bridge No. 715-0.0 Repairs below).
(g) - Period of Performance. See Part 1, Section F, Clause 53.211-10. All work under this contract has a completion date of October 1, 2011 with a mandatory construction period for specific phases of the project as follows:
· Cliff Creek Bridge Replacement – Due to this section of Road No. 326 being the concessionaire bus route for the Route of the Hiawatha Trail facility, this portion of the project must be completed between September 20, 2010 and October 15, 2010. See Section 156 of Supplemental Specification for the 12 day Road Closure Period allowed for the Cliff Creek Bridge replacement.
· Treated Timber Bridge Repairs – Due to the time it takes to secure the treated timber bridge components, number of bridge repair sites and fish window restrictions, this portion of the project will be completed by October 1, 2011. Repair of the following two treated timber bridges must be completed during the 2011 construction season. Refer to Subsection (h) - Restrictions below for in-stream work restrictions.
· Little North Fork Clearwater River Bridge Road No. 301-32.0
· St. Joe River Bridge No. 715-0.0
(h) - Restrictions.
Color Key for In-stream Work Dates:
July 15 – Sept. 1
July 15 – Aug. 5
July 15 – Oct. 31
Cliff Creek Bridge Replacement & Avery/Red Ives Treated Timber Bridge Repairs
| Construction Site |
| In-stream Work Period |
| Stream |
| Fish Bearing |
| Brief Description of Major In-Stream Work |
| Cliff Creek Bridge No. 326-3.2 Replacement |
| July 15 – Oct. 31 |
Mandatory 2010 Construction
| Cliff Creek |
| Y |
| Existing bridge removal. riprap keyway excavation and riprap section construction |
| Frazier Creek Bridge No. 326-2.1 |
| July 15 – Oct. 31 |
| Frazier Creek |
| Y |
| None |
| Manhattan Creek Bridge No. 326-7.0 |
| July 15 – Oct. 31 |
| Manhattan Creek |
| Y |
| Wingwall and abutment post replacements and reinforcements |
| Ward Creek Bridge No. 326-9.0 |
| July 15 – Oct. 31 |
| Ward Creek |
| Y |
| Wingwall post relacement |
| Adair Creek Bridge No. 1268-4.8 |
| July 15 – Sept. 1 |
| Adair Creek |
| Y |
| None |
| Little NF Clearwater River Bridge No. 301-32.0 |
| July 15 – Aug. 5 |
Mandatory 2011 Construction
| Little NF Clearwater River |
| Y |
| Mid-span pier abutment post and backing plank repairs, reinforce existing abutment posts and replace wingwall posts |
| Gold Creek Bridge No. 1222-0.0 |
| July 15 – Sept. 1 |
| Gold Creek |
| Y |
| None |
| Red Ives Creek Bridge No. 218-9.9 |
| July 15 – Sept. 1 |
| Red Ives Creek |
| Y |
| None |
| Red Ives Creek Bridge No. 320-0.1 |
| July 15 – Sept. 1 |
| Red Ives Creek |
| Y |
| Abutment settlement mitigation work (jacking & grouting) and keyed riprap |
| St Joe River Bridge No. 715-0.0 |
| July 15 – Aug. 5 |
Mandatory 2011 Construction
| St. Joe River |
| Y |
| Gabion basket installation for abutment scour protection, replace abutment and wingwall posts and place riprap |
| Heller Sherlock Creek Bridge No. 320-15.5 |
| July 15 – Sept. 1 |
| Heller Sherlock Creek |
| Y |
| Gabion basket installation for abutment scour protection and replace abutment and wingwall posts. |
| Medicine Creek Bridge No. 320-19.7 |
| July 15 – Sept. 1 |
| Medicine Creek |
| Y |
| Reinforce existing abutment posts |
File details come from the government source that posted it. Updated .