Location Map and 11 Drawings Cliff Creek Bridge

View the file

Other files

File Type Posted
AG-82B1-S-10-0112.pdf PDF
Amendment 005 S-10-0112.pdf PDF
Amendment 004 S-10-0112.pdf PDF
SZ Timber Bridge Repairs Section C S-10-0112.docx DOCX document
Page 2 continuation of Amendment No 003 S-10-0112.docx DOCX document
Amendment 003 S-10-0112.pdf PDF
South Zone Bridge Upgrade 14 to 26.pdf PDF
A-2- S-10-0112.pdf PDF
FP-03 SUPPLEMENTAL SPECS.doc DOC document
A-1-10-0112.txt.pdf PDF
S-10-0112 B-M.doc DOC document
S-10-0112 map and drawings South Zone Bridge Upgrade 1 to 13.pdf PDF
db Idaho wage rates.txt TXT text file
S-10-0112 Cover Pages.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NO. DATEBYREVISION DESCRIPTION

SHEET NO.

SET NO.

PROJECT:

DATE:SHEET INDEX OCTOBER 23, 2009

1-09172

BRIDGE #2075

SHEET 1 COVER

SHEET 2 GENERAL NOTES & QUANTITIES

SHEET 3 TYPICAL BRIDGE & ROADWAY SECTION

SHEET 4 ROAD PLAN & PROFILE

SHEET 5 BRIDGE ELEVATION & ABUTMENT DETAILS

SHEET 6 ABUTMENT PLAN & ELEVATION

SHEET 7 ABUTMENT DETAILS

SHEET 8 SUPERSTRUCTURE PLAN

SHEET 9 SUPERSTRUCTURE DETAILS

SHEET 10-12 ROADWAY CROSS SECTIONS

CLIFF CREEK BRIDGE

(F.S. ROAD NO. 326 M.P. 3.2)

CONSTRUCTION PLANS FOR

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REGION ONE

Falls Twin

Boise

Home Mountain

Lewiston

Grangeville

Meadows New

St Maries

Coeur D'Alene

Sandpoint

Pocatello

Burley

Shoshone

Arco

Rigby

Idaho Falls

Salmon

Kooskia

Pierce PROJECT LOCATION

IDAHO PANHANDLE NATIONAL FORESTS

ST. JOE RANGER DISTRICT

SHOSHONE COUNTY, IDAHO

PROJECT LOCATION

DATE

DATE

DATE

DATE

APPROVED:

RECOMMENDED:

REVIEWED:

APPROVED:

PLANS PREPARED BY:

RYAN ELLIOTT, E.I.

QA/QC BY:

KARL YAKAWICH, P.E.

SECTION 10, TOWNSHIP 46 N, AND RANGE 6 E

THIS PROJECT

- WASTE AREA

CLIFF CREEK BRIDGE

GENERAL NOTES & QUANTITIES

ROAD NO. 326- M.P. 3.2

IDAHO PANHANDLE NATIONAL FORESTS

1-09172 OCTOBER 23, 2009

SHEET NO.

2 OF 12RME

RME

KFY

KFY

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

(406)449-8627 REGION ONE

PREPARED BY:

PROJECT:

DESIGNED:

DRAWN:

DESIGN CHECKED:

DRAWING CHECKED:

DATE: NO. DATEBYREVISION DESCRIPTION

ITEM DESCRIPTION

METHOD OF

MEASUREMENT

UNIT QUANTITY

15101 MOBILIZATION LSQ LS 1

15221 CONSTRUCTION SURVEY AND STAKING LSQ LS 1

15713 SOIL EROSION AND POLLUTION CONTROL LSQ LS 1

20304 REMOVAL OF EXISTING BRIDGE LSQ LS 1

20411 ROADWAY EMBANKMENT DQ CY 260

20806 STRUCTURE EXCAVATION LSQ LS 1

20808 STRUCTURAL BACKFILL LSQ LS 1

25101 PLACED RIPRAP, CLASS 5 (COMMERCIAL SOURCE) DQ CY 135

27250 GEOCELL ABUTMENT STABILIZATION, 6 INCH DEPTH AQ SY 32

30801 CRUSHED AGGREGATE, COMPACTION METHOD 1 (COMMERCIAL SOURCE) DQ CY 90

553A01 PRECAST CONCRETE MEMBER, GRADE BEAMS & WINGWALLS LSQ LS 1

55301 PRECAST PRESTRESSED CONCRETE MEMBER, TRIDECK BEAMS AQ EA 3

62201a HYDRAULIC EXCAVATOR WITH THUMB AQ HR 8

62201b LARGE DUMP TRUCK AQ HR 8

62528 SEEDING, DRY METHOD LSQ LS 1

63305 POSTS, WOOD AQ LF 36

63306 OBJECT MARKERS, TYPE 3 AQ EA 4

*INFORMATIONAL ONLY - NOT FOR BIDDING PURPOSES - REFER TO BID SCHEDULE

GENERAL NOTES:

TYPICAL BRIDGE & ROADWAY SECTION

ROAD NO. 326- M.P. 3.2

IDAHO PANHANDLE NATIONAL FORESTS

1-09172 OCTOBER 23, 2009

SHEET NO.

3 OF 12RME

RME

KFY

KFY

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

(406)449-8627 REGION ONE

PREPARED BY:

PROJECT:

DESIGNED:

DRAWN:

DESIGN CHECKED:

DRAWING CHECKED:

DATE: NO. DATEBYREVISION DESCRIPTION

DESCRIPTION NORTHING EASTING ELEVATION

STA. 2+45 BEGIN ROADWORK 4833.07 4718.20 993.73

STA. 2+60 4845.85 4726.04 994.65

STA. 2+80 4862.90 4736.50 995.88

STA. 3+00 4879.95 4746.96 997.11

STA. 3+20 4897.00 4757.42 998.34

STA. 3+30.56 PC 4906.00 4762.94 998.99

STA. 3+40 4913.84 4768.19 999.57

STA. 3+60 4928.96 4781.24 1000.80

STA. 3+80 4941.70 4796.63 1002.03

STA. 4+00 4951.72 4813.91 1003.18

STA. 4+20 4958.73 4832.62 1003.86

STA. 4+34.93 PT 4961.88 4847.20 1004.00

STA. 4+35.60 ℄ BEARING 4961.98 4847.86 1004.00

STA. 4+85.60 ℄ BEARING 4969.49 4897.30 1004.00

STA. 5+04.13 PC 4972.27 4915.62 1003.63

STA. 5+20 4976.54 4930.86 1003.36

STA. 5+40 4986.93 4947.86 1003.20

STA. 5+60 5001.98 4960.91 1003.26

STA. 5+80 5020.27 4968.79 1003.52

STA. 5+87.89 PT 5028.01 4970.30 1003.69

STA. 6+00 5040.02 4971.89 1004.00

STA. 6+20 5059.85 4974.51 1004.69

STA. 6+30 END ROADWORK 5069.76 4975.82 1005.11

N O R T H

CLIFF CREEK BRIDGE

ROAD PLAN & PROFILE

ROAD NO. 326- M.P. 3.2

IDAHO PANHANDLE NATIONAL FORESTS

1-09172 OCTOBER 23, 2009

SHEET NO.

4 OF 12RME

RME

KFY

KFY

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

(406)449-8627 REGION ONE

PREPARED BY:

PROJECT:

DESIGNED:

DRAWN:

DESIGN CHECKED:

DRAWING CHECKED:

DATE: NO. DATEBYREVISION DESCRIPTION

POINT NORTHING EASTING ELEVATION DESCRIPTION

CP1 5000.00 5000.00 1000.00 REBAR W/ CAP

CP2 5107.49 5000.00 1006.06 REBAR W/ CAP

CP3 4963.59 4904.09 1002.62 REBAR W/ CAP

CP4 4941.62 4816.13 1001.96 REBAR W/ CAP

CP5 5000.27 4808.61 1028.16 REBAR W/CAP

CP6 4793.24 4700.41 992.00 REBAR W/ CAP

NOTES:

C

LI

FF

C

R

EE

K

R O

A D

N O

. 3

ROAD NO. 326

R O

A D

N O

. 5

NOTE:

PROJECT:

DESIGNED:

DRAWN:

DESIGN CHECKED:

DRAWING CHECKED:

DATE: NO. DATEBYREVISION DESCRIPTION

CLIFF CREEK BRIDGE

BRIDGE ELEVATION & ABUTMENT DETAILS

ROAD NO. 326- M.P. 3.2

IDAHO PANHANDLE NATIONAL FORESTS

1-09172 OCTOBER 23, 2009

SHEET NO.

5 OF 12RME

RME

KFY

KFY

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

(406)449-8627 REGION ONE

PREPARED BY:

DRAWN:

DESIGN CHECKED:

DRAWING CHECKED:

DATE: NO. DATEBYREVISION DESCRIPTION

CLIFF CREEK BRIDGE

ABUTMENT PLAN & ELEVATION

ROAD NO. 326- M.P. 3.2

IDAHO PANHANDLE NATIONAL FORESTS

1-09172 OCTOBER 23, 2009

SHEET NO.

6 OF 12RME

RME

KFY

KFY

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

ABUTMENT DETAILS

ROAD NO. 326- M.P. 3.2

IDAHO PANHANDLE NATIONAL FORESTS

1-09172 OCTOBER 23, 2009

SHEET NO.

7 OF 12RME

RME

KFY

KFY

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

(406)449-8627 REGION ONE

PREPARED BY:

PROJECT:

DESIGNED:

DRAWN:

DESIGN CHECKED:

DRAWING CHECKED:

DATE: NO. DATEBYREVISION DESCRIPTION

DRAWN:

DESIGN CHECKED:

DRAWING CHECKED:

DATE: NO. DATEBYREVISION DESCRIPTION

CLIFF CREEK BRIDGE

SUPERSTRUCTURE PLAN

ROAD NO. 326- M.P. 3.2

IDAHO PANHANDLE NATIONAL FORESTS

1-09172 OCTOBER 23, 2009

SHEET NO.

8 OF 12RME

RME

KFY

KFY

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

(406)449-8627 REGION ONE

PRESTRESSED BEAM NOTES:

DRAWN:

DESIGN CHECKED:

DRAWING CHECKED:

DATE: NO. DATEBYREVISION DESCRIPTION

CLIFF CREEK BRIDGE

SUPERSTRUCTURE DETAILS

ROAD NO. 326- M.P. 3.2

IDAHO PANHANDLE NATIONAL FORESTS

1-09172 OCTOBER 23, 2009

SHEET NO.

9 OF 12RME

RME

KFY

KFY

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

ROADWAY CROSS SECTIONS

ROAD NO. 326- M.P. 3.2

IDAHO PANHANDLE NATIONAL FORESTS

1-09172 OCTOBER 23, 2009

SHEET NO.

10 OF 12RME

RME

KFY

KFY

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

(406)449-8627 REGION ONE

PREPARED BY:

PROJECT:

DESIGNED:

DRAWN:

DESIGN CHECKED:

ROAD NO. 326- M.P. 3.2

IDAHO PANHANDLE NATIONAL FORESTS

1-09172 OCTOBER 23, 2009

SHEET NO.

11 OF 12RME

RME

KFY

KFY

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

(406)449-8627 REGION ONE

PREPARED BY:

PROJECT:

DESIGNED:

DRAWN:

DESIGN CHECKED:

ROAD NO. 326- M.P. 3.2

IDAHO PANHANDLE NATIONAL FORESTS

1-09172 OCTOBER 23, 2009

SHEET NO.

12 OF 12RME

RME

KFY

KFY

engineering

2501 BELT VIEW DRIVE

HELENA, MT 59601

(406)449-8627 REGION ONE

PREPARED BY:

PROJECT:

DESIGNED:

DRAWN:

DESIGN CHECKED:

File details come from the government source that posted it. Updated .