Best Management Practices 10-0026.docx
DOCX document 32 KB Posted
- Solicitation number
- AG-82B1-S-10-0026
About this file
Best Management Practices Directive Attachment (4 pages)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A-4 10-0026.pdf | ||
| A-3 S-10-0026.pdf | ||
| A-3 S-10-0026.pdf | ||
| A-2 S-10-0026.pdf | ||
| A- 001 S-10-0026.pdf | ||
| S- 10-0026 B .docx | DOCX document | |
| Wage Determination Montana.txt | TXT text file | |
| FP03 FS Specs_Blue Sky.doc | DOC document | |
| blue sky maps and drawings.pdf | ||
| Blue Sky Spec Cover Page.docx | DOCX document | |
| 10-0026 cover.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Best Management Practices (BMPs)
SITE SPECIFIC BEST MANAGEMENT PRACTICES.
Description of the soil and water conservation practices from the Forest Service Soil and Water Conservation Practices Handbook (FSH 2509.22) will be applied in all alternatives. The location where the practices will be applied is specified in the table below. For a more detailed description of a specific Best Management Practice (BMP), refer to the Soil and Water Conservation Handbook.
| Abbreviations used in this table: | |
| KNF = Kootenai National Forest | AQS = Aquatic Specialist (Fish Biologist or Hydrologist) |
| COR = Contracting Officer's Rep. |
| SWCP |
| SWCP OBJECTIVE |
| APPLICABLE UNITS/ROADS |
| RECOMMENDED BEST MANAGEMENT PRACTICES BY IDT/TSA |
| CONSIDERATIONS FOR BEST MANAGEMENT PRACTICES |
| PERSON (S) |
RESPONSIBLE
CONTRACT
CLAUSES
| 15.01 |
| GENERAL GUIDELINES FOR TRANSPORTATION PLANNING - To introduce soil and water resource considerations into transportation planning. |
| 114 |
| 1. Transportation plans include installing and maintaining proper drainage. |
| The AQS has evaluated watershed characteristics and has estimated the response of fish and water resources to proposed transportation alternatives and activities. |
| COR |
| N/A |
| 15.02 |
| GENERAL GUIDELINES FOR THE LOCATION AND DESIGN OF ROADS AND TRAILS - To locate and design roads and trails with minimal soil and water impact while considering all design criteria. |
| 114 |
| 1. Follow INFISH Standards and Guidelines for Road Management. |
| The Design Team has insured that the location and design of roads and trails are based on multiple resource objectives. Mitigation measures have been designed to protect the fish and water resources. Contract provisions will be prepared by the COR that meet the fish and water resource protection requirements |
| COR |
| N/A |
| 15.03 |
| ROAD AND TRAIL EROSION CONTROL PLAN - To prevent, limit, and mitigate erosion, sedimentation, and resulting water quality degradation prior to the initiation of construction by timely implementation of erosion control practices. |
| 114 |
| 1. Seed cut and fill slopes. |
2. Ditching.
3. Proper drainage.
4. Road grade breaks.
5. Limit amount of road.
6. Avoid wet areas.
7. See 15.02 from BMP form 4.
| AQS has established soil/water conservation objectives, and mitigation measures. COR will then prepare a contract that reflects the objectives. COR will see that erosion control measures are approved and completed in a timely manner. AQS will review project to check effectiveness of erosion control features. |
| AQS, COR |
| B(T)6.31 |
B(T)6.5 B(T)6.6 C(T)6.3
| 15.04 |
| TIMING OF CONSTRUCTION ACTIVITIES - To minimize erosion by conducting operations during minimal runoff periods. |
| 114, Bridge replacement |
| 1. Construction timing between July 15th and August 30th. |
| AQS/COR has outlined detailed erosion control measures in design and Biological Assessment. COR puts these measures into contract provisions. Compliance is assured by COR. |
| AQS, COR |
| C(T)6.3 |
C(T)6.311 B(T)6.31 B(T)6.6
SPS 204
| 15.05 |
| SLOPE STABILIZATION AND PREVENTION OF MASS FAILURES - To reduce sedimentation by minimizing the chances for road-related mass failures, including landslides and embankment slumps. |
| 114, Trail |
| 1. Seed cut and fill slopes. |
| Correct slope construction. |
Use approved seed mix.
COR
| 15.06 |
| MITIGATION OF SURFACE EROSION AND STABILIZATION OF SLOPES - To minimize soil erosion from road cutslopes, fill slopes, and travelways. |
| 114, Trail |
| 1. Seed cut and fill slopes. |
| Correct slope construction. |
Use approved seed mix.
| COR |
| Std Spec. 50.4, 203, 204, 206A 210, 212, 412 619, 625, 626 629, 630 B(T)6.31 B(T)6.6, B(T)6.62 B(T)6.65 B(T)6.66, C(T)5.2 C(T)5.23, C(T)5.4 C(T)5.441 C(T)5.46, C(T)6.36 C(T)6.52 C(T)6.6, C(T)6.601 C(T)6.622 |
| 15.07 |
| CONTROL OF PERMANENT ROAD DRAINAGE - To minimize the erosive effects of concentrated water and the degradation of water quality by proper design and construction of road drainage systems and drainage control structures. |
| 114 |
| 1. Avoid long, steep grades. |
2. Adequate surface drainage.
3. Prevent erosion of culvert fills.
| Design Team identified locations, design criteria, drainage control features, and mitigation. Compliance will be assured by the COR. |
| COR, Design team |
| B(T)5.4 |
B(T)5.41 C(T)5.4 C(T)5.42 B(T)6.6 C(T)6.3 C(T)6.6
| 15.09 |
| TIMELY EROSION CONTROL MEASURES ON INCOMPLETE ROADS AND STREAM CROSSING PROJECTS - To minimize erosion of and sedimentation from disturbed ground on incomplete projects. |
| 114, Bridge |
| 1. Restrict construction season from July 15th to August 30th. |
| Fish Biologist has identified project location and mitigative measures analysis for the BA. Protective measures will be kept current on all areas of disturbed, erosion-prone areas. COR ensures contract compliance. |
| COR |
| B(T)6.31 |
B(T)6.6 B(T)5.23 B(T)6.65
| 15.10 |
| CONTROL OF ROAD CONSTRUCTION, EXCAVATION, AND SIDE-CAST MATERIAL - To reduce sedimentation from unconsolidated excavated and side-cast material caused by road reconstruction, and trail construction. |
| 114 and Trail |
| 1. Pull material onto road during blading. |
| COR and Design Team has identified project location and mitigative measures. Protective measures will be kept current on all areas of disturbed, erosion-prone areas. COR ensures contract compliance. |
| COR, Design team |
| C(T)5.4 |
Std Spec 203
SPS 204
| 15.11 |
| SERVICING AND REFUELING EQUIPMENT - To prevent contamination of waters from accidental spills of fuels, lubricants, bituments, and other harmful materials. |
| 114 |
| 1. Proper fuel storage and transportation. |
2. Fuel away from streams.
3. A minimum of one HAZMAT spill containment kit on site during project.
| COR will designate the location, size and uses of service refueling areas. All projects will adhere to the KNF Hazardous Substance Spill Plan in case of accidents. |
| COR |
| C(T)6.221 |
B(T)6.34 C(T)6.34
| 15.12 |
| CONTROL OF CONSTRUCTION IN RIPARIAN AREAS - To minimize the adverse effects on riparian areas form roads. |
| 114 |
| 1. Seed cut and fill slopes. |
2. Install silt fence at base of constructed fill slopes.
| COR will provide oversight during project. |
| COR |
| B(T)6.5 |
B(T)6.61 C(T)6.50 Std Spec 206 206A
| 15.13 |
| CONTROLLING IN-CHANNEL EXCAVATION - To minimize stream channel disturbances and related sediment production. |
| 114 |
| 1. Minimize time in the stream. |
2. Minimize directly dumping dirt into the stream.
3. Minimize the number of stream crossings. Maximum of 4 over-and-back crossings allowed.
| All in channel work will be conducted between July 15th and August 30th. |
| COR |
| B(T)6.5 |
SPS 204
Std Spec 206 206A
| 15.19 |
| STREAMBANK PROTECTION - To minimize sediment production from streambanks and structural abutments in natural waterways. |
| 114 |
| 1. Use silt fences to minimize introduced sediment. |
2. Seed fill slopes.
3. Minimize directly dumping dirt into the stream.
| Follow plans and keep riprap out of the bankfull channel to avoid channel constriction. |
| COR, AQS |
| Std Spec 619 |
Blue Sky Trail Bridge Replacement Biological Assessment
Design Criteria
All activities are designed to protect water resources by avoiding potential erosion as follows:
1. Best Management Practices modified from the Forest Service Handbook 2509.22 "Soil and Water Conservation Practices Handbook" would be implemented to minimize effects to soil and water resources.
2. No in-stream activities would occur (construction or crossing) between September 1 and July 15 in order to protect bull trout and westslope cutthroat trout.
3. Silt fence would be constructed at the toe of the fill slope on all new construction.
4. All constructed fill slopes would be seeded with approved seed mix.
5. A minimum of one spill containment kit will be on-site at all times when equipment is working. The kit will be of an appropriate size for the equipment on site and will be able to limit the spread of petroleum products in the stream and soil.
6. A maximum of four back-and-forth crossings will be allowed for the duration of the project. Each equipment crossing will be preceded by blocking the upstream end of the project site with a net, disturbing the site by walking (herding) fish out of the site, and immediately blocking the downstream end of the site with a second net. When the equipment comes back to the road, the nets will be pulled out of the stream to allow fish passage through the site during the night.
7. The contractor will need to minimize the number of days on site by working with a larger crew, or working longer hours during each day to minimize the number of days of disturbance to bull trout.
8. Excess earth pulled from the trail side of the bridge will be wasted in a location approximately 100 feet up the trail as designated by the COR. The waste material will be blended in with the local area and seeded. Straw wattles will be used to control erosion immediately below the wasted material.