sections_details.pdf
PDF 203 KB Posted
- Solicitation number
- AG-82B1-S-09-0128
About this file
section details
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bidders list.pdf | ||
| AG-82B1-S-09-0128.pdf | ||
| overlay.pdf | ||
| additional.pdf | ||
| CorSpec.doc | DOC document | |
| wage determination.txt | TXT text file | |
| location.pdf | ||
| SF 1442.pdf | ||
| 1combined_spec_list.doc | DOC document | |
| sf24_f.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GRAND MESA, UNCOMPAHGRE,
& GUNNISON NATIONAL FORESTS
MESA TOP TRAILHEAD
PARKING LOT PAVING
SECTIONS & DETAILS
NOT TO SCALE 4
GAG
GAG
TLC
9/19/09 k:\eng\projects\rec_sites_proj\summit\phase_II\dwgs\sections_details.dwg
U.S. DEPARTMENT OF AGRICULTURE
A P
E D R-2
ROCKY MOUNTAIN REGION
U
TL
OTNEMT
R UCIRGAF
E R
FOREST SERVICE
Date
Checked
Design
Drawn Forest Project Name of
Sheet Title
Scale Sheet
Natural Ground
3" Existing
Asphalt Existing
4" Class 6
Aggregate
38'-0"
Existing
Asphalt
Natural Ground
2'-0"
3:
Shoulder Gravel
2%
2" Asphalt Overlay This Contract
Place 4" Depth
Class 6 Aggregate This Contract
5" Depth
New Asphalt This Contract
2'-0"
3:1
60'-0"
3" Existing
Asphalt
4" Thickness
Existing Class 6
Aggregate
16'-0"
Existing
Asphalt
5" Total
Depth Asphalt
C L
3:1
3:1
4'-0" 2'-0"
3:1
9" 5" New Shoulder
2" OVERLAY
Existing 3" Thick Asphalt Over 4" Thickness Class 6 Aggregate
2'-0"
Build Up This Area as Needed
New Class 6
Aggregate
Existing Fill
2'-3"
4'-0"
Natural Ground
Build Up This Area With Excess Material From The West End of
The Parking Area as Needed to
Obtain Full Road/Shoulder Width
Natural Ground Natural Ground
24'-0" New
Asphalt
Build Up This Area With Excess Material From The West End of
The Parking Area as Needed to
Obtain Full Road/Shoulder Width
2'-0"
3:1
9" New Class 6
Aggregate
2'-3"5" Depth New
Asphalt This Contract
Place 4" Depth
Class 6 Aggregate This Contract Existing Fill
Natural Ground Natural Ground
2% 2%
Crown OR Slope to Drain as Directed in the Field by Contracting Officer
1. Construct project as outlined in pertinent sections of Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-03) and these specifications.
2. Apply Tackifier (CRS-1) to all Surfaces to be Paved (Overlay Areas and Additional Areas) in Accordance With FP-03 Section 412.-Asphalt Tack Coat. Emulsified Asphalt Tack is subsidiary to 403-(Hot Asphalt Concrete Pavement) & will not be paid separately.
3. Hot Asphalt Concrete Pavement Mix shall be SX 100 PG 58-28 (AC 10) or approved equal.
4. Furnish, shape, and compact CDOT Class 6 aggregate to the lines shown on the drawings.
5. Prepare surfaces to be paved in accordance with Subsection 401.06-Surface Preparation.
6. Place asphalt only when conditions are acceptable by Subsection 401.07-Weather Limitations.
7. Protect and deliver asphalt to project as prescribed in Subsection 401.11-Hauling.
8. Place, finish, and compact asphalt as directed in Subsection 401.13-Placing & Finishing and Subsection 401.14-Compacting.
9. Treat all joints and edges as prescribed in Subsection 401.15-Joints, Edges, and Cleanup and dispose of trimmings and waste as addressed in that subsection.
10. Apply Type A markings as described in Section 634-Permanent Pavement Markings.
Notes:
TYPICAL ACCESS ROAD SECTION
TYPICAL PARKING LOT SECTION
| Model |
| Layout1 |
File details come from the government source that posted it. Updated .