About this file

Additional Information

View the file

Other files

File Type Posted
Bidders list.pdf PDF
AG-82B1-S-09-0128.pdf PDF
overlay.pdf PDF
CorSpec.doc DOC document
wage determination.txt TXT text file
sections_details.pdf PDF
location.pdf PDF
SF 1442.pdf PDF
1combined_spec_list.doc DOC document
sf24_f.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1+ .0

1+ 50.00

1+ 00.00

0+ 50.00

PL0+

00.00

RW

4+51.72

4+00.00

3+50.00

3+ .00

2+ .0 0 2+ .0

3+ 50.00

3+ 00.00

2+ 50.00

2+ 00.00

1+ .00

0+50.00

RW

0+00.00

5+ 50.00

5+ 00.00

4+ 50.00

4+ 00.00

7+ 50.00

7+ 00.00

6+ 50.00

6+ 00.00

9+ 50.00

9+ 00.00

8+ 50.00

8+ 00.00

RE

2+89.10

2+50.00

2+00.00

1+50.00

1+00.00

0+50.00

RE

0+00.00

PL9+

96.98

HWY. 65

Bench Mark 2

18" CMP

24" CMP

Bench Mark 1

EXISTING

RESTROOM

EXISTING

CHANGING

ROOM

EXISTING

RESTROOM

EXISTING

CHANGING

ROOM

Existing 16' Wide Access Road

Existing 44' Long Culvert

NEW AREA TO HAVE

4" THICKNESS OF CDOT CLASS 6 AGGREGATE

(AGGREGATE TO EXTEND 2' BEYOND ASPHALT)

AND 5" THICKNESS NEW ASPHALT INSTALLED

FINE GRADE AREA BEFORE PLACING AGGREGATE

MAIN 60,760 FT SQ, 2865 FT LENGTH

SLIVER 1080 FT SQ, 575 FT LENGTH

(61,197 FT SQ BY GPS)

(61840 FT SQ requires 1965 TONS ASPHALT

800 C.Y. (1200 TONS) CLASS 6 AGGREGATE

k:\eng\projects\rec_sites_proj\summit\phase_II\dwgs\additional.dwg

AREA TO HAVE 4" THICKNESS CDOT CLASS 6

AGGREGATE AND 5" THICKNESS NEW ASPHALT

LEGEND

0"

R 50'

R50'

R50'

R5 0'

3+70

EXCESS MATERIAL (APPROX. 90 C.Y.)

TO BE USED IN BUILDING UP SUBGRADE

AT ACCESS ROAD FROM HIGHWAY 65

EXCESS MATERIAL (APPROX. 90 C.Y.)

FROM WEST END OF PARKING AREA IS

TO BE USED IN BUILDING UP SUBGRADE

ALONG BOTH SIDES OF ACCESS ROAD

BEFORE PLACING ASPHALT AND AGGREGATE.

THIS WILL PERMIT FULL SHOULDER WIDTH.

Slope 1.5% Min.

Sl op e 2%

Checked:

Design:

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

ROCKY MOUNTAIN REGION

TLTNEMTR

AP

ED

UCIRGAFO

ERU R-2

Forest

Date:

Drawn:

Sheet Title: Sub Sheet:

Sheet

OF

Project No:

SITE PLAN

ADDITIONAL AREA TO BE PAVED

MESA TOP TRAILHEAD

GAG

GAG

TLC

9/19/09

GRAND MESA, UNCOMPAHGRE,

& GUNNISON NATIONAL FORESTS

GRAND VALLEY RANGER DISTRICT

3 4

CONTOUR INTERVAL = 1'

SCALE OF FEET

0 10050

DRAINAGE

DITCH

PROPOSED DISPOSAL

AND BORROW SITE

APPROX. 1500'

DRAINAGE DITCH

MIN. 2% SLOPE

FINAL DITCH LOCATIONS

SHALL BE APPROVED BY CO

PRIOR TO CONSTRUCTION

NOTE:

ADDITIONAL BORROW

SITES MAY BE

DESIGNATED BY C.O.

WITHIN 5 MILES OF

PROJECT AREA

NOTE: